Cliente:
Proyecto:
Material:
Sistema:
Partida:
MINERAL CUARCIFERO
Tajo Abierto
PERFORACION
Equipo:
DESCRIPCION
1.
2.
Fecha:
6-Nov-12
Fragment.:
10 cms
Merma:
0%
SD 1300E
CANT
MANO DE OBRA
Mecnico, electricista
Operario Trackdrill Hidrulico
Ayudante Trackdrill
MATERIALES
Broca de Botones T45, de 4"
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10%
3.
1.00
90.00
7.00
Petrleo (Gl/hr)
COSTO DIRECTO
GASTOS GENERALES
15.00%
UTILIDAD
10.00%
Tal
Pulg.
m/hr
Prod/Turno:
TMS
INSUMO
(Cant/TMS)
0.0021
0.0021
0.0021
V.Util (m)
450
2,500
3,000
200
4,860
0.9
Hr
UND
P. Unit.
US$/Und
P.e.:
B (m):
E (m):
H (m):
S (m):
TM/Mt
2.50
3.00
4.00
6.00
1.00
27.00
Mts/da
180.00
Parcial
US$/TM
30
10,800.00
TOTAL
US$/TMS
HH
HH
HH
12.13
10.43
7.15
0.0250
0.0215
0.0147
0.0611
pza
pza
pza
pza
425.00
650.00
450.00
100.00
0.0350
0.0096
0.0056
0.0035
0.0537
0.0019
HM
90.00
0.1667
0.0130
HM
4.60
0.0596
0.2263
PERFORADO (4" )
PRECIO UNITARIO BASE (US$/m)
NUEVO PRECIO UNITARIO (US$/m)
DIFERENCIA PRECIOS (US$/m)
DIFERENCIA MENSUAL (US$/mes)
US$/TMS
US$/TMS
0.3411
0.0512
US$/TMS
0.0341
US$/TMS
0.4263
S/. / TMS
1.1085
US$/m.p.
11.511
11.51
11.51
0.00
0
CASO 2
CASO 3
CUARCITA
VOLCANICO
16
22
m/mes
250
800