Federal Register / Vol. 71, No.

132 / Tuesday, July 11, 2006 / Notices 39089

so indicate by writing to the Secretary 385.214. In determining the appropriate with the Commission and is available
of the Commission. action to take, the Commission will for public inspection:
n. Competing Preliminary Permit: consider all protests or other comments a. Type of Application: Preliminary
Ayone desiring to file a competing filed, but only those who file a motion Permit.
application for preliminary permit for a to intervene in accordance with the b. Project No.: 12691–000.
proposed project must submit the Commission’s Rules may become a c. Date Filed: June 15, 2006.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: Public Utility District
of intent to file such an application, to protests, or motions to intervene must No. 1 of Snohomish County,
the Commission on or before the be received on or before the specified Washington.
specified comment date for the comment date for the particular e. Name of Project: Agate Passage
particular application (see 18 CFR 4.36). application. Tidal Energy Project.
Submission of a timely notice of intent Comments, protests and interventions f. Location: The project would be
allows an interested person to file the may be filed electronically via the located in a section of Agate Passage in
competing preliminary permit Internet in lieu of paper; See 18 CFR Puget Sound, between the north end of
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions Bainbridge Island and the Kitsap
the specified comment date for the on the Commission’s Web site under ‘‘e- Peninsula in Kitsap County,
particular application. A competing filing’’ link. The Commission strongly Washington.
preliminary permit application must g. Filed Pursuant to: Federal Power
encourages electronic filing.
conform with 18 CFR 4.30(b) and 4.36. Act, 16 U.S.C. 791(a)–825(r).
s. Filing and Service of Responsive h. Applicant Contacts: Mr. Steven
o. Competing Development
Documents: Any filings must bear in all Klein, General Manager, P.O. Box 1107,
Application: Any qualified development
capital letter the title ‘‘COMMENTS’’, 2320 California Street, Everett, WA
applicant desiring to file a competing
‘‘RECOMMENDATIONS FOR TERMS 98206, (425) 783–8473.
development application must submit to
AND CONDITIONS’’, ‘‘PROTEST’’, i. FERC Contact: Chris Yeakel, (202)
the Commission, on or before a
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE 502–8132.
specified comment date for the
OF INTENT’’, or ‘‘COMPETING j. Deadline for filing comments,
particular application, either a
APPLICATION’’, as applicable, and the protests, and motions to intervene: 60
competing development application or a
Project Number of the particular days from the issuance date of this
notice of intent to file such an
application. Submission of a timely application to which the filing refers. notice.
notice of intent to file a development Any of the above-named documents The Commission’s Rules of Practice
application allows an interested person must be filed by providing the original and Procedure require all intervenors
to file the competing application no and the number of copies provided by filing documents with the Commission
later than 120 days after the specified the Commission’s regulations to: The to serve a copy of that document on
comment date for the particular Secretary, Federal Energy Regulatory each person in the official service list
application. A competing license Commission, 888 First Street, NE., for the project. Further, if an intervenor
application must conform with 18 CFR Washington, DC 20426. A copy of any files comments or documents with the
4.30(b) and 4.36. motion to intervene must also be served Commission relating to the merits of an
p. Notice of Intent: A notice of intent upon each representative of the issue that may affect the responsibilities
must specify the exact name, business Applicant specified in the particular of a particular resource agency, they
address, and telephone number of the application. must also serve a copy of the document
prospective applicant, and must include t. Agency Comments: Federal, State, on that resource agency.
an unequivocal statement of intent to and local agencies are invited to file k. Description of Project: The
submit, if such an application may be comments on the described application. proposed project would consist of: (1)
filed, either a preliminary permit A copy of the application may be Tidal In Stream Energy Conversion
application or a development obtained by agencies directly from the (TISEC) devices consisting of, (2)
application (specify which type of applicant. If an agency does not file rotating propeller blades 3 meters in
application). A notice of intent must be comments within the time specified for diameter, (3) integrated generators with
served on the applicant(s) named in this filing comments, it will be presumed to a capacity of 50 kW, (4) anchoring
public notice. have no comments. One copy of an systems, (5) mooring lines; and (6)
q. Proposed Scope of Studies under agency’s comments must also be sent to interconnection transmission lines. The
Permit: A preliminary permit, if issued, the Applicant’s representatives. project is estimated to have an annual
does not authorize construction. The generation of 146.2 gigawatt-hours per
Magalie R. Salas,
term of the proposed preliminary permit year, which would be distributed by the
Secretary.
would be 36 months. The work Snohomish County Public Utility
proposed under the preliminary permit [FR Doc. E6–10801 Filed 7–10–06; 8:45 am] District.
would include economic analysis, BILLING CODE 6717–01–P l. Locations of Applications: A copy of
preparation of preliminary engineering the application is available for
plans, and a study of environmental inspection and reproduction at the
impacts. Based on the results of these DEPARTMENT OF ENERGY Commission in the Public Reference
studies, the Applicant would decide Federal Energy Regulatory Room, located at 888 First Street, NE.,
whether to proceed with the preparation Commission Room 2A, Washington, DC 20426, or by
of a development application to calling (202) 502–8371. This filing may
construct and operate the project. Notice of Application Accepted for also be viewed on the Commission’s
r. Comments, Protests, or Motions to Web site at http://www.ferc.gov using
sroberts on PROD1PC70 with NOTICES

Filing and Soliciting Motions To


Intervene: Anyone may submit Intervene, Protests, and Comments the ‘‘eLibrary’’ link. Enter the docket
comments, a protest, or a motion to number excluding the last three digits in
intervene in accordance with the July 3, 2006. the docket number field to access the
requirements of Rules of Practice and Take notice that the following document. For assistance, call toll-free
Procedure, 18 CFR 385.210, 385.211, hydroelectric application has been filed 1–866–208–3676 or e-mail

VerDate Aug<31>2005 16:49 Jul 10, 2006 Jkt 208001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\11JYN1.SGM 11JYN1
39090 Federal Register / Vol. 71, No. 132 / Tuesday, July 11, 2006 / Notices

FERCOnlineSupport@ferc.gov. For TTY, of a development application to DEPARTMENT OF ENERGY


call (202) 502–8659. A copy is also construct and operate the project.
available for inspection and Federal Energy Regulatory
r. Comments, Protests, or Motions To
reproduction at the address in item h Commission
Intervene: Anyone may submit
above. comments, a protest, or a motion to
m. Individuals desiring to be included Notice of Application Accepting for
intervene in accordance with the Filing and Soliciting Motions To
on the Commission’s mailing list should
requirements of Rules of Practice and Intervene, Protests and Comments
so indicate by writing to the Secretary
Procedure, 18 CFR 385.210, 385.211,
of the Commission. July 3, 2006.
385.214. In determining the appropriate
n. Competing Preliminary Permit: Take notice that the following
Anyone desiring to file a competing action to take, the Commission will
consider all protests or other comments hydroelectric application has been filed
application for preliminary permit for a with the Commission and is available
proposed project must submit the filed, but only those who file a motion
to intervene in accordance with the for public inspection:
competing application itself, or a notice a. Type of Application: Preliminary
of intent to file such an application, to Commission’s Rules may become a
Permit.
the Commission on or before the party to the proceeding. Any comments,
b. Project No.: 12693–000.
specified comment date for the protests, or motions to intervene must c. Date Filed: June 16, 2006.
particular application (see 18 CFR 4.36). be received on or before the specified d. Applicant: Sutton Hydroelectric
Submission of a timely notice of intent comment date for the particular Company LLC.
allows an interested person to file the application. e. Name of Project: Sutton
competing preliminary permit Comments, protests and interventions Hydroelectric Project.
application no later than 30 days after may be filed electronically via the f. Location: On Elk River, in Sutton,
the specified comment date for the Internet in lieu of paper; See 18 CFR Braxton County, West Virginia. The
particular application. A competing 385.2001 (a)(1)(iii) and the instructions Sutton Dam is owned and operated by
preliminary permit application must on the Commission’s Web site under the U.S. Army Corps of Engineers.
conform with 18 CFR 4.30(b) and 4.36. ‘‘e-filing’’ link. The Commission g. Filed Pursuant to: Federal Power
o. Competing Development strongly encourages electronic filing. Act, 16 U.S.C. 791(a)–825(r).
Application: Any qualified development h. Applicant Contacts: Mr. M. Clifford
applicant desiring to file a competing s. Filing and Service of Responsive Phillips, Advanced Hydro Solutions
development application must submit to Documents: Any filings must bear in all LLC, 150 North Miller Road, Suite 450
the Commission, on or before a capital letters the title ‘‘COMMENTS’’, C, Fairlawn, OH 44333, (330) 869–8451.
specified comment date for the ‘‘RECOMMENDATIONS FOR TERMS i. FERC Contact: Etta Foster, (202)
particular application, either a AND CONDITIONS’’, ‘‘PROTEST’’, 502–8769.
competing development application or a ‘‘COMPETING APPLICATION’’ OR j. Deadline for filing comments,
notice of intent to file such an ‘‘MOTION TO INTERVENE’’, as protests, and motions to intervene: 60
application. Submission of a timely applicable, and the Project Number of days from the issuance date of this
notice of intent to file a development the particular application to which the notice.
application allows an interested person filing refers. Any of the above-named All documents (original and eight
to file the competing application no documents must be filed by providing copies) should be filed with Magalie R.
later than 120 days after the specified the original and the number of copies Salas, Secretary, Federal Energy
comment date for the particular provided by the Commission’s Regulatory Commission, 888 First
application. A competing license regulations to: The Secretary, Federal Street, NE., Washington, DC 20426.
application must conform with 18 CFR Energy Regulatory Commission, 888 Please include the project number (P–
4.30(b) and 4.36. First Street, NE., Washington, DC 20426. 12693–000) on any comments, protests,
p. Notice of Intent: A notice of intent A copy of any motion to intervene must or motions filed.
must specify the exact name, business also be served upon each representative k. Description of Project: The
address, and telephone number of the of the Applicant specified in the proposed project would utilize the
prospective applicant, and must include existing U.S. Army Corps of Engineers’
particular application.
an unequivocal statement of intent to Sutton Dam and would consist of: (1) A
submit, if such an application may be t. Agency Comments: Federal, State, proposed powerhouse containing 2 or 3
filed, either a preliminary permit and local agencies are invited to file vertical turbine/generating units with a
application or a development comments on the described application. nominal total generating capacity of 12
application (specify which type of A copy of the application may be MW; (2) a 10-foot-diameter penstock; (3)
application). A notice of intent must be obtained by agencies directly from the a proposed 3⁄4 mile-long, 14.7 kV
served on the applicant(s) named in this Applicant. If an agency does not file transmission line; (4) a tailrace, and (5)
public notice. comments within the time specified for appurtenant facilities.
q. Proposed Scope of Studies under filing comments, it will be presumed to The project would have an estimated
Permit: A preliminary permit, if issued, have no comments. One copy of an annual generation of approximately
does not authorize construction. The agency’s comments must also be sent to 50,000 MWH. The applicant plans to
term of the proposed preliminary permit the Applicant’s representatives. sell the generated energy.
would be 36 months. The work l. Location of Application: A copy of
proposed under the preliminary permit Magalie R. Salas, the application is available for
would include economic analysis, Secretary. inspection and reproduction at the
sroberts on PROD1PC70 with NOTICES

preparation of preliminary engineering [FR Doc. E6–10802 Filed 7–10–06; 8:45 am] Commission in the Public Reference
plans, and a study of environmental BILLING CODE 6717–01–P Room, located at 888 First Street, NE.,
impacts. Based on the results of these Room 2A, Washington, DC 20426, or by
studies, the Applicant would decide calling (202) 502–8371. This filing may
whether to proceed with the preparation also be viewed on the Commission’s

VerDate Aug<31>2005 16:49 Jul 10, 2006 Jkt 208001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\11JYN1.SGM 11JYN1