Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices 68159

plans, and a study of environmental DEPARTMENT OF ENERGY l. The existing project works consists
impacts. Based on the results of these of the following two developments:
studies, the Applicant would decide Federal Energy Regulatory As licensed, the existing Badger
whether to proceed with the preparation Commission Development utilizes the head created
of a development application to [Project No.: 2677–019]
by the 22-foot-high Army Corps of
construct and operate the project. Engineers (Corps) Kaukauna dam and
r. Comments, Protests, or Motions To City of Kaukauna, WI; Notice of consists of: (1) A 2,100-foot-long, 100-
Application Accepted for Filing and foot-wide power canal that bifurcates
Intervene—Anyone may submit
Soliciting Motions To Intervene and into a 260-foot-long, 200-foot-wide canal
comments, a protest, or a motion to
Protests and a 250-foot-long, 80-foot-wide canal
intervene in accordance with the
leading to; (2) the Old Badger
requirements of Rules of Practice and November 27, 2007. powerhouse containing two 1,000-
Procedure, 18 CFR 385.210, .211, .214.
Take notice that the following kilowatt (kW) generating units for a total
In determining the appropriate action to
hydroelectric application has been filed installed capacity of 2,000 kW; and (3)
take, the Commission will consider all
with the Commission and is available the New Badger powerhouse containing
protests or other comments filed, but
for public inspection. two 1,800-kilowatt (kW) generating
only those who file a motion to a. Type of Application: New Major units for a total installed capacity of
intervene in accordance with the License. 3,600 kW; and (4) appurtenant facilities.
Commission’s Rules may become a b. Project No.: 2677–019. As licensed, the existing Rapide
party to the proceeding. Any comments, c. Date filed: August 29, 2007. Croche Development utilizes the head
protests, or motions to intervene must d. Applicant: City of Kaukauna, created by the 20-foot-high Corps
be received on or before the specified Wisconsin. Rapide Croche dam, located
comment date for the particular e. Name of Project: Badger-Rapide approximately 4.5 miles downstream
application. Croche Hydroelectric Project. from the Badger Development and
Comments, protests and interventions f. Location: On the Fox River in consists of: (1) A powerhouse, located
may be filed electronically via the Outagamie County, near the city of on the south end of the dam, containing
Internet in lieu of paper; See 18 CFR Kaukauna, Wisconsin. The project does four 600-kW generating units for a total
385.2001 (a)(1)(iii) and the instructions not affect federal lands. installed capacity of 2,400 kW; (2) the
on the Commission’s Web site under ‘‘e- g. Filed Pursuant to: Federal Power 5-mile-long, 12-kV transmission line;
filing’’ link. The Commission strongly Act, 16 U.S.C. 791 (a)–825(r). and (3) appurtenant facilities.
encourages electronic filing. h. Applicant Contact: Mike Pedersen, The license application also indicates
Kaukauna Utilities, 777 Island Street, that flashboards are used at the
s. Filing and Service of Responsive
P.O. Box 1777, Kaukauna, WI 54130– Kaukauna (6-inch-high) and Rapide-
Documents—Any filings must bear in
7077, 920–462–0220, or Arie DeWaal, Croche (30-inch-high) dams to provide
all capital letters the title
Mead & Hunt, Inc., 6501 Watts Road, additional head for project generation.
‘‘COMMENTS’’, The proposed project would include
Madison, WI 53719, 608–273–6380.
‘‘RECOMMENDATIONS FOR TERMS i. FERC Contact: John Smith (202) decommissioning the Old Badger and
AND CONDITIONS’’, ‘‘PROTEST’’, 502–8972 or john.smith@ferc.gov. New Badger plants and constructing a
‘‘COMPETING APPLICATION’’ OR j. Deadline for filing motions to new 7–MW powerhouse about 150 feet
‘‘MOTION TO INTERVENE’’, as intervene and protests: 60 days from the upstream from the existing New Badger
applicable, and the Project Number of issuance date of this notice. plant site. Proposed project works
the particular application to which the All documents (original and eight would consist of: (1) A modified power
filing refers. Any of the above-named copies) should be filed with: Kimberly canal leading to; (2) a new powerhouse
documents must be filed by providing D. Bose, Secretary, Federal Energy with integral intake; and (3) two
the original and the number of copies Regulatory Commission, 888 First identical 3.5– to 3.6–MW horizontal
provided by the Commission’s Street, NE., Washington, DC 20426. Kaplan ‘‘S’’ type turbines. The Old
regulations to: The Secretary, Federal The Commission’s Rules of Practice Badger development would be
Energy Regulatory Commission, 888 require all intervenors filing documents converted to an alternative use. The
First Street, NE., Washington, DC 20426. with the Commission to serve a copy of New Badger development would be
A copy of any motion to intervene must that document on each person on the decommissioned, demolished, and
also be served upon each representative official service list for the project. removed. The existing service road
of the Applicant specified in the Further, if an intervenor files comments would be demolished and removed. The
particular application. or documents with the Commission tailrace area associated with the existing
t. Agency Comments—Federal, state, relating to the merits of an issue that Old Badger development would be
and local agencies are invited to file may affect the responsibilities of a filled with soil. A new service road
comments on the described application. particular resource agency, they must would be constructed over the filled
A copy of the application may be also serve a copy of the document on area. No significant changes are
obtained by agencies directly from the that resource agency. proposed for the Rapide Croche
Applicant. If an agency does not file Motions to intervene and protests may development.
comments within the time specified for be filed electronically via the Internet in The existing Badger and Rapide
filing comments, it will be presumed to lieu of paper. The Commission strongly Croche developments currently operate
have no comments. One copy of an encourages electronic filings. See 18 in run-of-river mode and as proposed,
agency’s comments must also be sent to CFR 385.2001(a)(1)(iii) and the the new project would continue to
mstockstill on PROD1PC66 with NOTICES

the Applicant’s representatives. instructions on the Commission’s Web operate in a run-of-river mode.
site (http://www.ferc.gov) under the ‘‘e- m. A copy of the application is
Kimberly D. Bose, available for review at the Commission
Filing’’ link.
Secretary. k. This application has been accepted, in the Public Reference Room or may be
[FR Doc. E7–23444 Filed 12–3–07; 8:45 am] but is not ready for environmental viewed on the Commission’s Web site at
BILLING CODE 6717–01–P analysis at this time. http://www.ferc.gov using the

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
68160 Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices

‘‘eLibrary’’ link. Enter the docket Kimberly D. Bose, document on the Applicant. In reference
number excluding the last three digits in Secretary. to filings initiating a new proceeding,
the docket number field to access the [FR Doc. E7–23454 Filed 12–3–07; 8:45 am] interventions or protests submitted on
document. For assistance, contact FERC BILLING CODE 6717–01–P or before the comment deadline need
Online Support at not be served on persons other than the
FERCOnlineSupport@ferc.gov or toll- Applicant.
free at 1–866–208–3676, or for TTY, DEPARTMENT OF ENERGY The Commission encourages
(202) 502–8659. A copy is also available electronic submission of protests and
Federal Energy Regulatory interventions in lieu of paper, using the
for inspection and reproduction at the
Commission FERC Online links at http://
address in item h above.
www.ferc.gov. To facilitate electronic
You may also register online at http:// Combined Notice of Filings #1 service, persons with Internet access
www.ferc.gov/docs-filing/ who will eFile a document and/or be
November 27, 2007.
esubscription.asp to be notified via e- listed as a contact for an intervenor
Take notice that the Commission has
mail of new filings and issuances must create and validate an
received the following Natural Gas
related to this or other pending projects. Pipeline Rate and Refund Report filings: eRegistration account using the
For assistance, contact FERC Online eRegistration link. Select the eFiling
Docket Numbers: RP07–319–001.
Support. link to log on and submit the
Applicants: Viking Gas Transmission
n. Anyone may submit a protest or a intervention or protests.
Company. Persons unable to file electronically
motion to intervene in accordance with Description: Viking Gas Transmission
should submit an original and 14 copies
the requirements of Rules of Practice Company submits Substitute Twelfth
of the intervention or protest to the
and Procedure, 18 CFR 385.210, Revised Sheet 5C to FERC Gas Tariff,
Federal Energy Regulatory Commission,
385.211, and 385.214. In determining First Revised Volume 1.
888 First St., NE., Washington, DC
the appropriate action to take, the Filed Date: 11/20/2007.
20426.
Commission will consider all protests Accession Number: 20071121–0122.
The filings in the above proceedings
filed, but only those who file a motion Comment Date: 5 p.m. Eastern Time
are accessible in the Commission’s
to intervene in accordance with the on Monday, December 3, 2007.
eLibrary system by clicking on the
Commission’s Rules may become a Docket Numbers: RP96–320–074. appropriate link in the above list. They
party to the proceeding. Any protests or Applicants: Gulf South Pipeline are also available for review in the
motions to intervene must be received Company, LP. Commission’s Public Reference Room in
on or before the specified deadline date Description: Gulf South Pipeline Washington, DC. There is an
for the particular application. Company, LP submits negotiated rate eSubscription link on the Web site that
contracts executed and its various enables subscribers to receive e-mail
All filings must (1) bear in all capital customers in relation to the East Texas
letters the title ‘‘PROTEST’’ or notification when a document is added
to Mississippi Expansion Project. to a subscribed dockets(s). For
‘‘MOTION TO INTERVENE;’’ (2) set Filed Date: 11/20/2007.
forth in the heading the name of the assistance with any FERC Online
Accession Number: 20071121–0080.
service, please e-mail
applicant and the project number of the Comment Date: 5 p.m. Eastern Time
FERCOnlineSupport@ferc.gov, or call
application to which the filing on Monday, December 3, 2007.
(866) 208–3676 (toll free). For TTY, call
responds; (3) furnish the name, address, Docket Numbers: RP99–176–144. (202) 502–8659.
and telephone number of the person Applicants: Natural Gas Pipeline Co.
protesting or intervening; and (4) of America, Natural Gas Co. of America. Nathaniel J. Davis, Sr.,
otherwise comply with the requirements Description: Natural Gas Pipeline Acting Deputy Secretary.
of 18 CFR 385.2001 through 385.2005. Company of America submits [FR Doc. E7–23446 Filed 12–3–07; 8:45 am]
Agencies may obtain copies of the Amendment 1 to the Transportation BILLING CODE 6717–01–P
application directly from the applicant. Rate Schedule FTS Agreement with
A copy of any protest or motion to Eagle Energy Partners 1, LP.
intervene must be served upon each Filed Date: 11/20/2007. ENVIRONMENTAL PROTECTION
representative of the applicant specified Accession Number: 20071120–0131. AGENCY
Comment Date: 5 p.m. Eastern Time
in the particular application. [EPA–R05–OAR–2007–0957; FRL–8501–2]
on Monday, December 3, 2007.
o. Procedural schedule: The Any person desiring to intervene or to
application will be processed according protest in any of the above proceedings Adequacy Status of the Kewaunee
to the following Hydro Licensing must file in accordance with Rules 211 County, Wisconsin, Submitted 8-Hour
Schedule. Revisions to the schedule will and 214 of the Commission’s Rules of Ozone Redesignation and Maintenance
be made as appropriate. Practice and Procedure (18 CFR 385.211 Plan for Transportation Conformity
and 385.214) on or before 5 p.m. Eastern Purposes
Issue Acceptance letter ...... November time on the specified comment date. It AGENCY: Environmental Protection
2007. is not necessary to separately intervene Agency (EPA).
Issue Scoping Document 1 April 2008. again in a subdocket related to a ACTION: Notice of adequacy.
for comments. compliance filing if you have previously
Issue Scoping Document 2 June 2008. intervened in the same docket. Protests SUMMARY: In this notice, EPA is
mstockstill on PROD1PC66 with NOTICES

(if necessary). will be considered by the Commission notifying the public that we have found
Notice of application is October 2008. in determining the appropriate action to that the motor vehicle emissions
ready for environmental
be taken, but will not serve to make budgets (MVEBs) for 8-hour ozone in
analysis.
protestants parties to the proceeding. Kewaunee County, Wisconsin are
Notice of the availability of June 2009.
the draft EA. Anyone filing a motion to intervene or adequate for conformity purposes. As a
protest must serve a copy of that result of our finding, Kewaunee County

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1