01
01
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Observation:
Immediate action:
Time Scale
Immediate
Short term:
Hazard & Consequences:
Health surveillance
Chemicals hazard, i.e, Calcium
Carbonate, Hydro-Chloric Acid,
Calcium Chloride, coal and
Flocculent.
One week
Long Term:
Exposure limit to chemical will
decrease by job rotation.
Regularly
Observation
Immediate action:
Immediate
Short term:
One week
Ensure proper housekeeping of
the Workplace on daily basis.
Long Term:
Regular
Monitor and check workplace
regularly. Make employees aware
of the hazards by providing
information and training.
Item
03
04
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Observation
Immediate action:
Long Term:
Collision hazard
Personal Injury, pedestrian injury, ,
property damage,
Because of one way from main gate
to plant area, collision with
pedestrian, vehicles, can cause
injury
Observation
Immediate action:
Time Scale
Immediate
Short term:
Segregate the area for vehicles &
pedestrians by barriers
Two Days
One Week
Immediate
Short term:
Use natural lights such as roof
lights, Where natural light is not
satisfactory. Use artificial lighting.
Two Days
Long Term:
Periodic maintenance and
inspections of artificial lighting
and replacing them from time to
time.
Ongoing
Item
05
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Observation
Immediate action:
Time Scale
Immediate
Short term:
Hazard & Consequences:
Noise Hazard.
Noise at work can cause hearing
loss that can be temporary or
permanent. Hearing loss is not the
only problem. People may develop
tinnitus (ringing, whistling, buzzing or
humming in the ears).
06
Two Days
Fit sound-proof enclosure,
Acoustic shielding. Fit silencers,
balance machine, or mount on
anti-vibration mountings.
One Week
Long Term:
Eliminate/ Substitute with less
noise blower.
Observation
Immediate action:
Immediate
Short term:
Two Days
Dust hazard.
Calcium Chloride Power
Long Term:
Irritant, Causes irritation to skin, eyes
and respiratory organs. Harmful if
Keep routine monitoring and
inhaled or swallowed. Effects can be inspection of the lines
possible coughing, sneezing, asthma
and blocked filters of machines.
07
Observation
Immediate action:
Contact Hazards
Regularly
Immediate
Long Term:
One Week
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Observation
Immediate action:
Time Scale
Immediate
One Day
Provide trolley
Hazard & Consequences:
Long Term:
Manual Handling,
Can cause back bone problem, slip
disc issue, Hernia, can cause
musculoskeletal disorders (MSDs).
09
Observation
Employee using hand drill machine
with broken handle & corroded flex
Hazard & Consequences:
Electrical hazard
Electric shock, Fire & explosion
Hand vibration syndrome, Noise
10
Observation
Chemical sewage drain system was
made of sanitary and at some points
cover was not installed and light was
not good at those Points.
Hazard & Consequences:
Falling hazard into sewage drains.
Can cause serious injury or death
One Week
Immediate
Short term:
Inform the maintenance staff to
do the pre use check before
using electrical equipments
Daily
Long Term:
Conduct monthly inspection of all
electrical equipments & repair if
needed.
Immediate action:
Immediately barricade the open
points.
Short term:
Close the open points by sanitary
work or by keeping covers made
of any material
1 Week
Immediate
Two Days
Long Term:
One Week
Erect proper and good sewage
Observation
Hazards and Consequences
Observation
Observed one employee sitting in
office in odd posture in front of
computer
Hazard & Consequences:
Ergonomic Hazard,
WRULD, Eyes strain, Back pain,
Cervical spondylosis
Control Measures
Immediate/longer term action
Immediate action:
Provide frequent breaks
Short term:
Make the assessment of
workplace to provide standard
DSE arrangements to suit the
worker.
Long Term:
Time Scale
Immediate
One day
One Week
Observation
Observed that there was no notice
board to give the information about
procedures and different information
to workers to update.
Hazard & Consequences:
Disciplinary Hazard.
Lack of knowledge and information
(Regulatory, Company policies, &
working procedures), un competent
workers, and development of
negative culture.
13
Observation
There were no proper washing areas
for workers.
Hazard & Consequences:
Biological Hazard.
Biological hazards due to poor
Immediate:
There must be a supervisor who
informed to workers about rules
and laws about their specific job.
Short Term:
There must be one notice board
containing company policy, Rules
& Regulations and other
information.
Long Term:
Conduct inspection and provide
training to employee and keep
them update about company
rules, laws and job related
information.
Immediate:
Following good hygiene practices.
Short Term:
Training to employees and give
them information about personal
hygiene.
Immediate
Two days
Ongoing
Immediate
One Day
Item
14
Observation
Hazards and Consequences
Long Term:
Build up a washing area for
workers nearby workers
changing room/ locker area and
provide proper ventilation
system.
Control Measures
Immediate/longer term action
Observation
Immediate:
One Week
Time Scale
Immediate
Short Term:
Install line at top of tank and put
the line in the vessel filled with
water so fumes could absorb in
water and water can be drained.
And install new valve.
Two days
Long Term:
One Week
Shift acid storage tanks to away
from the workplace and with
strong foundation and proper
fumes collection system.
15
Observation
The Chemical mist from the exhaust
vent of scrubber was generating
liquid droplets and those were falling
around the plant area and on the
worker at workplace, such mist being
absorbed through the skin and
mucus membrane of eye and can
cause skin problems such as
dermatitis and irritation.
Hazard & Consequences:
Health and chemical hazard,
The Chemical liquids such solvents
being absorbed through the skin and
mucus membrane of eye and can
cause skin problems such as
dermatitis and irritation.
Item
16
Observation
Hazards and Consequences
Observation
Combustion air fan and moving parts
cover was open in hot air coal
furnace plant.
Hazard & Consequences:
Entanglement hazard
Worker can came in entanglement
with the moving parts of the
combustion air fan and can cause
sever injury.
Immediate:
Wear personal protective
equipments
Such as coveralls and gloves.
Using cream to form a barrier to
prevent hazardous chemical
getting into the body and skin.
Immediate
One day
Short Term:
Adopting good hygiene practices.
Minimize the frequency and
duration of
Being exposed to mist.
One week
Long Term
Provide mist collector or mist
absorber at the discharge of
scrubber.
Control Measures
Immediate/longer term action
Time Scale
Immediate:
Provide awareness to every
worker at workplace about it. And
provide personal protective
equipments
Short Term:
Immediate
Two Day
One Week
17
Observation
Immediate:
Secure
trailing
cables
left
unattended on the floor surfaces.
remove
Obstructions in the walkway.
Immediate
Short Term:
Two days
Item
18
Observation
Hazards and Consequences
Observation
Few fire extinguishers are empty.
This can cause delay while
extinguishing fire during any fire
emergency.
Control Measures
Immediate/longer term action
Time Scale
Immediate:
Inspection of all fire
extinguishers,
Immediate
Short Term:
Replace empty fire extinguisher
with new fire extinguisher.
Two days
19
Discipline Hazards.
Can increase the severity of
accident.
One Week
Indent new fire extinguishers.
Observation
Immediate:
Immediatel
y
Short Term:
All personnel should be trained
for lifting safety process.
one Week
Item
20
Observation
Hazards and Consequences
Regular
Control Measures
Immediate/longer term action
Time Scale
Observation
Immediate:
Immediate
Short Term:
Scaffold training (erection &
dismantling )
One Week
Regular
21
Observation:
Immediate:
Short Term:
Immediate
One day
Long Term:
One week
Item
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Time Scale
22
Observation:
Immediate:
Immediate
Short Term:
Three days
One week
Long Term:
Install camera inside the Prill or
drying tower to watch the fluidized
bed height and condition of
spoilage or non spoilage.
23
Observation:
Immediate:
Immediate
One day
Falling Hazard
Risk of people, material and Short Term:
equipments
falling
into
the
excavations and the possible results Organizing
a
good
traffic
could be fatalities.
management system in place.
Traffic routes should be clearly
marked.
One week
Long Term:
Excavations must be inspected at
the
Beginning of the shift on daily
basis.
All personnel need to be trained
and competent to carry out their
tasks safely.
Item
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Time Scale
24
Observation:
Immediate:
Immediate
Observation:
Immediate:
25
Immediate
Short Term:
Provide training and supervision
One Week
Long Term:
Observation:
Immediate:
Short Term:
Regular
26
Immediate
One day
Long Term:
one week
Install smoke detector in the
warehouse
Good Practices
Maintain
Keep it up
Keep up
Keep up
Keep up
Keep up
Keep up
Keep up
Introduction
This inspection was done at Travancore Cochin chemicals, Kochi on 08/02/2015 near to
Eloor.its a heavy chemical industry engaged in the manufacturing & marketing of
Caustic soda, Chlorine & allied chemicals. The methodology used was observation.
Purpose of conducting an observation with the help of manager was to identify
significant hazards and risks in the above mentioned locations/ areas and to make
recommendations and improvement. The main activity during the time of inspection was
production of Hydrochloric Acid & Liquid Chlorine. The average size of the company is
500 and during the inspection there were around 300 people. Equipment used at site
include Wheel barrow, Forklift etc. Language being used at site includes Malayalam and
Hindi some times. TCC is accredited with ISO 9001 : 2008 certification.
Executive Summary
The aim of this report is to identify significant hazards and risks in the above
mentioned locations/ areas and to make recommendations and improvement. While
observation, those inspected areas were noticed that need of serious commitment from
the management to improve the area into safe working condition. During our inspection
we observed the presence of danger to life and health of the operatives due to unsafe
acts and unsafe condition of Chemical processing, unguarded machines, dust and noise
are not reasonably uncontrolled, poor house keeping some of places, stacking of
materials and equipment not well organized, misused of PPE such as personal fall
arrest system or harness, flammable materials stored inappropriately.
These numbers of observation have been recorded with the corresponding appropriate
recommendations for early improvement. The nonattendance of competent workers and
supervisor to oversee the whole processing/handling operation resulted operatives cut
particular areas. Long term action to correct the hazard is to provide separate entry and
exit routes with separation between pedestrian and vehicle as well as equipments.
Approximate cost for taking above corrective is Rs 25,000. Supervisor/manager is
responsible for taking the a corrective action. Corrective action should take as soon as
possible and should be within one week.
Biological Hazard
Lack of facility for an employee to be in hygiene after handling the harmful chemicals, it
can lead to cause biological hazard by if the employee cannot wash his hand properly
after handling it by hand he may use the same hand for eat his food too. Thus chemical
may go inside his body and will cause biological hazard. Poor personnel hygiene can
cause health problem such as infection and diseases. Employee as well as employer
will be affected by this hazard. Employee may affect the consequences directly by loss
of income during these days, or even it can lead to the death of the person too.
Employer may affect it either directly or indirectly, we can consider direct events such as
legal punishment ,compensation to victim, loosing further orders, credibility of
organisation etc, and indirect events such as loss of time , recruitment & training of new
employee etc. so from this we can conclude it as High risk hazard. It is crystal clear that
violation of regulations such as ILO C 155, ILO R 164 & COSHH 2002. Short term
action to correct the hazards is to provide proper hand wash facilities as well as
cleaning liquids and train their employees to practice it. Long term action to correct the
hazard is to build up washing area, changing area, locker facility etc. Approximate cost
for taking above corrective is Rs 10,000. Supervisor/manager is responsible for taking
the a corrective action. Corrective action should take as soon as possible and should be
within one week.
Health & Chemical Hazard
Chemical mist from the exhaust vent of the scrubber will generate droplets of liquids
and it may fell on the surroundings and it will cause chemical & health hazard. These
liquids may fall on the skin, hair and other parts. This will cause skin problems such as
dermatitis and irritations. Employee as well as employer will be affected by this hazard.
Employee may affect the consequences directly by loss of income during these days, or
even it can lead to the death of the person too. Employer may affect it either directly or
indirectly, we can consider direct events such as legal punishment ,compensation to
victim, loosing further orders, credibility of organisation etc, and indirect events such as
loss of time , recruitment & training of new employee etc. so from this we can conclude
it as High risk hazard. It is crystal clear that violation of regulations such as ILO C 155,
ILO R 164 & COSHH 2002. Short term action to correct the hazards is to wear Personal
Protective Equipments such as coveralls and gloves. Long term action to provide mist
collector at the discharge of scrubber. . Approximate cost for taking above corrective is
Rs 20,000. Supervisor/manager is responsible for taking the a corrective action.
Corrective action should take as soon as possible and should be within one week.
Discipline Hazards
Some of the fire extinguishers were found empty during the inspection, with these fire
extinguishers if any fire occurs in the plant then the availability of this will not help to
reduce the fire instead of it will increase the risk.so such hazard should be avoided.
Instead of reducing risk these empty fire extinguishers increase the severity of risk.
Employee as well as employer will be affected by this hazard. Employee may affect the
consequences directly by loss of income during these days, or even it can lead to the
death of the person too. Employer may affect it either directly or indirectly, we can
consider direct events such as legal punishment ,compensation to victim, loosing further
orders, credibility of organisation etc, and indirect events such as loss of time ,
recruitment & training of new employee etc. so from this we can conclude it as High risk
hazard. It is crystal clear that violation of regulations such as ILO C 155, ILO R 164.
Short term action is replacing the empty with new one. Long term action to Intend for
new fire extinguishers. Approximate cost for taking above corrective is Rs 30,000.
Supervisor/manager is responsible for taking the a corrective action. Corrective action