Professional Documents
Culture Documents
TRAINING
FACILITIES
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 1 of 11
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 2 of 11
HOUSEKEEPING SCHEDULE
Qualification
Area/Section
In-Charge
CHS NC II
Station/Bldg
COMPUTER
WIZARD SCHOOL
COMPUTER
LABORATORY
Pepito Masagca
Schedule for the Month of November, 2014
ACTIVITIES
Responsible
Person
Pepito
Masagca
Pepito
Masagca
Daily
Every
15th
Day
Month
ly
Remarks
Weekly
Pepito
Masagca
Robert
Deniro
Every
other
Day
jcmolina
NO
INSPECTION ITEMS
1.
2.
3.
Are the floor, windows, walls and ceilings cleaned and checked?
4.
Is the workshop cleaned and checked? Is it well ventilated and with enough
illumination by dusting lamps/bulbs and replacing non-functional lamps?
Is the aircon kept clean?
5.
6.
Is the Tool Room cleaned, checked and maintained if free of dust, tools in
appropriate positions/locations, with visible labels/signage, logbook and
forms complete, in order and updated? Are the lights functional and with
good ventilation?
7.
Is there available receptacle for waste, are the waste materials properly
segregated & disposed?
Are the personal computers accessories clean from dust and properly
secured?
Are the working tables for personal computers properly arranged and
cleaned? Are the tables checked for stability?
Inspected by:
jcmolina
JAYSON C. MOLINA
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 4 of 11
COMPUTER/SYSTEM UNIT
EQUIPMENT CODE
CL-0001
LOCATION
COMPUTER LABORATORY
ACTIVITIES
MANPOWER
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
Every
Other
Day
Weekly
Remarks
Activity
Done
before
using the
equipment
Activity
Done after
using the
equipment
Activity
Done after
using the
equipment
Activity
Done after
using the
equipment
Activity
Done after
using the
equipment
December 2014
Templates
Monthly
Date Developed:
Trainers
Methodology Level I
Every
15th
Day
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 5 of 11
6. Shutdown the
computer if necessary
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
9. Update anti-virus
and malware to
download new virus
definition.
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
Pepito
Masagca
Activity
Done after
using the
equipment
Activity
Done after
using the
equipment
Activity
Done after
using the
equipment
Activity
Done
before
using the
equipment
Activity
done before
using the
equipment
Activity
done after
using the
equipment
Depends
on user/
companie
s need
Pepito
Masagca
Restore if
needed
Pepito
Masagca
Activity
done to
tune-up
computer
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 6 of 11
Desktop Computers
Property Code/Number :
CLR212
Location
Computer Laboratory
YES
NO
INSPECTION ITEMS
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 7 of 11
jcmolina
Inspected by: Jayson C. Molina
ID DC-001
DESKTOP COMPUTER
1. COMPUTER LABORATORY SERVER
2. COMPUTER LABORATORY CLIENT no. 3
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 8 of 11
Findings:
Recommendation:
1. DEFECTIVE HARD
DRIVE 2Terabyte Sata
2. DEFECTIVE
MOTHERBOARD
1155
LGA
Inspected by:
Reported to:
jcmolina
PPM
JAYSON C. MOLINA
Date :
2014
DECEMBER
Subsequent
Taken:
PEPITO MANALOTO
1,
DECEMBER 1, 2014
Action Recommendation:
Inspection of the
equipment
By:
Date:
jcmolina
Reported to:
JAYSON C. MOLINA
Date : December 1, 2014
PPM
PEPITO MANALOTO
Date :
DECEMBER 1, 2014
TAG-OUT BILL
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 9 of 11
LOG
DATE
TYPE
DESCRIPTION
DATE
SERIAL
ISSUED
(Danger/Caution)
(System Components,
COMPLETED
SMIT001
12-0114
Do not use/Out
of order/Under
rapair
1. Computer Lab
Server
12-03-14
Lab
(Defective
motherboard)
Prepared by:
Approved:
jcmolina
PPM
Jayson C. Molina
PEPITO MANALOTO
Trainer
Supervisor
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 10 of 11
Qualification
Area / Section
Computer Laboratory
In - Charge
April T. Tatad
GENERAL / ACCUMULATED
WASTES
Personal computer Broken Battery
Broken Mouse
Used wire/Cables/
Broken Keyboard
Computer cases
Broken RJ 45/Networking
Broken Monitor
CD/DVD/Memory stick
Motherboard
AVR/UPS
Memories/RAM
Headset/Speaker/
Camera
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 11 of 11
Scanner/Printer
Power Supply
PURCHASE REQUEST
Date:
December 2, 2014
Requested by:
April T. Tatad
Department/Location
:
Phone #:
09497341040
Jayson C. Molina
Approved by:
Purpose of Purchase:
New Equipment
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 12 of 11
MATERIAL
NUMBER
DESCRIPTION
QUANTIT
Y
UNIT
COST
TOTAL
COST
2014-01
P2,900.00
P 2,900.00
2014-02
P3,000.00
P3,000.00
P5,900.00
TOTAL
Prepared by:
Approved:
Att
jcmolina
April T. Tatad
Trainer
Jayson C. Molina
Supervisor
Date Developed:
December 2014
Trainers
Methodology Level I
Templates
Date Revised:
December 2014
Developed by:
jcmolina
Revision # 01
Page 13 of 11