You are on page 1of 1

PAGE 1 OF 1

STRUCTURAL STEEL / PLATE WORK INSPECTION REPORT


RECORD NUMBER: SS.01

DATE: 25 FEB2015

TIME: 15:33

PROJECT NUMBER: ESCC.01

PROJECT NAME: Coal Mill Feeding Project

UNIT/AREA: 461

SYSTEM: Filter

BUILDING: 461.BF300

DESCRIPTION: Filter Supporting Steel Structure Building Inspection

REFERENCE DOCUMENT NO.

REV. NO.

REMARKS

1.DWG 7 , 10

0,0

ALEX Steel GA Drawing

2.DWG 13 , 14

0,0

ALEX Steel GA Drawing

WORK PACKAGE NUMBER: N.A

ITEM

ACCEPT

1.

Base plates at correct elevation ( Level Check )

2.

Base plates at correct NS & EW location ( Verticality & Alignment )

3.

Column hold down nuts and washers in place and torqued

4.

Columns plumb in all directions

5.

Horizontal steel framing at correct elevation

6.

Bolted connections properly torqued using correct bolting material

7.

Plate washers provided to cover long slotted holes as required

8.

Weld filler material and completed weldment acceptable

9.

Post weld heat treatment complete and acceptable

REJECT

N/A

N.A

N.F

REMARKS

10. Welding nondestructive examination complete and acceptable


11. Vertical and horizontal bracing complete and properly bolted
12. Exterior siding supports installed correctly
13. Temporary supports and brackets removed from structure
14. Miscellaneous steel (ladders, platforms, etc.) properly installed
15. Grouting completed

Need APR

16. Coatings touched up as required


17. Fire proofing repaired as required
CHECKED MEASURMENTS ( HAND WRITING )
1.

2.

3.

4.

5.

6.

7.

8.

DESIGNED

ACTUAL

TOLERANCE

COMMENTS: The Steel Building columns is ready for release the grout casting ( RIGA ).
The Erected parts only will be marked in the attached DWG.s

PERFORMED BY: AHMAD.Eldagen

ROLE : RIGA

DATE:

REVIEWED BY: Amr.Mamdouh

ROLE : ESCC

DATE:

RECIVED BY: PRASAD

ROLE : FLS

DATE:

ACCEPT

REJECT

N/A