Federal Register / Vol. 72, No.

76 / Friday, April 20, 2007 / Notices 19919

appropriate action to be taken, but will and charging unjust and unreasonable DEPARTMENT OF ENERGY
not serve to make protestants parties to rates because the respondents have
the proceeding. Any person wishing to misclassified certain interconnection- Federal Energy Regulatory
become a party must file a notice of related facilities in the Hot Spring-EAI Commission
intervention or motion to intervene, as Interconnection Agreement and is
appropriate. Such notices, motions, or refusing to provide transmission credits [Docket No. CP07–8–000]
protests must be filed in accordance for facilities that should properly be
with the provisions of Section 154.210 classified as Network Upgrades under Guardian Pipeline, L.L.C; Notice of
of the Commission’s regulations (18 CFR the Commission’s Interconnection Availability of the Draft Environmental
154.210). Anyone filing an intervention Policy. Impact Statement for the Guardian
or protest must serve a copy of that Expansion and Extension Project
document on the Applicant. Anyone The complainant states that copies of
the Complaint have been served on the April 13, 2007.
filing an intervention or protest on or
before the intervention or protest date respondents. The staff of the Federal Energy
need not serve motions to intervene or Any person desiring to intervene or to Regulatory Commission (FERC or
protests on persons other than the protest this filing must file in Commission) has prepared this draft
Applicant. accordance with Rules 211 and 214 of Environmental Impact Statement (EIS)
The Commission encourages for the construction and operation of the
the Commission’s Rules of Practice and
electronic submission of protests in lieu natural gas pipeline facilities (referred
Procedure (18 CFR 385.211, 385.214).
of paper using the ‘‘eFiling’’ link at to as the G–II Project or Project) as
Protests will be considered by the
http://www.ferc.gov. Persons unable to proposed by Guardian Pipeline, L.L.C.
Commission in determining the (Guardian) in the above-referenced
file electronically should submit an appropriate action to be taken, but will
original and 14 copies of the protest to docket.
not serve to make protestants parties to The draft EIS was prepared to satisfy
the Federal Energy Regulatory
the proceeding. Any person wishing to the requirements of the National
Commission, 888 First Street, NE.,
become a party must file a notice of Environmental Policy Act (NEPA). The
Washington, DC 20426.
The filing is accessible on-line at intervention or motion to intervene, as FERC staff concludes that approval of
http://www.ferc.gov, using the appropriate. The Respondent’s answer the G–II Project, with appropriate
‘‘eLibrary’’ link and is available for and all interventions, or protests must mitigating measures as recommended,
review in the Commission’s Public be filed on or before the comment date. would have limited adverse
Reference Room in Washington, DC. The Respondent’s answer, motions to environmental impact. The draft EIS
There is an ‘‘eSubscription’’ link on the intervene, and protests must be served evaluates alternatives to the proposal,
Web site that enables subscribers to on the Complainants. including system alternatives and
receive e-mail notification when a The Commission encourages pipeline route alternatives.
document is added to a subscribed electronic submission of protests and The Bureau of Indian Affairs, the U.S.
docket(s). For assistance with any FERC interventions in lieu of paper using the Army Corps of Engineers (COE) are
Online service, please e-mail ‘‘eFiling’’ link at http://www.ferc.gov. federal cooperating agencies for the
FERCOnlineSupport@ferc.gov, or call Persons unable to file electronically development of this EIS. The State of
(866) 208–3676 (toll free). For TTY, call should submit an original and 14 copies Wisconsin Department of Natural
(202) 502–8659. of the protest or intervention to the Resources is also a cooperating agency.
Federal Energy Regulatory Commission, Cooperating agencies have jurisdiction
Philis J. Posey,
by law or have special expertise with
Deputy Secretary. 888 First Street, NE., Washington, DC
respect to any environmental impact
[FR Doc. E7–7515 Filed 4–19–07; 8:45 am] 20426.
involved with the proposal and is
BILLING CODE 6717–01–P This filing is accessible on-line at involved in the NEPA analysis or
http://www.ferc.gov, using the similar type of environmental analysis.
‘‘eLibrary’’ link and is available for The purpose of the G–II Project is to
DEPARTMENT OF ENERGY review in the Commission’s Public provide the facilities necessary to
Federal Energy Regulatory Reference Room in Washington, DC. provide about 537,200 decatherms per
Commission There is an ‘‘eSubscription’’ link on the day of additional natural gas capacity to
Web site that enables subscribers to Guardian’s existing pipeline system.
[Docket No. EL07–54–000] receive e-mail notification when a The proposed additional capacity would
document is added to a subscribed facilitate the transport of natural gas to
Hot Spring Power Company, LP,
docket(s). For assistance with any FERC customers within the state of Wisconsin
Complainant v. Entergy Arkansas, Inc.,
Online service, please e-mail and provide those customers with the
Entergy Services, Inc., Respondents;
FERCOnlineSupport@ferc.gov, or call necessary infrastructure to support
Notice of Complaint
(866) 208–3676 (toll free). For TTY, call growth and competition within the
April 16, 2007. (202) 502–8659. natural gas marketplace. Guardian
Take notice that on April 13, 2007, proposes to have the project constructed
Comment Date: 5 p.m. Eastern Time and operational by November 2008.
pursuant to Section 206 of the Federal on May 3, 2007.
Power Act, Hot Spring Power Company, The draft EIS addresses the potential
LP (complainant) filed a formal Philis J. Posey, environmental effects of the
complaint against Entergy Arkansas, construction and operation of the
sroberts on PROD1PC70 with NOTICES

Deputy Secretary.
Inc. and Entergy Services, Inc. [FR Doc. E7–7510 Filed 4–19–07; 8:45 am] following natural gas pipeline facilities:
(respondents) alleging that the • 83.6 miles of 30-inch-diameter
BILLING CODE 6717–01–P
respondents are violating the natural gas pipeline in Jefferson, Dodge,
Commission’s Interconnection Policy, Fond du Lac, Calumet, Brown, and
engaging in prohibited ‘‘and’’ pricing, Outagamie Counties, Wisconsin;

VerDate Aug<31>2005 18:52 Apr 19, 2007 Jkt 211001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1
19920 Federal Register / Vol. 72, No. 76 / Friday, April 20, 2007 / Notices

• 25.9 miles of 20-inch-diameter www.ferc.gov under the ‘‘Documents who requested a copy of the draft EIS
natural gas pipeline in Brown and and Filings’’ link. or provided comments during scoping;
Outagamie Counties, Wisconsin; In addition to or in lieu of sending libraries; newspapers; and parties to this
• two new 39,000 horsepower (hp) written comments, we invite you to proceeding.
electric motor driven compressor attend the public comment meeting Additional information about the
stations including the Sycamore scheduled as follows: project is available from the
Compressor Station located in the May 15, 2007, 7 p.m. (CST) Commission’s Office of External Affairs,
Sycamore Township in DeKalb County, Radisson Hotel and Conference Center at 1–866–208-FERC or on the FERC
Illinois and the Bluff Creek Compressor of Green Bay 2040 Airport Drive Internet Web site (http://www.ferc.gov).
Station located in the Town of La Green Bay, WI US To access information via the FERC
Grange in Walworth County, Wisconsin; Telephone: (920) 405–6404 Web site click on the ‘‘eLibrary’’ link
• modifications to the existing Ixonia May 16, 2007, 7 p.m. (CST) then click on ‘‘General Search’’ and
Meter Station in Jefferson County, Bauer Ramada Plaza Hotel 1 North enter the docket number excluding the
Wisconsin and the construction of seven Main Street last three digits in the Docket Number
new meter stations in the Counties of Fond Du Lac, WI 54935 field. Be sure you have selected an
Dodge, Fond du Lac, Calumet, Brown, Telephone: (920) 923–3000 appropriate date range. The ‘‘eLibrary’’
and Outagamie Counties, Wisconsin; May 17, 2007, 7 p.m. (CST) link provides access to the texts for
• two new pig launcher facilities Olympia Conference Center 1350 formals documents issued by the
including a 30-inch launcher within Royale Mile Road Commission, such as orders, notices,
Guardian’s existing Ixonia Meter Station Oconomowoc, WI 53066 and rulemakings. For assistance with
in Jefferson County, Wisconsin; a 30- Telephone: (262) 369–4969 ‘‘eLibrary’’, please contact FERC Online
inch-diameter receiver and 20-inch- The public comment meetings will be Support at FERCOnlineSupport@
diameter launcher within the proposed posted on the FERC’s calendar located ferc.gov or toll free at 1–866–208–3676,
Fox Valley Meter Station in Brown at http://www.ferc.gov/EventCalendar/ or for TTY, contact (202) 502–8659.
County, Wisconsin; and a 20-inch- EventsList.aspx. Interested parties and In addition, the Commission now
diameter receiver within the proposed individuals are encouraged to attend offers a free service called eSubscription
West Green Bay Meter Station in and present oral comments on the draft which allows you to keep track of all
Outagamie County Wisconsin; and EIS. Transcripts of the meetings will be formal issuances and submittals in
• six new mainline valves (MLV), prepared. specific dockets. This can reduce the
four of which would occur along the 30- After these comments are reviewed, amount of time you spend researching
inch-diameter pipeline in the counties any significant new issues are proceedings by automatically providing
of Dodge, Fond du Lac, and Calumet, investigated, and modifications are you with notification of these filings,
Wisconsin and two which would occur made to the draft EIS, a final EIS will document summaries and direct links to
along the 20-inch-diameter pipeline in be published and distributed by the the documents. To learn more about
Brown and Outagamie Counties, FERC staff. The final EIS will contain ‘‘eSubscription’’ and to sign up for this
Wisconsin. the staff’s responses to timely comments service please go to http://www.ferc.gov/
Project construction would be received on the draft EIS. esubscribenow.htm.
initiated in the spring of 2008 and Comments will be considered by the
would be completed for a proposed in- Commission but will not serve to make Kimberly D. Bose,
service date in November 2008. the commentor a party to the Secretary.
proceeding. Any person seeking to [FR Doc. E7–7566 Filed 4–19–07; 8:45 am]
Comment Procedures and Public
become a party to the proceeding must BILLING CODE 6717–01–P
Meetings
file a motion to intervene pursuant to
Any person wishing to comment on Rule 214 of the Commission’s Rules of
the draft EIS may do so. To ensure Practice and Procedures (18 CFR DEPARTMENT OF ENERGY
consideration prior to a Commission 385.214). Anyone may intervene in this
decision on the proposal, it is important proceeding based on this draft EIS. You Federal Energy Regulatory
that we receive your comments before must file your request to intervene as Commission
the date specified below. Please specified above.1 You do not need [Docket No. CP07–32–000]
carefully follow these instructions to intervenor status to have your
ensure that your comments are received comments considered. Gulf South Pipeline Company, LP;
and properly recorded: The draft EIS has been placed in the Notice of Availability of the Draft
• Send an original and two copies of public files of the FERC and is available Environmental Impact Statement for
your comments to: Kimberly D. Bose, for distribution and public inspection the Proposed Southeast Expansion
Secretary, Federal Energy Regulatory at: Federal Energy Regulatory Project
Commission, 888 First Street, NE., Commission, Public Reference Room,
Room 1A, Washington, DC 20426. April 13, 2007.
888 First Street, NE., Room 2A,
• Label one copy of the comments for Washington, DC 20426, (202) 502–8371. The staff of the Federal Energy
the attention of the Gas Branch 1, DG2E; A limited number of hard copies and Regulatory Commission (FERC or
and Reference Docket No. CP07–8–000 CD copies of the draft EIS are available Commission) has prepared a Draft
on the original and both copies. from the Public Reference Room Environmental Impact Statement (EIS)
• Mail your comments so that they identified above. Copies of the draft EIS on the natural gas pipeline facilities
will be received in Washington, DC on have been mailed to federal, state, and proposed by Gulf South Pipeline
or before May 29, 2007. Company, LP (Gulf South) in the above-
sroberts on PROD1PC70 with NOTICES

local agencies; public interest groups;


Please note that the Commission referenced docket.
individuals and affected landowners
strongly encourages electronic filing The Draft EIS was prepared to satisfy
(‘‘eFiling’’) of comments. Instructions on 1 Interventions may also be filed electronically via the requirements of the National
how to ‘‘eFile’’ can be found on the the Internet in lieu of paper. See the previous Environmental Policy Act. The FERC
Commission’s Web site at http:// discussion on filing comments electronically. staff concludes that the proposed

VerDate Aug<31>2005 18:52 Apr 19, 2007 Jkt 211001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\20APN1.SGM 20APN1