You are on page 1of 2

19060 Federal Register / Vol. 73, No.

68 / Tuesday, April 8, 2008 / Notices

DEPARTMENT OF ENERGY horsepower compressor station along • Send an original and two copies of
Vector’s existing pipeline system in your comments to: Kimberly D. Bose,
Federal Energy Regulatory Calhoun County, Michigan and Secretary, Federal Energy Regulatory
Commission modifications at the existing Springville Commission, 888 First St., NE., Room
and Highland Compressor Stations, 1A, Washington, DC 20426;
[Docket Nos. EG08–19–000; EG08–20–000;
which are located along Vector’s
EG08–21–000; EG08–22–000; EG08–23–000; • Reference Docket No. CP08–29–
EG08–24–000; EG08–25–000; EG08–27–000; pipeline system in LaPorte County,
000;
EG08–28–000] Indiana and Oakland County, Michigan,
respectively. The ACE Project would • Label one copy of the comments for
Sweetwater Wind 5 LLC; South Trent increase mainline capacity by the attention of the Gas Branch 1, PJ–
Wind LLC; Forward Windpower, LLC; approximately 105,000 dekatherms per 11.1; and
Lookout Wind Power, LLC; Breech day. • Mail your comments so that they
Ridge Energy LLC; Las Vegas The EA has been placed in the public will be received in Washington, DC, on
Cogeneration Limited Partnership; files of the FERC. A limited number of or before April 30, 2008.
Buffalo Gap Wind Farm 3, LLC; Rail copies of the EA are available for
Splitter Wind Farm, LLC; Waterbury distribution and public inspection at: Comments will be considered by the
Generation, LLC; Notice of Federal Energy Regulatory Commission, Commission but will not serve to make
Effectiveness of Exempt Wholesale Public Reference Room, 888 First Street, the commentor a party to the
Generator or Foreign Utility Company NE., Room 2A, Washington, DC 20426, proceeding. Any person seeking to
Status (202) 502–8371. become a party to the proceeding must
Copies of the EA have been mailed to file a motion to intervene pursuant to
March 31, 2008. Federal, State, and local agencies, Rule 214 of the Commission’s Rules of
Take notice that during the month of public interest groups, interested Practice and Procedures (18 CFR
February 2008, the status of the above- individuals, newspapers, and parties to 385.214).1 Only intervenors have the
captioned entities as Exempt Wholesale this proceeding. right to seek rehearing of the
Generators became effective by Any person wishing to comment on Commission’s decision.
operation of the Commission’s the EA may do so. To ensure
consideration prior to a Commission Affected landowners and parties with
regulations. 18 CFR 366.7(a).
decision on the proposal, it is important environmental concerns may be granted
Kimberly D. Bose, that we receive your comments before intervenor status upon showing good
Secretary. the date specified below. cause by stating that they have a clear
[FR Doc. E8–7286 Filed 4–7–08; 8:45 am] Please note that the Commission and direct interest in this proceeding
BILLING CODE 6717–01–P strongly encourages electronic filing of which would not be adequately
any comments or interventions or represented by any other parties. You do
protests to this proceeding. See 18 Code not need intervenor status to have your
DEPARTMENT OF ENERGY of Federal Regulations comments considered.
385.2001(a)(1)(iii) and the instructions Additional information about the
Federal Energy Regulatory on the Commission’s Internet Web site
Commission project is available from the
at http://www.ferc.gov under the link to Commission’s Office of External Affairs,
[Docket No. CP08–29–000] ‘‘Documents and Filings’’ and ‘‘eFiling.’’ at 1–866–208–FERC or on the FERC
eFiling is a file attachment process and Internet Web site (http://www.ferc.gov)
Vector Pipeline L.P.; Notice of requires that you prepare your using the eLibrary link. Click on the
Availability of the Environmental submission in the same manner as you
eLibrary link, click on ‘‘General Search’’
Assessment for the Proposed Athens would if filing on paper, and save it to
and enter the docket number excluding
Compressor Expansion Project a file on your hard drive. New eFiling
the last three digits in the Docket
users must first create an account by
March 31, 2008. clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ Number field. Be sure you have selected
The staff of the Federal Energy You will be asked to select the type of an appropriate date range. For
Regulatory Commission (FERC or filing you are making. This filing is assistance, please contact FERC Online
Commission) has prepared an considered a ‘‘Comment on Filing.’’ In Support at FercOnlineSupport@ferc.gov
environmental assessment (EA) on the addition, there is a ‘‘Quick Comment’’ or toll free at 1–866–208–3676, or for
natural gas pipeline facilities proposed option available, which is an easy TTY, contact (202) 502–8659. The
by Vector Pipeline L.P. (Vector) in the method for interested persons to submit eLibrary link also provides access to the
above-referenced docket. text only comments on a project. The texts of formal documents issued by the
The EA was prepared to satisfy the Quick-Comment User Guide can be Commission, such as orders, notices,
requirements of the National viewed at http://www.ferc.gov/docs- and rulemakings.
Environmental Policy Act. The FERC filing/efiling/quick-comment-guide.pdf. In addition, the Commission now
staff concludes that approval of the Quick Comment does not require a offers a free service called eSubscription
proposed project, with appropriate FERC eRegistration account; however, which allows you to keep track of all
mitigating measures, would not you will be asked to provide a valid formal issuances and submittals in
constitute a major federal action e-mail address. All comments submitted specific dockets. This can reduce the
significantly affecting the quality of the under either eFiling or the Quick amount of time you spend researching
human environment. Comment option are placed in the proceedings by automatically providing
The EA assesses the potential public record for the specified docket.
pwalker on PROD1PC71 with NOTICES

you with notification of these filings,


environmental effects of the If you are filing written comments, document summaries and direct links to
construction and operation of Vector’s please carefully follow these
proposed Athens Compressor Expansion instructions to ensure that your 1 Interventions may also be filed electronically via
(ACE) Project. The ACE Project would comments are received in time and the Internet in lieu of paper. See the previous
involve construction of a new 15,000- properly recorded: discussion on filing comments electronically.

VerDate Aug<31>2005 16:09 Apr 07, 2008 Jkt 214001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\08APN1.SGM 08APN1
Federal Register / Vol. 73, No. 68 / Tuesday, April 8, 2008 / Notices 19061

the documents. Go to http:// the deadline above, the Noble f. Location: The project is located on
www.ferc.gov/esubscribenow.htm. Applicants are authorized to issue the Deschutes River in Jefferson County,
securities and assume obligations or Oregon. The project occupies 3,503.74
Kimberly D. Bose,
liabilities as a guarantor, indorser, acres of federal and tribal lands
Secretary. surety, or otherwise in respect of any administered by the U.S. Forest Service
[FR Doc. E8–7288 Filed 4–7–08; 8:45 am] security of another person; provided (FS), U.S. Bureau of Land Management,
BILLING CODE 6717–01–P that such issuance or assumption is for and U.S. Bureau of Indian Affairs.
some lawful object within the corporate g. Filed Pursuant to: Federal Power
purposes of the Noble Applicants, Act, 16 U.S.C. 791(a)–825(r).
DEPARTMENT OF ENERGY compatible with the public interest, and h. Applicant Contact: Ms. Julie A.
is reasonably necessary or appropriate Keil, Director of Hydro Licensing,
Federal Energy Regulatory Portland General Electric Company, 121
Commission for such purposes.
The Commission reserves the right to SW Salmon, Portland, OR 97204, (503)
[Docket Nos. ER08–577–000; ER08–577– require a further showing that neither 464–8864.
001; ER08–578–000; ER08–578–001; ER08– public nor private interests will be i. FERC Contact: Any questions on
579–000; ER08–579–001] adversely affected by continued this notice should be addressed to
approvals of the Noble Applicants’ Christopher Yeakel at (202) 502–8132,
Nobel Bellmont Windpark, LLC; Noble or by e-mail:
issuance of securities or assumptions of
Chateaugay Windpark, LLC; Noble christopher.yeakel@ferc.gov.
liability.
Wethersfield Windpark, LLC; Notice of Copies of the full text of the Director’s j. Deadline for filing comments and/
Issuance of Order Order are available from the or motions: 30 days from the date of this
Commission’s Public Reference Room, notice.
April 1, 2008. All documents (original and eight
Noble Bellmont Windpark, LLC, 888 First Street, NE., Washington, DC
copies) should be filed with: Kimberly
Noble Chateaugay Windpark, LLC, 20426. The Order may also be viewed
D. Bose, Secretary, Federal Energy
Noble Wethersfield Windpark, LLC on the Commission’s Web site at
Regulatory Commission, DHAC, PJ–
(Noble Applicants) filed applications for http://www.ferc.gov, using the eLibrary 12.1, 888 First Street, NE., Washington,
market-based rate authority, with link. Enter the docket number excluding DC 20426. Please include the project
accompanying market-based rate tariffs. the last three digits in the docket number (p–2030–141) on any comments
The proposed market-based rate tariffs number filed to access the document. or motions filed. Comments, protests
provides for the sale of energy, capacity Comments, protests, and interventions and interventions may be filed
and ancillary services at market-based may be filed electronically via the electronically via the Internet in lieu of
rates. The Noble Applicants also Internet in lieu of paper. See, 18 CFR paper. See, 18 CFR 385.2001(a)(1)(iii)
requested waivers of various 385.2001(a)(1)(iii) and the instructions and the instructions on the
Commission regulations. In particular, on the Commission’s Web site under the Commission’s Web site under the ‘‘e-
the Noble Applicants requested that the ‘‘e-Filing’’ link. The Commission Filing’’ link. The Commission strongly
Commission grant blanket approval strongly encourages electronic filings. encourages electronic filings.
under 18 CFR part 34 of all future Kimberly D. Bose, k. Description of Proposal: The
issuances of securities and assumptions Secretary. licensees propose to amend the
of liability by the Noble Applicants. approved Recreation Resources
[FR Doc. E8–7283 Filed 4–7–08; 8:45 am]
On March 27, 2008, pursuant to Implementation Plan (RRIP) pursuant to
BILLING CODE 6717–01–P
delegated authority, the Director, article 424 of the project license by
Division of Tariffs and Market modifying the schedule and revising
Development-West, granted the request DEPARTMENT OF ENERGY those measures outlined in table 1 of the
for blanket approval under part 34 RRIP. The proposed modifications
(Director’s Order). The Director’s Order Federal Energy Regulatory consist of the addition, deletion, and
also stated that the Commission would Commission postponement of various measures
publish a separate notice in the Federal determined by the Recreation Resources
Register establishing a period of time for [Project No. 2030–141] Working Group to address resource
the filing of protests. Accordingly, any Portland General Electric Company; concerns and evolving recreation needs.
person desiring to be heard concerning Notice of Application and Soliciting The specific proposed changes are
the blanket approvals of issuances of Comments, Motions To Intervene, and detailed in the licensees’ annual report
securities or assumptions of liability by Protests pursuant to article 424 filed on March
the Noble Applicants, should file a 20, 2008, and pertain to Cove Palisades
protest with the Federal Energy March 31, 2008. State Park, Street Creek Boat Launch,
Regulatory Commission, 888 First Take notice that the following Perry South and Monty Campgrounds,
Street, NE., Washington, DC 20426, in application has been filed with the Pelton Bark, and Lake Billy Chinook.
accordance with Rules 211 and 214 of Commission and is available for public Proposed changes at Cove Palisades
the Commission’s Rules of Practice and inspection: State Park include postponing of road
Procedure. 18 CFR 385.211, 385.214 a. Application Type: Amendment of repairs, installing additional parking,
(2007). The Commission encourages the Project License. lawn areas, and a restroom, and
electronic submission of protests using b. Project No.: 2030–141. eliminating a new trail segment to
the FERC Online link at http:// c. Date Filed: March 20, 2008. Willow Creek from the Canyon Rim
www.ferc.gov. d. Applicant: Portland General Trail and a boat-in camping area.
pwalker on PROD1PC71 with NOTICES

Notice is hereby given that the Electric Company and the Confederated Proposed changes at Street Creek Boat
deadline for filing protests is April 28, Tribes of the Warm Springs Reservation Launch include the eliminating a new
2008. of Oregon (CTWS). restroom and courtesy dock, delaying
Absent a request to be heard in e. Name of Project: Pelton Round installation of additional gravel parking,
opposition to such blanket approvals by Butte Hydroelectric Project. and adding a measure to develop an