You are on page 1of 26

KPI

General Meaning

Time Period for


measurement

Targets

Cell BBH

>=96%

Cell BBH

>=96%

Cell BBH

<=1%

Setup and Access should be taken for calculation


including all types of congestion
CS RRC Setup and Access Completion Ratio
Successful CS RRC connections / Total CS RRC
connection request

PS (All Bearer) RRC Setup and Access Completion Ratio

Setup and Access should be taken for calculation


including all types of congestion
Successful PS RRC connections / Total PS RRC
connection request

CS and PS (all Bearer) call blocking due to Call Admission


Control
PS and HS RAB Setup Success Rate

Success RAB connection completion / Total RAB


connection Request

Cell BBH

>=96.5%

CS and Video RAB Setup Success Rate

Success RAB connection completion / Total RAB


connection Request

Cell BBH

>=96.5%

CS NBH

<=1.75%

PS Drop Call Rate


HS Drop Call Rate

RAB drop (with respect to the total number of


calls ending in 3G), counting only the drops on
the best serving cell including all AMR Drops
RAB drop (R99 only)
RAB drops pertaining to HS

PDP Busy Hour


PDP Busy Hour

<2%
<2%

CS Inter System Handover Success Rate( 3G - 2G, 2G-3G)

Including IRAT per call

CS BBH

IRAT : >95%

Cell Data Busy


Hour

1 Mbps and CQI


16 with more
than 5 MB
download

Voice Drop Call Rate

Average HSDPA DL Throughput per user (Cell Data Busy Hour)


HSDPA Download Throughput per user ( User
perceived Throughput)

Best of three days out of five days (excluding Saturday and Sunday). (Greenfield)
80% of the KPIs are must to pass the Final Site AT. Above KPIs shall be applicable for new 3G circles. (Green Field Circle+ Existing Circle)
If any KPI target for any respective cell is not achieved more than 1 months, Both the teams (Bharti and NSN) will validate the reasons and close. (Green Field Circle+
Existing Circle)
For new Cell/Site addition in the existing cluster, Existing cells achieved KPIs should not degrade.
Target of new cell shall be either as per the existing cluster achieved targets (Average of 5 working days) or above given targets for respective KPIs and the same will
be achieved post for new site (Average of 5 working days). (Existing Circles)

NSN Signature:

Bharti Signature:

Existing Cells
achieved KPI in
case of infill site

Achieved KPIs for


new site

Single Cell Function Test (SCFT)


Site ID:
New Site:
Others:

Y
No.

Idle

Connection

Site Name:
Site Connected to RNC:
Last Drive Performed:

BRA02324

Brazzaville28
BRARNC
11-MAR-15

Activity/Process

MS1

Cell ID:

MS2

MS3

Dongle

cell 1
Check
629
01
1001
100
10637
337
100%
100%
100%
100%
100%
100%
100%

result

Remarks

Y
Y
Y

13

13.5

13

9.5

13

12.1

0.512

0.56

0.512

0.59

0.512

0.64

3.5

4.3

3.5

2.4

3.5

2.8

0.064

0.34

0.064

0.36

0.064

0.46

98%

100%

98%

100%

98%

100%

For Voice Call : 3G to 2G at all cells and 2G to 3G whereever applicable.


For PS calls : 2G to 3G at all cells and 3G to 2G whereever applicable.
Target >=97.5%

98%

100%

98%

100%

98%

100%

Both Soft and Softer Handover needs to be checked.


Target >=98%

Y
Y
Y
Y
Y

Y
Y
Y
Y
Y

98%

100%

98%

100%

98%

100%

Target >=98%

98%

100%

98%

100%

98%

100%

Target >=98%

97%

100%

97%

100%

97%

100%

Target >=97%

200,90

MNC
MCC
LAC
RAC
ARFCN
PSC
RSCP(nearby site)
Ec/Io(nearby site)
Voice Call Setup Success rate (MO & MT)
Video Call Setup Success rate (MO & MT)
PS Setup Success rate
HSUPA Setup Success rate
HSDPA Setup Success rate

Y
Y
Y
Y
Y
Y
Y

Y
Y
Y
Y
Y
Y
Y

Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

14

HSDPA Throughput

15

R99 Throughput (DL)

16

HSUPA Throughput

17
18

R99 Throughput (UL)


Handover Function

Y
Y

19

2G to 3G and 3G to 2G (IRAT handover -both ways)

20

3G to 3G

21
22
23
24
25

PS Soft HO
PS Softer HO
PS Hard HO
PDP context activation Success rate
PS & CS CCSR

Y
Y
Y
Y
Y

Y
Y
Y
Y
Y

26

Latency( R99,HSPA)

Y
Y

plan
629
01
1001
100
10637
339
90%
95%
99%
98%
98.5%
98.5%
98.5%

25161 25162 25163

cell 3
Check
629
01
1001
100
10637
339
100%
100%
100%
100%
100%
100%
100%

plan
629
01
1001
100
10637
337
90%
95%
99%
98%
98.5%
98.5%
98.5%

1
2
3
4
5
6
7
8
9
10
11
12
13

plan
629
01
1001
100
10637
338
90%
95%
99%
98%
98.5%
98.5%
98.5%

cell 2
Check
629
01
1001
100
10637
338
100%
100%
100%
100%
100%
100%
100%

25706
370
92
26168
26076
0.9964842556

RSCP >= -92dBm for 90% samples


Ec/Io >=-12 dB for 90% samples to 95% samples
MOC & MTC >= 99%
MOC & MTC >= 98%
98.50%
98.50%
98.50%

More than 13 Mbps peak without any bandwith bottleneck. E2E backhaul
to be provided with a 20% Overrate to meet this target
Target shall be applicable with Dongle in static condition

PS
>=512 Kbps
More than 3.5 Mbps without any bandwith bottleneck. E2E backhaul to
be provided with a 20% Overrate to meet this target
Target shall be applicable with Dongle in static condition

Handover

100%

100%

100%

100%

100%

100%

350,200

200,90

310,205

200,90

> =64 Kbps

Static tests only.


Average of all samples.
R99: 200msec,
HS: 90 msec

320,215

Target shall be applicable with Dongle in static condition


Multiple 512 byte pings with 5-second interval. Minimum of 100 pings
attempt

drive
map

27
28
29
30
31

CS & PS call setup time


CS & PS drop call rate
Packet drop
Packet retransmission
Interrrupt time

Remarks (Comments):

RSCP PLOT

ECNO PLOT

Y
Y
Y
Y
Y

Y
Y
Y
Y
Y

Y
Y
Y
Y
Y

4.6

4.2

4.3

CS <= 1% & PS <= 1.5%

If Applicable
If Applicable

RSCP covery map per site

SP Signature

SC PLOT

Y
Y
Y
Y
Y

SCFT will be conducted using 3 class of handset and one dongle.


RSCP Coverage check till first handover or coverage dies out (whichever happens earlier)

Bharti Signature:

Date:

PING TEST
DONE WITH
HTTP SERVER
AS FTP
SERVER WAS
NOT WORKING

SEC 1

SEC 2

SEC 3

SEC 1

SEC 2

SEC 3

SEC 1

SEC 2

SEC 3

SEC 1

SEC 2

SEC 3

SEC 1

SEC 2

SEC 3

SEC 1

SEC 2

SEC 3

You might also like