You are on page 1of 2

Federal Register / Vol. 72, No.

205 / Wednesday, October 24, 2007 / Notices 60331

of the Commission. Any successor to the directly with OMB and should address telephone at (202) 502–8415, by fax at
licensee may assign the rights of the a copy of those comments to the (202) 273–0873, and by e-mail at
original license but is subject to all of Commission as explained below. The michael.miller@ferc.gov.
the conditions of the license. Commission received no comments in SUPPLEMENTARY INFORMATION:
The information filed with the response to an earlier Federal Register
Commission is a mandatory requirement notice of June 6, 2007 (72 FR 31305) and Description
contained in the format of a written has made this notification in its The information collection submitted
application for transfer of license, submission to OMB. for OMB review contains the following:
executed jointly by the parties to the DATES: Comments on the collection of 1. Collection of Information: FERC–
proposed transfer. The transfer of a information are due by November 20, 515 ‘‘Declaration of Intention’’.
license may be occasioned by the sale or 2007. 2. Sponsor: Federal Energy Regulatory
merger of a licensed hydroelectric ADDRESSES: Address comments on the
Commission.
project. It is used by the Commission’s 3. Control No.: 1902–0079.
collection of information to the Office of The Commission is now requesting
staff to determine the qualifications of Management and Budget, Office of
the proposed transferee to hold the that OMB approve and reinstate with a
Information and Regulatory Affairs, three-year extension of the expiration
license, and to prepare the transfer of Attention: Federal Energy Regulatory
the license order. The Commission date, with no changes to the existing
Commission Desk Officer. Comments to collection. The information filed with
implements these requirements in the OMB should be filed electronically, c/o
Code of Federal Regulations (CFR) the Commission is mandatory.
oira_submission@omb.eop.gov and 4. Necessity of the Collection of
under 18 CFR Part 9 and 131.20. include the OMB Control No. as a point
5. Respondent Description: The Information: Submission of this
of reference. The Desk Officer may be information is necessary to enable the
respondent universe currently reached by telephone at 202–395–7345.
comprises 23 respondents (average) Commission to carry out its
A copy of the comments should also be responsibilities in implementing the
subject to the Commission’s jurisdiction sent to the Federal Energy Regulatory
6. Estimated Burden: 920 total hours, statutory provisions of Part I, Section
Commission, Office of the Executive 23(b) of the Federal Power Act (FPA).
23 respondents (average per year), 1 Director, ED–34, Attention: Michael
response per respondent, and 40 hours Section 23(b) authorizes the
Miller, 888 First Street NE., Washington, Commission to make a determination as
per response (average). DC 20426. Comments may be filed
7. Estimated Cost Burden to to whether it has jurisdiction over a
either in paper format or electronically. proposed hydroelectric project. Section
respondents: 920 hours/2080 hours per Those persons filing electronically do
years × $122,137 per year = $54,022. 23(b) also requires that any person
not need to make a paper filing. For intending to construct project works on
The cost per respondent is estimated to paper filings, such comments should be
be on average $2,349. navigable commerce clause waters must
submitted to the Office of the Secretary, file a declaration of their intention to do
Statutory Authority: Sections 4(e) and 8 of Federal Energy Regulatory Commission, so with the Commission. If the
the Federal Power Act (16 U.S.C. 792–828c). 888 First Street, NE. Washington, DC Commission finds the proposed project
Kimberly D. Bose, 20426 and should refer to Docket No. will have an impact on ‘‘interstate or
Secretary. IC07–515–001. foreign commerce’’, then person
Documents filed electronically via the intending to construct the project must
[FR Doc. E7–20883 Filed 10–23–07; 8:45 am]
Internet must be prepared in obtain a Commission license or
BILLING CODE 6717–01–P
WordPerfect, MS Word, Portable exemption before construction. Such
Document Format, or ASCII format. To sites are generally on streams defined as
file the document, access the U.S. navigation waters, and over which
DEPARTMENT OF ENERGY
Commission’s Web Site at www.ferc.gov the Commission has jurisdiction under
Federal Energy Regulatory and click on ‘‘Make an E-filing,’’ and its authority to regulate foreign and
Commission then follow the instructions for each interstate commerce. The information is
screen. First time users will have to collected in the form of a written
[Docket No. IC07–515–001, FERC–515] establish a user name and password. declaration, informing the Commission
The Commission will send an automatic of the applicant’s intent and used by
Commission Information Collection
acknowledgment to the sender’s E-mail Commission staff to research the
Activities, Proposed Collection;
address upon receipt of comments. User jurisdictional aspects of the project. A
Comment Request; Submitted for Omb
assistance for electronic filings is finding of non-jurisdictional by the
Review
available at 202–502–8258 or by e-mail Commission eliminates a substantial
October 15, 2007. to efiling@ferc.gov. Comments should paperwork burden for the applicant who
AGENCY: Federal Energy Regulatory not be submitted to the e-mail address. might otherwise have to file for a license
Commission. All comments are available for review or an exemption application.
ACTION: Notice.
at the Commission or may be viewed on The information filed with the
the Commission’s Web Site at http:// Commission is a mandatory
SUMMARY: In compliance with the www.ferc.gov, using the ‘‘eLibrary’’ link. requirement. The Commission
requirements of section 3507 of the Enter the docket number excluding the implements these filing requirements in
Paperwork Reduction Act of 1995, 44 last three digits in the docket number the Code of Federal Regulations (CFR)
U.S.C. 3507, the Federal Energy field to access the document. For under 18 Part 24.
Regulatory Commission (Commission) assistance, contact FERC Online 5. Respondent Description: The
has submitted the information Support at 202–502–6652 respondent universe currently
yshivers on PROD1PC62 with NOTICES

collection described below to the Office ferconlinesupport@ferc.gov or toll-free comprises 10 respondents (average)
of Management and Budget (OMB) for at (866) 208–3676, or for TTY, contact subject to the Commission’s
review and reinstatement of this (202) 502–8659. jurisdiction.
information collection requirement. Any FOR FURTHER INFORMATION CONTACT: 6. Estimated Burden: 800 total hours,
interested person may file comments Michael Miller may be reached by 10 respondent (average per year), 1

VerDate Aug<31>2005 15:33 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\24OCN1.SGM 24OCN1
60332 Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Notices

response per respondent, and 80 hours person; provided that such issuance or toll-free, (886) 208–3676 or TYY, (202)
per response (average). assumption is for some lawful object 502–8659.
7. Estimated Cost Burden to within the corporate purposes of Chien Specifically, DTI filed its application
respondents: 800 hours / 2080 hours per Energy, compatible with the public on behalf of PPL Gas Utilities
years × $122,137 per year = $46,975. interest, and is reasonably necessary or Corporation and as operator of the Tioga
Statutory Authority: Sections 23(b) of the appropriate for such purposes. Storage Complex. DTI proposes to plug
Federal Power Act (16 U.S.C. 816) The Commission reserves the right to and abandon wells TW–201 and TW–
require a further showing that neither 206 located in the West End Tioga
Kimberly D. Bose, public nor private interests will be Storage Pool. The certificated physical
Secretary. adversely affected by continued parameters, including total inventory,
[FR Doc. E7–20884 Filed 10–23–07; 8:45 am] approvals of Chien Energy’s issuance of reservoir pressure, reservoir and buffer
BILLING CODE 6717–01–P securities or assumptions of liability. boundaries, and certificated capacity
Copies of the full text of the Director’s will remain unchanged.
Order are available from the Any questions concerning this
DEPARTMENT OF ENERGY Commission’s Public Reference Room, application may be directed to Matthew
888 First Street, NE., Washington, DC R. Bley, Manager, Gas Transmission
Federal Energy Regulatory 20426. The Order may also be viewed Certificates, Dominion Transmission,
Commission on the Commission’s Web site at Inc., 120 Tredegar Street, Richmond, VA
[Docket No. ER07–1297–000] http://www.ferc.gov, using the eLibrary 23219, or telephone (804) 819–2877.
link. Enter the docket number excluding Any person or the Commission’s Staff
Chien Energy, LLC; Notice of Issuance the last three digits in the docket may, within 60 days after the issuance
of Order number filed to access the document. of the instant notice by the Commission,
Comments, protests, and interventions file pursuant to Rule 214 of the
October 17, 2007.
may be filed electronically via the Commission’s Procedural Rules (18 CFR
Chien Energy, LLC (Chien Energy)
internet in lieu of paper. See, 18 CFR 385.214) a motion to intervene or notice
filed an application for market-based
385.2001(a)(1)(iii) and the instructions of intervention and, pursuant to section
rate authority, with an accompanying
on the Commission’s Web site under the 157.205 of the Commission’s
rate schedule. The proposed market-
‘‘e-Filing’’ link. The Commission Regulations under the Natural Gas Act
based rate schedule provides for the sale
strongly encourages electronic filings. (NGA) (18 CFR 157.205) a protest to the
of energy and capacity at market-based
request. If no protest is filed within the
rates. Chien Energy also requested Kimberly D. Bose,
time allowed therefore, the proposed
waivers of various Commission Secretary.
activity shall be deemed to be
regulations. In particular, Chien Energy [FR Doc. E7–20891 Filed 10–23–07; 8:45 am] authorized effective the day after the
requested that the Commission grant BILLING CODE 6717–01–P time allowed for protest. If a protest is
blanket approval under 18 CFR part 34
filed and not withdrawn within 30 days
of all future issuances of securities and
after the time allowed for filing a
assumptions of liability by Chien DEPARTMENT OF ENERGY protest, the instant request shall be
Energy.
On October 16, 2007, pursuant to Federal Energy Regulatory treated as an application for
delegated authority, the Director, Commission authorization pursuant to section 7 of
Division of Tariffs and Market the NGA.
[Docket No. CP08–3–000] The Commission strongly encourages
Development—West, granted the
electronic filings of comments, protests,
requests for blanket approval under Part Dominion Transmission, Inc.; Notice of and interventions via the internet in lieu
34 (Director’s Order). The Director’s Request Under Blanket Authorization of paper. See 18 CFR 385.2001(a)(1)(iii)
Order also stated that the Commission
October 15, 2007. and the instructions on the
would publish a separate notice in the
Take notice that on October 3, 2007, Commission’s Web site (http://
Federal Register establishing a period of
Dominion Transmission, Inc (DTI), 120 www.ferc.gov) under the ‘‘e-Filing’’ link.
time for the filing of protests.
Tredegar Street, Richmond, VA 23219, Comment Date: December 14, 2007.
Accordingly, any person desiring to be
heard concerning the blanket approvals filed in Docket No. CP08–3–000 a prior Kimberly D. Bose,
of issuances of securities or assumptions notice request pursuant to sections Secretary.
of liability by Chien Energy, should file 157.205, 157.208 and 157.211 of the [FR Doc. E7–20881 Filed 10–23–07; 8:45 am]
a protest with the Federal Energy Commission’s regulations under the
BILLING CODE 6717–01–P
Regulatory Commission, 888 First Natural Gas Act (NGA) and DTI’s
Street, NE., Washington, DC 20426, in blanket certificate issued in Docket No.
accordance with Rules 211 and 214 of CP82–537–000 for authorization to plug DEPARTMENT OF ENERGY
the Commission’s Rules of Practice and and abandon two wells located in the
Procedure. 18 CFR 385.211, 385.214 Tioga Storage Complex in Tioga County, Federal Energy Regulatory
(2004). Pennsylvania, all as more fully set forth Commission
Notice is hereby given that the in the application, which is on file with
[Docket No. CP08–9–000]
deadline for filing protests is November the Commission and open to public
15, 2007. inspection. The filing may also be Enogex Inc.; Notice of Application for
Absent a request to be heard in viewed on the Web at http:// a Limited-Jurisdiction Certificate of
opposition to such blanket approvals by www.ferc.gov using the ‘‘eLibrary’’ link.
yshivers on PROD1PC62 with NOTICES

Public Convenience and Necessity


the deadline above, Chien Energy is Enter the docket number excluding the
authorized to issue securities and last three digits in the docket number October 15, 2007.
assume obligations or liabilities as a field to access the document. For Take notice that on October 9, 2007,
guarantor, indorser, surety, or otherwise assistance, contact FERC at Enogex Inc. (Enogex), tendered for filing
in respect of any security of another FERCOnlineSupport@ferc.gov or call an application in abbreviated form

VerDate Aug<31>2005 15:33 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\24OCN1.SGM 24OCN1

You might also like