You are on page 1of 2

Federal Register / Vol. 72, No.

180 / Tuesday, September 18, 2007 / Notices 53277

Any person may inspect the request Guidelines. Separate schedule DATES: Effective Date: The effective date
in person at the FAA office listed above facilitation is done at the airport level of the start of FAA’s review of the
under FOR FURTHER INFORMATION for international passenger flights associated noise compatibility program
CONTACT. operating at Terminal 5. Carriers also is September 7, 2007. The public
In addition, any person may, upon should file Terminal 5 schedules, if comment period ends November 6,
request, inspect the application, notice appropriate, to the address listed in the 2007.
and other documents relevant to the IATA Worldwide Scheduling FOR FURTHER INFORMATION CONTACT:
application in person at the Dallas/Fort Guidelines, Annex 3. Scott L. Seritt, Federal Aviation
Worth International Airport. DATES: Requests for international Administration, Atlanta Airports
Issued in Fort Worth, Texas on September schedule approval must be submitted no District Office, 1701 Columbia Avenue,
10, 2007. later than October 11, 2007. Suite 2–260, College Park, Georgia
Kelvin L. Solco, ADDRESSES: Requests may be submitted 30337, 404–305–7150. Comments on the
Manager, Airports Division. by mail to Slot Administration Office, proposed noise compatibility program
[FR Doc. 07–4604 Filed 9–17–07; 8:45 am] AGC–240, Office of the Chief Counsel, should also be submitted to the above
BILLING CODE 4910–13–M 800 Independence Ave., SW., office.
Washington, DC 20591; facsimile: 202– SUPPLEMENTARY INFORMATION: This
267–7277; ARINC: DCAYAXD; or by e- notice announces that the FAA is
DEPARTMENT OF TRANSPORTATION mail to: 7–AWA–slotadmin@faa.gov. reviewing a proposed Noise
FOR FURTHER INFORMATION CONTACT: Compatibility Program for Hartsfield-
Federal Aviation Administration Jackson Atlanta International Airport
Komal Jain, Regulations Division, Office
of the Chief Counsel, Federal Aviation which will be approved or disapproved
Notice of Submission Deadline for
Administration, 800 Independence on or before March 4, 2008. This notice
International Arrival Authorizations at
Avenue, SW., Washington, DC 20591; also announces the availability of this
Chicago O’Hare International Airport
telephone number: 202–267–3073. program for public review and
for the Summer 2008 Scheduling
comment.
Season Issued in Washington, DC on September
An airport operator who has
12th 2007.
AGENCY: Department of Transportation, submitted Noise Exposure Maps that are
James W. Whitlow,
Federal Aviation Administration (FAA). found by FAA to be in compliance with
Deputy Chief Counsel. the requirements of 14 CFR part 150,
ACTION: Notice of submission deadline.
[FR Doc. 07–4605 Filed 9–17–07; 8:45 am] promulgated pursuant to the Act, may
SUMMARY: The FAA announces on BILLING CODE 4910–13–M submit a Noise Compatibility Program
October 11, 2007, deadline for for FAA approval which sets forth the
submitting requests for international Measures the operator has taken or
Arrival Authorizations at Chicago DEPARTMENT OF TRANSPORTATION proposes to reduce existing non-
O’Hare International Airport (ORD) for compatible uses and prevent the
Federal Aviation Administration
allocation under 14 CFR 93.29. The introduction of additional non-
deadline coincides with the submission Receipt of Noise Compatibility compatible uses.
deadline established by the Program and Request for Review; The FAA has formally received the
International Air Transport Association Hartsfield-Jackson Atlanta Noise Compatibility Program for
(IATA) for the Summer 2008 Schedules International Airport, Atlanta, GA Hartsfield-Jackson Atlanta International
Conference. Airport, effective on September 7, 2007.
The U.S. summary scheduling season AGENCY: Federal Aviation The airport operator has requested that
is from March 9, 2008 through Administration, DOT. the FAA review this material and that
November 1, 2008, in recognition of the ACTION: Notice. the noise mitigation measures, to be
U.S. daylight saving time dates. The implemented jointly by the airport and
FAA is aware that the IATA summer SUMMARY: The Federal Aviation surrounding communities, be approved
2008 season is March 30, 2008 through Administration (FAA) announces that it as a Noise Compatibility Program under
October 25, 2008. The FAA will accept is reviewing a proposed Noise section 47504 of the Act. Preliminary
schedule changes that coincide with the Compatibility Program that was review of the submitted material
IATA scheduling season, rather than submitted for Hartsfield-Jackson Atlanta indicates that it conforms to the
U.S. daylight saving dates, in order to International Airport under the requirements for the submittal of Noise
ease the administrative burdens on provisions of 49 U.S.C. 47504 et. seq Compatibility Programs, but that further
carriers conducting international (the Aviation Safety and Noise review will be necessary prior to
operations and in order to ensure that Abatement Act hereinafter referred to as approval or disapproval of the program.
FAA has the most accurate schedule ‘‘the Act’’) and 14 CFR part 150 by the The formal review period, limited by
information. Schedules for the City of Atlanta, Georgia. This program law to a maximum of 180 days, will be
beginning or end of a U.S. scheduling was submitted subsequent to a completed on or before March 4, 2008.
season may be reviewed at the winter or determination by FAA that the The FAA’s detailed evaluation will be
summer schedules conference, as associated Noise Exposure Maps conducted under the provisions of 14
appropriate. submitted under 14 CFR part 150 for CFR Part 150, section 150.33. The
The FAA limits arrivals at ORD from Hartsfield-Jackson Atlanta International primary considerations in the
7 a.m. to 9 p.m., Central Time, Monday Airport were in compliance with evaluation process are whether the
through Friday, and 12 p.m. to 9 p.m., applicable requirements effective April proposed measures may reduce the level
pwalker on PROD1PC71 with NOTICES

on Sunday, based primarily on runway 10, 2007, and was published in the of aviation safety or create an undue
capacity limits. The FAA’s restrictions Federal Register on April 23, 2007. The burden on interstate or foreign
at ORD are the equivalent of a Level 3 proposed Noise Compatibility Program commerce, and whether they are
Full Coordinated Airport as used in the will be approved or disapproved on or reasonably consistent with obtaining the
IATA Worldwide Scheduling before March 4, 2008. goal of reducing existing non-

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
53278 Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices

compatible land uses and preventing the (Technology and Innovation, Reusable Hampton, Chief Financial Officer,
introduction of additional non- Launch Vehicle, Risk Management, and Metropolitan Washington Airport
compatible land uses. Launch Operations and Support) will be Authority at the following address: 1
Interested persons are invited to held on Wednesday, October 10, 2007. Aviation Circle, Washington, DC 2001–
comment on the proposed program with For specific information concerning the 6000.
specific reference to these factors. All times and locations of the working Air carriers and foreign air carriers
comments relating to these factors, other group meetings, contact the Contact may submit copies of written comments
than those properly addressed to local Person listed below. previously provided to the Metropolitan
land use authorities, will be considered Individuals who plan to attend and Washington Airport Authority under
by the FAA to the extent practicable. need special assistance, such as sign section 158.23 of part 158.
Copies of the Noise Exposure Maps, the language interpretation or other
FOR FURTHER INFORMATION CONTACT: Luis
FAA’s evaluation of the maps, and the reasonable accommodations, should
inform the Contact Person listed below Loarte, Airport Planner, Washington
proposed Noise Compatibility Program
in advance of the meeting. Airports District Office (ADO), 23723
are available for examination at the
Air Freight Lane, Suite 210, Dulles,
following locations: Federal Aviation FOR FURTHER INFORMATION CONTACT:
Virginia, 20166, (703) 661–1365.
Administration, Atlanta Airports Brenda Parker (AST–100), Office of
District Office, 1701 Columbia Avenue, Commercial Space Transportation, 800 The application may be reviewed in
Suite 2–260, College Park, Georgia Independence Avenue, SW., Room 331, person at this same location.
30337. Washington, DC 20591, telephone (202) SUPPLEMENTARY INFORMATION: The FAA
Questions may be directed to the 267–3674; e-mail proposes to rule and invites public
individual named above under the brenda.parker@faa.gov. comment on the application to impose
heading, FOR FURTHER INFORMATION Issued in Washington, DC, September 7, a PFC at Ronald Reagan Washington
CONTACT. 2007. National Airport (DCA), and use the
Issued in College Park, Georgia, on Patricia G. Smith, Revenue from the PFC at Washington
September 7, 2007. Associate Administrator for Commercial
Dulles International Airport (IAD) under
Scott L. Seritt, Space Transportation. the provisions of 49 U.S.C. 40117 and
Manager, Atlanta Airports District Office. [FR Doc. 07–4607 Filed 9–13–07; 11:09 am]
Part 158 of the Federal Aviation
Regulations (14 CFR part 158).
[FR Doc. 07–4603 Filed 9–17–07; 8:45 am] BILLING CODE 4910–13–P
BILLING CODE 4910–13–M
On June 21, 2007, the FAA
determined that the application to
DEPARTMENT OF TRANSPORTATION impose and use the revenue from a PFC
DEPARTMENT OF TRANSPORTATION submitted by Metropolitan Washington
Federal Aviation Administration Airport Authority was substantially
Federal Aviation Administration complete within the requirements of
Notice of Intent to Rule on Application section 158.25 of part 158. The FAA
Commercial Space Transportation 07–08–C–00–DCA to impose a will approve or disapprove the
Advisory Committee—Open Meeting Passenger Facility Charge (PFC) at application, in whole or in part, no later
Ronald Reagan Washington National than October 21, 2007.
AGENCY: Federal Aviation Airport (DCA), Alexandria, Virginia and
Administration (FAA), DOT. The following is a brief overview of
use the Revenue from the PFC at the application.
ACTION: Notice of Commercial Space Washington Dulles International
Transportation Advisory Committee Proposed charge effective date:
Airport (IAD), Dulles, VA
Open Meeting. January 1, 2011.
AGENCY: Federal Aviation Proposed charge expiration date: May
SUMMARY: Pursuant to section 10(a)(2) of Administration (FAA), DOT. 1, 2014.
the Federal Advisory Committee Act ACTION: Notice of intent to rule on Level of the proposed PFC: $4.50.
(Pub. L. 92–463, 5 U.S.C. App. 2), notice application. Total estimated PFC revenue:
is hereby given of a meeting of the $124,914,400.
Commercial Space Transportation SUMMARY: The FAA proposes to rule and
Advisory Committee (COMSTAC). The invites public comment on the Brief description of proposed
meeting will take place on Thursday, application to impose a PFC at Ronald project(s): Expansion of the
October 11, 2007, starting at 8 a.m. at Reagan Washington National Airport International Arrival Building (IAB).
the Federal Aviation Administration (DCA), and use the Revenue from the Class or classes of air carriers which
Headquarters Building, 800 PFC at Washington Dulles International the public agency has requested not be
Independence Avenue SW., Airport (IAD) under the provisions of required to collect PFCs: Non
Washington, DC., in the Bessie Coleman the 49 U.S.C. 40117 and part 158 of the Scheduled/On Demand Air Carriers
Conference Center, located on the 2nd Federal Aviation Regulations (14 CFR Filing Form 1800–31.
Floor. This will be the forty-sixth part 158). Any person may inspect the
meeting of the COMSTAC. DATES: Comments must be received on application in person at the FAA office
The proposed agenda for the meeting or before October 18, 2007. listed above under FOR FURTHER
will feature briefings on Operationally ADDRESSES: Comments on this INFORMATION CONTACT and at the FAA
Responsive Space and China’s space application may be mailed or delivered regional airports office located at: 159–
activities, a report on activities in the in triplicate to the FAA at the following 30 Rockaway Blvd, Jamaica, New York.
FAA Office of Commercial Space address: Washington Airports District In addition, any person may, upon
pwalker on PROD1PC71 with NOTICES

Transportation (AST), and COMSTAC Office (ADO), 23723 Air Freight Lane, request, inspect the application, notice
Working Group reports. An agenda will Suite 210, Dulles, Virginia, 20166. and other documents germane to the
be posted on the FAA Web site at In addition, one copy of any application in person at the
http://ast.faa.gov. Meetings of the comments submitted to the FAA must Metropolitan Washington Airport
COMSTAC Working Groups be mailed or delivered to Lynn Authority.

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1

You might also like