Group No : H
CALCULATIONS
6.0 DETERMINATION OF LATERAL LOADS
OUTPUT
X
Breadth
Depth
Hourly mean win speed
Vz
61
59
m
m
= V M(z,cat) Ms Mt Mi
H = 270 m
= 0.9
> 12
=
=
Ms
1.0
Mt
1.0
= 38*0.87*1*1*1
= 33.06 m/S
Roughness Factor
29
Date
= 1 + r g v2 B (1 + w ) 2 + g r SE
= 2*v/ Vz
Mt
Group No : H
CALCULATIONS
From table 4.2.5.3; at Z = 270m and Terrain Category 3
Roughness Factor
v
Vz
0.125
Mt
1.0
=
=
2*0.125
1.0
0.25
3.7
Peak factor
gv
Background factor
1
36h2+64b3
Lh
1+
h
b
Lh
270
=
= 61
= 1000*(h/10)0.25
Lh
= 1000*(270/10)0.25
=
2279.5 m
1
36*2702+64*613
2279.5
0.355
1+
0.14
46
h
= 46
270
= 0.170 Hz
30
Date
OUTPUT
Group No : H
CALCULATIONS
Ratio of the expected peak factor
gf
= 2ln(3600na)
OUTPUT
= 2*ln(3600*0.024)
Size factor
3.582
1
3.5nah
1+
Vh
1+
4nab
Vh
1
3.5*0.170*270
4*0.170*59
1+
1+
33.06
33.06
=
N
0.0757
= naLh
Vh
= 0.170*2280
33.06
= 11.722
0.47N
(2 +N2)
5/6
= 0.47* 11.72
(2+11.722)
=
5/6
0.09
0.01
Gust Factor
G = 1+ 0.25 [3.72*o.335(1+0.142) +3.5822*0.076*0.09]
0.01
=
31
1.97
Date
CALCULATIONS
6.1.2 Along Wind Acceleration
a
= (2 n ) 2 g r
a
f
Assume deflection of structure
OUTPUT
SE
150 mm
0.064 ms
Date
Group No : H
0.15
2
-2
1 .5 ( g f q h b )
mo
Cf s
(0.76 + 0.24k )
Vh
nc b
33.06
0.017*61
= 3.19
= 59
61
=
270
=
= 59:61:270
= 1.1.5
d
b
h
b:d:h
qh
2
-3
= 0.6 Vh *10
qh
2
-3
= 0.6*33.06 *10
0.0008
0.66
=
K
Yc =
1.5*(3.582*0.66*103*61)
1,223,460
=
-2
0.0886 ms
32
kPa
1
(0.76+0.24*1) *0.0008
0
Group No : H
CALCULATIONS
REF.
OUTPUT
b. Wind in Y direction
1 .5 ( g f q h b )
Yc =
mo
Cf s
(0.76 + 0.24k )
Vh
= 33.06
nc b
0.017*59
From Fig 4.4.3(A) by interpolating
Cfs
Yc =
Yc =
0.0008
1.5*(3.582*0.66*103*59)
1,223,460
(0.76+0.24*1) *0.0008
0
0.086 ms-2
Vz
Shielding Multiplier
= V M(z,cat) Ms Mt Mi
H = 270 m
M(z,cat) = 0.9
> 12
1.0
Mt
1.0
= 38*M(z,cat)*1*1*1
= 38*M(z,cat)
qh
= 0.6*(38*M(z,cat))2 * 10-3
33
Date
Group No : H
CALCULATIONS
Fz
Forces acting on wall at height z;
= CpeqzAz
Az
Cpe
OUTPUT
Cpe
Table 4.4.2.1;
Height
Node
1
2
3
4
5
6
7
8
9
10
11
12
13
Az
= 0.8-(-0.5)
= 1.3
Fz
= 1.3*0.6*(38*M(z,cat))2 * 10-3*Az
Fz
Fz
(m)
Directi Directi Mz,cat Directi Directi
10.8
212.4
219.6
0.45 48.444 50.086
32.4
637.2 658.8
0.58
241.43 249.62
54
637.2 658.8
0.64 293.97 303.93
75.6
637.2 658.8
0.68
331.86 343.11
97.2
637.2 658.8
0.72 372.05 384.66
118.8
637.2 658.8
0.74
393.01 406.33
140.4
637.2 658.8
0.77 425.52 439.94
162
637.2 658.8
0.79
447.91 463.09
183.6
637.2 658.8
0.81
470.88 486.84
205.2 637.2 658.8
0.83 494.42 511.18
226.8 637.2 658.8
0.84
506.4 523.57
248.4 637.2 658.8
0.85
518.53 536.11
270
637.2 658.8
0.87 543.22 561.63
Total wind load
5087.6 5260.1
Notional load
34
Date
Group No : H
Directi
50.086 3599
249.62 21594
303.93 21594
343.11 13818
384.66 13818
406.33 13818
439.94 13818
463.09 13818
486.84 13818
511.18 13818
523.57 13818
536.11 13818
561.63 13818
5260.1 184967
load
Directi
48.444
241.43
293.97
331.86
372.05
393.01
425.52
447.91
470.88
494.42
506.4
518.53
543.22
5087.6
OUTPUT
Notinal
Node
(m)
1
10.8
2
32.4
3
54
4
75.6
5
97.2
6
118.8
7
140.4
8
162
9
183.6
10
205.2
11
226.8
12
248.4
13
270
Total wind load
(m )
Height
Area
CALCULATIONS
REF.
750.39
4502.3
4502.3
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
38566
Wind load
X
Y
Directi
750.39
4502.3
4502.3
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
38566
Directi
750.39
4502.3
4502.3
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
2881.1
38566
= ZIKCSW
35
Date
Group No : H
CALCULATIONS
REF.
C =
0.1
15T
OUTPUT
T 0.3s
C = 1/(15*3.11)
=
0.0378
S =
CS
0.1
1
0.04
0.1
OK
W = Total dead load + appropriate portion of the live load.
W=
=
2,582,620
2,845,804
+ 0.4*
657,960
kN
Base shear
V =
3
16
*1.25*1.33*0.04*2,582,620
35,484
kN
T =
3.11
S >
0.7 S
36
Date
7724.87 kN
Group No : H
CALCULATIONS
Distribution of the base shear along the building height
Fx = (V-Ft)hx
n
hi
1
n
hi
1
n
hi
1
n
2
= 3.6*
=
(1+n)
75
2
10260 m
Node
1
2
3
4
5
6
7
8
9
10
11
12
13
Height
10.8
32.4
54
75.6
97.2
118.8
140.4
162
183.6
205.2
226.8
248.4
270
Lateral force(Ft)
29.22
87.66
146.10
204.54
262.98
321.42
379.86
438.30
496.74
555.18
613.62
672.06
730.50
37
(1+75)
Date
OUTPUT
Group No : H
CALCULATIONS
REF.
OUTPUT
F
W
A
= qh *b*h
= 0.66*59*255.5
9949 kN
=
38,739 kN
=
38,739 * 255.5
+
2
= 5227828 kNm
3.6*2
2,582,620
= 0.25* 657,960
= 164,490
2,747,110
Restoring moment
61 * 2,747,110
2
83,786,855 kNm
=
F.O.S
= Restoring moment
Over turning moment at A
=
=
38
Date
83786855
5227828.05
16
>1.5
Date
Group No : H
CALCULATIONS
6.3.2 Stability check for seismic load
OUTPUT
Ft
V-Ft
W
A
Consider X direction
Ft
V-Ft
Over turning moment at A
=
=
7,725 *270 +
=
=
Restoring moment
=
=
F.O.S
7724.87 kN
27,759 kN
7,082,370
27,759 *270*2
3
kNm
2,582,620
61 * 2,582,620
2
78,769,910 kNm
= Restoring moment
Over turning moment at A
=
=
39
78,769,910
7,082,370
11.122 >1.5