You are on page 1of 2

Federal Register / Vol. 72, No.

54 / Wednesday, March 21, 2007 / Notices 13271

Any person or the Commission’s staff Docket Numbers: ER02–1175–003. Accession Number: 20070314–0080.
may, within 60 days after issuance of Applicants: Boralex Fort Fairfield, LP. Comment Date: 5 p.m. Eastern Time
the instant notice by the Commission, Description: Boralex Ft Fairfield, LP on Monday, April 02, 2007.
file pursuant to Rule 214 of the submits Revised Original Sheet 1 to Docket Numbers: ER07–617–000.
Commission’s Procedural Rules (18 CFR FERC Electric Tariff, First Revised Applicants: Carolina Power & Light
385.214) a motion to intervene or notice Original Volume 1 in compliance Company.
of intervention and pursuant to Section w/Designation of Electric Rate Schedule Description: Carolina Power & Light
157.205 of the regulations under the Sheets, Order 614. Co. dba Progress Energy Carolinas, Inc.
NGA (18 CFR 157.205), a protest to the Filed Date: 03/12/2007. requests to amend its Large Generator
request. If no protest is filed within the Accession Number: 20070314–0053. Interconnection Agreement to add
time allowed therefore, the proposed Comment Date: 5 p.m. Eastern Time Appendix N etc., with an effective date
activity shall be deemed to be on Monday, April 02, 2007. of 2/13/07.
authorized effective the day after the Docket Numbers: ER02–2330–046. Filed Date: 03/12/2007.
time allowed for filing a protest. If a Applicants: New England Power Pool. Accession Number: 20070314–0081.
protest is filed and not withdrawn Description: ISO New England, Inc. Comment Date: 5 p.m. Eastern Time
within 30 days after the allowed time submits the eighteenth of the required on Monday, April 02, 2007.
for filing a protest, the instant request Standard Market Design Status Report Docket Numbers: ER07–618–000.
shall be treated as an application for pursuant to the Commission’s 9/20/02 Applicants: American Transmission
authorization pursuant to Section 7 of Order. Systems, Inc.
the NGA. Filed Date: 03/12/2007. Description: American Transmission
Accession Number: 20070314–0051. Systems, Inc., acting on its own behalf
Philis J. Posey, Comment Date: 5 p.m. Eastern Time as well as an agent for Ohio Edison
Acting Secretary. on Monday, April 02, 2007. Company submits a Construction
[FR Doc. E7–5122 Filed 3–20–07; 8:45 am] Docket Numbers: ER07–423–001. Agreement, Open Access Transmission
BILLING CODE 6717–01–P Applicants: South Carolina Electric & Tariff, Service Agreement 353, effective
Gas Company. 2/9/07.
Description: South Carolina Electric & Filed Date: 03/12/2007.
DEPARTMENT OF ENERGY Gas Company submits its responses to Accession Number: 20070314–0060.
FERC’s 2/9/07 deficiency letter. Comment Date: 5 p.m. Eastern Time
Federal Energy Regulatory
Filed Date: 03/12/2007. on Monday, April 02, 2007.
Commission
Accession Number: 20070314–0059. Any person desiring to intervene or to
Combined Notice of Filings #1 Comment Date: 5 p.m. Eastern Time protest in any of the above proceedings
on Monday, April 02, 2007. must file in accordance with Rules 211
March 15, 2007. Docket Numbers: ER07–606–000. and 214 of the Commission’s Rules of
Take notice that the Commission Applicants: Duke Energy Indiana, Inc. Practice and Procedure (18 CFR 385.211
received the following electric rate Description: Duke Energy Indiana, and 385.214) on or before 5:00 p.m.
filings. Inc. submits the updated summary Eastern time on the specified comment
Docket Numbers: ER98–4652–004. schedules for the Transmission and date. It is not necessary to separately
Applicants: Boralex Stratton Energy, Local Facilities Agreement for the intervene again in a subdocket related to
LP. calendar year 2005 w/Wabash Valley a compliance filing if you have
Description: Boralex Stratton Energy, Power Association, Inc. etc. previously intervened in the same
LP submits FERC Electric Tariff, First Filed Date: 03/07/2007. docket. Protests will be considered by
Revised Volume 1. Accession Number: 20070309–0559.
Filed Date: 03/12/2007. the Commission in determining the
Comment Date: 5 p.m. Eastern Time appropriate action to be taken, but will
Accession Number: 20070314–0057. on Wednesday, March 28, 2007.
Comment Date: 5 p.m. Eastern Time not serve to make protestants parties to
on Monday, April 02, 2007. Docket Numbers: ER07–615–000. the proceeding. Anyone filing a motion
Applicants: Southern California to intervene or protest must serve a copy
Docket Numbers: ER01–2568–004.
Applicants: Boralex Ashland, LP. Edison Company. of that document on the Applicant. In
Description: Boralex Ashland, LP Description: Southern California reference to filings initiating a new
submits tariff sheets to FERC Electric Edison Company submits a Large proceeding, interventions or protests
Tariff, First Revised Volume 1. Generator Interconnection Agreement submitted on or before the comment
Filed Date: 03/12/2007. among Walnut Creek Energy LLC and deadline need not be served on persons
Accession Number: 20070314–0058. California Independent System Operator other than the Applicant.
Comment Date: 5 p.m. Eastern Time Corporation. The Commission encourages
on Monday, April 02, 2007. Filed Date: 03/12/2007. electronic submission of protests and
Docket Numbers: ER01–2569–004. Accession Number: 20070314–0079. interventions in lieu of paper, using
Applicants: Boralex Livermore Falls, Comment Date: 5 p.m. Eastern Time the FERC Online links at http://
LP. on Monday, April 02, 2007. www.ferc.gov. To facilitate electronic
Description: Boralex Livermore Falls, Docket Numbers: ER07–616–000. service, persons with Internet access
LP submits Revised Original Sheet 1 to Applicants: Carolina Power & Light who will eFile a document and/or be
FERC Electric Tariff, Revised Original Company. listed as a contact for an intervenor
Volume 1 in compliance w/Designation Description: Carolina Power & Light must create and validate an
of Electric Rate Schedule Sheets, Order Co. dba Progress Energy Carolinas, Inc. eRegistration account using the
jlentini on PROD1PC65 with NOTICES

614. submits an amendment to Large eRegistration link. Select the eFiling


Filed Date: 03/12/2007. Generator Interconnection Agreement to link to log on and submit the
Accession Number: 20070314–0052. add Appendix N, a dynamic schedule intervention or protests.
Comment Date: 5 p.m. Eastern Time arrangement etc., effective 2/13/07. Persons unable to file electronically
on Monday, April 02, 2007. Filed Date: 03/12/2007. should submit an original and 14 copies

VerDate Aug<31>2005 17:08 Mar 20, 2007 Jkt 211001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1
13272 Federal Register / Vol. 72, No. 54 / Wednesday, March 21, 2007 / Notices

of the intervention or protest to the i. FERC Contacts: Sean Murphy at spillway; (d) a 112-foot-long
Federal Energy Regulatory Commission, (202) 502–6145 or embankment wall situated above the
888 First St. NE., Washington, DC sean.murphy@ferc.gov. powerhouse; and (e) a 429.25-foot-long
20426. j. Site Visit: The Applicant and FERC earth embankment; (2) a 4,072 acre
The filings in the above proceedings staff will conduct a series of project site reservoir with a normal water surface
are accessible in the Commission’s visits beginning at 8 a.m. on March 26, elevation of 935 feet above msl; (4) a
eLibrary system by clicking on the 27, 29, and 30, 2007. All interested powerhouse integral to the dam,
appropriate link in the above list. They individuals, organizations, and agencies situated between the gated spillway and
are also available for review in the are invited to attend. Anyone with the earth embankment, containing two
Commission’s Public Reference Room in questions about the site visits should vertical Francis-type turbines directly
Washington, DC. There is an contact the applicant. connected to two generators, each rated
eSubscription link on the Web site that k. This application is not ready for at 18,000 kW for a total installed
enables subscribers to receive e-mail environmental analysis at this time. capacity of 35.7 MW; and (5) other
notification when a document is added l. The existing Catawba-Wateree appurtenances.
to a subscribed dockets(s). For Project consists of eleven developments: 4. The Lookout Shoals development
assistance with any FERC Online 1. The Bridgewater development consists of the following existing
consists of the following existing facilities: (1) The Lookout Shoals dam
service, please e-mail
facilities: (1) The Catawba dam consisting of: (a) A 282.08-foot-long
FERCOnlineSupport@ferc.gov. or call
consisting of: (a) A 1,650-foot-long, 125- concrete gravity bulkhead section; (b) a
(866) 208–3676 (toll free). For TTY, call
foot-high earth embankment; (b) a 305- 933-foot-long uncontrolled concrete
(202) 502–8659.
foot-long, 120-foot-high concrete gravity gravity ogee spillway; (c) a 65-foot-long
Philis J. Posey, ogee spillway; and (c) a 850-foot-long, gravity bulkhead section; and (d) a
Acting Secretary. 125-foot-high earth embankment; (2) the 1,287-foot-long, 88-foot-high earth
[FR Doc. E7–5129 Filed 3–20–07; 8:45 am] Paddy Creek dam consisting of: a 1,610- embankment; (2) a 1,155 acre reservoir
BILLING CODE 6717–01–P
foot-long, 165-foot-high earth with a normal water surface elevation of
embankment; (3) the Linville dam 838.1 feet above msl; (3) a powerhouse
consisting of: a 1,325-foot-long, 160- integral to the dam, situated between
DEPARTMENT OF ENERGY foot-high earth embankment; (4) a 430- the bulkhead on the left bank and the
foot-long uncontrolled low overflow ogee spillway, containing three main
Federal Energy Regulatory weir spillway situated between Paddy vertical Francis-type turbines and two
Commission Creek Dam and Linville Dam; (5) a 6,754 smaller vertical Francis-type turbines
acre reservoir formed by Catawba, directly connected to five generators,
[Project No.: P–2232–522] Paddy Creek, and Linville with a normal three main generators rated at 8,970 kW,
water surface elevation of 1,200 feet and two smaller rated at 450 kW for a
Duke Energy Carolinas LLC; Notice of above mean-sea-level (msl); (6) a 900- total installed capacity of 25.7 MW; and
Site Visits foot-long concrete-lined intake tunnel; (4) other appurtenances.
(7) a powerhouse containing two 5. The Cowans Ford development
March 15, 2007. vertical Francis-type turbines directly consists of the following existing
Take notice that the following connected to two generators, each rated facilities: (1) The Cowans Ford dam
hydroelectric application was filed with at 10,000 kilowatts (kW), for a total consisting of: (a) A 3,535-foot-long
Commission and is available for public installed capacity of 20.0 megawatts embankment; (b) a 209.5-foot-long
inspection: (MW); and (8) other appurtenances. gravity bulkhead; (c) a 465-foot-long
a. Type of Application: New Major 2. The Rhodhiss development consists concrete ogee spillway with eleven
License. of the following existing facilities: (1) Taintor gates, each 35-feet-wide by 25-
b. Project No.: P–2232–522. The Rhodhiss dam consisting of: (a) A feet-high; (d) a 276-foot-long bulkhead;
c. Dates filed: August 29, 2006. 119.58-foot-long concrete gravity and (e) a 3,924-foot-long earth
d. Applicant: Duke Energy Carolinas, bulkhead; (b) a 800-foot-long, 72-foot- embankment; (2) a 3,134-foot-long
LLC. high concrete gravity ogee spillway; (c) saddle dam (Hicks Crossroads); (3) a
e. Name of Project: Catawba-Wateree a 122.08-foot-long concrete gravity 32,339 acre reservoir with a normal
Hydroelectric Project. bulkhead with an additional 8-foot-high water surface elevation of 760 feet above
f. Locations: The Catawba-Wateree floodwall; and (d) a 283.92-foot-long msl; (4) a powerhouse integral to the
Project is located on the Catawba River rolled fill earth embankment; (2) a 2,724 dam, situated between the spillway and
in Alexander, Burke, Caldwell, Catawba, acre reservoir with a normal water the bulkhead near the right
Gaston, Iredell, Lincoln, McDowell, and surface elevation of 995.1 feet above embankment, containing four vertical
Mecklenburg counties, North Carolina, msl; (4) a powerhouse integral to the Kaplan-type turbines directly connected
and on the Catawba and Wateree Rivers dam, situated between the bulkhead on to four generators rated at 83,125 kW for
in the counties of Chester, Fairfield, the left bank and the ogee spillway a total installed capacity of 332.5 MW;
Kershaw, Lancaster, and York, South section, containing three vertical and (5) other appurtenances.
Carolina. There are no federal lands Francis-type turbines directly connected 6. The Mountain Island development
affected by this project. to three generators, two rated at 12,350 consists of the following existing
g. Filed Pursuant to: Federal Power kW, one rated at 8,500 kW for a total facilities: (1) The Mountain Island dam
Act, 16 U.S.C. 791(a)–825(r). installed capacity of 28.4 MW; and (5) consisting of: (a) A 997-foot-long, 97-
h. Applicant Contacts: Jeffrey G. other appurtenances. foot-high uncontrolled concrete gravity
Lineberger, Catawba-Wateree Hydro 3. The Oxford development consists ogee spillway; (b) a 259-foot-long
jlentini on PROD1PC65 with NOTICES

Relicensing Manager; and E. Mark of the following existing facilities: (1) bulkhead on the left side of the
Oakley, Catawba-Wateree Relicensing The Oxford dam consisting of: (a) A powerhouse; (c) a 200-foot-long
Project Manager, Duke Energy, Mail 74.75-foot-long soil nail wall; (b) a 193- bulkhead on the right side of the
Code EC12Y, P.O. Box 1006, Charlotte, foot-long emergency spillway; (c) a 550- powerhouse; (d) a 75-foot-long concrete
NC 28201–1006. foot-long gated concrete gravity core wall; and (e) a 670-foot-long, 140-

VerDate Aug<31>2005 17:08 Mar 20, 2007 Jkt 211001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1