You are on page 1of 12

No. Anglo American Sur S.A.

DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.

Rev

Quantity

Description

Unit
Price

Extension

1.1 WORK INCLUDED


Furnish all labor, equipment, materials and services
required for the design, fabrication, tagging, testing,
preparation for shipment and delivery, supervision of
erection and commissioning assistance associated
to the supply of the twenty-Four (24) Tanks and
ancillary equipments. All equipment shall be in
accordance with the Technical Specifications, Data
Sheets and Drawings listed in Section 2 and
Technical Notes in Section 1.3 below. The equipment
shall be complete and operational when installed in
accordance with Sellers instructions, and include all
necessary accessories except as specifically
excluded in Section 1.2 below. The work shall
include, but not be limited to, the following items:
0.001

25Lot

Drawings and Data for Tanks in accordance with


attached Drawing and Data Requirements, Section
3.

0.002

25 Lot

Supplier Quality Surveillance in accordance with


attached Supplier Quality Surveillance, Section 5.

0.003

25 Lot

Export preparation and packing charges for the


Tanks and ancillary equipment.

0.004

25 Lot

Expediting and Scheduling Reports in accordance


with attached Expediting Requirements, Section 7.

0.005

1 Lot

Sellers Service Engineer for erection and preoperational testing of equipment at the jobsite.
Sellers
service
engineer
shall
sign
the
documentation confirming that the equipment has
been installed in accordance with the manufacturer
requirements.
Quote the daily rate for normal work days, daily rate
for holidays, hourly overtime rate for normal work
days, hourly overtime rate for holidays, quote the
number of persons, and expected total number of
days required for Sellers service engineer.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 2 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.
0.006

Rev

Quantity

1 Lot

Description

Unit
Price

Extension

Sellers Service Engineer for commissioning of the


equipment. Sellers service engineer shall sign the
documentation confirming that the equipment has
been commissioned in accordance with the
manufacturer requirements.
Quote the daily rate for normal work days, daily rate
for holidays, hourly overtime rate for normal work
days, hourly overtime rate for holidays, quote the
number of persons, and expected total number of
days required for Sellers service engineer

0.007

1 Lot

Training of operators and maintenance personnel at


jobsite.

0.008

25 Lot

2 millimeter stainless steel tags firmly attached by


stainless steel wire or stainless steel screws to each
item and instrument which is shipped disassembled.
Each tag shall be stamped with:
a)
b)

Purchase Order Number


Purchase Order Item Number
c) Equipment or Instrument Tag Number specified
by Buyer.
0.009

1 Lot

Recommended Spare Parts and consumables for


pre-operational testing, including 30% minimum
spare power and control fuses of each size & type.
Submit a priced list including a description and
manufacturers part number for each spare part.

0.010

1 Lot

Recommended Spare Parts and consumables for


commissioning, including 30% minimum spare power
and control fuses of each size & type. Submit a
priced list including a description and manufacturers
part number for each spare part.

0.011

1 Lot

Recommended Spare Parts for one (1) year of


operation & maintenance. Submit a priced list
including a description and manufacturers part
number for each spare part.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 3 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.

Rev

Quantity

Description

0.012

1 Lot

Recommended Capital and Strategic spare parts.


This shall include all those spares of longer delivery
time which can be defined as strategic for the
operation of the equipment. Submit a priced list
including a description and manufacturers part
number for each spare part.

0.013

25 Lot

Excel spreadsheet templates in accordance with


Seller Data List Input Sheets, Section 2.

0.014

25 Lot

Inland freight to Ex-work for Tanks and ancillary


equipment.

0.015

1 Lot

SPECIAL TOOLS

Unit
Price

Extension

Seller shall include two separate lists, Special Tool


for Construction and Special tools for Maintenance,
including the following, if applicable:
a) All eyebolts and other lifting devices.
Special wrenches.
0.016

1 Lot

Safety Manual, as per section 3.

0.017

1 Lot

Part and Component Manual at Link One Format, as


per section 3.

0.018

1 Lot

Bolting hardware
Supplier to provide all bolting hardware (bolts, nuts,
washers and fastener) required for assembling and
erecting the complete equipment including holddown bolts if required. Amount of hardware will be
100 % plus an additional 10 % per bolt size.
Hardware is to meet bolt specification N 25414-1383PS-SS01-00001 Supply of Structural Steel and
Miscellaneous Metal.
This hardware is to be bagged and tagged for each
separate piece of equipment and shipped within the
same crate as the equipment itself.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 4 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.
1.000

Rev
C

2.000

Quantity
1 EA

Description
ESTANQUE ALMACENAMIENTO CONCENT. MOLY
#1
Constr. A.C. c/ soporte agitador 4520-AGA-006,
Revestido en Neopreno
TAG N: 4520-TKS-006
DATA SHEET: 25414-138-MTD-MTS0-00002

1 EA

ESTANQUE ALMACENAMIENTO CONCENT. MOLY


#2
Constr. A.C. c/ soporte agitador 4520-AGA-007,
Revestido en Neopreno
TAG N: 4520-TKS-007
DATA SHEET: 25414-138-MTD-MTS0-00003

3.000

1 EA

ESTANQUE ALMACENAMIENTO CONCENT. MOLY


#3
Constr. A.C. c/ soporte agitador 4520-AGA-008,
Revestido en Neopreno
TAG N: 4520-TKS-008
DATA SHEET: 25414-138-MTD-MTS0-00004

4.000

1 EA

ESTANQUE ALMACENAMIENTO & DISTRIBUCION


DIESEL
Constr. A.C.
TAG N: 4520-TKS-014
DATA SHEET: 25414-138-MTD-MTS0-00005

5.000

1 EA

ESTANQUE ALMACENAMIENTO ACIDO


SULFURICO
Constr. A.C. y boquillas in Ac. Inox. A304-L
TAG N: 4520-TKS-015
DATA SHEET: 25414-138-MTD-MTS0-00006

6.000

1 EA

ESTANQUE CONSUMO DIARIO ACIDO


SULFURICO
Constr. A.C. y boquillas in Ac. Inox. A304-L
TAG N: 4520-TKS-016
DATA SHEET: 25414-138-MTD-MTS0-00007

7.000

1 EA

ESTANQUE PREPARACION P-4000


Constr. A.C.
TAG N: 4520-TKS-017
DATA SHEET: 25414-138-MTD-MTS0-00008

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Unit
Price

Extension

Page 5 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.
8.000

Rev
C

9.000

Quantity
1 EA

Description
ESTANQUE DISTRIBUIDOR P-4000
Constr. A.C.
TAG N: 4520-TKS-018
DATA SHEET: 25414-138-MTD-MTS0-00009

1 EA

ESTANQUE DIARIO NaHS


Constr. Ac. Inoxidable A-304 L
TAG N: 4520-TKS-033
DATA SHEET: 25414-138-MTD-MTS0-00010

10.000

1 EA

ESTANQUE DIARIO DIESEL PLANTA MOLY


Constr. A.C.
TAG N: 4520-TKS-057
DATA SHEET: 25414-138-MTD-MTS0-00011

11.000

1 EA

ESTANQUE DE AGUA LAVADO FILTROS


Constr. A.C.
TAG N: 4540-TKS-011
DATA SHEET: 25414-138-MTD-MTS0-00012

12.000

1 EA

ESTANQUE ALMACENAMIENTO COLECTOR


PRIMARIO
Constr. Ac. Inoxidable A-304
TAG N: 4550-TKS-021
DATA SHEET: 25414-138-MTD-MTS0-00013

13.000

1 EA

ESTANQUE PREPARACION COLECTOR


SECUNDARIO
Constr. Ac. Inoxidable A-304 c/ soporte agitador
4550-AGA-022
TAG N: 4550-TKS-022
DATA SHEET: 25414-138-MTD-MTS0-00014

14.000

1 EA

ESTANQUE ALMACENAMIENTO COLECTOR


SECUNDARIO
Constr. Ac. Inoxidable A-304 c/ soporte agitador
4550-AGA-023
TAG N: 4550-TKS-023
DATA SHEET: 25414-138-MTD-MTS0-00015

15.000

1 EA

ESTANQUE ALMACENAMIENTO ESPUMANTE # 1


Constr. A.C.
TAG N: 4550-TKS-024
DATA SHEET: 25414-138-MTD-MTS0-00016

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Unit
Price

Extension

Page 6 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.
16.000

Rev
C

17.000

Quantity
1 EA

Description
ESTANQUE ALMACENAMIENTO ESPUMANTE # 2
Constr. A.C.
TAG N: 4550-TKS-025
DATA SHEET: 25414-138-MTD-MTS0-00017

1 EA

ESTANQUE DIARIO ESPUMANTE # 1


Constr. A.C.
TAG N: 4550-TKS-026
DATA SHEET: 25414-138-MTD-MTS0-00018

18.000

1 EA

ESTANQUE DIARIO ESPUMANTE # 2


Constr. A.C.
TAG N: 4550-TKS-027
DATA SHEET: 25414-138-MTD-MTS0-00019

19.000

1 EA

ESTANQUE DIARIO COLECTOR PRIMARIO


Constr. Ac. Inoxidable A-304
TAG N: 4550-TKS-041
DATA SHEET: 25414-138-MTD-MTS0-00020

20.000

1 EA

ESTANQUE ALMACENAMIENTO REACTIVO


RESERVA
Constr. Ac. Inoxidable A-304 c/ soporte agitador
4550-AGA-042
TAG N: 4550-TKS-042
DATA SHEET: 25414-138-MTD-MTS0-00021

21.000

1 EA

ESTANQUE DIARIO REACTIVO DE RESERVA


Constr. Ac. Inoxidable A-304 c/ soporte agitador
4550-AGA-043
TAG N: 4550-TKS-043
DATA SHEET: 25414-138-MTD-MTS0-00022

22.000

1 EA

ESTANQUE PREPARACION AYUDA FILTRANTE


Constr. AC. Revestido en resina c/ soporte agitador
4550-AGA-044
TAG N: 4550-TKS-044
DATA SHEET: 25414-138-MTD-MTS0-00023

23.000

1 EA

Unit
Price

Extension

ESTANQUE DIARIO DIESEL PLANTA FLOTACION


Cu-Mo
Constr. A.C.
TAG N: 4550-TKS-065
DATA SHEET: 25414-138-MTD-MTS0-00024

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 7 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.
24.000

Rev
C

25.000

26.000

1 EA

PRECIOS UNITARIOS

26.001

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno, vulcanizado en caliente de 6 mm de
espesor.

26.002

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en caliente de 12 mm de
espesor.

26.003

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en caliente de 25 mm de
espesor

26.004

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en fro de 6 mm de espesor.

26.005

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en fro de 12 mm de espesor.

26.006

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en fro de 25 mm de espesor.

26.007

1 M2

Precio unitario ($/m2) por recubrimiento de


Neopreno vulcanizado en caliente de 25 mm de
espesor.

26.008

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en caliente de 6 mm de
espesor.

26.009

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en caliente de 12 mm de

Quantity
0 EA

0 EA

Description

Unit
Price

Extension

ESTANQUE ALMACENAMIENTO #1 LECHADA DE


CAL LAS TORTOLAS
(ELIMINATED)
ESTANQUE ALMACENAMIENTO #2 LECHADA DE
CAL LAS TORTOLAS
(ELIMINATED)

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 8 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.

Rev

Quantity

Description

Unit
Price

Extension

espesor.
26.010

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en caliente de 25 mm de
espesor

26.011

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en fro de 6 mm de espesor.

26.012

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en fro de 12 mm de espesor.

26.013

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en fro de 25 mm de espesor.

26.014

1 M2

Precio unitario ($/m2) por recubrimiento de Goma


Natural Vulcanizada en caliente de 25 mm de
espesor.

26.015

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 2" dimetro.

26.016

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 3" dimetro.

26.017

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 4" dimetro.

26.018

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 6" dimetro.

26.019

1 EA

26.020

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 10" dimetro.

26.021

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 12" dimetro.

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 8" dimetro.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 9 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.

Rev

Quantity

Description

26.022

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 20" dimetro.

26.023

1 EA

Precio unitario ($/un) para boquillas de acero A-105,


150 # de 24" dimetro.

26.024

1 EA

Precio unitario ($/kg) para manto, techo y fondo de


Estanque.

26.025

1 M2

Precio unitario ($/m2) por recubrimiento de Resina

27.000

1 M2

ESTANQUE ALMACENAMIENTO AGUA POTABLE


Constr. A.C.
TAG N: 4282-TKS-076
DATA SHEET: 25414-138-MTD-MTS0-00027

Unit
Price

Extension

Each Equipment assembly shall include, but not


limited to, the following:
a) Manufacturer's standard accessories
b) Shop assembly and testing.
c) Surface preparation, prime and finish painting in
accordance with pre approved manufacturer's
standard.
d) Preparation for shipment.
e) Foundation and foundation bolts design.
f) Piping, Fitting and Valves.
g) Seller shall provide all structures, stairs and
ladders, covers, walkways, platforms and
handrails. Ready to be erected by others.
h) Seller shall provide the Agitator Supports
i) Quote shall include structures total weight and
unit price (USD/tonnes).
j) Engineering.
k) Start up assistance.
l) All tanks used for storage mineral slurry should
Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 10 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Item
No.

Rev

Quantity

Description
have nozzle of sacrifice (wear) according to
measure indicated in the data sheet.
m) All tanks shall include at roof, a spare nozzle
(with blind flange 3 mm and gasket, diameter 6.
n) All manhole (roof and sheel), correspondent 3
mm gasket.

Unit
Price

Extension

1.2 WORK NOT INCLUDED


a) Receiving and unloading at the jobsite.
b) Field installation labor and tools.
c) Foundation and foundation bolts.
d) Utilities comprising plant air and electrical feeders.
e) Electrical wiring and conduit external to the equipment.
f)

Motor starters and control panels.

g) Piping and tubing external to the equipment.

1.3 TECHNICAL NOTES


1.3.1

General

a) Definitions :
Special tools for erection: those tools required to allow the erector to complete the
installation of equipment, which can not be carried out using standard tools.
Special tools for maintenance: those tools required to allow operations to perform
appropriate maintenance of the equipment, which can not be carried out using standard
tools.
Spares parts for pre-operational testing: spares parts required during the erection and preoperations phase. This phase includes running of motors, loop checking, balancing of
equipment, hydrotesting but does not involve the introduction of feed

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 11 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING


Spares parts for commissioning: spares parts required during the commissioning phase.
This phase involves the introduction of feed and ramp up to full production.
Spares parts for one year operations: spare parts required for the one year of operations.
These parts are those that would normally be used during planned maintenance and also
includes those parts that have a high probability of failure.
Capital spares: these are spares with a long delivery time or the risk of downtime is very
high if the parts are not readily available. This category includes complete spare or spare
components such as pumps.
b) Seller Quality System shall meet Group I Requirements in accordance with General
Specification "Supplier Quality System Requirements" No. 25414-138-2QS-Q06L00002. All dimensions on drawing shall be in SI units.
1.3.2

Mechanical

a) Seller shall contact the Buyer in writing for resolution of conflicts between documents listed
in Section 2.
b) All calculations and dimensions on drawings shall be in the metric SI unit system. Additional
English units within brackets are acceptable.
c) Complete design and supply for all mechanical components and systems shall be in
accordance with Technical Specification for Mechanical Equipment N 25414-138-3PSM000-00001, Especificacin Tcnica para Calderera Fabricada en Taller N25414-1383PS-MTS0-00001 Especificacin Tcnica de Materiales para Caeras, Fitting y Vlvulas
N 25414-138-3PS-P000-00001.
d) All exposed metal surfaces shall be prepared, primed and finish painted according to
Technical Specification for shop priming and painting, N 25414-138-3GS-NX00-00001.
Seller standard shall be accepted previously approved by buyer.
e) All tie-ins shall be flanged connection as per ASME B31.3, class # 150.
f)

All manholes (roof and shell) shall be 24(600mm) unless other diameter specifically
indicated.

g) All tanks shall include all pipe nozzles flanges.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 12 of 13

No. Anglo American Sur S.A.


DLB-REQ-1000-ME-2014

MATERIAL REQUISITION NO.

25414-138-MRA-MTS0-00001

Rev. C

SECTION 1 SCOPE OF WORK AND PRICING

1.3.3

Civil

a) Structural design shall be in accordance with Criterio de Diseo Civil Estructural N 25414138-3DR-S15L-00001.
b) Snow loads shall be in accordance with Chilean Standard NCh 431 and recommendation
given by ASCE 7.
c) For seismic calculations, the Chilean Seismic Standard shall apply. See Code N NCh 2369,
edition 2003, or latest, for a seismic zone 2. The seismic design shall be revised and
certified by a competent Chilean consultant firm.
d) Wind loads shall be determined in accordance with Chilean Standard N NCh 432 and
ASCE 7, for topics not covered by the Chilean Codes. Basic pressures will be 118 kg/m2 for
Las Trtolas.
e) Seller shall deliver anchorage loads in accordance with Technical Specification for
Structural Requirements for Mechanical Equipment N 25414-138-3PS-S000-00001.
f)

All welding processes shall be in accordance with the latest edition of Structural Welding
CodeSteel, standard AWS D1.1.

g) All platforms and ladder shall be according to drawing:


o

General Estandar Acero Notas Generales

N 25414-138-S0-1000-00101

General Estandar Acero Barandas

N 25414-138-S0-1000-00102

General Estandar Acero Escaleras

N 25414-138-S0-1000-00103

h) All structures and ancillary platforms shall be ready to install by others. Any modification
required at site due fabrication failures, to be back charged to seller.

Electronic documents, once printed, are uncontrolled and may become outdated.
Refer to the electronic documents in Project InfoWorks for current revision.
BECHTEL Confidential BECHTEL 2008. All rights reserved

Page 13 of 13

You might also like