You are on page 1of 29

Disclaimer:

Exhibit B.2
Huawei Technical Site Survey Report
for Existing Sites
All commitments and compliances set out in each of the Exhibit of this Master Agreement
have been duly clarified and confirmed, of which shall be a consecutive part of the Contract
Documents, any changes from the one signed thereof will only be made upon prior written
approval from PT Smart Telecom.
Vendor acknowledges and understands that the interpretation of Purchaser in respect of
any matter set forth in the relevant Exhibit shall apply in any circumstance, whether or not
a discrepancy may exist, and in addition to the provision of stringent requirement applies
as Vendor obligations under the Contract Documents.
Notwithstanding the foregoing, Vendor warrants that the performance of Works by Vendor
in respect of the specific matters in accordance with provisions set out in any Exhibit must
be at all times in full compliance with, and not causing any delay to, the Required Critical
Milestone Dates. Any request by Vendor of Purchasers review, verification and/or approval
in whatsoever manner shall in no circumstances waives or reduces each and/or overall
Vendors responsibilities with respect to the supply and delivery of each Project Item,
Equipment, or Service within Network or NETWORK Platform on Turnkey Basis to meet the
Network Requirements or Platform Requirements (as the case may be) under the Contract
Documents.
Site ID
Vendor ID
Site Name
Site Address
Cisuritami
Surveyor
Survey Date
Technical Site Survey Report
SMARTFREN Contact Person
Huawei Contact Person
Site Survey Report (CDMA Site)
Survey Items
Site ID:
Address:
Longitude (E): Latitude(S): Elevation:
Roof Fan room Shelter
Platform Pump room Equipment room
Water tank Meter room Cabinet
Floor no.: CTER
Elevator room Other :
Need to climb ladder
Other: Other :
Site attach Smart Mobile 8 Tower Provider
Defined by coverage Indoor Outdoor
Defined by equipment location Indoor Outdoor
Site type: Rooftop Greenfield BSC&RNC&CN Others :
Tower type: Angular Tubular Mini Pole Others:
Tower/Pole Height 9m Building Height: 15m (mandatory when using rooftop site)
Wiring way of cable: Not Applicable Applicable, Way of Installation : UP/DOWN
Existing anti-static floor Available Not Available
Height of anti-static floor Anti Static Floor Connected to
Yes No
Yes No
Yes No
keeper
Fax: 1
Need Access Key Yes No
Need Landlord Key Yes No
Need Other Access Key Yes No
Please specific:
Lift Stairs Other
Remarks
Phone:
Day before :
Site access
key
Site access
information
Access Restriction Specific Reason:
Twenty-four hours Specific time: 09:00 - 16:00
Prior appointment for access ( person to be informed before site access )
Contact: Mrs. Mira
Equipment delivery method Direct, crane etc..
Private shopping arcade
Greenfield Greenfield
Site type
Protelindo
Site
environment
checking
Property type Equipment room location Installation type
High rise building
Government premises
Public housing estate
Village type housing
The link
1. Current Information
1.1 Site information
Survey Contents
Site location
information
ZTE_0234 Site Name: Ruko Kramat
Jl. Kramat Pulo, Kec. Senen - Jakarta Pusat
106.8457 -6.18245
All information contained herein the document is confidential! Page 3
Site Survey Report (CDMA Site)
Others:
AC DC
Voltage: V VDC
KVA Current Load : A
A Max Rectifier Module : qty : 6
Single phase Rectifier Module Equipped : qty : 4
Load R: A Each Rectifier Module Capacity : A
Load S: A Max Battery Bank Qty : Bank
Load T: A Battery Bank Equopped Qty : Bank
Rectifier MCB capacity at ACPDB: A Each Battery Capacity : AH
Spare Breaker Qty: 1:3Px16A,2:1Px4A,1:1Px6A
Qty of Available Breaker Slots: N/A Total output current: 170 A
13.2 3.089 Load current: 40.7 A
Air Conditioner : :condition: Total output power: 8959 W
:condition: Load power : 2145 W
DC Fan : :condition:
Type: FT12-150 (12V,150AH) Brand: LEOCH
Model: AGM GEL 05 Jul 2013
Battery Visual Condition Check (No Leakage, No Corrosion, No Crack, No Swollen, etc.)
Battery Group
Battery Voltage Measurement :
Battery Group
Grounding Resistance Measurement : (Ohm) Grounding Bar Material: Indoor Aluminum Cuprum
Outdoor Aluminum Cuprum
Spare Qty:
Length Pole GPS:
Length Of GPS Cable to BTS: 35 m
GPS Antenna Height: RT. 15 + 3
Voltage: 52.7
40.7
50
2
Manufacture date:
Remarks
Existing GPS
System
Feeder
outlet(FEP)
Total hole
Qty:
12 -
Notes:
Grounding
Grounding bar Qty (Outdoor):
3
Spare GND port Qty (Outdoor):
1;3;5
Grounding bar Qty (Indoor):
1
Spare GND port Qty (Indoor):
11
Bank -3
Bank -4
- - - -
Block -3 Block -4
Bank -1
13.3 V 13.3 V 13.3 V 13.3 V
Bank -2
13.3 V 13.3 V 13.3 V 13.3 V
Bank -3
- - - -
Block -1 Block -2 Block -3
OK OK OK
Bank -2 OK OK
Block -4
Bank -1
Bank -4
- - - -
Block -1 Block -2
2.77
3x16
2
150
LLVD 1 MCB spare (qty&spare) : 2x16A,2x32A,1x63A,2x100A
OK
LLVD 2 MCB spare (qty&spare) : 1x16A,2x32A,2x63A
(including battery charging load)
(including battery charging load)
Three phases
Current Load 5.81
5.46
Power supply
220
Electricity PLN : 13.2
Main Breaker at KWH : 3x20
Input Capacity: Output Capacity:
2 x 2 pk
Good
x pk
x set
1.2 Existing Equipment information
Existing
equipment
configuration
information
CDMA800
CDMA1900
System CDMA800 CDMA1900 Rectifier Rack 19'
Rack Qty
1 1 1
All information contained herein the document is confidential! Page 4
Site Survey Report (CDMA Site)
System Type
1/2 feeder
7/8 feeder 5/4 feeder
1/2 feeder
7/8 feeder 5/4 feeder
1/2 feeder
7/8 feeder 5/4 feeder
5m
5m
Antenna type Other
Ant.
No.
Azim
uth ()
Downtilt
()
1 0 2
2 145 2
3 235 3
4
Antenna type Other
Ant.
No.
Azim
uth ()
Downtilt
()
N/A
Antenna type Other
Ant.
No.
Azim
uth ()
Downtilt
()
Note: Spare length = Usable length minus existing antenna length.
Space available for new equipment (indoor/outdoor): Yes No
Type of existing foundation: Concrete Steel Base Frame Dimension:
Overview
photo of site
Access Road Flat Roof/Ground Equipment Room Outlook Equipment Room Inside
0 30 60 90
120 150 180 210
240 270 300 330
360
Pole1 Pole2 Pole3 Pole4
Pole5 Pole6 Pole7 Pole8
Remarks
Pole/Leg
photo
Civil work
Radio
environment
photo
Remarks:N/A
Remark
Pole
Pole No. Total length(m) Spare length(m) Antenna No.
1 9
RF: 3 MW:2
Outdoor
Antenna
and Cable
CDMA800
CDMA1900
Model Ant. Height
(Building+Pol
e/ Tower) (m)
Jumper length(m)
CDMA800
CDMA1900
Model Ant. Height
(Building+Pol
e/ Tower) (m)
Jumper length(m) Feeder length(m)
N/A
Model Ant. Height
(Building+Pol
e/ Tower) (m)
Jumper length(m) Feeder length(m)
Remark
CDMA800
CDMA1900
MOBI MB800-65-17DE14 RT. 15 + 7 3 35m
35m
Indoor
Jumper
System Type
1/2 Jumper length(m) 1/2 Jumper Qty
MOBI MB800-65-17DE14 RT. 15 + 7 3
Other
Connector type
CDMA800
6 DML-DMS
CDMA1900
6
co anntena
MOBI MB800-65-17DE14 RT. 15 + 7 3 co anntena
Feeder length(m)
Remark
50m co anntena
DML-DMS
1.3 Existing Feeder & Antenna and Civil Work Information
Feeder
Main feeder type
CDMA800
CDMA1900
Other
All information contained herein the document is confidential! Page 5
New Equipment for LTE (eNodeB) without Power
New Equipment for LTE (eNodeB) including Power
New Equipment for Microwave
New Equipment for Router/Switch
Power Rack/Cabinet Qty: Power supply AC DC Dimension: 600mm(W)600mm(D)2000mm(H)
Oudoor Cabinet (BBU) Qty: Power supply AC DC Dimension:
Indoor Rack (BBU) Qty: 1 Power supply AC DC Dimension:
Installation
Enough space for Power Rack/Cabinet
Enough space for BBU Cabinet/Rack
Not enough space for BBU Rack, Insert BBU in existing 19" Rack
Need dismantle, Details :
BBU Qty: 1 Power supply AC DC Dimension: 442mm(W)310mm(D)86mm(H)
RRU Qty: 3 Power supply AC DC Dimension: 482mm(W)270mm(D)140mm(H)
HUB/SUBHUB Qty: Power supply AC DC Dimension: 442mm(W)x220mm(D)x 43.6mm(H)
Installation
Enough space for BBU : existing 19" Rack Inside New Power Cabinet Inside New BBU Cabinet
Enough space for HUB/SUBHUB in: existing 19" Rack Inside New Power Cabinet Inside New BBU Cabinet
Linked-mount for RRU, ( Indoor Outdoor )
Steel frame for RRU, ( Indoor Outdoor )
Pole-mount for RRU, ( Indoor Outdoor )
Structural stability Yes Future checking
DC outdoor LPB Qty: LPB(Lighting Protect Box)
Installation Wall-mount Steel frame Others: Pole-mount
DC indoor LPB Qty:
Installation Wall-mount Steel frame Others: Use Existing
Indoor Grounding bar propose Qty: 0 Outdoor Grounding bar Qty: 0
Qty
DC 1 Ground Other:
2 Ground Other
2 Ground Other
1 Ground Other
AC
pole-mount Wall-mount
New Battery Yes No
New Battery Cabinet Yes No
New Battery Replacement Yes No
How many bank battery can be inserted to exsiting battery rack? bank block
Is there available space to propose new battery rack? Yes No
2.2 Preliminary Solution
Battery
Indoor Outdoor
AC distribution box
pole-mount Indoor Outdoor
Indoor Outdoor
2. New equipment information
2.1 Summary
Implementatio
n summary
2.2.1 LTE (eNodeB)
Site
configuration
information
(preliminary
stage)
Power
configuration
information
(preliminary
stage)
Power type Equipment Installation type Position
Rectifier pole-mount Indoor
DC distribution box pole-mount Indoor Outdoor
Breaker Qty: capacity: Phase:
Outdoor
Rectifier Module
Battery (Bank) pole-mount
eNodeB(DCDU)-Rectifier DC length: 2 m
eNodeB-MCB AC length: NA m
DC power(Rectifier) - MCB AC length: 8 m
m
10 m
Cable for Indoor or outdoor coverage site?
RRU-MCB AC power cable length: m
RRU-Rectifier or DCDU DC power cable length: m
Fiber length (BTS to RRU) : m
BBU GND cable length :
m
Sct1 Sct2 Sct3 Sct4 Sct5 Sct6
4x3 4x3 4x3
10 10 10
New vertical cable tray required: Yes No length:
New horizontal cable tray required: Yes No length:
Transmission cable type:
Optical Cable
Transmission cable connector:
Transmission cable length: m
RRU installation
Indoor Outdoor
Feeder/Jumper length (RRU to Antenna)
Sct1: 3 m Feeder/Jumper type: 1/2" 7/8" 5/4"
Cell1: m Qty: Sct2: 3 m Feeder/Jumper type: 1/2" 7/8" 5/4"
Cell2: m Qty: Sct3: 3 m Feeder/Jumper type: 1/2" 7/8" 5/4"
Cell3: m Qty: Sct4: m Feeder/Jumper type: 1/2" 7/8" 5/4"
Sct5: m Feeder/Jumper type: 1/2" 7/8" 5/4"
Sct6: m Feeder/Jumper type: 1/2" 7/8" 5/4"
Length Pole of GPS antenna m
Length Of GPS Cable to BBU m
GPS Antenna Height m
Cable type 9mm 1/2" 7/8" RG-8U
Delete antenna
Ant.
No.
Pole
No./Tower
leg
Ant.
No.
Pole
No.
Ant.
No.
Pole
No.
1 1
2 2
3 3
4 4
Add antenna
New
Ant.
Pole
No./Tower
leg
N1 1
Az follow existing
N2 2
N3 3
N4 4
N/A N/A
N/A N/A
Propose new foundation outdoor: Yes No Dimension:
Propose new sun shield: Yes No
Propose extend shelter : Yes No
Propose new air conditioner : Yes No qty : x pk
Propose upgrade electricity : VA, from . VA to : . VA
Comments:
Civil work
Remarks
Obsolete
equipment list
Equipment No Equipment name Qty
Dimension
1 1
2
4
5
3
ADU451816v01 42 40 240
Azimuth () Downtilt () Remark
ADU451816v01 42 40 0
ADU451816v01 42 40 120
Proposed GPS
System (if any)
30
3.5
Antenna
suggestion
(preliminary
stage)
Ant. Model Ant. Model Ant. Model
Ant. Model Pole/Tower
height(m)
Ant. height (m)
Cable
Power cable
DC Indoor LPB rectifier length:
power rack/cabinet GND cable length:
Indoor
Feeder cable (BTS to Ant.) (Qty*Length(m))
1/2 Jumper length (RRU to existing feeder
system)
Feeder cable
tray
10
(1*60 + 2*40)
10
Outdoor Cable type
Feeder/jumper cable (RRU to Ant.) (Qty*Length(m))
NA
DC outdoor LPB - RRU (Qty*Length(m))
RRU GND cable length (m)
Fiber cable (BTS to RRU) (Qty*Length(m))
(1*60 + 2*40) m
LC-FC
DC Indoor LPB - DC outdoor LPB DC power cable
(Qty*Length(m))
(1*60 + 2*40)
Equipment Type: MW Optical Transceiver HDSL Direct connect to 2Mwire
Transmission Medium: MW Optical Fiber HDSL 2Mwire FE/RJ45
Transmission Cable Type: E1 T1 75ohm 120ohm Others: Fiber
ODF Type: FC SC DDF Type: LSA
Existing Microwave Antena Load Info(All Existing Antena)
Site ID Site
Name
1 A
2 B
3 C
4
5
6
7
8
9
Site ID Site Name Type Suband Hi,Lo Tx
1
2
3
4
5
6
7
8
9
10
Site ID Site Name
Available
Port
1
Mux/Route
r
2
3
4
5
6
7
8
9
10
Item Far End ID Remark
1
2
3
4
5
6
Site ID Site Name
1
2
3
4
5
6
7
Space Power
Site ID Site Name
Cabinet/S
ubrack qty
Requirement
Port
(OK/NOK) (Watt)
1
2
3
4
5
6
7
8
9
10
Remark: The cable length must be measured from proposed New Installation Position (cabinet/19" subrack, IDU, rectifier, DCPDB, etc)
Site ID
1
2
3
4
5
6
7
8
9
Existing Outdoor Busbar on Tower(From down to top)
Amount of busbar on tower Set
Height of busbar 1 Meter
Height of busbar 2 Meter
Height of busbar 3 Meter
Remark
Remarks:
Remarks:
Existing
Transmission
Proposed
Transmission
ODU Frame
Support Remark
ODU Frame
Support
Existing Transport
Item
Far end site
Transport
Type
Capacity
Type Hi,Lo Frame Type
Tower Leg
Far end site
Antenna
Size
Antena
height
2.2.2 Transmission
New Proposed IDU/ODU
Item Far end site IDU Type Capacity Config ODU
Remark Configuration Item
Antena
frequency
Antenna
Brand
Antenna Type Azimuth Operator
Existing IDU/ODU (Microwave)
Item Far end site IDU Type Capacity Config ODU Link Frequency
Rx Frame Type
Proposed New Antenna Information for Smartfren
far End Site Name Antena Antena Height Tower Leg Azimuth NewAntenna
Space
Transport
Type
Capacity
Equipment
Remark
Type
Item Length (Meters/pc) Qty Remark
DC Power Cable from IDU to rectifier
Cable length Information
Equipment MCB
(Axpcs)
Remark
New Proposed Transport
Item
Far end site
2MTrunk cable from IDU to DDF (If any)
E1 Jumper from existing DDF to Proposed DDF (if any)
IDU grounding cable to grounding point
If Cable layout from IDU to bottom of tower (all direction)
Ethernet cable from IDU to BBU
Optical Patch cord from IDU to ODF
Distance from ODU Grounding cable to Grounding Point
MW mounting pole Information (new Proposed)
Item
Far End Site
Mounting Pole Dia.
Mounting Pole height Mounting Pole
Leg
Mounting Pole azzimuth
Site name
Type
Insert in existing 19" Rack
Insert in new Indoor 19" Rack/Outdoor BBU Cabinet
Insert in new Power Rack
Need dismantle, details :
* Connect to : _______
* Port Number : _______
- Optical Cables/Patch Core:
Remarks:
* Length : _______m
* Connect to : _______
* Port Number : _______
* Peer connector type : ___FC/SC____
- Optical Cables/Patch Core:
* Connect to : _______
* Port Number : _______
* Peer connector type : _______
* MCB Allocation-1: _______; Capacity: _______
* MCB Allocation-2: _______; Capacity: _______
- Power Cables (Blue & Black):
- FE Cables:
* Length : _______m
2.2.3 New Transport Auxiliary Information
NEW EQUIPMENT
-Position NEW EQUI PMENT:
* Length : _______m
* Length : _______m
* Connect to : _______
* Port Number : _______
* Peer connector type : ___FC/SC____
- E1 Cable :
* Blue Cable Length : _______m
* Black Cable Length : _______m
* Yellow Green Cable Length : _______m
* Connect to : _______
* Position NEW EQUI PMENT:
-Power Alocation :
SN Detail Photo Taken Number of Photos
A Site Overview Photo
1 Access Road
2 Existing Site Front View
3 Existing Site Gate
4 Existing Surrounding View
5 Existing Tower (overview)
6 Existing Tower (Leg A)
7 Existing Tower (Leg B)
8 Existing Tower (Leg C)
9 Existing Tower (Leg D)
10 Existing Shelter & Foundation, Stairs etc
11 Existing Oudoor Foundation
B Existing Equipment Information
1 Power
a Existing KWH Meter
b Existing main MCB at KWH meter
c Existing ACPDB
d Existing AC Current Load
e Existing Air Conditioner (indoor site)
f Existing DC Fan (indoor site)
g Existing Rectifier Cabinet
h Existing DC Current Load
i Existing DCPDB internal (at rectifier rack)
j Existing DCPDB external (outside rectifier rack)
k Existing Battery System
l Others: (Specify)
2 RF
a Existing RF Antenna
b RF Component in Sector 1
c RF Component in Sector 2
d RF Component in Sector 3
3 Microwave
IDU
a IDU Rack 1 over view
b IDU Rack 2 over view
c IDU-1 Installation Label
d IDU-1 Factory Label
e IDU-2 Installation Label
f IDU-2 Factory Label
g IDU-3 Installation Label
h IDU-3 Factory Label
i IDU-4 Installation Label
j IDU-4 Factory Label
k IDU-5 Installation Label
l IDU-5 Factory Label
ODU and Antenna
a Photo of MW Antenna
b Photo of MW Antenna
c Antenna-1 Total View
d Antenna-1 Factory Label
e Antenna-1 Installation Label
f Waveguide Interface to Antenna-1 (if have)
g ODU-1 Frame Label (1+0 or 1+1)-if have
h ODU-1 Factory Label
i ODU-1 Installation Label
j Others: (Specify)
k Antenna-2 Total View
l Antenna-2 Factory Label
m Antenna-2 Installation Label
n Waveguide Interface to Antenna-2 (if have)
o ODU-2 Frame Label (1+0 or 1+1)-if have
p ODU-2 Factory Label
q ODU-2 Installation Label
r Others: (Specify)
4 Indoor/Outdoor Shelter
a Existing Cable Ladder
b Existing Indoor Grounding Bar
c Existing Outdoor Grounding Bar
d Existing Inlet grounding bar
e Existing Inlet
f Existing Transmission Equipment
g Existing DDF
h Tower Busbar 1
i Tower Busbar 2
j Tower Busbar 3
k Existing NE
l Existing NE
m Existing NE
n Existing NE
o Existing NE
p Others: (Specify)
5 Existing ODF, DDF & FIBER
a Existing ODF
b Existing ODF
c Existing DDF
d Existing DDF
e Existing Fiber
f Existing Fiber
C
Panoramic Surroundings
Overview
1 0 degree
2 30 degree
3 60 degree
4 90 degree
5 120 degree
6 150 degree
7 180 degree
8 210 degree
9 240 degree
10 270 degree
11 300 degree
12 330 degree
D New Equipment Proposal
1 Proposed NewIndoor Equipment LTE
2
Proposed New Vertical Cable Ladder For
Cabinet
3 Proposed Cable Routing for LTE
4 Proposed NewInlet for LTE
5
Proposed Reuse existing MGB for LTE (Indoor)
6
Proposed Reuse Existing MGB on Tower for
LTE (Outdoor)
7 Proposed newMGB on Tower for LTE
8 Proposed AC Power System
9 Proposed NewRF Antenna & RRU
10 Proposed Jumper fromAntenna to RRU
11 Proposed NewGPS Antenna for LTE
12 Proposed NewOutdoor cabinet
13 Proposed Rectifier System
14 Proposed NewBattery
15 Proposed NewCable Ladder
16 Proposed Transmission Equipment (IDU)
17 Proposed Transmission Equipment (ODU)
18
Proposed MW Antenna Position, and Direction to
far end
19 Proposed Router Equipment
20 Proposed Switch Equipment
21 Proposed ODF/OTB Equipment
22
Others: (Specify : new rack, cable route, new
DCPDB, etc)
Site Photo Check List
Comment:
3. Site Photo
A Site Overview Photo
Access Road Existing Site Front View
Existing Site Gate Existing Surrounding View
Existing Tower (overview) Existing Tower (Leg A)
Existing Tower (Leg B) Existing Tower (Leg C)
B Existing Equipmet Information
1 POWER
Existing ACPDB Existing AC Current Load
Existing Tower (Leg D) Existing Shelter & Foundation, Stairs etc
Existing Oudoor Foundation
Existing KWH Meter Existing main MCB at KWH Meter
Existing DCPDB internal (at rectifier rack) Existing DCPDB external (outside rectifier rack)
Existing Battery System Others: (Specify)
Existing Air Conditioner (indoor site) Existing DC Fan (indoor site)
Existing Rectifier Cabinet Existing DC Current Load
2 RF
3 MICROWAVE
IDU Rack 2 Over View
IDU-1 Installation Label IDU-1 Factory Label
IDU Rack 1 Over View
Existing RF Antenna
RF Component in Sector 1
RF Component in Sector 2 RF Component in Sector 3
IDU-2 Factory Label IDU-2 Installation Label
IDU-3 Installation Label IDU-3 Factory Label
IDU-4 Installation Label IDU-4 Factory Label
IDU-5 Installation Label IDU-5 Factory Label
ODU
`
Photo of MW Antenna Photo of MW Antenna
Antenna-1 Total View Antenna-1 Factory Label
ODU-1 Frame Label (1+0 or 1+1)-if have ODU-1 Factory Label
Antenna-1 Installation Label Waveguide Interface to Antenna-1 (if have)
`
ODU-1 Installation Label Others: (Specify)
Antenna-2 Total View Antenna-2Factory Label
Antenna-2 Installation Label Waveguide Interface to Antenna-2 (if have)
ODU-2 Frame Label (1+0 or 1+1)-if have ODU-2Factory Label
`
4 INDOOR/OUTDOOR SHELTER/CORE ROOM
`
`
Existing Cable Ladder Existing Indoor Grounding Bar
Existing Outdoor Grounding Bar Existing Inlet grounding bar
Existing Transmission Equipment
ODU-2 Installation Label Others: (Specify)
Existing Inlet
`
`
`
Existing NE
Existing NE
Existing DDF Tower Busbar 1
Tower Busbar 2 Tower Busbar 3
Existing NE
Existing NE
5 EXISTING ODF,DDF & FIBER
Existing DDF Existing DDF
Existing Fiber Existing Fiber
Existing NE
Existing ODF Existing ODF
Others(Spesify)
C Panoramic Surroundings Overview
EN 120 EN 150
EN 180 EN 210
EN 0 EN 30
EN 60 EN 90
D New Equipment Proposal
EN 240 EN 270
EN 300 EN 330
Proposed New Indoor Equipment LTE Proposed New Vertical Cable Ladder For Cabinet
Proposed Cable Routing for LTE Proposed New Inlet for LTE
Proposed New RF Antenna & RRU Proposed Jumper from Antenna to RRU
Proposed New GPS Antenna for LTE Proposed New Outdoor cabinet
Proposed Reuse existing MGB for LTE (Indoor) Proposed Reuse Existing MGB on Tower for LTE (Outdoor)
Proposed new MGB on Tower for LTE Proposed AC Power System
Proposed Router Equipment Proposed Switch Equipment
Proposed Rectifier System Proposed New Battery
Proposed Transmission Equipment (ODU) Proposed MW Antenna Position, and Direction to far end
Proposed New Cable Ladder Proposed Transmission Equipment (IDU)
Proposed ODF/OTB Equipment Others: (Specify : new rack, cable route, new DCPDB, etc)
`
4.1 Current RAN system configuration from SMART
4.2 Preliminary stage RAN system configuration
SHELTER EXISTING TANPA TRAY
SHELTER LAYOUT DENGAN PROPOSED TANPA TRAY
4.3 Commecial stage RAN system configuration
4.4 Existing Equipment room layout
TOWER LAYOUT
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY
4.5 Equipment room cable routing
4.6 Rooftop site layout and cable routing
site LAYOUT/ ROOF TOP LAYOUT
SHELTER LAYOUT DENGAN PROPOSED DENGAN TRAY DENGAN KABEL ROUTE (DITAMBAH ROUTE UNTUK KABEL TRANSMISI)
Site Survey Report (GSM and UMTS Site)
5.Survey Memorandum
Signature of SMARTFREN representative:
Date:
Signature of HUAWEIs representative:
Date:
Note: This survey report provides the basic data for equipment commissioning, and
shall not be modified once confirmed by both parties. If the user needs to modify the
data due to special reasons, contact the local office of HUAWEI in time. HUAWEI
shall not be responsible for the delay in project implementation due to the modification
of the survey results required by the user.