SOLAR POLICY 23 rd May 2013, Hyderabad Central Power Distribution Company of Andhra Pradesh Limited 1 STRUCTURE OF PRESENTATION Central Power Distribution Company of Andhra Pradesh Limited 2 1. Energy Scenario 2. A.P-Renewable Energy Potential 3. DISCOMS-RPPO 4. Solar policy of the State 5. Discom Perspective
ENERGY SCENARIO Central Power Distribution Company of Andhra Pradesh Limited 3 Parameter Country AP Installed Capacity 2,23,000 MW 15,791 Thermal 1,30,000 MW 8,142 Hydel 39,000 MW 3,817 Oil & Gas 21,000 MW 2,638 Nuclear 5,000 MW nil Renewable 28,000 MW 1112 RENEWABLE ENERGY SCENARIO Central Power Distribution Company of Andhra Pradesh Limited 4 Parameter Country AP Installed Capacity 28,000 MW 1112 Wind 19,000 MW 450 Mini-Hydel 3,600 MW 104 Bagasse 2,300 MW 294 Bio-mass 1,300 MW 220 Solar 1,700 MW 44 RENEWABLE ENERGY -POTENTIAL Central Power Distribution Company of Andhra Pradesh Limited 5 Parameter Country AP Wind 50,000 MW 6,000 Solar 5,000 Trillion units/yr 5-7 KWh/sqmt APGENCO Thermal; 35,958 ; 40.0% APGENCO Hydel; 7,057 ; 7.8% CGS - Thermal; 26,740 ; 29.7% Gas; 4,137 ; 4.6% Nuclear; 3,473 ; 3.9% Renewable; 2,431 ; 2.7% Other; 10,138 ; 11.3% Energy Procurement (MU) - AP: FY 2013-14 Renewable sources of energy should play a major role in reducing energy deficits in the state Central Power Distribution Company of Andhra Pradesh Limited 6 Energy Deficits AP: FY 2013-14 Unrestricted demand (MU) 106,061 Demand Met (MU) 89,934 Deficit (%) 15.2% Andhra Pradesh has been facing severe energy deficits and the situation is likely to continue in the coming years
The deficits are likely to continue due to : Domestic coal shortages Drastic drop in domestic gas availability from KG D6
DISCOMs plan to tap the Renewable potential in the state in coming years
APERC Tariff order FY 2013-14 APERC-REGULATION ON RPPO Central Power Distribution Company of Andhra Pradesh Limited 7 APERC issued regulation 1/2012
Regulation makes it mandatory for every distribution licensee to purchase a quantum of not less than 5% of total consumption from Renewable energy sources during each years from 2012-13 to 2016-17 A minimum of 0.25% out of the total 5% Renewable power purchase obligation from Generation based on Solar energy Entity can also fulfill the RPOO by purchase of certificates
APERC Tariff order FY 2013-14 Renewable power procurement : Andhra Pradesh Central Power Distribution Company of Andhra Pradesh Limited 8 No. of solar power projects in Andhra Pradesh is low which can be increased in future as AP provides huge scope for setting up solar power projects in the state.
Currently, NTPC Vidyut Vyapar Nigam (NVVN) is supplying 30 MW capacity solar power to Andhra Pradesh out of 65 MW capacity allotted.
Andhra Pradesh Installed capacity (MW) Parameter Solar Non Solar No of Projects 15 204 Installed capacity in MW 44 1,068 APDISCOMS status of Renewable Obligations Central Power Distribution Company of Andhra Pradesh Limited 9 Status of RPPO in APDISCOMS (Consolidated) FY 2012-13 Parameter Total Procurement (MU) APERC RPPO Target (%) RPPO met (%) DISCOM Procurement 82,117 -NA- -NA- Non Solar RE Procurement 2,459 4.75% 2.99% Solar Power Procurement 103 0.25% 0.13%
DISCOMs were not able to meet the RPPO targets
Financial implication for purchase of REC is around Rs 105 Crs No budgetary provision during 2012-13
Renewable power procurement : APCPDCL Central Power Distribution Company of Andhra Pradesh Limited 10 Under Phase I of Jawaharlal Nehru National Solar Mission, NVVN 65 MW Solar power was allocated to AP under Bundled Scheme (35 MW allocated to APCPDCL)
Currently, NVVN is supplying 30 MW capacity solar power to Andhra Pradesh out of 65 MW capacity allotted. APCPDCL Installed capacity (MW) Parameter Solar Non Solar No of Projects 12 76 Installed capacity in MW 24.89 300.23 APCPDCL Status on Renewable Power purchase obligation Central Power Distribution Company of Andhra Pradesh Limited 11 Status of RPPO in CPDCL FY 2012-13 Parameter Total Procureme nt (MU) APERC RPPO Target (%) RPPO met (%) DISCOM Procurement 35,077 - NA - - NA - Non Solar RE Procurement 524 4.75% 1.50% Solar Power Procurement 22 0.25% 0.06%
DISCOMs were not able to meet the RPPO targets
RENEWABLE POWER PURCHASE OBLIGATION FOR 2013-14 Central Power Distribution Company of Andhra Pradesh Limited 12
APERC Tariff order FY 2013-14 Parameter STATE CPDCL Energy Requirement MU 89,934 40498 Renewable Power purchase obligation MU 4496 2024 Solar power purchase obligation MU 224 101 The Andhra Pradesh government is undertaking several steps to encourage renewable power Central Power Distribution Company of Andhra Pradesh Limited 13 Solar Power Policy Tariff Increase To encourage, develop and promote solar power generation in the State, the government announced several policy incentives for solar power generation GoAP has announced an incentive of up to Rs.1.50/kWh for FY 2013-14 over and above the APERC tariff for biomass power producers, subject to a maximum tariff of Rs.5.50/unit APERC has increased the tariff applicable for wind energy generators to Rs. 4.70/kWh Net metering facility to be provided to the consumers to generate solar power for self-consumption and feeding excess power into the grid Roof top solar and Net metering The government has called a tender for procurement of 1,000 MW of solar power 1,000 MW Solar power tender AP Solar Power Policy (1/2) Central Power Distribution Company of Andhra Pradesh Limited 14 The Government of AP is providing the following incentives to the solar power generators in the state for encouraging solar power generation: 100% banking facility No wheeling & transmission charges No cross subsidy surcharge Electricity Duty exemption VAT refund for all the inputs required Refund of Stamp Duty & Registration charges REC eligibility AP Solar Power Policy (2/2) Central Power Distribution Company of Andhra Pradesh Limited 15 Status of Projects under this policy Sl. No Description No of applications received Capacity in MW Technical feasibility reports received No of plants synchronized No of Plants Capacity in MW 1 Sale to DISCOM at Pooled cost 12 59 9 46 -- 2 Third Party/ Captive use 74 357.65 61 288.9 3 (19 MW) AP is planning to 1,000 MW of solar power through a competitive bidding process (1/2) Central Power Distribution Company of Andhra Pradesh Limited 16 1. Government of AP formulated a solar policy in which it directed the DICCOMs to procure 1,000 MW of solar power through a competitive bidding process
2. Accordingly, APTRANSCO initiated the tender process in January 2013 3. Financial bids of qualified bidders were evaluated & the lowest bid was Rs. 6.49/kWh 4. This rate was offered to all bidders
Encouraging solar roof top and net metering Central Power Distribution Company of Andhra Pradesh Limited 17 1. Net Metering facility to be implemented to encourage consumers to set up solar PV plants at unutilized places on rooftops, waste lands, industries,offices, institutions, etc,
2. Under this facility, consumer will generate solar power for self consumption and feed excess power into the grid
3. The consumer would be paid a certain tariff for the energy injected into the grid
4. Net metering facility shall be allowed only for 3 Phase service consumers. Single phase consumers are not eligible for net metering to avoid imbalance in the phases
ROAD AHEAD Central Power Distribution Company of Andhra Pradesh Limited 18 1. It is expected that State policy on solar power shall give a big fillip to solar power generation and DISCOM s shall fulfill its obligation 2. In case of any shorfall, the DISCOMs can fulfil its obligation by purchasing RECs as APERC has made a budgetary provision of Rs 122 crs for all discoms and for CPDCL Rs 93 crs
Thank You