You are on page 1of 1

Federal Register / Vol. 73, No.

57 / Monday, March 24, 2008 / Notices 15543

Holders of renewed licenses must The meeting will be open to public participation in ACRS meetings were
retain in an auditable and retrievable attendance, with the exception of published in the Federal Register on
form, for the term of the renewed portions that may be closed to discuss September 26, 2007 (72 FR 54695).
operating license, all information and proprietary information pursuant to 5 Further information regarding this
documentation required to document U.S.C. 552b(c)4 for presentations meeting can be obtained by contacting
compliance with 10 CFR Part 54. The covering information that is proprietary the Designated Federal Official between
NRC needs access to this information for to PSEG Nuclear LLC or its contractors 7:30 a.m. and 4:15 p.m. (ET). Persons
continuing effective regulatory such as General Electric and Continuum planning to attend this meeting are
oversight. Dynamics. All other items pertaining to urged to contact the above named
Submit by May 23, 2008, comments this meeting remain the same as individual at least two working days
that address the following questions: published previously in the Federal prior to the meeting to be advised of any
1. Is the proposed collection of Register on Friday, March 7, 2008 (73 potential changes to the agenda.
information necessary for the NRC to FR 12474). Dated: March 13, 2008.
properly perform its functions? Does the FOR FURTHER INFORMATION CONTACT: Ms. Cayetano Santos,
information have practical utility? Zena Abdullahi, Designated Federal Branch Chief, ACRS.
2. Is the burden estimate accurate? Official (Telephone: 301–415–8716)
3. Is there a way to enhance the [FR Doc. E8–5897 Filed 3–21–08; 8:45 am]
between 7:30 a.m. and 4:15 p.m. (ET) or
quality, utility, and clarity of the by e-mail zxa@nrc.gov.
BILLING CODE 7590–01–P

information to be collected?
4. How can the burden of the Dated: March 14, 2008.
information collection be minimized, Cayetano Santos, NUCLEAR REGULATORY
including the use of automated Chief, Reactor Safety Branch, ACRS. COMMISSION
collection techniques or other forms of [FR Doc. E8–5894 Filed 3–21–08; 8:45 am]
Seeks Qualified Candidates for the
information technology? BILLING CODE 7590–01–P
Advisory Committee on Reactor
A copy of the draft supporting
Safeguards
statement may be viewed free of charge
at the NRC Public Document Room, One NUCLEAR REGULATORY AGENCY: U.S. Nuclear Regulatory
White Flint North, 11555 Rockville COMMISSION Commission.
Pike, Room O–1F21, Rockville, MD ACTION: Request for résumés.
20852. OMB clearance requests are Advisory Committee on Reactor
available at the NRC Web site: http:// Safeguards (ACRS); Meeting of the SUMMARY: The U.S. Nuclear Regulatory
www.nrc.gov/public-involve/doc- ACRS Subcommittee on Reliability and Commission (NRC) seeks qualified
comment/omb/index.html. The Probabilistic Risk Assessment; Notice candidates for the Advisory Committee
document will be available on the NRC of Meeting on Reactor Safeguards (ACRS). Submit
web site for 60 days after the signature The ACRS Subcommittee on résumés to Ms. Janet Riner, Executive
date of this notice. Reliability and Probabilistic Risk Secretary, ACRS/ACNW&M, Mail Stop
Comments and questions about the Assessment (PRA) will hold a meeting T2E–26, U.S. Nuclear Regulatory
information collection requirements on April 18, 2008, Room T–2B1, 11545 Commission, Washington, DC 20555–
may be directed to the NRC Clearance Rockville Pike, Rockville, Maryland. 0001, or e-mail JML1@NRC.GOV.
Officer, Margaret A. Janney (T–5F52), The entire meeting will be open to SUPPLEMENTARY INFORMATION: The ACRS
U.S. Nuclear Regulatory Commission, public attendance. is a part-time advisory group, which is
Washington, DC 20555–0001, by The agenda for the subject meeting statutorily mandated by the Atomic
telephone at 301–415–7245, or by e-mail shall be as follows: Energy Act of 1954, as amended. ACRS
to INFOCOLLECTS@NRC.GOV. Friday, April 18, 2008—8:30 a.m. provides independent expert advice on
until the conclusion of business matters related to the safety of existing
Dated at Rockville, Maryland, this 17th day
of March 2008. The Subcommittee will discuss the and proposed nuclear power plants and
draft NUREG–1855, ‘‘Guidance on the on the adequacy of proposed reactor
For the Nuclear Regulatory Commission.
Treatment of Uncertainties Associated safety standards. Of primary importance
Gregory Trussell, are the safety issues associated with the
with PRAs in Risk-Informed
Acting NRC Clearance Officer, Office of Decisionmaking.’’ The Subcommittee operation of 104 commercial nuclear
Information Services. power plants in the United States and
will hear presentations by and hold
[FR Doc. E8–5884 Filed 3–21–08; 8:45 am] discussions with representatives of the regulatory initiatives, including risk-
BILLING CODE 7590–01–P NRC staff and the Electric Power informed and performance-based
Research Institute (EPRI) regarding this regulations, license renewal, power
matter. The Subcommittee will gather uprates, and the use of mixed oxide and
NUCLEAR REGULATORY information, analyze relevant issues and high burnup fuels. An increased
COMMISSION facts, and formulate proposed positions emphasis is being given to safety issues
and actions, as appropriate, for associated with new reactor designs and
Advisory Committee on Reactor
deliberation by the full Committee. technologies, including passive system
Safeguards (ACRS); Subcommittee
Members of the public desiring to reliability and thermal hydraulic
Meeting on Power Uprates (Hope
provide oral statements and/or written phenomena, use of digital
Creek); Revised; Notice of Meeting
comments should notify the Designated instrumentation and control,
The Federal Register Notice for the Federal Official, Dr. Hossein P. international codes and standards used
mstockstill on PROD1PC66 with NOTICES

ACRS Subcommittee Meeting on Power Nourbakhsh (Telephone: 301–415– in multinational design certifications,
Uprates scheduled to be held on March 5622), five days prior to the meeting, if material and structural engineering,
20–21, 2008 has been revised to correct possible, so that appropriate nuclear analysis and reactor core
an inadvertent error (PPL Hope Creek arrangements can be made. Electronic performance, and nuclear materials and
LLC has been changed to PSEG Nuclear recordings will be permitted. Detailed radiation protection. In addition, the
LLC) as noted below. procedures for the conduct of and ACRS may be requested to provide

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1

You might also like