You are on page 1of 149

National Highways Authority of India

(Ministry of Shipping Road Transport & Highways)


Government of India

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000
( end of Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the
State of Madya Pradesh, Package - ADB-II/C- 8

Consultant: Renardet S.A. JV with ICT in a/s Feedback.


Contractor: Ssangyong Engineering & Construction Co. Ltd.

75%
IPC-50
For the month of Oct-2011

Volume - I (A)

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping Road Transport & Highways)
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS


CONTRACT PACKAGE: ADB-II/C - 8

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

75%
IPC-50

For the month of Oct-2011


PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping Road Transport & Highways)
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS


CONTRACT PACKAGE: ADB-II/C - 8

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

Measurment Sheets
75%
IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping Road Transport & Highways)
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS


CONTRACT PACKAGE: ADB-II/C - 8

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

Bill of Quantities
75%
IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping Road Transport & Highways)
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS

CONTRACT PACKAGE: ADB-II/C - 8

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

Material Advance

IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

75%

Escalation(BASE)

IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

Cross Section

IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

NATIONAL HIGHWAYS AUTHORITY OF INDIA


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Government of India

ASIAN DEVELOPMENT BANK FUNDED PROJECTS

Name of Work: Four Laning of Jhansi Lakhanadon Section from Km. 297+000 ( end of
Grade Separator at Rajmarg Chowraha) to 351+000 on NH - 26 in the State of Madya
Pradesh, Package - ADB-II/C- 8

75%

Complience of Letter No. TL/NSP/1060/10-173/8B

IPC-50

PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NORTH - SOUTH CORRIDOR PROJECT
PIU, NARSINGHPUR, MADHYA PRADESH.

Renaedet,Switherland
In association with
ICT & Feedback, New Delhi
NH-26, Narsinghpur, Madya Pradesh.

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km.


351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II /
C-8
IPC-50 FOR THE MONTH OF OCT-2011

IPC INDEX
Sl. No.

Description

Top Sheet IPC -50

Hold Statement Sheet

Interest Calculation Over


Mobilization/Equipment Advance

BOQ Summary

BOQ

Material Advance & Invoices

Summary of Escalation and its


Enclousures

Measurement Sheet

10

Complience of Letter No.


TL/NSP/1060/10-173/8B

Reference Page

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km.


351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II /
C-8
IPC-49 (100%)

IPC INDEX
Sl. No.

Description

Quality Certificate

Certification of Labour Law

Material Indeminity Bond

Percentage Check of NHAI

Percentage Check of TL

Percentage Check of RE

Combined Top Sheet IPC -49

Top Sheet

Hold/Release Statement

10

Interest Calculation Over


Mobilization/Equipment Advance

11

BOQ Summary

12

BOQ

13

Material Advance & Invoices

14

Summary of Escalation and its


Enclousures

15

Measurement Sheet

16

Complience of Letter No.


TL/NSP/1060/10-173/8B

17

Royality Statement

18

Approved RFIs and its Enclousures

Reference Page

Quality Certificate
[100% Certification of IPC-49, Package C-8]
It is here-by certified that all the executed items at site as claimed here in IPC-49 for the month of Sep 2011 have
been checked in respect of quantity as well as quality and found to confirm to the contract specifications.

L.N.Tiku

M.P.Asthana

Silvio Gerardi

Resident Engineer, Package C-8

Sr.Bridge Engineer

Sr. Pavement Material Engineer

Renardet S.A./ ICT / Feedback

Renardet S.A./ ICT / Feedback

Renardet S.A./ ICT / Feedback

Efren. L.Bacani
Team Leader / Engineers Representative
Renardet S.A./ ICT / Feedback

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

IPC-50 FOR THE MONTH OF OCTOBER -2011


Certificate of Percentage Check of work done during the month of Sep -2011

BOQ Item

Unit

Quantity for
the Month

BOQ Rate after


rebate

Amount

Quantity Checked

Amount of Quantity
Checked

MB Ref.

Percentage Check

6.21(c)

Cum

99.900

3672.00

366833

149.420

548670

MB No.63/Page No.87

3.00%

Total BOQ Amount Checked

548670.00

Manager Technical

Project Director

Package-ADB-II/C-8

Package-ADB-II/C-7,8,9

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

IPC-50 FOR THE MONTH OF OCTOBER -2011


Certificate of Percentage Check of work done during the month of Sep -2011
Designation : Team Leader

BOQ Item

Unit

Quantity for
the Month

BOQ Rate after


rebate

Amount

Quantity Checked

Amount of Quantity
Checked

MB Ref.

6.21(b)

Cum

89.14

4364.00

389007

76.060

331926

MB No.63/Page No.
86

6.22(c)

MT

243.67

36329.00

8852251

22.739

826093

MB No.182/Page
No. 26,27

Total BOQ Amount Checked

Team Leader
Package-ADB-II/C-8

1158019.00

7 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

THE MONTH OF OCTOBER -2011

onth of Sep -2011

Percentage
Check

6.00%

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

IPC-50 FOR THE MONTH OF OCTOBER -2011


Certificate of Percentage Check of work done during the month of Sep -2011
Designation : Resident Engineer

BOQ Item

Unit

Quantity for
the Month

BOQ Rate after


rebate

Amount

Quantity Checked

Amount of Quantity
Checked

MB Ref.

6.06(b)

Cum

0.00

2584.00

66.98

173076

MB No. 63/Page No. 82

6.23(a)

Cum

405.24

4523.00

1832901

80.42

363740

MB No. 63/Page No. 92

6.22(a)

MT

0.46

831.00

382

2.466

2049

MB No. 111/Page No. 84,85

6.22(c)

MT

243.67

36329.00

8852251

12.545

455747

MB No. 182/Page No. 29,30

6.24

MT

13.80

119150.00

1643793

7.588

904110

MB No. 182/Page No.33,34

Total BOQ Amount Checked

Resident Engineer
Package-ADB-II/C-8

1898722

Percentage Check

11.00%

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION Co;Ltd
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
1

2
Up to date Amount

S.No.

Description

Work done for BOQ Item

Material Advance

Item Under Variation


Orders(Derived from BOQ)

4
5
6

Up to date Total
Up to Date
Amount Certified in
(INR) @86.207
IPC (INR)
(2) = (5+8)
1 =( 4+7)

Total Amount Eligible for


Escalation (1+2+3)
Price Variation (Change in
cost in Legislation)
New / Extra Item (Approved
rates other than BOQ rates)

Gross Amount (3+4+5+6)

Advance

Mobilization Advance( 1st Install.)

Machinery Advance

Mobilization Advance( 2nd Install.)

Total of 8

10

Recovery

10.10

Mobilization & Equipment


Interest over Mobilisation
10.1(a) Advance/Equipment (10%of
10.1)

5
Up to Last month Amount

Period Ending : 31st Oct 2011


7

This month Amount

Certified In
Up to Date
Certified In This This IPC
Certified Upto Last Certified Upto Last Total Amount
(USD) @ Total Certified Up to
IPC (INR) @
(USD)
IPC (INR) @
IPC (USD)@
Certified In This
13.793/43.99 Last IPC (INR) (4)
86.207%
9 = (7)
86.207%
(5) 13.793% /43.99 (6)
IPC (INR) (7)
3= (6+9)
8= (7) *(0.86207) *(0.13793/43.
99)

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION Co;Ltd
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

11

Total of 10

12

Deduction

12.10

Retention @10% on (7-2)

Period Ending : 31st Oct 2011

Income Tax @ 1% on Total of


(7) 0.75% From 1.04.09 to
12.20
31.03.10 and 1.04.2010 to
31.03.11
12.30

Sales Tax @ 2% on( 7-2)

12.40

M.P.State Labour Welfare Tax


@ 1% on (7-2)

13

Net Deductions

14

Withheld Amount (As per detail


attached in IPC)

15

Released Amount (As per detail


attached in IPC)

16

Net Payable Amount (7+9-1314+15)

86.207% OF INR
13.793% OF USD

Submitted By

Recommended By

Recommended By

(D.H.Ryu)
Project Manager

(L.N.Tiku)
Resident Engineer

(Nirmal Kumar srivastava)


Senoir Quantity Engineer

Ceritified By

Team Leader
Engineer's Representative

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION Co;Ltd
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Period Ending : 31st Oct 2011
Up to date Amount
Up to Last month Amount
This month Amount

S.No.

Description

Up to date Total
Amount Certified in
IPC (INR)
1 =( 4+7)

Work done for BOQ Item

Material Advance

Err:502

Item Under Variation


Orders(Derived from BOQ) with
Price adjustment base year
2005-2006 with rebate

12,381,344.00

4
5

Total Amount Eligible for


Escalation (1+2+3)
Price Variation (Change in cost
in Legislation)

1,628,259,689.00

Up to Date
(INR) @86.207
(2) = (5+8)

1,403,673,830.00
Err:502

10,673,585.00

Up to Date
Certified Upto Last IPC Certified Upto Last IPC
Total Amount
(USD) @
Total Certified Up to
(INR) @ 86.207%
(USD)@ 13.793% /43.99 Certified In This
13.793/43.99 3= Last IPC (INR) (4)
(5)
(6)
IPC (INR) (7)
(6+9)

5,105,384.38

1,610,261,225.00

1,388,157,894.00

37,410,213.00

37,410,213.00

38,821.52

12,381,344.00

10,673,585.00

38,821.52

5,048,950.46
-

17,998,464.00
Err:502

Certified In This
IPC (INR) @
86.207%
8= (7) *(0.86207)

Certified In This
IPC (USD)
9 = (7)
*(0.13793/43.99)

15,515,936.00

56,433.92

Err:502

Err:502

Err:502

5,144,205.90

1,660,052,782.00

1,436,241,692.00

5,087,771.98

Err:502

Err:502

56,433.92

Err:502

Err:502

1,481,433.76

404,241,835.00

360,380,304.00

997,079.63

Err:502

Err:502

484,354.13

-1,402.79

-480,394.00

6,624,236.87

2,063,814,223.00

1,796,223,804.00

6,083,403.36

New / Extra Item (Approved


rates other than BOQ rates)
Without Prices adjustment &
without rebate

Gross Amount (3+4+5+6)

Advance

Mobilization Advance( 1st Install.)

109,505,842.00

94,401,700.00

343,354.00

109,505,842.00

94,401,700.00

343,354.00

###

Machinery Advance

100,824,640.00

86,917,897.00

316,134.20

100,824,640.00

86,917,897.00

316,134.20

###

Mobilization Advance( 2nd Install.

109,505,842.00

94,401,700.00

343,354.00

109,505,842.00

94,401,700.00

343,354.00

###

Total of 8

319,836,324.00

275,721,297.00

1,002,842.20

319,836,324.00

275,721,297.00

1,002,842.20

10

Recovery
319,836,324.00

275,721,297.00

1,002,842.07

319,836,324.00

275,721,297.00

1,002,842.07

39,643,288.00

33,835,406.00

132,027.32

39,643,288.00

33,835,406.00

132,027.32

359,479,612.00

309,556,703.00

1,134,869.39

359,479,612.00

309,556,703.00

1,134,869.39

10.10

Mobilization & Equipment


Interest over Mobilisation
10.1(a) Advance/Equipment (10%of
10.1)
11
Total of 10
12

Deduction

-465,894.00

Err:502

-385,692.00

Err:502

-398,192.00

-1,448.25

14,500.00

Err:502

12,500.00

Err:502

45.46

540,833.51

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION Co;Ltd
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Period Ending : 31st Oct 2011
Up to date Amount
Up to Last month Amount
This month Amount

S.No.

12.10

Description

Retention @10% on (7-2)

Up to date Total
Amount Certified in
IPC (INR)
1 =( 4+7)

109,505,840.00

Up to Date
Certified Upto Last IPC Certified Upto Last IPC
Total Amount
(USD) @
Total Certified Up to
(INR) @ 86.207%
(USD)@ 13.793% /43.99 Certified In This
13.793/43.99 3= Last IPC (INR) (4)
(5)
(6)
IPC (INR) (7)
(6+9)

Up to Date
(INR) @86.207
(2) = (5+8)

94,401,699.00

343,353.96

109,505,840.00

94,401,699.00

343,353.96

Certified In This
IPC (INR) @
86.207%
8= (7) *(0.86207)

Certified In This
IPC (USD)
9 = (7)
*(0.13793/43.99)

###

Income Tax @ 1% on Total of (7)


0.75% From 1.04.09 to 31.03.10
12.20
and 1.04.2010 to 31.03.11,
1.04.2011 to 31.03.12 @ 1.5%

Err:502

Err:502

71,498.73

21,121,206.00

18,332,847.00

63,386.23

Err:502

Err:502

8,112.50

12.30

Err:502

Err:502

129,511.46

40,528,430.00

35,307,044.00

118,694.79

Err:502

Err:502

10,816.67

Sales Tax @ 2% on( 7-2)

12.40

M.P.State Labour Welfare Tax @


1% on (7-2)

Err:502

Err:502

66,590.46

20,941,086.00

18,249,687.00

61,182.12

Err:502

Err:502

5,408.34

13

Net Deductions

Err:502

Err:502

1,745,824.00

551,576,174.00

475,847,980.00

1,721,486.49

Err:502

Err:502

24,337.51

14

Withheld Amount (As per detail


attached in IPC)

0.00

0.00

8,279,840.00

8,279,840.00

15

Released Amount (As per detail


attached in IPC)

16

Net Payable Amount (7+9-1314+15)

Err:502

Err:502

5,881,255.07

1,823,794,533.00

1,587,817,281.00

Recommended By

Recommended By

(D.H.Ryu)
Project Manager

(L.N.Tiku)
Resident Engineer

(Nirmal Kumar srivastava)


Senoir Quantity Engineer

8,279,840.00

###
5,364,759.07
86.207% OF INR
13.793% OF USD

Submitted By

- 8,279,840.00 -

Err:502

Err:502

516,496.00

Err:502
516,496.00

Ceritified By

Team Leader
Engineer's Representative

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Calculation of Interest over Mobilization Advance


CALCULATION FOR INR PORTION
Description
ofAdvance

IPC No.

IPC Month

Date of Receipt
of Cheque

Period of Interset

Total days
upto date

Advance Amount

Recovered Amount
up to Previous
Month

Recovered Amount
during This Month

Cummalative
Recovered Amount

Out standing
Advance of IPC
on 1st day of
Month

Interest on
outstanding Advance
up to the end of
Month

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10 = Prev. mth.


Recovery +This mth.
Recovery

C11=C 7-C8

C12=C11*C6/365*10
%

1st Installment
(Mobilization)

31-May-07

28.09.2006

29.09.06 to 31.05 2007

246

94401700

10259993

10259993

94401700

6362416.00

30-Jun-07

1.06.07 to 30.06.2007

30

94401700

10259993

6643505

16903498

84141707

691576.00

31-Jul-07

1.07.07 to 31.07.2007

31

94401700

16903498

1136684

18040182

77498202

658204.00

31-Aug-07

1.08.07 to 31.08.2007

31

94401700

18040182

997107

19037289

76361518

648550.00

10

30-Sep-07

1.09.07 to 30.09.2007

30

94401700

19037289

3462531

22499820

75364411

619434.00

11

31-Oct-07

1.10.07 to 31.10.2007

31

94401700

22499820

4417222

26917042

71901880

610674.00

12

30-Nov-07

1.11.07 to 30.11.2007

30

181319597

26917042

6092430

33009472

154402555

1269062.00

13

31-Dec-07

1.12.07 to 31.12.07

31

181319597

33009472

9098825

42108297

148310125

1259620.00

14

31-Jan-08

1.01.08 to 31.01.08

31

181319597

42108297

6500511

48608808

139211300

1179112.00

15

29-Feb-08

1.02.08 to 29.02.09

29

181319597

48608808

6014624

54623432

132710789

1051534.00

16

31-Mar-08

1.03.08 to 31.03.08

31

181319597

54623432

5666482

60289914

126696165

1073110.00

17

30-Apr-08

1.04.08 to 30.04.08

30

181319597

60289914

10618347

70908261

121029683

992047.00

18

31-May-08

1.05.08 to 31.05.08

31

181319597

70908261

10154016

81062277

110411336

935178.00

19

30-Jun-08

1.06.08 to 30.06.08

30

181319597

81062277

5396606

86458883

100257320

821781.00

20

31-Jul-08

1.07.08 to 31.07.08

31

181319597

86458883

14026057

100484940

94860714

803465.00

21

31-Aug-08

1.08.08 to 31.08.08

31

181319597

100484940

660776

101145716

80834657

684665.00

21

30-Sep-08

1.09.08 to 30.09.08

30

275721297

101145716

5762909

106908625

174575581

1430947.00

22
22
23
23
24
25
26
27
28
28
29
29
29
29
30
31
32
33
34
35
36
37

31-Oct-08
30-Nov-08
31-Dec-08
31-Jan-09
28-Feb-09
31-Mar-09
30-Apr-09
31-May-09
30-Jun-09
31-Jul-09
31-Aug-09
30-Sep-09
31-Oct-09
30-Nov-09
31-Dec-09
31-Jan-10
28-Feb-10
31-Mar-10
30-Apr-10
30-May-10
30-Jun-10
31-Jul-10

1.10.08 t0 31.10.08
1.11.08 t0 30.11.08
1.12.08 t0 31.12.08
1.01.09 t0 31.01.09
1.02.09 t0 28.02.09
1.03.09 t0 31.03.09
1.04.09 t0 30.04.09
1.05.09 t0 31.05.09
1.06.09 t0 30.06.09
1.07.09 t0 31.07.09
1.08.09 t0 31.08.09
1.09.09 to 30.09.09
1.10.09 to 31.10.09
1.11.09 to 30.11.09
1.12.09 to 31.12.09
1.01.10 to 31.01.10
1.02.10 to 28.02.10
1.03.10 to 31.03.10
1.04.10 to 30.04.10
1.05.10 to 31.05.10
1.06.10 to 30.06.10
1.07.10 to 31.07.10

31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31

275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297
275721297

106908625
103054686
113862107
120286014
138151789
171139949
193324464
206063624
216858138
219851774
219656726
221526586
220445109
219840876
229616465
238427979
246691264
256216306
264761595
275715882
275715882
275715882

-3853939
10807421
6423907
17865775
32988160
22184515
12739160
10794514
2993636
-195048
1869860
-1081477
-604233
9775589
8811514
8263285
9525042
8545289
10954287
0
0
0

103054686
113862107
120286014
138151789
171139949
193324464
206063624
217050352
219851774
219656726
221526586
220445109
219840876
229616465
238427979
246691264
256216306
264761595
275715882
275715882
275715882
275715882

168812672
172666611
161859190
155435283
137569508
104581348
82396833
69657673
58863159
55869523
56064571
54194711
55276188
55880421
46104832
37293318
29030033
19504991
10959702
0
0
0

1429834.00
1415300.00
1370938.00
1320135.00
1055328.00
888225.00
677234.00
591613.00
483807.00
474508.00
476165.00
445436.00
469469.00
459291.00
391575.00
316738.00
222696.00
165659.00
90080.00
0.00
0.00
0.00

Equipment Advance

2nd Installment
(Mobilization)

Total

1.11.2008

01.09.2008

275715882.00

33835406.00

Four laning of Jhansi-Lakhnadon on Section from Km. 297 to Km. 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Calculation of Interest over Mobilization Advance


CALCULATION FOR USD PORTION
Description
ofAdvance

IPC No.

IPC Month

Date of Receipt
of Cheque

Period of Interset

Total days
upto date

Advance Amount

Recovered Amount
during Previous
Month

Recovered Amount
during This Month

Cummalative
Recovered Amount

Out standing
Advance of IPC
on 1st day of
Month

Interest on
outstanding Advance
up to the end of
Month

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10 = Prev. mth.


Recovery +This mth.
Recovery

C11=C 7-C8

C12=C11*C6/365*10
%

1st Installment
(Mobilization)

31-May-07

16.10.2006

16.10.06 to 31.05 2007

228

343354.00

0.00

26758.92

26758.92

343354.00

21447.87

8
9

30-Jun-07
31-Jul-07

1.06.07 to 30.06.2007
1.07.07 to 31.07.2007

30
31

343354.00
343354.00

26758.92
52752.01

25993.09
2875.27

52752.01
55627.28

316595.08
290601.99

2602.15
2468.13

Equipment Advance

2nd Installment
(Mobilization)

31-Aug-07

1.08.07 to 31.08.2007

31

343354.00

55627.28

2778.04

58405.32

287726.72

2443.71

10

30-Sep-07

1.09.07 to 30.09.2007

30

343354.00

58405.32

12593.78

70999.10

284948.68

2342.04

11

31-Oct-07

12

30-Nov-07

1.10.07 to 31.10.2007
1.11.07 TO 30.11.07
14.11.2007 TO 30.11.2007

31
30
17

343354.00
343355.00
316134.20

70999.10
87065.24
0.00

16066.14
22159.14
0.00

87065.24
109224.38
0.00

272354.90
256289.76
316134.20

2313.15
2106.49
1472.41

13

31-Dec-07

1.12.07 to 31.12.07

31

659488.20

109224.38

33093.87

142318.25

550263.82

4673.47

14
15
16
17
18
19
20
21
21

31-Jan-08
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
30-Sep-08

1.01.08 to 31.01.08
1.02.08 to 29.02.09
1.03.08 to 31.03.08
1.04.08 to 30.04.08
1.05.08 to 31.05.08
1.06.08 to 30.06.08
1.07.08 to 31.07.08
1.08.08 to 31.08.08
1.09.08 to 30.09.08

31
29
31
30
31
30
31
31
30

659488.20
659488.20
659488.20
659488.20
659488.20
659488.20
659488.20
659488.20
659488.20

142318.25
165961.64
187837.78
208447.67
247068.28
284000.05
303628.36
318029.97
320374.78

23643.39
21876.14
20609.89
38620.61
36931.77
19628.31
14401.61
2344.81
18023.14

165961.64
187837.78
208447.67
247068.28
284000.05
303628.36
318029.97
320374.78
338397.92

517169.95
493526.56
471650.42
451040.53
412419.92
375488.15
355859.84
341458.23
339113.42

4380.40
3910.46
3994.85
3697.05
3493.17
3077.77
3014.11
2892.13
2779.62

21

30-Sep-08

10.09.08 to 30.09.08

21

343354.00

0.00

0.00

0.00

343354.00

1970.06

22
22
23
23
24
25
26
27
28
28
29
29
29
29
30
31
32
33
34
35
36
37

31-Oct-08
30-Nov-08
31-Dec-08
1-Jan-09
28-Feb-09
31-Mar-09
30-Apr-09
31-May-09
30-Jun-09
31-Jul-09
31-Aug-09
30-Sep-09
31-Oct-09
30-Nov-09
31-Dec-09
31-Jan-10
28-Feb-10
31-Mar-10
30-Apr-10
30-May-10
30-Jun-10
31-Jul-10

1.10.08 t0 31.10.08
1.11.08 t0 30.11.08
1.12.08 t0 31.12.08
1.01.09 t0 31.01.09
1.02.09 t0 28.02.09
1.03.09 t0 31.03.09
1.04.09 t0 30.04.09
1.05.09 t0 31.05.09
1.06.09 t0 30.06.09
1.07.09 t0 31.07.09
1.08.09 t0 31.08.09
1.09.09 to 30.09.09
1.10.09 to 31.10.09
1.11.09 to 30.11.09
1.12.09 to 31.12.09
1.01.10 to 31.01.10
1.02.10 to 28.02.10
1.03.10 to 31.03.10
1.04.10 to 30.04.10
1.05.10 to 31.05.10
1.06.10 to 30.06.10
1.07.10 to 31.07.10
Total

31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31

1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20
1002842.20

338397.92
360342.81
404778.88
424711.07
472166.16
541744.61
616661.56
699943.56
710298.43
740688.65
727134.50
730641.90
730705.40
730768.89
758145.52
788626.49
818903.13
839774.75
872297.66
906219.45
1002838.64
1002838.64

21944.89
44436.07
19932.19
47455.09
69578.45
74916.96
83282.00
10354.87
30390.22
-13554.15
3507.40
63.50
63.50
27376.62
30480.97
30276.65
20871.62
32522.91
33921.79
96619.19
0.00
0.00
1002838.64

360342.81
404778.88
424711.07
472166.16
541744.61
616661.56
699943.56
711049.82
740688.65
727134.50
730641.90
730705.40
730768.89
758145.52
788626.49
818903.13
839774.75
872297.66
906219.45
1002838.64
1002838.64
1002838.64

664444.28
642499.39
598063.32
578131.13
530676.05
461097.60
386180.64
302898.64
292543.77
262153.55
275707.70
272200.30
272136.80
272073.31
244696.69
214215.72
183939.07
163067.45
130544.54
96622.75
0.00
0.00

5627.81
5266.39
5065.56
4910.15
4070.94
3916.17
3174.09
2572.56
2404.47
2226.51
2341.63
2237.26
2311.30
2236.22
2078.25
1819.37
1411.04
1384.96
1072.97
820.63
0.00
0.00
132027.32

14.11.2007

10.09.2008

Total Amount of Interest over Mobilization Advance in INR (A+B)=

132027.32 *43.99

33835406.00

39643288

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State
of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

SUMMARY OF BILL OF QUANTITIES


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F
Period Ending : 31st Oct 2011
Bill
No.

Bill Description

Site Clearance

Contract
Amount
(Rs)

Up to Date
(Rs)

Previous Month
(Rs)

This month
(Rs)

4,939,319

6,957,197

6,957,197

Earthworks

581,084,446

579,250,232

579,077,634

172,598

Sub-Base and Base Cours

499,747,680

391,491,415

391,491,415

Bituminous Courses

722,516,178

427,747,044

425,796,430

1,950,614

Culverts

116,082,158

111,061,344

110,840,031

221,313

New Bridges, Grade


separators, ROBs

1,021,705,686

742,961,111

718,974,769

23,986,342

Drainage and Protective


Works

56,856,707

2,300,054

2,300,054

Traffic Signs, Markings


and Road Appurtenances

83,186,280

24,960,894

24,960,894

Miscellaneous

7,926,231

4,157,700

4,157,700

0
0

10

Maintenance of Road

30,619,875

42,847,429

42,847,429

11

Toll Plaza

27,609,510

12

Shifting of Electrical Utilit

51,759,000

48,329,349

48,329,349

Sub-Total of BOQ

###

Applying Rebate @ 31.645%

###

Actual amount after Rebate

###

Total amount of BOQ Variation


Total work done amount of
with BOQ Variation

(D.H.Ryu)
Project Manager

2,382,063,769 2,355,732,902
753,804,080

1,628,259,689 1,610,261,225
12,381,344

###

745,471,677

12,381,344

1,640,641,033 1,622,642,569

(L.N.Tiku)
Resident Engineer

Team Leader
Engineer's Representative

26,330,867
8,332,403
17,998,464
0
17,998,464

(Nirmal kr srivastava)
Senior Quantity Engineer

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State
of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
SUMMARY OF BILL OF QUANTITIES
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Period Ending : 31st Oct 2011

Bill
No.

Bill Description

Contract
Amount
(Rs)

Site Clearance

Earthworks

Sub-Base and Base Courses

Bituminous Courses

Culverts

New Bridges, Grade


separators, ROBs

Drainage and Protective


Works

Traffic Signs, Markings


and Road Appurtenances

Miscellaneous

10

Maintenance of Road

11

Toll Plaza

12

Shifting of Electrical Utilities

Up to Date
(Rs)

Previous Month
(Rs)

This month
(Rs)

Sub-Total of BOQ
Applying Rebate @ 31.645%
Actual amount after Rebate
Total amount of BOQ Variation
Total work done amount of
with BOQ Variation

(D.H.Ryu)
Project Manager

(L.N.Tiku)
Resident Engineer

Team Leader
Engineer's Representative

(Nirmal kr srivastava)
Senior Quantity Engineer

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

SITE CLEARANCE

1.01

Cleaning & grubbing road land, drains and


cross-drainage structures complete as per
drawings and Tech. Spec. Clause 201

1.02

Dismantling structures and pavements and


including disposing of resulting material
and/ or salvaging useful materials as per
drawings and Techical Specifications
Clause 202 and Section 2800.

Hct.

22356

a) Brick Masonry
b) Stone Masonry

Cum
Cum

324
243

c) Plain Cement Concrete


d) Reinforced Cement Concrete including
reinforcement
e) Pavement Structure

Cum

405

Cum

810

Cum

324

Cum

162

Nos.

243

Sqm

486

(i) Upto 600mm dia

Lm

162

(ii) Above 600mm dia

Lm

162

i) Bituminous Course
ii) Sub base/Base Course
f) Guard Stones/KM Stones/Sign
post/Hect.Stones
g) Temporary Structures(Pucca/Semi Pucca)
h) Removal of hume pipes

1.03

Removal of stumps and roots of girth above


300mm and back filling to required
compaction complete as per drawings and
Tech. Spec. Clause 201and 305

a) Above 300 mm to 600 mm

Nos.

111

b) Above 600 mm to 900 mm

Nos.

224

c) Above 900 mm to 1800 mm

Nos.

398

d) Above 1800 mm

Nos.

723

Contractors Representative

24 of 149

0.000

Consultants Representative

No.

1.04

Particulars

Contents
of Area

Unit

4
Rate

5
Total Value to
Date
Amount

Rs.

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Credit for salvage value of dismantled


materials from pavements and structures
etc. as per drawings and Tech. Spec.
Clause 202
a) Brick Masonry

Cum

b) Stone Masonry

Cum

-81

c) Plain Cement Concrete

Cum

d) Reinforced Cement Concrete including


reinforcement

Cum

-81

i) Bituminous Course

Cum

-16

ii) Sub base/Base Course

Cum

-32

Nos.

Sqm

e) Pavement Structure

f) Guard Stones/KM Stones/Sign


post/Hect.Stones
g) Temporary Structures(Pucca/Semi Pucca)
h) Removal of hume pipes
() Upto 600mm dia

1.05

() Above 600mm dia


i) Stone pitching/boulder apron/brick
soling/stone soling
Credit for salvage value of stumps and
roots of girth above 300mm as per Tech.
Spec. Clause No.202

Lm

Lm

Cum
0

a) Above 300 mm to 600mm

Nos.

-162

b) ABOVE 600 mm to 900 mm

Nos.

-324

c) Above 900 mm to 1800mm

Nos.

-810

d) Above 1800 mm

Nos.

-1134

TOTAL ( Bill No.1)


2

0.000

Earthworks

Contractors Representative

25 of 149

Consultants Representative

No.

2.01

Particulars

Contents
of Area

Unit

4
Rate
Rs.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Earthwork in excavation necessary for


construction of roadway complete as per
drawings and Tech. Spec. Clause 301& A-7
(a) in all types of soil excluding marshysoil

cum

62

(b) Ordimary Rock(not requiring blasting)

cum

78

(d) Hard Rock(blasting prohibited)

cum

311

2.02

Construction of embankment with approved


materials from borrow areas complete as
per drawings and Tech. Spec. Clause 305
with all leads and lifts

cum

188

2.03

Construction of embankment with approved


materials obtained from roadway and
drainage excavations complete as per
drawings and Tech. Spec. Clause 305 with
all leads and lifts

cum

62

2.04

Construction of subgrade/shoulder with


approved materials from borrow areas
complete as per drawings and Tech. Spec.
Clause 305 & 407 with all leads and lifts.
cum

214

cum

239

2.07

Earthwork in filling of median/island area


with selected earth complete as per
drawings and Tech. Spec. Clause 407 with
all leads and lifts.

cum

188

2.08

Filling of rock - fill in the median/ island


area with broken hard rock fragments not
exceeding 200 mm laid in layers as per
drawings and Tech. Spec. Clause 313

cum

389

(a) Selected earth for subgrade


(CBR not less than 10)
(b) Selected Earth for Shoulders
(CBR not lass than 10)

Contractors Representative

26 of 149

Consultants Representative

No.

2.10

Particulars

Contents
of Area

Unit

Filling of wells complete as per drawings


and Tech. Spec. Section 1200 & A-10.

4
Rate
Rs.

cum

486

3.01

Constructions of Granular sub-base,


Complete as per drawings and Technical
Specification Clause 401, using Close
graded materials conforming to Grading-of
Table 400-1

cum

674

3.02

Construction of Wet Mix Macadam(WMM)


base with approved material complete as
per drawings and Technical Speccification
Clause 406.

cum

1,216

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Total(Bill No.2)
3

SUB-BASE AND BASE COURSES

TOTAL ( Bill No.3)


4

BITUMINOUS COURSES

4.01

Providing and applying prime Coat with


bitumen emulsion complete as per
drawings and Technical Specification
Clause 502

4.02

Providing and applying Tack Coat with


bitumen emulsion complete as per
drawings and Technical Specification
Clause 503

4.03

sqm

16

a) @ 0.275kg per sqm on primed surface

sqm

13

b) @ 0.225kg per sqm on bituminous


surface

sqm

11

Providing and laying Bituminous


Macadam(BM) Course by using bitumen
grade 60-70 as per Technical Specification
Clause 504.

cum

3,835

Contractors Representative

27 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

4.04

Providing and laying Dense Graded


Bituminous Macadam (DBM) course by
using bitumen grade 60-70 complete as per
drawings and Technical Specification
Clause 507 and confirming to Table 500-10

cum

4,490

4.05

Providing and laying Bituminous Concrete


(BC) wearing course using PMB-40
complete as per drawings and Technical
Specification Clause 509 & 521

cum

5,987

Adjustment of Atual consuption of bitumen

mt

13,549.95

Providing and laying 25mm thick Semi


Dense Bitumenous Concrete (SDBC)
Wearing Course complete as per drawings
and Technical Specification Clause 500 &
3000

cum

5,238

4.06

TOTAL ( Bill No.4)


5

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

CULVERTS

5.01

Earthwork in excavation for structures in all


types of soil excluding rock, including all
lifts and leads complete as per drawings
and Technical Specification Clause No.304

cum

79

5.02

Providing and laying in position Plain


Cement Concrete in M-15 grade leveling
course below foundations and approach
slabs complete as per drawings and
Technical Specification Section 1500 and
2700

cum

2,716

5.03

Providing and laying in position plain


Cement Concrete of Grade M20 in cut off
walls, head walls complete as per drawings
and Technical Specification Section 1500,
2100 and 2700

cum

4,054

Contractors Representative

28 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

5.04

Providing and laying in position Reinforced


Cement Concrete grade M 25 in box cell
structures for culverts complete as per
drawings and Technical Specification
Section 1500, 1700 and 2200

cum

4,548

5.05

Providing and laying in position Reinforced


Cement Concrete grade M25 in deck slabs
in culverts excluding reinforcement
complete as per drawings and Technical
Specification Section 1500, 1700 and 2300

cum

3,890

5.06

Providing & fixing in position HYSD (TMT)


Fe 415 grade reinforcement bars in
foundations, substructures, box strucutre
and crash barrier complete as per drawings
and Technical Specification Section 1600

MT

51,876

5.07

Providing and laying boulder apron for bed


protection works complete as per drawings
and Technical Specification Clause
No.2503

Cum

894

5.08

Providing and laying 150mm thick flat rigid


apron embedded in 300mm thick concrete
grade M15 for bed protection works with all
leads and lift as per Drawing and Technical
Specifications Clause 2503

Cum

2,218

5.09

Providing and fixing in position Expansion


joints complete as per Drawing and
Technical Specifications Section 2600
Lm.

1,605

(a)Filler type Moulded

Contractors Representative

5
Total Value to
Date
Amount

29 of 149

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Consultants Representative

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

5.11

providing and laying in position Reinforced


Cement Concrete grade M 25 in approach
slabs including reinforcement and
bituminous joint filler with joint sealing
compound between approach slab and dirt
wall complete as per Drawinga and
Technical Specificati

Cum

6,591

5.12

Providing and laying in position Reinforced


Cement Concrete grade M40 in crash
barriers including reinforcement, providing
bituminous fiber board and Polysulphide
joint filler at expansion joints/gap locations
complete as per Drawings and Technical
Specif

Cum

3552

5.14

Providing & laying Tar paper bearing


complete as per Technical Specifications
Clause 2000

Sqm

19

5.17

Providing and fixing weep holes in wing


wall, head wall, return wall and retaining
wall complete as per Drawings and
Technical Specifications Clause 2706.

Lm

256

5.19

Providing and laying back filling behind


abutments,splayed wing walls, return wall
or any other area with selected imported
granular materials of approved quality
complete as per Drawings and Technical
Specifications Clause305 and Appendis-6
of IRC:78-200

Cum

315

5.20

Providing and laying filter media behind


box structure, splayed wing wall, retaining
walls and return wall complete as per
drawings and Tech. Specifications Clause
305 and Section 2500

Cum

728

TOTAL ( Bill No.5)

Contractors Representative

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

0.000

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

0.00

30 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

NEW BRIDGES, GRADE SEPARATORS, ROBS

6.01

6.02

6.03

6.04

6.05

6.06

Earthwork in excavation for structures in all


types of soil excluding rock, including all
lifts and leads complete as per drawings
and Technical Specifications Clause
No.304.
Earthwork in excavation for structures in
ordinary rock, including all lifts and leads
complete as per drawings and Technical
Specifications Clause No.302 and 304.

Cum

79

Cum

270

Earthwork in excavation for structures in


hard rock including all lifts and leads
complete as per drawings and Technical
Specifications Clause No.302 and 304 and
Clause 'A7' of Additional Technocal
Specifications.
(a) Bblasting Prohibited
Earthwork in excavation for structures in
Marshy soil excluding rock, including
dewatering and all lifts and leads complete
as per drawings and Technical
Specifications Clause No.304.
Providing and laying in position plain
Cement Concrete of Grade M 15 in leveling
course below open foundations, pile caps,
approach slabs, annular filling around
foundation in rock and bed protection
complete as per drawings and Tech.
Specifications Secti

Cum

764

Cum

213

Cum

2,855

Providing and laying in position Reinforced


Cement Concrete in open foundations
complete as per drawings and Technical
Specifications Sections 1500, 1700 and
2100.

Contractors Representative

31 of 149

Consultants Representative

No.

6.08

6.09

6.10

6.11

Particulars

Contents
of Area

Unit

4
Rate
Rs.

(a) Grade M 30

Cum

3,641

(b) Grade M 35

Cum

3,780

MT

84,901

Cum

5,258

Cum

5,819

Lm
Lm
Lm
Lm

29,360
34,035
38,711
43,386

Lm
Lm
Lm
Lm

38,337
43,012
47,687
52,362

Providing, fabricating & laying in position


cutting edge for well foundations
comprising of steel sections and plates
(structural steel) along with steel liner on
well curbs and well steining complete as
per drawings and Technical Specifications
Clause No
P&L in position Reinforced Cement
Concrete of Grade M35 in well curbs
complete as per drawings and Technical
Specifications Clause No.1205, 1214,
1215.
Providing & laying in position Reinforced
Cement Concrete of Grade M35 in well
steining complete as per drawings and
Technical Specifications Clause No.1206,
1214, 1215 and Sections 1500 and 1700

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Sinking of well foundations upto different


levels complete as per construction
drawings and Technical Specifications
Clause No.1207.
(a) 7.0m dia. Well
() 0 - 10m depth
(ii) 10 - 20m depth
() 20 - 30m depth
() 30 - 40m depth
(b) 8.0m dia. Well
In soil
() 0 - 10m depth
(ii) 10 - 20m depth
() 20 - 30m depth
() 30 - 40m depth

Contractors Representative

32 of 149

Consultants Representative

No.

6.12

6.13

6.14

6.15

6.16

Particulars

Contents
of Area

Unit

Providing and laying in position Plain


Cement Concrete grade M25 in bottom
Plug with 10% extra cement including the
cost of creation of key in the bottom plug
and anchor bars whether shown in the
drawings complete as per drawings and
Technical Specificati
Providing and filling clean, sieved,
approved sand in the dredge holes of the
wells up to height specified in the drawings
including all leads and lifts and as per
drawings and Technical Specifications
Clause Nos. 1209, 1214 and 1215.
Providing and laying in position Plain
Cement Concrete grade M25 in Top /
Intermediate Plug in dry condition complete
as per drawings and Technical
Specifications Clause Nos. 1210, 1214
Section 1700.
Reinforced Cement Concrete grade M35 in
well cap including construction of false
steining and dismantling of extruding false
steining above well cap if any, complete as
per drawings and Technical Specifications
Clause Nos. 1211, 1214 and Section 1700.
Bored Cast-in-situ vertical piles of dia
1200mm RCC grade M-35 excluding
reinforcement complete as per drawings
and Tech. Spec. Section 1100, 1700 & IRC
78-2000 and removal of excavated earth
with all lifts and lead.

Contractors Representative

4
Rate
Rs.

Cum

3,960

Cum

469

Cum

5,120

Cum

4,510

Cum

9,141

5
Total Value to
Date
Amount

33 of 149

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Consultants Representative

No.

6.17

6.19

6.20

Particulars

Contents
of Area

Unit

Carring out initial load test (Static Load


Test) both vertical & lateral on test piles for
bored cast-in situ piles including cost of
installation RCC M35 boring, arranging
kentledge / anchor piles and all testing
equipments, accessories etc. excluding r

6.22

Rs.

Nos.

841,535

Cum

3,861

Cum

4,326

(a) T-Beam and Slab of grade M 30

Cum

5,934

(b) Box Girder of grade M 35

Cum

6,385

(c) RCC Slab over PSC girders grade M45

Cum

5,372

Providing & fixing in position HYSD (TMT)


Fe 415 grade reinforcement bars in
foundations, substructures, superstructures
etc. complete as per drawings and
Technical Specifications Sections 1600

MT

(a) In Foundation

MT

51,502

(b) In Sub Structure

MT

51,876

(c) In Super Structure

MT

53,148

Reinforced Cement concrete in M35 grade


for file cap complete as per drawings and
Technical Specifications Section 1100,
1500 and 1700.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Providing and laying in position Reinforced


Cement Concrete in pier, pier cap,
pedestals, cantilever/counterfort abutment,
abutment cap, dirt wall, retaining wall,
buffer wall etc. complete as per drawings
and Technical Specifications Sections
1500, 1700
(a) Grade M 35

6.21

4
Rate

Providing and laying in position Reinforced


Cement Concrete in superstructure
complete as per drawings and Technical
Specifications Sections 1500, 1700, 2300
and clause A-5.

Contractors Representative

34 of 149

Consultants Representative

No.

6.23

Particulars

Contents
of Area

Unit

6.26

6.27

Rs.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Providing & fixing in position Prestressed


concrete in superstructure including
pedestals complete as per drawings and
technical Spec. Section 1500, 1700 and
2300
(a) Grade M45 in Box girder

6.24

4
Rate

(b) Grade M45 in Precast Post-tensioned


Girders
Supplying, providing and placing in position
and profiling high tensile steel of 19
T13(Class-ll low relaxation) strands
conforming to IS: 6006 of specified ultimate
strength including cutting, threading, tying
and providing necessary anchorage,
sheathing

Cum

6,617

Cum

6,043

MT

174,310

Cucm

1
0

Nos.

49,744

Providing and fixing in position bearings


true to line and level complete as per
drawings and Technical Specifications
Section 2000, IRC : 83 (Part-) 1987 and
IRC : 83(Part-) 2002.
(A) Elastomeric bearings
(B) POT cum PTFE bearings
() Fixed bearings of 300T Vertical load
carrying capacity
() Free / Guided Bearings of 300T
vertical load carrying capacity
Providing and fixing in position Expansion
Joints complete as per drawings and
Technical Specifications Clause 2600.
(a) Strip seal type accomodating a
movement upto 70mm.
(b) Modular type 70mm.

Contractors Representative

68,794

Lm
Lm

9,350
112,205

35 of 149

Consultants Representative

No.

6.32

6.35

6.37

6.40

6.43

Particulars

Contents
of Area

Unit

Providing and laying in position Reinforced


Cement Concrete grade M40 in crash
barriers including reinforcement including
providing bityminous fiber board and
Polysulphide joint filler at expansion
joints/gap locations complete as per
drawings and Technic

4
Rate
Rs.

Cum

11,187

Lm

256

Cum

315

Cum

894

(a) In soil

Lm

655

(b) In Soft rock

Lm

1,636

Providing and fixing weep holes in


abutments, splayed wing wall, median wall,
retaining wall or any other earth retaining
structure complete as per drawings and
Technical Specifications Clause 2706.
providing and laying back filling behind
abutments, splayed wing walls, return wall
or any other area with selected imported
granular materials of approved quality
complete as per drawings and Technical
Specifications Clause 305 and Appendix-6
of IRC : 78
providing and laying Boulder apron on bed
for protection against scour with stone
boulders weighing not less than 40 Kg.
each complete as per drawings and
Technical Specifications.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Carrying out sub soil


investigation/confirmatory boreholes at
specified foundation locations before
commencement of construction, except in
case of well foundation where confirmatory
boring shall be carried out before bottom
plugging for confirmation of s

Contractors Representative

36 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

(c) In Hard rock

Lm

TOTAL ( Bill No.6)


7

4
Rate
Rs.

5
Total Value to
Date
Amount

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

2,291
0

DRAINAGE AND PROTECTIVE WORKS


0

7.02

Construction of open cross drains in


median on superelevated section with PCC
grade M20 including leveling course in
cement concrete M15 as per drawings and
Technical Specifications Section 1500,
1600 and 1700.

Lm

1027

7.06

Providing and laying stone pitching of


300mm thick on Embankment slopes as
per drawings and Technical Specifications
Clauses 1400 and 2500.

cum

987

TOTAL ( Bill No.7)


8

TRAFFIC SIGNS, MARKINS AND ROAD APPURTENANCES

8.10

Providing and laying M20 grade cement


concrete kerb for median/island complete
as per drawings and Technical
Specifications Clause 408.

Lm

315

8.11

Providing and laying M20 grade cement


concrete kerb with channel for
median/island in super-elevated portions
complete as per drawings and Technical
Specifications Clause 408.

Lm

370

TOTAL ( Bill No.8)


9

MISCELLANEOUS

9.03

Providing and maintaining vehicles for the


Employer's Representative and his support
staff including driver, POL, etc., complete
as per drawings and Technical
Specification clause 124.

Contractors Representative

37 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

a) Hard top passenger car Non A.C. (One


Number)

9.05

10

Supplying colour video cassette & CD


ROM records during construction
consisting of each set of edited master
cassetters & C.D. with 4 copies each of
cassettes & CD ROMs complete as per
drawings and Technical Specification
clause 126.

4
Rate
Rs.

Veh.
Month

76,179

Set

44,034

TOTAL ( Bill No.9)


MAINTENANCE OF ROAD / CONSTRUCTION OF DIVERSION ROAD
sqm

30

Carrying out repairs to pot holes and


perform any necessary patching to existing
10.03 bituminous C/W conforming as per
Drawings and Technical Specification
Clause 3004.

sqm

553

Providing Renewal Coat with Mix Seal


SURFACING ( Type A) including tack coat
10.04 to the areas of the existing carriageway as
per Drawings and Technical Specification
Clause 512

sqm

94

11

6
Deduct Previous
mesurements
Page
Quantity

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

Maintenance of Earthen shoulder complete


10.02 as per Drawings and Technical
Specification Clause 3003

TOTAL ( Bill No.10)

5
Total Value to
Date
Amount

TOLL PLAZA

TOTAL ( Bill No.11)


TOTAL ( Bill No.12)=

0.00

Sub-Total of BOQ=

Applying Rebate @ 31.645% =

Actual amount after Rebate=

Extra Items Derived from BOQ


1000MM DIA PIPE Provisionally allowed
V-13
@75% (3855*0.75)

Contractors Representative

Lm

2891.00

0.00

38 of 149

Consultants Representative

No.

Particulars

Contents
of Area

Unit

4
Rate
Rs.

4.01
var.
Adjustment of Atual consuption of Emulsion
(Provisi
onal)

MT

9261.00

Excess Consumption of Bitumen for DBM &


BC Provisionally allowed @ 75 % 15632

MT

11724.00

Excess Consumption of Tack Coat for DBM


& BC Provisionally allowed @ 75 % 15632

MT

11724.00

V-24

Total Of Section
Extra Items Non BOQ
Installation of Mobile Sets

20

Nos.

10000.00

V-04

Maintanance of Mobile Sets

480

Nos.

1000.00

Cum

-48.75

RM

323.25

Credit on Hard Rock


Maintanance of Narmada Railing (Allowed
@ 75% of 215931)
Total Of NON BOQ ITEM

6
Deduct Previous
mesurements
Page
Quantity

501

Contractors Representative

7
Since Last Mesurement
Quantity
Value at rates in Remarks
(Cols.(2)-(6) cols (4) (Rs.)

V-03

V-28

5
Total Value to
Date
Amount

39 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
1
SITE CLEARANCE
1.01 Cleaning & grubbing road land,
drains and cross-drainage structures
Hct.
144
22356
3219264
121.720
2721172
121.72
2721172
0.000
0
complete as per drawings and Tech.
Spec. Clause 201
1.02 Dismantling structures and

MB
Ref.

% age
Completion

84.53%

pavements and including disposing of


resulting material and/ or salvaging
useful materials as per drawings and
Techical Specifications Clause 202
and Section 2800.
a) Brick Masonry

Cum

50

324

16200

656.380

212667

656.38

212667

1312.76%

b) Stone Masonry

Cum

100

243

24300

1,868.940

454152

1,868.94

454152

1868.94%

c) Plain Cement Concrete


d) Reinforced Cement Concrete
including reinforcement
e) Pavement Structure

Cum

100

405

40500

1,003.240

406312

1,003.24

406312

1003.24%

Cum

75

810

60750

353.430

286278

353.43

286278

471.24%

i) Bituminous Course

Cum

3,615

324

1171260

7,911.090

2563193

7911.09

2563193

218.84%

ii) Sub base/Base Course

Cum

250

162

40500

6,012.630

974046

6012.63

974046

2405.05%

350

243

85050

2,000

486

972000

959.870

466497

f) Guard Stones/KM Stones/Sign


Nos.
post/Hect.Stones
g) Temporary Structures(Pucca/Semi
Sqm
Pucca)
h) Removal of hume pipes

0
466497

959.87

0.00%

75929

72.11%

Lm

100

162

16200

(ii) Above 600mm dia

Lm

650

162

105300

468.700

100

162

16200

150516
170688
304868

0
0
0

Removal of stumps and roots of girth


above 300mm and back filling to
required compaction complete as per
drawings and Tech. Spec. Clause
201and 305
a) Above 300 mm to 600 mm
b) Above 600 mm to 900 mm
c) Above 900 mm to 1800 mm

Contractors Representative

Nos.
Nos.
Nos.

476
872
1,308

111
224
398

47.99%

(i) Upto 600mm dia

i) Stone pitching/boulder apron/brick


Cum
soling/stone soling
1.03

52836
195328
520584

1,356.000
762.000
766.000
40 of 149

75929

150516
170688
304868

468.70

1,356
762
766

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
d) Above 1800 mm
Nos.
238
723
172074
591.000
427293
591
427293
0
1.04 Credit for salvage value of
dismantled materials from pavements
0
0
0
0
and structures etc. as per drawings
and Tech. Spec. Clause 202
a) Brick Masonry
b) Stone Masonry

Cum
Cum

50
100

c) Plain Cement Concrete


d) Reinforced Cement Concrete
including reinforcement
e) Pavement Structure
i) Bituminous Course

Cum
Cum

100
75

Cum

ii) Sub base/Base Course


Cum
f) Guard Stones/KM Stones/Sign
Nos.
post/Hect.Stones
g) Temporary Structures(Pucca/Semi Sqm
h) Removal of hume pipes
() Upto 600mm dia

Lm

() Above 600mm dia


Lm
i) Stone pitching/boulder apron/brick
Cum
soling/stone soling
1.05

2.01

% age
Completion

656.380
1,868.930

0
-151383

656.38
1,868.93

0
-151383

0.000

-81

0
-8100

0
0

1312.76%
1868.93%

0
-81

0
-6075

1,003.240
353.430

0
-28628

1,003.24
353.43

0
-28628

0.000
0.000

0
0

1003.24%
471.24%

3,615

-16

-57840

7,911.090

-126577

7,911.09

-126577

0.00

0
0

218.84%

250
350
2,000

-32
0
0

-8000
0
0

6,012.630
959.870

-192404
0
0

6,012.63
959.87

-192404
0
0

0.00

0
0
0

47.99%

100
650

0
0

0
0

0
0

0
0

0
0

100

468.700

468.70

100

Credit for salvage value of stumps


and roots of girth above 300mm as
per Tech. Spec. Clause No.202

0.000

a) Above 300 mm to 600mm

Nos.

476

-162

-77112

1,356.000

-219672

1,356

-219672

0.000

b) ABOVE 600 mm to 900 mm

Nos.

872

-324

-282528

762.000

-246888

762

-246888

0.000

c) Above 900 mm to 1800mm


d) Above 1800 mm

Nos.
Nos.

1,308
238

-810
-1134

-1059480
-269892

766.000
591.000

-620460
-670194

766
591

-620460
-670194

0.000
0.000

0
0

4939319

TOTAL ( Bill No.1)


2

MB
Ref.

6957197

6957197

28934894

157945

468.70%

Earthworks
Earthwork in excavation necessary
for construction of roadway complete
as per drawings and Tech. Spec.
Clause 301& A-7
(a) in all types of soil excluding marshy cum

168,404

62

10441048

466,691.84

(b) Ordimary Rock(not requiring blastin cum

25,240

78

1968720

2,024.94

Contractors Representative

41 of 149

28934894
157945

466,691.84
2,024.94

277.13%
Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount

2.02

2.03

2.04

(c) Hard Rock(requiring blasting)

cum

140

233

32620

(d) Hard Rock(blasting prohibited)

cum

2,664

311

828504

6,059.40

1,900,460

188

357286480

2,067,376.22

252,304

62

15642848

46,008.92

Construction of embankment with


approved materials from borrow
areas complete as per drawings and cum
Tech. Spec. Clause 305 with all leads
and lifts
Construction of embankment with
approved materials obtained from
roadway and drainage excavations
complete as per drawings and Tech.
Spec. Clause 305 with all leads and
lifts
Construction of subgrade/shoulder
with approved materials from borrow
areas complete as per drawings and
Tech. Spec. Clause 305 & 407 with
all leads and lifts.
(a) Selected earth for subgrade
(CBR not less than 10)
(b) Selected Earth for Shoulders
(CBR not lass than 10)

2.05

2.06

2.07

cum

0
1884473

388666729

2852553

0.00
6,059.40

2,067,376.22

43,225.08

MB
Ref.

% age
Completion

1884473

388666729

108.78%

172598

18.24%

2679955

2783.84

cum

713,176

214

152619664

607,797.04

130068567

607,797.04

130068567

85.22%

cum

59,650

239

14256350

14,263.30

3408929

14,263.30

3408929

23.91%

cum

40,000

23

920000

Loosening and recompacting ground


below subgrade in all kinds of soil, if
cum
necessary, complete as per drawings
and Tech. Spec. Clauses 301 & 305

95,560

31

2962360

Earthwork in filling of median/island


area with selected earth complete as
cum
per drawings and Tech. Spec. Clause
407 with all leads and lifts.

83,360

188

15671680

102,370.55

19245663

Loosening and recompacting ground


below embankment in all kinds of
soil, if necessary, complete as per
drawings and Tech. Spec. Clauses
301 & 305

Contractors Representative

42 of 149

19245663

102,370.55

122.81%
Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
2.08
Filling of rock - fill in the median/
island area with broken hard rock
fragments not exceeding 200 mm laid cum
9,348
389
3636372
1,686.16
655917
1,686.16
655917
0
in layers as per drawings and Tech.
Spec. Clause 313
2.09

2.10

Turfing of embankment slopes,


median and other locations with
green sods all complete as per
drawings and Tech. Spec. Clauses
307.

cum

285,925

16

4574800

Filling of wells complete as per


drawings and Tech. Spec. Section
1200 & A-10.

cum

500

486

243000

6,943.54

Total(Bill No.2)
3
3.01

3.02

581084446

4.01

3374562

6,943.54

579250232

3374562

579077634

172598

SUB-BASE AND BASE COURSES

% age
Completion

18.04%

1388.71%

Constructions of Granular sub-base,


Complete as per drawings and
Technical Specification Clause 401,
cum
using Close graded materials
conforming to Grading-of Table 4001

234,480

674

158039520

206,304.22

139049043

206,304.22

139049043

Construction of Wet Mix


Macadam(WMM) base with approved
material complete as per drawings
cum
and Technical Speccification Clause
406.

281,010

1216

341708160

207,600.64

252442379

207,600.64

252442379

499747680

391491415

16

17984800

12244247

TOTAL ( Bill No.3)


4

MB
Ref.

391491415

87.98%

73.88%

BITUMINOUS COURSES
Providing and applying prime Coat
with bitumen emulsion complete as
per drawings and Technical
Specification Clause 502

Contractors Representative

sqm

1,124,050

765,265.46

43 of 149

12244247

765265.460

68.08%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
4.02 Providing and applying Tack Coat
with bitumen emulsion complete as
per drawings and Technical
Specification Clause 503
a) @ 0.275kg per sqm on primed
surface

4.03

4.04

4.05

4.06

5.01

0.000

% age
Completion

68.44%

85663

37.23%

sqm

1,124,050

13

14612650

769,342.88

10001457

769342.880

10001457

b) @ 0.225kg per sqm on bituminous


sqm
surface

1,834,700

11

20181700

682,981.17

7512793

675193.670

7427130

Providing and laying Bituminous


Macadam(BM) Course by using
cum
bitumen grade 60-70 as per Technical
Specification Clause 504.

45,868

3835

175903780

38,920.75

149261076

38920.750

149261076

84.85%

Providing and laying Dense Graded


Bituminous Macadam (DBM) course
by using bitumen grade 60-70
complete as per drawings and
Technical Specification Clause 507
and confirming to Table 500-10

cum

59,628

4490

267729720

48,224.99

216530205

48224.990

216530205

80.88%

Providing and laying Bituminous


Concrete (BC) wearing course using
PMB-40 complete as per drawings
and Technical Specification Clause
509 & 521

cum

36,694

5987

219686978

5,377.87

32197308

5066.370

30332357

1864951

14.66%

Providing and laying 25mm thick


Semi Dense Bitumenous Concrete
(SDBC) Wearing Course complete as cum
per drawings and Technical
Specification Clause 500 & 3000

1,225

5238

6416550

722516178

79

1587900

TOTAL ( Bill No.4)


5

MB
Ref.

0.00%

427747044

7787.50

311.50

425796430

1950614

1977704

2.00

CULVERTS
Earthwork in excavation for structures
in all types of soil excluding rock,
including all lifts and leads complete cum
as per drawings and Technical
Specification Clause No.304

Contractors Representative

20,100

25,034.23

44 of 149

1977704

25034.23

124.55%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
5.02
Providing and laying in position Plain
Cement Concrete in M-15 grade
leveling course below foundations
cum
1,685
2716
4576460
2,394.92
6504614
2378.44
6459854
16.48
44760
and approach slabs complete as per
drawings and Technical Specification
Section 1500 and 2700
5.03

5.04

5.05

5.06

5.07

MB
Ref.

% age
Completion

142.13%

Providing and laying in position plain


Cement Concrete of Grade M20 in
cut off walls, head walls complete as
cum
per drawings and Technical
Specification Section 1500, 2100 and
2700

3,730

4054

15121420

11,633.71

47163042

11633.71

47163042

311.90%

Providing and laying in position


Reinforced Cement Concrete grade
M 25 in box cell structures for
culverts complete as per drawings
and Technical Specification Section
1500, 1700 and 2200

6,830

4548

31062840

5,861.10

26656283

5861.10

26656283

85.81%

Providing and laying in position


Reinforced Cement Concrete grade
M25 in deck slabs in culverts
excluding reinforcement complete as cum
per drawings and Technical
Specification Section 1500, 1700 and
2300

245

3890

953050

309.77

1205005

309.77

1205005

126.44%

Providing & fixing in position HYSD


(TMT) Fe 415 grade reinforcement
bars in foundations, substructures,
box strucutre and crash barrier
complete as per drawings and
Technical Specification Section 1600

650

51876

33719400

407.264

21127227

407.264

21127227

62.66%

240

894

214560

109.54

97929

109.54

97929

45.64%

cum

MT

Providing and laying boulder apron


for bed protection works complete as
Cum
per drawings and Technical
Specification Clause No.2503

Contractors Representative

45 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
5.08
Providing and laying 150mm thick flat
rigid apron embedded in 300mm
thick concrete grade M15 for bed
Cum
2,430
2218
5389740
376.30
834625
371.58
824164
4.72
10460
protection works with all leads and lift
as per Drawing and Technical
Specifications Clause 2503
5.09

Providing and fixing in position


Expansion joints complete as per
Drawing and Technical Specifications
Section 2600
(a)Filler type Moulded

5.10

5.11

5.12

5.13

Lm

Providing and fixing in position


drainage spouts complete as per
Nos.
Drawing and Technical Specifications
Clause 2705
providing and laying in position
Reinforced Cement Concrete grade
M 25 in approach slabs including
reinforcement and bituminous joint
Cum
filler with joint sealing compound
between approach slab and dirt wall
complete as per Drawinga and
Technical Specificati
Providing and laying in position
Reinforced Cement Concrete grade
M40 in crash barriers including
reinforcement, providing bituminous
Cum
fiber board and Polysulphide joint
filler at expansion joints/gap locations
complete as per Drawings and
Technical Specif
Providing and fixing 80mm dia
nominal size MS pipe(NB) rail on
crash barrier complete including
providing three or more coats of
Lm
epoxy paint of approved colour, make
and quality over a coat of epoxy
primer complete as per Drawings and
Technical Specificat

Contractors Representative

3,060

1605

4911300

380.13

185

2244

415140

110

6591

725010

197.40

1,536

3552

5455872

7.14

1,536

1522

2337792

46 of 149

0
610109
0

0.000
380.130
0

610109

1301063

172.2

1134970

25361

7.14

25.200

MB
Ref.

% age
Completion

15.49%

12.42%

166093

179.45%

25361

0.46%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
5.14 Providing & laying Tar paper bearing
complete as per Technical
Sqm
1,540
19
29260
118.47
2251
118.47
2251
0
Specifications Clause 2000
5.15

5.16

5.17

5.18

5.19

Providing and laying in position


Reinforced Cement Concrete M35 in
median kerbs over culverts, grade
separators excluding cost of
reinforcement steel, complete as per
Drawings and Technical
Specifications Section 1700

Lm

Providing & laying Reinforced cement


concrete hume pipe clause NP4(IS:458) of 1200 mm dia for culverts
on first class bedding of granular
Lm
material including fixing collar with
cement mortar 1:2 but not excluding
excavation, protection works
complete as p
Providing and fixing weep holes in
wing wall, head wall, return wall and
Lm
retaining wall complete as per
Drawings and Technical
Specifications Clause 2706.
Providing and painting of structure
no., span arrangement and flow
directions complete as per Drawings Nos.
and Technical Specifications Section
800
Providing and laying back filling
behind abutments,splayed wing
walls, return wall or any other area
with selected imported granular
materials of approved quality
complete as per Drawings and
Technical Specifications Clause305
and Appendis-6 of IRC:78-200

Contractors Representative

Cum

478

589

281542

36

6653

239508

796

256

203776

475.80

121805

278

561

155958

14,890

315

4690350

8,923.06

2810763

47 of 149

121805

2810763

475.80

8923.06

MB
Ref.

% age
Completion
7.69%

0.00%

59.93%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
5.20
Providing and laying filter media
behind box structure, splayed wing
wall, retaining walls and return wall
Cum
5,510
728
4011280
856.55
623568
856.55
623568
0
complete as per drawings and Tech.
Specifications Clause 305 and
Section 2500
TOTAL ( Bill No.5)
6
6.01

6.02

6.03

6.04

116082158

111061344

110840031

221313

MB
Ref.

% age
Completion

15.55%

NEW BRIDGES, GRADE SEPARATORS, ROBS


Earthwork in excavation for structures
in all types of soil excluding rock,
including all lifts and leads complete Cum
as per drawings and Technical
Specifications Clause No.304.

24,834.00

79

1961886

27,548.50

2176332

27548.5

2176332

110.93%

Earthwork in excavation for structures


in ordinary rock, including all lifts and
leads complete as per drawings and Cum
Technical Specifications Clause
No.302 and 304.

6,938.00

270

1873260

2,620.36

707497

2620.36

707497

37.77%

Earthwork in excavation for structures


in hard rock including all lifts and
leads complete as per drawings and
Technical Specifications Clause
No.302 and 304 and Clause 'A7' of
Additional Technocal Specifications.
(a) blasting Prohibited
Cum
Earthwork in excavation for structures
in Marshy soil excluding rock,
including dewatering and all lifts and
leads complete as per drawings and Cum
Technical Specifications Clause
No.304.

Contractors Representative

1,473.00

764

1125372

27,735.39

21189838

27,735.39

21189838

1882.92%

1,555.00

213

331215

1,417.45

301917

1,417.45

301917

91.15%

48 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.05 Providing and laying in position plain
Cement Concrete of Grade M 15 in
leveling course below open
foundations, pile caps, approach
slabs, annular filling around
Cum
982.00
2855
2803610
1,829.68
5223736
1,807.48
5160355
22.20
63381
foundation in rock and bed protection
complete as per drawings and Tech.
Specifications Secti
6.06

6.07

Providing and laying in position


Reinforced Cement Concrete in open
foundations complete as per
drawings and Technical
Specifications Sections 1500, 1700
and 2100.

6.09

% age
Completion

186.32%

(a) Grade M 30

Cum

1,636.00

3641

5956676

3,234.90

11778271

3,234.90

11778271

197.73%

(b) Grade M 35

Cum

2,455.00

3780

9279900

7,708.46

29137979

7,708.46

29137979

313.99%

Providing & constructing temporary


island 16m diameter for construction
of well foundation upto 8m dia. Well
(a) Depth of water 1.0m and height of
Nos.
island to be 1.25m
(b) Depth of water 4.0m and height of
Nos.
island to be 4.5m

6.08

MB
Ref.

Providing, fabricating & laying in


position cutting edge for well
foundations comprising of steel
sections and plates (structural steel)
along with steel liner on well curbs
and well steining complete as per
drawings and Technical
Specifications Clause No

MT

P&L in position Reinforced Cement


Concrete of Grade M35 in well curbs
complete as per drawings and
Cum
Technical Specifications Clause
No.1205, 1214, 1215.

Contractors Representative

2.00

280512

561024

2.00

981791

1963582

12.00

84901

1018812

24.125

2048237

24.13

2048237

201.04%

641.00

5258

3370378

824.39

4334643

824.39

4334643

128.61%

49 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.10 Providing & laying in position
Reinforced Cement Concrete of
Grade M35 in well steining complete
Cum
9,352.00
5819
54419288
11,609.22
67554051
11,609.22
67554051
0
as per drawings and Technical
Specifications Clause No.1206, 1214,
1215 and Sections 1500 and 1700
6.11

Sinking of well foundations upto


different levels complete as per
construction drawings and Technical
Specifications Clause No.1207.

(a) 7.0m dia. Well

In soil

6.12

124.14%

Lm

100.00

29360

2936000

99.80

2930128

99.80

2930128

99.80%

() 10 - 20m depth

Lm

98.00

34035

3335430

99.80

3396693

99.80

3396693

101.84%

() 20 - 30m depth

Lm

65.00

38711

2516215

37.66

1457856

37.66

1457856

() 30 - 40m depth

Lm

1.00

43386

43386

In soil

% age
Completion

() 0 - 10m depth

(b) 8.0m dia. Well

MB
Ref.

() 0 - 10m depth

Lm

80.00

38337

3066960

80.00

3066960

80.00

3066960

100.00%

() 10 - 20m depth

Lm

80.00

43012

3440960

80.00

3440960

80.00

3440960

100.00%

() 20 - 30m depth

Lm

79.00

47687

3767273

70.69

3370899

70.69

3370899

89.48%

() 30 - 40m depth

Lm

15.00

52362

785430

11.47

600592

11.47

600592

76.47%

2,579.00

3960

10212840

2,074.74

8215970

2,074.74

8215970

80.45%

Providing and laying in position Plain


Cement Concrete grade M25 in
bottom Plug with 10% extra cement
including the cost of creation of key in
the bottom plug and anchor bars
Cum
whether shown in the drawings
complete as per drawings and
Technical Specificati

Contractors Representative

50 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.13 Providing and filling clean, sieved,
approved sand in the dredge holes of
the wells up to height specified in the
drawings including all leads and lifts
Cum
6,245.00
469
2928905
3,880.07
1819753
3,880.07
1819753
0
and as per drawings and Technical
Specifications Clause Nos. 1209,
1214 and 1215.
6.14

6.15

6.16

6.17

Providing and laying in position Plain


Cement Concrete grade M25 in Top /
Intermediate Plug in dry condition
complete as per drawings and
Cum
Technical Specifications Clause Nos.
1210, 1214 Section 1700.
Reinforced Cement Concrete grade
M35 in well cap including
construction of false steining and
dismantling of extruding false steining
Cum
above well cap if any, complete as
per drawings and Technical
Specifications Clause Nos. 1211,
1214 and Section 1700.
Bored Cast-in-situ vertical piles of dia
1200mm RCC grade M-35 excluding
reinforcement complete as per
drawings and Tech. Spec. Section
Cum
1100, 1700 & IRC 78-2000 and
removal of excavated earth with all
lifts and lead.
Carring out initial load test (Static
Load Test) both vertical & lateral on
test piles for bored cast-in situ piles
including cost of installation RCC
M35 boring, arranging kentledge /
anchor piles and all testing
equipments, accessories etc.
excluding r

Contractors Representative

Nos.

MB
Ref.

% age
Completion

62.13%

230.00

5120

1177600

163.28

835994

163.28

835994

1,705.00

4510

7689550

1,604.46

7236115

1,604.46

7236115

8,550.00

9141

78155550

8,336.37

76202758

8,336.37

76202758

97.50%

841535

2524605

5.00

4207675

5.0

4207675

166.67%

3.00

51 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.18 Providing and conducting nondestructive pile driving analyser to
evaluate the indegnity of the installed Nos.
4.00 187008
748032
0
0
0
pile as per Technical Specification
Section 1113.
6.19

6.20

6.21

6.22

Reinforced Cement concrete in M35


grade for Pile cap complete as per
drawings and Technical
Specifications Section 1100, 1500
and 1700.

Cum

Providing and laying in position


Reinforced Cement Concrete in pier,
pier cap, pedestals,
cantilever/counterfort abutment,
abutment cap, dirt wall, retaining wall,
buffer wall etc. complete as per
drawings and Technical
Specifications Sections 1500, 1700
(a) Grade M 35
Cum

4,966.00

3861

19173726

4,981.04

9,736.00

4326

42117936

11,879.80

Providing and laying in position


Reinforced Cement Concrete in
superstructure complete as per
drawings and Technical
Specifications Sections 1500, 1700,
2300 and clause A-5.

19231795

51392015

4,981.04

11,758.09

19231795

50865497

121.71

526517

MB
Ref.

% age
Completion

0.00%

100.30%

122.02%

(a) T-Beam and Slab of grade M 30

Cum

3,250.00

5934

19285500

1,029.70

6110210

899.65

5338493

130.05

771717

31.68%

(b) Box Girder of grade M 35

Cum

1,400.00

6385

8939000

971.24

6201367

882.10

5632209

89.14

569159

69.37%

1,860.00

5372

9991920

1,035.97

5565231

936.07

5028568

99.90

536663

55.70%

(c) RCC Slab over PSC girders grade


Cum
M45
Providing & fixing in position HYSD
(TMT) Fe 415 grade reinforcement
bars in foundations, substructures,
superstructures etc. complete as per MT
drawings and Technical
Specifications Sections 1600

(a) In Foundation

MT

2,565.00

51502

132102630

2,607.903

134312220

2,607.443

134288529

0.460

23691

(b) In Sub Structure

MT

1,016.00

51876

52706016

1,649.228

85555366

1,633.642

84746827

15.586

808539

Contractors Representative

52 of 149

101.67%
162.33%
Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
(c) In Super Structure
MT
3,510.00
53148
186549480
2,021.343 107430338
1,777.674
94479818
243.669
12950520
6.23

Providing & fixing in position


Prestressed concrete in
superstructure including pedestals
complete as per drawings and
technical Spec. Section 1500, 1700
and 2300
(a) Grade M45 in Box girder

6.24

6.25

6.26

Cum

(b) Grade M45 in Precast PostCum


tensioned Girders
Supplying, providing and placing in
position and profiling high tensile
steel of 19 T13(Class-ll low
relaxation) strands conforming to IS: MT
6006 of specified ultimate strength
including cutting, threading, tying and
providing necessary anchorage,
sheathing
Providing and laying in position 65
mm thick wearing coat consisting of
40 mm thick bituminous concrete
overlaid with a 25 mm thick layer of
mastic asphalt over deck slab after
sqm
applying prime coat complete as per
drawings and Technical
Specifications Clau

Cucm

Contractors Representative

57.59%

6617

35659013

3,258.31

21560264

2,853.07

18878791

405.24

2681473

60.46%

2,610.00

6043

15772230

2,014.99

12176597

1,729.67

10452408

285.32

1724189

77.20%

174310

53164550

161.313

28118469

147.517

25713688

13.796

2404781

52.89%

804

17347104

3088800

92.00

49744

4576448

156.00

68794

10731864

305.00

21,576.00

3,088,800

(B) POT cum PTFE bearings


() Fixed bearings of 300T Vertical
Nos.
load carrying capacity
() Free / Guided Bearings of 300T
vertical load carrying capacity

% age
Completion

5,389.00

Providing and fixing in position


bearings true to line and level
complete as per drawings and
Technical Specifications Section
2000, IRC : 83 (Part-) 1987 and IRC
: 83(Part-) 2002.
(A) Elastomeric bearings

MB
Ref.

889,200.00

53 of 149

889200

842,400.00

842400

46800

46800

28.79%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.27 Providing and fixing in position
Expansion Joints complete as per
0
0
0
drawings and Technical
Specifications Clause 2600.
(a) Strip seal type accomodating a
movement upto 70mm.
(b) Modular type 70mm.
6.28

6.29

6.30

6.31

6.32

Lm

1,399.00

Lm

Providing and fixing in


positiondrainage spouts complete as Nos.
per drawings and Technical
Specifications Clause 2705.
Providing and fixing in position with
clamps 100 mm dia PVC downtake
and runner pipe including joining with
drainage spout pipe, providing
Lm
couplers, bends etc. in ROBs, Grade
separators etc. complete as per
Drawings.
Providing and laying in position
Reinforced Cement Concrete grade
M 30 in approach slabs including
reinforcement and bityminous joint
filler with joint sealing compound
between approach slab and dirt wall
complete as per drawings and
Technical Specificati

Cum

PCC M15 grade leveling course


below approach slab complete as per
Cum
drawings and Technical
Specifications Section 1700 and
2700
Providing and laying in position
Reinforced Cement Concrete grade
M40 in crash barriers including
reinforcement including providing
bityminous fiber board and
Cum
Polysulphide joint filler at expansion
joints/gap locations complete as per
drawings and Technic

Contractors Representative

9350

13080650

119.05

48.00

112205

5385840

430.00

2244

964920

2,190.00

291

637290

680.00

6777

4608360

227.00

2506

568862

3,210.00

11187

35910270

84.14

54 of 149

1113118

941274

71.40

45.40

667590

507890

47.65

38.74

445528

433384

MB
Ref.

% age
Completion

8.51%

2.62%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.33 Providing and fixing 80mm dia
nominal size MS pipe rail on crash
barrier complete including providing
three or more coats of epoxy paint of
approved colour, make and quality
Lm
13,360.00
1522
20333920
0
0
0
over a coat of epoxy primer complete
as per drawings and Technical
Specifications
6.34

6.35

6.36

6.37

RCC M35 in kerbs/railing/median


kerbs over bridges, grade separators,
ROBs and their approaches
excluding cost of reinforcement steel, Lm
complete as per drawings and
Technical Specifications Section 408
and 1700.
Providing and fixing weep holes in
abutments, splayed wing wall,
median wall, retaining wall or any
Lm
other earth retaining structure
complete as per drawings and
Technical Specifications Clause
2706.
Painting of structure no., span
arrangement and flow directions
complete as per drawings and
Nos.
Technical Specifications Section 800.
providing and laying back filling
behind abutments, splayed wing
walls, return wall or any other area
with selected imported granular
materials of approved quality
complete as per drawings and
Technical Specifications Clause 305
and Appendix-6 of IRC : 78

Contractors Representative

Cum

105.00

1162

122010

1,880.00

256

481280

876.38

140.00

935

130900

3,616.00

315

1139040

117.40

55 of 149

224353

36981

876.38

117.40

224353

36981

MB
Ref.

% age
Completion

46.62%

3.25%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
6.38 Providing and laying filter media
behind abutment, wing walls, buffer
walls, retaining walls and return walls
complete as per drawings and
Cum
1,087.00
728
791336
0
0
0
Technical Specifications Section 305
and 2500.
6.39

6.40

6.41

6.42

Providing and laying in position hand


packed boulder pitching on slopes of
embankment, in front of abutments
and in launching apron complete as Cum
per drawings and Technical
Specifications Section 2500.
providing and laying Boulder apron
on bed for protection against scour
with stone boulders weighing not less
than 40 Kg. each complete as per
Cum
drawings and Technical
Specifications.
Providing and laying filter material
underneath stone pitching in slope
complete as per drawings and
Technical Specifications Section
2500.
Construction of reinforced Earth
Structures(RES) as per approved
drawings
and Technical
Spec.
(a) P& e Precast
concrete
facia
Section
3100
panels of M-35 grade including
reinforcement, soil reinforcing
element, foundation pad, all
accessories, components and
drainage system including ground
improvement as per Specifications
Section 3100 and approved
drawings.

Contractors Representative

Cum

sqm

3,498.00

987

3452526

10,466.00

894

9356604

25.64

11,726.00

728

8536528

12,013.00

5323

63945199

56 of 149

22922

22922

25.64

MB
Ref.

% age
Completion

0.24%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
(b) P, L, Grading and compaction with
selected earth meeting the approved
design parameters in reinforced soil
Cum
8,800.00
467
4109600
0
0
0
zone as per design specifications
Section 3100.
(c) P, L in position RCC crash barriers
in M40 grade concrete with friction
slab including reinforcement as per
Cum
drawing and specifications
Section3100.
6.43

2,728.00

7.01

28780400

Carrying out sub soil


investigation/confirmatory boreholes
at specified foundation locations
before commencement of
construction, except in case of well
foundation where confirmatory boring
shall be carried out before bottom
plugging for confirmation of s

% age
Completion

(a) In soil

Lm

55.00

655

36025

910.03

596070

910.03

596070

1654.60%

(b) In Soft rock

Lm

40.00

1636

65440

33.90

55460

33.90

55460

84.75%

(c) In Hard rock

Lm

30.00

2291

68730

88.05

201723

88.05

201723

293.50%

1021705686

718974769

23986342

TOTAL ( Bill No.6)


7

10550

MB
Ref.

742961111

DRAINAGE AND PROTECTIVE WORKS


Construction of surface unlined ditch
drain in true line & grade including
excavation, dressing of sides &
bottom complete as per Drawings
and Technical Specification Clause
309.

Contractors Representative

###

0
Lm

40,000

70

2800000

57 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
7.02
Construction of open cross drains in
median on superelevated section
with PCC grade M20 including
leveling course in cement concrete
Lm
12,000
1027
12324000
2,156.55
2214778
2156.551
2214778
0
M15 as per drawings and Technical
Specifications Section 1500, 1600
and 1700.
7.03

7.04

7.05

7.06

Cement concrete open drain in M20


grade including execavation, dressing
the sides and bottom, proving
levelling course with cement concrete
Lm
M15 grade etc. complete as per
drawings and Technical
Specifications Section 1500 and
1700.

1,400

1825

2555000

Construction of cement concrete


open drain with cover in M20 grade
including execavation, dressing the
sides and bottom, levelling course
with cement concrete M15 grade etc.
complete as per drawings and
Technical Specifications Clause 309
and Section 1500

Lm

3,200

7080

22656000

Providing and laying filter media 200


mm thick beneath the stone pitching
complete

cum

6,580

728

4790240

Providing and laying stone pitching of


300mm thick on Embankment slopes
cum
as per drawings and Technical
Specifications Clauses 1400 and
2500.

9,575

987

9450525

86.40

Contractors Representative

58 of 149

85277

86.4

MB
Ref.

% age
Completion

17.97%

85277

0.00

0.90%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
7.07
Construction of drainage chute on
high embankment slopes in
superelevated section in cement
concrete M-20 with base concrete in Lm
1,500
822
1233000
0
0
0
0
M-15 grade as per drawings and
Technical Specification Section 1500
and 1700.
7.08

7.09

Construction of Energy Dissipation


Basin at toe of Chutes in M15 cement
concrete as per drawing and
Nos.
Technical Specification Sections
1500 and 1700.
Vertical Drain for water harvesting as
per drawing and Technical
Nos.
Specification and conforming to IRC
SP - 50 - 1999

8.01

% age
Completion

175

2614

457450

28

21089

590492

0.00

56856707

2300054

TOTAL ( Bill No.7)


8

MB
Ref.

2300054

TRAFFIC SIGNS, MARKINS AND ROAD APPURTENANCES


Providing, fixing and erection of traffic
sign boards made out of 2mm thick
aluminum sheet, face to be fully
covered by high intensity grade white
retro reflective sheeting of
encapsulated lens type. The
background/border/symbols/legend/a
rrows shall be ma
a) Octogonal stop sign 900mm size.

Nos.

50

8453

422650

b) Triangular sign 900 side.

Nos.

75

4881

366075

c) Triangular sign 600 side.

Nos.

50

4577

228850

d) Circular sign 900 dia.

Nos.

50

8453

422650

d) Circular sign 600 dia.

Nos.

50

4951

247550

e) Facility information signs 800mm x


Nos.
600mm

24

5885

141240

Contractors Representative

59 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
f) Facility information signs 600mm x
Nos.
10
6400
64000
0
0
0
0
450mm
8.02
Providing, fixing and erection of
direction & place identification sign
boards made out of 2mm thick
aluminum sheet, face to be fully
0
0
0
0
0
0
covered by high intensity grade white
retro reflective sheeting of
encapsulated lens type. The
background/border/symbols/

8.03

8.04

MB
Ref.

% age
Completion
0

a) 1200mm x 1800mm

Nos.

50

26708

1335400

b) 1500mm x 2400mm

Nos.

40

37914

1516560

c) 1800mm x 3600mm

Nos.

20

70225

1404500

Providing & fixing in position


reinforced cement concrete (grade
M20) 200 metre, Km and 5th Km
stone complete as per drawings and
Technical Specification clause 804.
a) 200 metre stone

Nos.

430

357

153510

b) Km stone

Nos.

86

1827

157122

c) 5th Km stone

Nos.

22

3151

69322

Supply and fixing tubular gantry


mounted Overhead / Cantileaver sign
as per drawings and technical
specifications clause 801 & 802.

Contractors Representative

60 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
a) Erection over head gantry /
cantileaver structures as per drawing
including steel works in trussess,
steel tubes cutting, bolting, welding,
fixing and installation in cement
concrete foundations with holding
down bolts, complete in all respects
as per

8.05

% age
Completion

MT

15

69045

1035675

b) The sign boards made out of 2 mm


thick aliminum sheet, face to be fully
covered by high intensity grade white
retro reflecting sheet of encapsulated sqm
lens type. The background/ border /
symbole / lengend / arrows shall be
made by transparent overlay fil

30

8134

244020

8,000

660

5280000

500

870

435000

Providing and laying pavement


marking with hot applied
thermoplastic paints ITYPE-2)
conforming to ASTM D-36/BS 3262
(Part-) complete as per drawings
and Technical Specification clause
803.
a) Lane/centreline/edge
marking/transverse and any other
marking.

sqm

b) Directional arrows, lettering etc. as


per Drawing No. 61 of MORT&H Type
Nos.
Design & Intersection of National
Highways.
8.06

MB
Ref.

Providing and fixing Road delineators


complete as per drawings and
Technical Specification Section 800.

Contractors Representative

61 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount

MB
Ref.

% age
Completion

a) Triangular Object Marker 300mm


side with four red reflector, made out
of 2mm thick aluminum sheet, face to
be fully covered by high intensity
Nos.
grade white retro reflective sheeting
of encapsulated lens type. The
background /border/ symbols shall be
made

50

1008

50400

b) Rectangular hazard marker


600mm x 300mm made out of 2mm
thick aluminum sheet, face to be fully
covered by high intensity grade white
Nos.
retro reflective sheeting of
encapsulated lens type. The
background/ border/ symbols shall be
made by screen printing o

100

2281

228100

c) Roadway Indicators shall be


1000mm high made with 80mm dia.
NB medium weight MS pipe. One
reflector of high intensity grade retro
Nos.
reflective sheeting with encapsulated
lens shall be provided alternatively of
40mm width, so that total width of
reflector

680

1321

898280

Supplying & fixing Route Marker sign


boards size 600mmX450mm with
definition plate 250mmX300 mm
made out of 2mm thick aluminim
Nos.
sheet, face to be fully covered by
high intensity grade white retro
reflective sheeting of encapsulated
lens type. The backgroun

4834

38672

8.07

Contractors Representative

62 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
8.08 Providing and erecting R. C.
boundary stone/ pillars including two
coats of painting with ready mix oil
Nos.
538
508
273304
0
0
0
0
bound paint complete as per
drawings and Technical
Specifications Clause 806.
8.09

8.10

8.11

8.12

8.13

Providing & fixing unidirectional


reflective pavement marker(road
studs) at every 40 to 50m on
pavement edge marking as per
drawings and Technical
Specifications Clause 800.

Nos.

2,200

467

1027400

Providing and laying M20 grade


cement concrete kerb for
median/island complete as per
drawings and Technical
Specifications Clause 408.

Lm

90,000

315

28350000

73,050.78

23010996

Providing and laying M20 grade


cement concrete kerb with channel
for median/island in super-elevated
portions complete as per drawings
and Technical Specifications Clause
408.

Lm

12,000

370

4440000

5,270.00

1949900

Providing & Painting of kerbs with two


coats of road marking paint(grade I
as per IS-164) in black & white paint
sqm
alternate bands complete as per
drawings and Technical
Specifications Clause 803.

90,000

94

8460000

Providing and installing single side


Metal Beam Crash Barrier system
including terminal unit for anchoring
end using cold rolled formed sections
Lm
comprising of "W" profile beams,
posts with base plate welded spacer
channels post delineators and
requisite n

12,000

2158

25896000

83186280

TOTAL ( Bill No.8)


9

24960894

MB
Ref.

% age
Completion

73050.78

23010996

81.17%

5270.00

1949900

43.92%

24960894

MISCELLANEOUS

Contractors Representative

63 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
9.01 Providing and installation of wireless
system complete as per drawings
Sets
3
1232947
3698841
0
0
0
0
and Technical Specification clause
123.
9.02
Maintaining of wireless system
set
complete as per drawings and
mont
108
8807
951156
0
0
0
0
Technical Specification clause 123.
h
9.03

9.04

9.05

Providing and maintaining vehicles


for the Employer's Representative
and his support staff including driver,
POL, etc., complete as per drawings
and Technical Specification clause
124.
Veh.
a) Hard top passenger car Non A.C.
Mont
(One Number)
h

36

76179

2742444

a) Supply of Colour Record


Photographs : Negative and two
Colour Prints thereof mounted in
Nos.
album complete as per drawings and
Technical Specification clause 125.

700

106

74200

b) Same as above - but additional


prints of colour record photographs.

Nos.

550

35

Supplying colour video cassette & CD


ROM records during construction
consisting of each set of edited
master cassetters & C.D. with 4
Set
copies each of cassettes & CD ROMs
complete as per drawings and
Technical Specification clause 126.

10

TOTAL ( Bill No.9)


10

54.00

MB
Ref.

% age
Completion

0.00%

0.00%

4113666

54

4113666

150.00%

0.00%

19250

0.00%

44034

440340

1.00

44034

44034

10.00%

7926231

4157700

4157700

0.00

MAINTENANCE OF ROAD / CONSTRUCTION OF DIVERSION ROAD

Contractors Representative

64 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
10.01
Restoration of Rain cuts in the
embankment and shoulders,
cum
3,145
195
613275
0
0
0
complete as per Drawings and
Technical Specification Clause 3002.
Maintenance of Earthen shoulder
10.02 complete as per Drawings and
sqm
52,420
30
1572600
54,919.27 1647578.00
54,919.27
1647578
0
Technical Specification Clause 3003
10.03 Carrying out repairs to pot holes and
perform any necessary patching to
existing bituminous C/W conforming sqm
30,000
553
16590000
47,157.63 26078171.00
47,157.63
26078171
0
as per Drawings and Technical
Specification Clause 3004.
10.04
Providing Renewal Coat with Mix
Seal SURFACING ( Type A) including
94
11844000
160,868.95 15121680.00
160,868.95
15121680
0.00
0
tack coat to the areas of the existing sqm 126,000
carriageway as per Drawings and
Technical Specification Clause 512
TOTAL ( Bill No.10)
11
11.01

11.02

30619875

42847429

42847429

MB
Ref.

% age
Completion

0.00%

104.77%

157.19%

127.67%

TOLL PLAZA
Providing & Construction of Dry Lean
Cement Concrete Base in cement
concrete of grade M-15 for pavement
cum
as per Drawings and Technical
Specification Clause 601 and Section
1500 & 1700

2,490

1838

4576620

Construction M40 grade cement


concrete pavement in Toll Plaza
including and providing polythene film
as separation membrane. Providing
cum
of contraction joint, expansion joint,
longitudinal joint, construction joint,
joint sealing comlound etc., complete
as

5,480

4173

22868040

Contractors Representative

65 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
11.03
Construction of M40 grade reinforced
cement concrete transition slab at
joint of rigid & flexible pavement
including reinforcement and providing
cum
30
5495
164850
0
0
0
0
polythene film as separation
membrane, contraction joint,
expansion joint, longitudinal joint,
construction jo
TOTAL ( Bill No.11)
12
12.01

(i)

(ii)

(iii)
B

()

()

27609510

SHIFTING OF ELECTRICAL UTILITIES

MB
Ref.

% age
Completion

Supply and Election of 52 Kg/m


13m. Long rail pole iccluding
excavation
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.
For 33 KV. Line
a) Single Pole

Nos.

98

41148

4032504

115.00

0
4732020

115

0
4732020

0.00

0
0

117.35%

b) Double Pole (22 D.Ps) 5 center

Nos.

44

41148

1810512

64.00

2633472

64

2633472

0.00

145.45%

For 11 KV. Line


a) Single Pole

Nos.

43

41148

1769364

74.00

0
3044952

0
74

0
3044952

0.00
0.00

0
0

172.09%

b) Double Pole (21 D.P) 4 center

Nos.

42

41148

1728216

53.00

2180844

53

2180844

0.00

126.19%

(14 D.P) 8 center


For LT Line (Single Line)
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).
For 33 KV. Line
a) Single Pole

Nos.
Nos.

28
195

41148
41148

1152144
8023860

34.00
188.00

1399032
7735824

34
188

1399032
7735824

0.00
0.00

0
0

121.43%
96.41%

0.00

Nos.

98

3810

373380

115.00

0
438150

0
115

0
438150

0.00
0.00

0
0

117.35%

b) Double Pole (22 D.Ps) 5 center

Nos.

44

3810

167640

64.00

243840

64

243840

0.00

145.45%

For 11 KV. Line


a) Single Pole

Nos.

43

3810

163830

74.00

0
281940

0
74

0
281940

0.00
0.00

0
0

172.09%

Contractors Representative

66 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
b) Double Pole (21 D.P) 4 center
()
12.02
A

12.03

MB
Ref.

% age
Completion

Nos.

42

3810

160020

51.00

194310

51

194310

0.00

121.43%

(14 D.P) 8 center


Nos.
For LT Line (Single Line)
Nos.
Supply and Election of R.S Joists 175
90 6m/m-9.1 meyers long.
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.
a) 11 KV. Line
) Single pole
Nos.
)DP 4ft center 1DP
Nos.
b) LT line 3 phase 4 wire / single phaseNos.
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).
a) 11 KV. Line
) Single pole
Nos.
)DP 4ft center 1DP
Nos.
b) LT line 3 phase 4 wire / single
Nos.
phase 3 wire

28
195

2286
2286

64008
445770

34.00
189.00
-

77724
432054
0

34
189
0

77724
432054
0

0.00
0.00
0.00

0
0
0

121.43%
96.92%

55
2
60

9906
9906
4661

61.00
4.00
62.00

544830
19812
279660

Set
Set

0.00

0
604266
39624
288982

0
61
4
62

0
604266
39624
288982

0.00
0.00
0.00
0.00

0
0
0
0

0.00

110.91%
200.00%
103.33%

55
2

3048
3048

167640
6096

61.00
4.00

0
185928
12192

0
61
4

0
185928
12192

0.00
0.00
0.00

0
0
0

110.91%
200.00%

60

2663

159780

62.00

165106

62

165106

0.00

103.33%

0.00

0.00

60724
79110

38
27

60724
79110

0.00
0.00

0
0

0.00

Supply and Fixing of Horizontal cross


bracing's for 33KV/11KV DP's
fbriocated from 50 50 6m/m M.S.
Angle with backclamp duly painted
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.
(a) For 5ft center DP
(b) For 4ft center DP

22
22

1598
2930

35156
64460

38.00
27.00

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

172.73%
122.73%

(a) For 5ft center DP

Set

22

333

7326

38.00

12654

38

12654

0.00

172.73%

(b) For 4ft center DP

Set

22

333

7326

27.00

8991

27

8991

0.00

122.73%

Contractors Representative

67 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
12.04
Supply and Fixing of double/single
0
0
0
0.00
0
channel cross arms fabricated from
100 50 6m/m M.S.
A

12.05

A
B

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.
a. DC cross arms 5 feet center for 33
KVDC
DPs
b.
cross arms 4 feet center for 11
KVDC
DPs
c.
cross arms 5 feet center for
Trans. DPs
d. Transformer Mounting Channel 8
feet centre
e. 11 Kv DO Mounting Channel 8 feet
centre
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).
a. DC cross arms 5 feet center for 33
KV
DPs
b. DC
cross arms 4 feet center for 11
KV
DPs
c. DC cross arms 5 feet center for
Trans. DPs
d. Transformer Mounting Channel 8
feet centre
e. 11 Kv DO Mounting Channel 8 feet
centre
Supply and fixing of LT four pin cross
arms with back clamp fabricated from
50
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Contractors Representative

0.00

MB
Ref.

% age
Completion

Nos.
Nos.
Nos.

22
22
14

2286
2286
2286

50292
50292
32004

64.00
42.00
30.00

146304
96012
68580

64
42
30

146304
96012
68580

0.00
0.00
0.00

0
0
0

290.91%
190.91%
214.29%

Nos.

14

2286

32004

23.00

52578

23

52578

0.00

164.29%

Nos.

14

2286

32004

17.00

38862

17

38862

0.00

121.43%

0.00

Nos.
Nos.

22
22

266
266

5852
5852

64.00
42.00

17024
11172

64
42

17024
11172

0.00
0.00

0
0

290.91%
190.91%

Nos.

14

266

3724

30.00

7980

30

7980

0.00

214.29%

Nos.

14

266

3724

23.00

6118

23

6118

0.00

164.29%

Nos.

14

266

3724

17.00

4522

17

4522

0.00

121.43%

0.00

Set

348

1598

556104

395.00

631210

395

631210

0.00

113.51%

Set

348

152

52896

395.00

60040

395

60040

0.00

113.51%

68 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
12.06
Supply and fixing of 33KV Strain sets
using 33KV strain Hardware suitable
for Raccon conductor with n3 os.
0
0
0
0.00
0
11KV disc T&C type complete in all
respect (six set per DP) (As per
specification & drawing)
A

12.07
A

12.08

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Set

Charges towards Transportation,


Storage, Erection, Testing &
Set
Commissioning
of
Supply and fixing(Inclusive
of 11KV Strain
sets
Insurance
all applicable).
using
11KV&strain
Hardware suitable
for Rabbit conductor with 1 nos. 11KV
disc T&C type complete in all respect
(six
set per
DP)
(As per specification
Materaia
cost
(inclusive
of all texes)
& drawing)all accessories and items
alongwith
Set
specified above.
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Set

MB
Ref.

% age
Completion

132

1598

210936

234.00

373932

234

373932

0.00

177.27%

132

305

40260

234.00

71370

234

71370

0.00

177.27%

0.00

216

1065

230040

327.00

348255

327

348255

0.00

151.39%

216

305

65880

327.00

99735

327

99735

0.00

151.39%

0.00

Supply and fixing of 33KV "V" cross


arms with backclamp suitable for 52
kg/m Rail pole fabricated from
75756m/m M.S. Angle as per
drawing duly painted with two coat
Red oxide paint one coat Aluminum
paint & fixing on all 33 KV single pole
location by u

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Set

98

2131

208838

140.00

298340

140

298340

0.00

142.86%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Set

98

305

29890

140.00

42700

140

42700

0.00

142.86%

Contractors Representative

69 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
12.09
Supply and fixing of 11KV "V" cross
arms with backclamp suitable for 52
kg/m Rail pole fabricated from
65656m/m M.S. Angle as per
0
0
0
0.00
0
drawing duly painted with two coat
Red oxide paint one coat Aluminum
paint & fixing on all 11 KV single pole
location by u
A

12.10

MB
Ref.

% age
Completion

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

100

762

76200

122.00

92964

122

92964

0.00

122.00%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

100

152

15200

122.00

18544

122

18544

0.00

122.00%

0.00

Supply and fixing of 33KV top clamp


fabricated from 75756m/m M.S.
Angle duly painted with two coat Red
oxide paint one coat Aluminum paint
& fixing on all 33 KV single poles &
on all DP's for jumpering of the
conductor by using appropriate size
of Hexa

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

164

305

50020

222.00

67710

222

67710

0.00

135.37%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

164

152

24928

222.00

33744

222

33744

0.00

135.37%

Contractors Representative

70 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
12.11
Supply and fixing of 11KV top clamp
fabricated from 65656m/m M.S.
Angle duly painted with two coat Red
oxide paint one coat Aluminum paint
0
0
0
0.00
0
& fixing on all 11 KV single poles &
on all DP's for jumpering of the
conductor by using appropriate size
of Hexa
A

12.12

12.13

MB
Ref.

% age
Completion

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

166

229

38014

354.00

81066

354

81066

0.00

213.25%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

166

115

19090

354.00

40710

354

40710

0.00

213.25%

0.00

Supply and fixing of 33KV PIN


insulator with one 33 KV GS pin for
binding of conductoe 33KV 'V' cross
armsand Top Clamps mounted on all
single pole/DP's as per requirements.
(As per specification & drawing)

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

350

762

266700

391.00

297942

391

297942

0.00

111.71%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

350

152

53200

391.00

59432

391

59432

0.00

111.71%

0.00

75392

0.00

Supply and fixing of 11KV PIN


insulator with one 33 KV GS pin for
binding of conductoe 11KV 'V' cross
armsand Top Clamps mounted on all
single pole/DP's as per requirements.
(As per specification & drawing)
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.

Contractors Representative

Nos.

346

152

52592

496.00
71 of 149

75392

496

143.35%
Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
B
Charges towards Transportation,
Storage, Erection, Testing &
Nos.
346
39
13494
496.00
19344
496
19344
0.00
0
Commissioning (Inclusive of
Insurance & all applicable).
12.14
Supply and erection of 20m/m (33
KV) Stay sets complete with anchor
rod, anchor plate, I bolt, Bow and
thimble duly painted with two coat red
0
0
0
0.00
0
oxide paint and one coat Aluminum
paint & erection including excavation
in any type of soil/rock. Grouting ,
conc
A

12.15

12.16

MB
Ref.

% age
Completion

143.35%

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

144

3048

438912

187.00

569976

187

569976

0.00

129.86%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

144

762

109728

187.00

142494

187

142494

0.00

129.86%

0.00

Supply and erection of 16m/m Stay


sets for 11KV/LT lines complete with
anchor rod, anchor plate, I bolt, Bow
and thimble duly painted with two
coat red oxide paint and one coat
Aluminum paint & erection including
excavation in any type of soil/rock.
Grout

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Nos.

288

2437

701856

525.00

1279425

525

1279425

0.00

182.29%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Nos.

288

609

175392

525.00

319725

525

319725

0.00

182.29%

0.00

Supply and fixing of following


materials on all LT line poles/LT
fittings (As per specification &
drawing)

Contractors Representative

72 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
A
Materaia cost (inclusive of all texes)
alongwith all accessories and items
0
0
0
0.00
0
specified above.
(a) LT glazed porcelain shackle
insulator 9075mm with one suitable
Nos.
one suitable Nut bolt (3 insulators per
fitting)

1,149.00

35619

1149

35619

0.00

108.40%

5700

380

5700

0.00

105.56%

160208

1054

160208

0.00

234.22%

0.00

15

5400

380.00

(c) LT Shackle hardware complete


with Nut bolts suitable for 9075mm
Shackle insulators on all end location Nos.
& cut points as per requirement (four
sets per fittings)

450

152

68400

1,054.00

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

(b) LT aluminum bobbins with 1


suitable Nut bolt for neutral wire (one Nos.
for each fitting)

32860

360

(c) LT Shackle hardware complete


with Nut bolts suitable for 9075mm
Shackle insulators on all end location Nos.
&
cut points
as per requirement
(four
Supply
of standard
ACSR conductor
sets
per fittings)
of
approved
make as per quantities
mentioned below, paying out/
stringing on all 33KV/11KV/LT newly
erected lines including binding and
jumpering in al respect alongwith
Materaia
cost (inclusive
all texes)
interconnection
of newlyof
erected
lines
alongwith
all
accessories
and
items
with existin
specified above.

Contractors Representative

1060

% age
Completion

31

(b) LT aluminum bobbins with 1


suitable Nut bolt for neutral wire (one Nos.
for each fitting)

(a) LT glazed porcelain shackle


insulator 9075mm with one suitable
Nos.
one suitable Nut bolt (3 insulators per
fitting)

12.17

1060

MB
Ref.

200

212000

1,149.00

229800

1149

229800

0.00

108.40%

360

133

47880

380.00

50540

380

50540

0.00

105.56%

450

200

90000

1,054.00

210800

1054

210800

0.00

234.22%

73 of 149

0.00

0.00

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount

12.18

(a) ACSR (075) Raccon conductor for


33 KV lines
(b) ACSR (05) Rabbit conductor for
11 KV & LT lines (including for road
crossing apans)
(c) ACSR (03) Weasel conductor for
Spur LT lines & neutral Wire
(d) ACSR (02) Squirrel conductoe for
KT line
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).
(a) ACSR (075) Raccon conductor for
33 KV lines
(b) ACSR (05) Rabbit conductor for
11 KV & LT lines (including for road
crossing apans)
(c) ACSR (03) Weasel conductor for
Spur LT lines & neutral Wire
(d) ACSR (02) Squirrel conductoe for
KT line

Contractors Representative

% age
Completion

Kms

55

76199

4190945

39.85

3036530

39.85

3036530

0.00

72.45%

Kms

108

53340

5760720

58.46

3118256

58.46

3118256

0.00

54.13%

Kms

35

38100

1333500

35.09

1336929

35.09

1336929

0.00

100.26%

Kms

30480

213360

0.00

0.00

0.00

Kms

55

10667

586685

39.85

425080

39.85

425080

0.00

72.45%

Kms

108

7619

822852

58.46

445407

58.46

445407

0.00

54.13%

Kms

35

6096

213360

35.09

213909

35.09

213909

0.00

100.26%

Kms

4571

31997

0.00

0.00

0.00

51557
62444
92964

0.00
0.00
0.00

0
0
0

Supply and fixing of Guarding


Channels Fabracated from MS
channel 100506m/m of different
length as per requirement duly
painted with coat of red oxide paint
and one coat of aluminum paint and
fixing them on supports (DP/single
pole as the location may b
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.
(a) 33 kV Guarding channels (4.00
mts11
long)
(a)
kV Guarding channels (3.00
mtsLT
long)
(a)
Guarding channels (2.00 mts
long)

MB
Ref.

Nos.
Nos.
Nos.

24
26
100

1199
932
732

28776
24232
73200

43.00
67.00
127.00

74 of 149

51557
62444
92964

43
67
127

179.17%
257.69%
127.00%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
B
Charges towards Transportation,
Storage, Erection, Testing &
0
0
0
0.00
0
Commissioning (Inclusive of
Insurance & all applicable).
(a) 33 kV Guarding channels (4.00
Nos.
24
133
3192
47.00
6251
47
6251
0.00
0
mts11
long)
(a)
kV Guarding channels (3.00
Nos.
26
127
3302
67.00
8509
67
8509
0.00
0
mtsLT
long)
(a)
Guarding channels (2.00 mts
Nos.
100
107
10700
127.00
13589
127
13589
0.00
0
long)
12.19
Supply and fixing of materials for
Guarding & Earthing of all 33 KV/LT
lines road crossing spans (as
0
0
0
0.00
0
specfied in item no. 12.20 and 12.21
below) as per specification & drawing
A

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.
(a) G.I Wire 6 SWG (5.00mm)
(b) G.I Wire 8 SWG (4.00mm)
(c) LT 'I' Bolts 16mm
(d) LT 'I' Bolts 12mm
(e) Earthing pipe fabricated from
40mm ISI-B Grade GI pipe 2mts.
Long
(f) Porcelain split Insulator for LT
Diamond guarding
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).
(a) G.I Wire 6 SWG (5.00mm)
(b) G.I Wire 8 SWG (4.00mm)
(c) LT 'I' Bolts 16mm
(d) LT 'I' Bolts 12mm
(e) Earthing pipe fabricated from
40mm ISI-B Grade GI pipe 2mts.
Long
(f) Porcelain split Insulator for LT
Diamond guarding

Contractors Representative

0.00

MB
Ref.

% age
Completion

195.83%
257.69%
127.00%

Kg
Kg
Nos.
Nos.

500
1,200
308
72

76
84
8
15

38000
100800
2464
1080

690.00
2,997.00
406.00
102.00

52440
251748
3248
1530

690
2997
406
102

52440
251748
3248
1530

0.00
0.00
0.00
0.00

0
0
0
0

138.00%
249.75%
131.82%
141.67%

Nos.

140

915

128100

300.00

274500

300

274500

0.00

214.29%

Nos.

700

23

16100

252.00

5796

252

5796

0.00

36.00%

0.00

Kg
Kg
Nos.
Nos.

500
1,200
308
72

3
3
1
1

1500
3600
308
72

690.00
2,997.00
406.00
102.00

2070
8991
406
102

690
2997
406
102

2070
8991
406
102

0.00
0.00
0.00
0.00

0
0
0
0

138.00%
249.75%
131.82%
141.67%

Nos.

140

305

42700

300.00

91500

300

91500

0.00

214.29%

Nos.

700

5600

252.00

2016

252

2016

0.00

36.00%

75 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
12.20
Guarding (Carpet type) on all
0
0
0
0.00
0
road/line crossing spans of 33 KV
line (as per drg D-13) using 6 SWG
A

12.21

12.22
A

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Span
Insurance & all applicable) alongwith
all accessories and items specified
above.

12

762

9144

19.00

Guarding (Carpet type) on all


road/line crossing spans of 11 KV line
(as per drg D-14) using 8 SWG

14478

19

14478

0.00

0.00

66294

87

66294

0.00

0.00

0.00

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Span
Insurance & all applicable) alongwith
all accessories and items specified
above.

76

762

57912

87.00

Supply and fixing of Transformer


protection devices on all 14 nos.
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.

MB
Ref.

% age
Completion

158.33%

114.47%

(a) 11 KV DO sets expulsion type


fabricated on post insulators mounted
on MS Galvanized channel with brass
Nos.
connecteors having 200 ampere
current carrying capacity with DO
Barrel complete

42

15240

640080

21.00

320040

21

320040

0.00

50.00%

(b) 11 KV out door metal oxide type


gapless Lightening Arresters

Nos.

42

610

25620

25.00

15250

25

15250

0.00

59.52%

(c) LT Distribution Box (MCCB type


with two outgoing circuits). 100 KVA

Nos.

14

6096

85344

15.00

91440

15

91440

0.00

107.14%

Contractors Representative

76 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
(d) PVC 3 1/2 core armoured cable
150 sqm/m (10 meters each)
(e) G.I earthing pipe fabricated from
B-class ISI G.I pipe (40mm 2mts.
Long) with welded clamp
(f) Transformers mounting base
channel set
(g) Transfomers belting set (turn
buckle 15mm) with pole clamps
(h) (Spare) Transformers 11/.4 KV (a)
110 KVA
(b) 63
KVA
(I) PVC 3 1/2 core armoured cable 70
sqmm (30 meters each)
B

MB
Ref.

% age
Completion

Mtrs.

140

1067

149380

150.00

160050

150

160050

0.00

107.14%

Nos.

42

1067

44814

44.00

46948

44

46948

0.00

104.76%

Nos.

14

4571

63994

27.00

123417

27

123417

0.00

192.86%

Nos.

14

1523

21322

22.00

33506

22

33506

0.00

157.14%

Nos.
Nos.

2
2

190499
152399

380998
304798

1.00

0
152399

0
1

0
152399

0.00
0.00

0
0

50.00%

Mtrs.

420

762

320040

510.00

388620

510

388620

0.00

121.43%

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

0.00

(a) 11 KV DO sets expulsion type


fabricated on post insulators mounted
on MS Galvanized channel with brass
Nos.
connecteors having 200 ampere
current carrying capacity with DO
Barrel complete

42

5334

224028

21.00

112014

21

112014

0.00

50.00%

(b) 11 KV out door metal oxide type


gapless Lightening Arresters

Nos.

42

229

9618

25.00

5725

25

5725

0.00

59.52%

(c) LT Distribution Box (MCCB type


with two outgoing circuits). 100 KVA

Nos.

14

2286

32004

15.00

34290

15

34290

0.00

107.14%

(d) PVC 3 1/2 core armoured cable


150 sqm/m (10 meters each)

Mtrs.

140

381

53340

150.00

57150

150

57150

0.00

107.14%

Nos.

42

381

16002

44.00

16764

44

16764

0.00

104.76%

Nos.

14

9144

128016

27.00

246888

27

246888

0.00

192.86%

(e) G.I earthing pipe fabricated from


B-class ISI G.I pipe (40mm 2mts.
Long) with welded clamp
(f) Transformers mounting base
channel set
Contractors Representative

77 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
(g) Transfomers belting set (turn
buckle 15mm) with pole clamps
(h) (Spare) Transformers 11/.4 KV (a)
110 KVA
(b) 63
KVA
(I) PVC 3 1/2 core armoured cable 70
sqmm (30 meters each)
12.23

12.24

14

534

7476

22.00

11748

22

11748

0.00

157.14%

Nos.
Nos.

2
2

38100
30481

76200
60962

1.00

0
30481

0
1

0
30481

0.00
0.00

0
0

50.00%

Mtrs.

420

76

31920

510.00

38760

510

38760

0.00

121.43%

0.00

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

Set

1067

6402

0.00

Charges towards Transportation,


Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Set

381

2286

0.00

0.00

0.00

0
24384

0
2

0
24384

0.00
0.00

0
0

0.00

0.00

Supply & Fixing of Airbrake switches


(AB switches) complete with back
clamps including jumpering &
earthing of AB switch handle
complete. As per specification and
drawing.

(a) 33 KV AB switch
Contractors Representative

% age
Completion

Nos.

Supply and fixing of 11 KV bridiling 'V'


cross arm & bridiling Top clamp for 11
KV single pole road crossing
supports fabricated from 65656
mm angle with backclamp complete
duly painted with two coat of redoxide
paint and one coat of Aluminum paint
incl

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.
(a) 33 KV AB switch
(b) 11 KV AB switch
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

MB
Ref.

Set
Set

Set

4
4

15240
12192

4571

60960
48768

2.00

18284
78 of 149

50.00%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
(b) 11 KV AB switch
12.25

3048

12192

2.00

6096

6096

0.00

Supply and erection of Aluminum


XLPE/armoured cable and its
erection accessories as under,
including excavation of cable trench
size 30 cm wide 90 cm deep in any
type of soil/rock. In complete width or
road span (60 mts) up to both end of
overhead cable

0.00

Materaia cost (inclusive of all texes)


alongwith all accessories and items
specified above.

0.00

% age
Completion
50.00%

(a) 11 KV PVC Aluminum


XLPE/armoured cable 3 core 185
sqmm (approx. 100 mts/crossing
span)

Mtrs.

200

7619

1523800

190.00

1447610

190

1447610

0.00

95.00%

(b) LT PVC Aluminum armoured


cable 3.5 core 120 sqmm (approx.
100mts/crossing span)

Mtrs.

200

6858

1371600

220.00

1508760

220

1508760

0.00

110.00%

(c) M. Seal push type cable


termination (jointing) kit complete
with its components suitable for 3
core XXLOE armoured cable as
under

Mtrs.

300

10667

3200100

Set

21860

87440

() for 11 KV XLPE/armoured cable


185 sqmm (2set/crossing)

Set

MB
Ref.

(d) ISI marked A class G.I pipe


complete with bend/socket etc.
complete for laying underground
cable as under
() G.I pipe 100 mm Dia for 11 KV
() G.I(approx.
pipe 75/50
mm Dia for LT
cables
90 mts/crossing)
cables (approx. 90 mts/crossing)
Charges towards Transportation,
Storage, Erection, Testing &
Commissioning (Inclusive of
Insurance & all applicable).

Contractors Representative

4.00

Mtrs.
Mtrs.

180
270

762
457

137160
123390

180.00
200.00
-

79 of 149

0.00

87440

87440

0.00

0.00

137160
91400

0.00
0.00

0
0

0.00

137160
91400
0

180
200
0

100.00%

100.00%
74.07%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
Mtrs.

200

2286

457200

190.00

434340

190

434340

0.00

95.00%

(b) LT PVC Aluminum armoured


cable 3.5 core 120 sqmm (approx.
100mts/crossing span)

Mtrs.

200

1981

396200

200.00

396200

200

396200

0.00

100.00%

(c) M. Seal push type cable


termination (jointing) kit complete
with its components suitable for 3
core XXLOE armoured cable as
under

Mtrs.

300

3048

914400

Set

6096

24384

4.00

(d) ISI marked A class G.I pipe


complete with bend/socket etc.
complete for laying underground
cable as under

% age
Completion

(a) 11 KV PVC Aluminum


XLPE/armoured cable 3 core 185
sqmm (approx. 100 mts/crossing
span)

() for 11 KV XLPE/armoured cable


185 sqmm (2set/crossing)

12.26

MB
Ref.

0.00

24384

24384

0.00

0.00

100.00%

() G.I pipe 100 mm Dia for 11 KV


cables (approx. 90 mts/crossing)

Mtrs.

180

229

41220

180.00

41220

180

41220

0.00

100.00%

() G.I pipe 75/50 mm Dia for LT


cables (approx. 90 mts/crossing)

Mtrs.

270

152

41040

200.00

30400

200

30400

0.00

74.07%

Supply & Fixing of 11KV


singabricated from 110506mm MS
channel (Set of 2 channels) duly
painted with two coar of redoxide
paint and 1 coat of Aluminum paint &
fixing in all 11 KV single pole cut point
location as per requirement by using
appropriate siz
Materaia cost (inclusive of all texes)
alongwith all accessories and items
specified above.

Contractors Representative

Set

4571

41139

7.00

80 of 149

0.00

31997

31997

0.00

77.78%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
B
Charges towards Transportation,
Storage, Erection, Testing &
Set
9
1523
13707
7.00
10661
7
10661
0.00
0
Commissioning (Inclusive of
Insurance & all applicable).
12.27
Charges towards dismantling of
existing 33 KV/11 KV/LT line with
care including digging out of poles &
0
0
0
0.00
0
refilling of fit sorting out of useful
material, stocking in stack & layers as
directed by the Engineer including
transportation within all lead & lift
A

Charges payable to the contractor


1) 33KV Top Clap
2) 33KV 'V' Cross Arm with back
clamp
3) 33KV G.I. Pin & Insulator
4) Rail pole 45kg/mx9 meter long
5) ACSR Conductor 20 Sq.mm
(Weasel)
6) D.C. Cross Arm 5' Centre
7) Hardware (33 K.V.) with Disc
8) Hardware (11 K.V.) with Disc
9) 11 KV 'V' Cross Arm
10) 11KV Top Clamp
11) 11KV G.I. Pin & Insulator
12) ACSR Conductor 30 Sq.mm
(Rabitt)
13) D.C. Cross Arm 8 Centre
14) D.C. Cross Arm 4' Centre
15) ACSR Conductor 13 Sq. mm
(Squirrel)
16) 11 K.V. D.O. Mounting channel
17) Transformer Mounting Channel
18) Rail pole 52kg/m x 13 meter long
19) LT four Pin fittings
20) LT shackle Insulator
21) Rail pole 52kg/m x 9 meter long
22) RS Joint 175X85mmX9.3m long
23) PCC poles 280kg/mX9m long

Contractors Representative

Nos.
Nos.
Nos.
Nos.
Km
Set
Nos.
Nos.
No.
Nos.
Nos.
Km
Set
Nos.
Km
Set
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

68
57
134
12
52
13
33
96
82
82
116
45
15
5
64
7
6
5
161
127
47
13
51

152
152
152
2286
6096
305
305
152
152
76
76
7619
305
305
4571
762
457
3048
152
76
2286
2286
2286

10336
8664
20368
27432
316992
3965
10065
14592
12464
6232
8816
342855
4575
1525
292544
5334
2742
15240
24472
9652
107442
29718
116586

68.00
57.00
134.00
12.00
52.00
13.00
33.00
96.00
82.00
82.00
116.00
45.00
15.00
5.00
64.00
7.00
6.00
5.00
161.00
127.00
47.00
13.00
51.00
81 of 149

0
10336
8664
20368
27432
316992
3965
10065
14592
12464
6232
8816
342855
4575
1525
292544
5334
2742
15240
24472
9652
107442
29718
116586

0
68
57
134
12
52
13
33
96
82
82
116
45
15
5
64
7
6
5
161
127
47
13
51

0
10336
8664
20368
27432
316992
3965
10065
14592
12464
6232
8816
342855
4575
1525
292544
5334
2742
15240
24472
9652
107442
29718
116586

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

MB
Ref.

% age
Completion

77.78%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount

24) PCC poles 140kg/mX8m long


25) Transformer 63/100 KVA
Material Cost recoverable from the
1) 33KV Top Clap

Contractors Representative

Nos.
Nos.

225
2

Nos.

1523
3810
0
-31

342675
7620
-248

225.00
2.00
8.00

82 of 149

342675
7620
0
-248

225
2
0
8

342675
7620
0
-248

0.00
0.00
0.00
0.00

0
0
0
0

MB
Ref.

% age
Completion
100.00%
100.00%
100.00%

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
2) 33KV 'V' Cross Arm with back
Nos.
6
-76
-456
6.00
-456
6
-456
0.00
0
clamp
3) 33KV G.I. Pin & Insulator
Nos.
15
-45
-675
15.00
-675
15
-675
0.00
0
4) Rail pole 45kg/mx9 meter long
Nos.
1
-12192
-12192
1.00
-12192
1
-12192
0.00
0
5) ACSR Conductor 20 Sq.mm
Nos.
6
-1523
-9138
6.00
-9138
6
-9138
0.00
0
(Weasel)
6) D.C. Cross Arm 5' Centre
Km
1
-305
-305
1.00
-305
1
-305
0.00
0
7) Hardware (33 K.V.) with Disc
Set
4
-610
-2440
4.00
-2440
4
-2440
0.00
0
8) Hardware (11 K.V.) with Disc
Nos.
11
-305
-3355
11.00
-3355
11
-3355
0.00
0
9) 11 KV 'V' Cross Arm
Nos.
9
-152
-1368
9.00
-1368
9
-1368
0.00
0
10) 11KV Top Clamp
No.
9
-45
-405
9.00
-405
9
-405
0.00
0
11) 11KV G.I. Pin & Insulator
Nos.
13
-76
-988
13.00
-988
13
-988
0.00
0
12) ACSR Conductor 30 Sq.mm
Nos.
5
-1828
-9140
5.00
-9140
5
-9140
0.00
0
(Rabitt)
13) D.C. Cross Arm 8 Centre
Km
2
-305
-610
2.00
-610
2
-610
0.00
0

MB
Ref.

% age
Completion
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

14) D.C. Cross Arm 4' Centre

Set

-305

-305

1.00

-305

-305

0.00

100.00%

15) ACSR Conductor 13 Sq. mm


(Squirrel)

Nos.

-1523

-10661

7.00

-10661

-10661

0.00

100.00%

16) 11 K.V. D.O. Mounting channel

Km

-152

-152

1.00

-152

-152

0.00

100.00%

17) Transformer Mounting Channel

Set

-305

-305

1.00

-305

-305

0.00

100.00%

18) Rail pole 52kg/m x 13 meter long Nos.

-15240

-15240

1.00

-15240

-15240

0.00

100.00%

19) LT four Pin fittings

Nos.

18

-76

-1368

18.00

-1368

18

-1368

0.00

100.00%

20) LT shackle Insulator

Nos.

14

-31

-434

14.00

-434

14

-434

0.00

100.00%

21) Rail pole 52kg/m x 9 meter long

Nos.

-12192

-60960

5.00

-60960

-60960

0.00

100.00%

22) RS Joint 175X85mmX9.3m long

Nos.

-4571

-4571

1.00

-4571

-4571

0.00

100.00%

23) PCC poles 280kg/mX9m long

Nos.

-305

-1830

6.00

-1830

-1830

0.00

100.00%

24) PCC poles 140kg/mX8m long

Nos.

25

-305

-7625

25.00

-7625

25

-7625

0.00

100.00%

Contractors Representative

83 of 149

Consultants Representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
ABSTRACT OF BILL
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to Date
Previous month
This Month
Item No.
(1)
(2)
(3)
Description
Unit
(4)
(5=2*4)
(6)
(7=6*2)
(8=4-6)
(9=2*8)
Qty
Rate
Amount
Qty
Amount
Qty
Amount
Qty
Amount
25) Transformer 63/100 KVA
TOTAL ( Bill No.12)=
Sub-Total of BOQ=
Applying Rebate @ 31.645% =
Actual amount after Rebate=

Nos.

-30480
0.00

-30480

1.00

-30480

-30480

0.00

MB
Ref.

% age
Completion
100.00%

51759000
3204033070

48329349
2382063770

48329349
2355732903

0
26330867

1013916265

753804080

745471677

8332403

0.82%

2190116805

1628259690

1610261226

17998464

74.89%

Extra Items Derived from BOQ with Price adjustment base year 2005-2006 with rebate
V-13

1000MM DIA PIPE Provisionally


allowed @ 75 % 3855

V-26

Adjustment of Atual consumption of


MT
Emulsion
Excess Consumption of Bitumen for
DBM & BC Provisionally allowed @
MT
75 % 15632
Excess Consumption of Tack Coat for
MT
DBM & BC

V-24
V-27

Lm

2891.00

1,807.50

5225495

1807.500

5225495

129.50

1199343

129.505

1199343

11724.00

470.22

5512906

470.224

5512906

11723.98

37.84

443600

37.837

443600

12381344

12381344

200000

200000

9261.00

Total
Extra Items Non BOQ Without Prices adjustment & without rebate
VO-03

Installation of Mobile Sets

VO-04
V-28

Nos.

20

10000.00

200000

Maintanance of Mobile Sets

Nos.

480

1000.00

480000

Credit on Hard Rock


Maintanance of Narmada Railing
(Allowed @ 75% of 215931)
Total Of NON BOQ ITEM

Cum

(D.H.Ryu)
Project Manager

Contractors Representative

RM

501

819654

-48.75

33,794.79

323.25

501.00
0

(L.N.Tiku)
Resident Engineer

805154

14500

-1647496

33794.79

-1647496

161948

501.00

161948

-480394

14500

-465894

(Nirmal kr srivastava)
Senior Quantity Engineer

84 of 149

0.00%
0.00

Team Leader
Engineer's Representative

Consultants Representative

Four Laning of Jhansi - Lakhnadon to Km 297.000 to Km 351.000 of NH-26 in the state of Madhya Pradesh
Material at Site Statement (Package ADB-II/C-8)
IPC-50 FOR THE MONTH OF OCTOBER -2011
Procurement
S.
No.

Material

GSB

Consumed quantity

Quantity
required
Up to date
Unit
as per Previous Qty This Month quantity
Qty
BOQ
(5+6)

Quantity for
Balance
Actual
which
material at Balance
Material
Up to date
Site
for
material
at
Previous This Month
Advance in
quantity
advance
Site for
Qty
Qty
Jul-11(IPC(8+9)
(7-10)
advance.
49)

Qty Consumed

Aug-11
(IPC-49)

Sep-11
(IPC-49)

Quantity
Within 90
Less
days (Aug- consumed
11,Sepin 90 days
11,Oct-11)
15=9+13+14 16= 12-15

7=5+6

10=8+9

11= 7-10

11A

12

13

14

Cum 522794

483845

483845

463627

463627

20218

0.00

0.000

0.00

1105.00

1105.000

-1105.00

40 MM

Cum 452305

268793

268793

178779

178779

90014

0.00

0.000

0.00

0.00

0.000

20MM

Cum 518825

258622

515

259137

211883

515

212398

46739

0.00

0.000

519.00

949.00

10MM

Cum 421180

191182

424

191606

146094

424

146518

45088

0.00

0.000

398.00

795.00

SAND

Cum 277760

61101

514

61615

61101

514

61615

0.000

0.000

0.000

407.00

HYSD
(TMT)
STEEL

Qty
75%
Eligible Proposed
Propos
Material Rate (Rs)
ed Rate
Advance
17 = 11A16

18

19

0.000

235

176

0.00

0.000

372

279

1983.000

-1983.00

0.000

372

279

1617.000

-1617.000

0.000

372

279

930.00

1851.000

-1851.000

0.000

230

173

MT

11374

9079.955

226.930

9306.885

6601.605

259.715

6861.320 2445.565 1530.37

979.123

190.626

298.766

749.107

230.016

BITUMEN MT

16138

9982.225

114.160

10096.385 9765.434

41.097

9806.531

289.854

238.287

165.224

0.000

0.000

41.097

124.127

114.160 13548.95 10162

CEMENT

MT

51290

41736.364

649.000

42385.364 38998.905

Err:502

Err:502

Err:502

Err:502

791.297

556.818

932.168

Err:502

Err:502

Err:502

10

Bearing

Nos

248

264.000

0.000

264.000

0.000

0.000

0.000

264.000

264.000

216.000

0.00

0.000

0.000

216.000

11

RE-Wall
Panel

Sqm

20240

16740.250

0.00

16740.250

0.000

0.000

0.000

16740.25 16740.25 7648.150

0.00

0.000

0.000

7648.150

305

194.001

0.000

194.001

147.517

13.796

161.313

32.688

32.688

75.372

16.028

12.860

42.684

32.688

72000.000

0.000

72000.000

0.000

0.000

0.000

72000.0

0.0

0.00

0.000

0.000

0.000

0.00

12

13

H.T
MT
STRANTD
Polyster
Friction
Ties for
RE Wall

RM

1300.351 26500

19875

3000

2250

48.000 39519

29639

9092.10

1159

0.00 47000

0.0

32

869
35250

24

Upto Date Amount in Rs=


PAID UPTO LAST IPC-49 (Sep-2011))=
Material Advance for this Bill=
100% of This Bill=

Submitted by

Recommended By

Recommended by

D.H.Ryu
Project Manager

L.N.Tiku
Resident Engineer

Nimal Kumar Shrivastava


Senior Quantity Engineer

Certified by

Efren.L.Bacani
Team Leader/Enginer's representative

297.000 to Km 351.000 of NH-26 in the state of Madhya Pradesh


e Statement (Package ADB-II/C-8)

Amount for
material at
site

20

0.00
0.00
0.00
0.00
0.00
25844482
1160061
Err:502
1422684
7903308
0

Err:502
37410213
Err:502
Err:502

Certified by

Efren.L.Bacani
Team Leader/Enginer's representative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Prades
Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Summary of Escalation (INR)


Sl. No.

Component on which
Escalation is applicable

Upto date Amount

up to
Previous
Month

This Month

Labour

Err:502

41782634

Err:502

Cement

Err:502

26809530

Err:502

Steel

Err:502

Plant, Machinery and Spares

Err:502

30350733

Err:502

Bitumen

Err:502

113810870

Err:502

Fuel and Lubricants

Err:502

15774368

Err:502

Other Local Materials

Err:502

92781967

Err:502

Total (INR)

Err:502

4
5
6
7

39,070,202

360380304

Err:502

Err:502

Summary of Escalation (USD)


Sl. No.

1
2

Component on which Escalation


is applicable

Labour
Plant, Machinery and Spares
Total (USD)

Upto date Amount

up to Previous
Month

This Month

1,080,725.76

727748.63

352,977.13

400,708.00

269331.00

131,377.00

1,481,433.76

997079.63

484354

TOTAL AMOUNT OF ESCALATION UPTO DATE MON Err:502

43.99* ###

TOTAL AMOUNT OF ESCALATION UP TO Sep-11 M

###

43.99* ###

Err:502

43.99* ###

TOTAL AMOUNT OF ESCALATION LESS PAID TO C

(D.H.Ryu)
Project Manager

(L.N.Tiku)
Resident Engineer

(Efren.L.Bacani)
Team Leader
Engineer's Representative

87 of 149

(Nirmal kr srivastava)
Senior Quantity Engineer

from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh,


ckage N0. ADB-II / C-8

R THE MONTH OF OCTOBER -2011

ary of Escalation (INR)


This Month
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
#
#

mary of Escalation (USD)


This Month

352,977.13
131,377.00
484354
##

Err:502

404241837

Err:502

(Nirmal kr srivastava)
Senior Quantity Engineer
#
##

(Efren.L.Bacani)
Team Leader
gineer's Representative

88 of 149

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Labour Component


30-Nov-06
10609058.00
31-Dec-06
10591594.00
31-Jan-07
34602450.00
28-Feb-07
27052245.00
31-Mar-07
59527213.00
30-Apr-07
30798029.00
31-May-07
55336234.00
30-Jun-07
37366604.67
30-Jul-07
4258555.33
31-Aug-07
5602747.33
30-Sep-07
18618960.00
31-Oct-07
22657569.33
30-Nov-07
32950987.67
31-Dec-07
47800976.33
31-Jan-08
34175537.33
29-Feb-08
29302621.33
31-Mar-08
21663993.00
30-Apr-08
41203073.00
31-May-08
57312083.00
30-Jun-08
23817193.00
31-Jul-08
56744532.00
31-Aug-08
2223439.00
30-Sep-08
23405523.00
31-Oct-08
-14458865.00
30-Nov-08
49776516.00
31-Dec-08
26281449.00
31-Jan-09
80099448.00
28-Feb-09
148625501.00
31-Mar-09
106093454.00
30-Apr-09
64935263.00
31-May-09
50943261.00
30-Jun-09
16219236.00
31-Jul-09
311937.00
31-Aug-09
8999269.00
30-Sep-09
-4955320.00
31-Oct-09
-2763032.00
30-Nov-09
46462061.00
31-Dec-09
40792865.00
31-Jan-10
40354084.67
28-Feb-10
44052942.00
31-Mar-10
41628326.00
30-Apr-10
51829525.00
31-May-10
29400611.00
30-Jun-10
20766124.00
31-Jul-10
7248090.00
31-Aug-10
9599408.00
30-Sep-10
17046705.00
31-Oct-10
19931718.00
30-Nov-10
33944335.00
31-Dec-10
59670909.00
31-Jan-11
77712458.00
28-Feb-11
68056270.00
31-Mar-11
77891164.00
30-Apr-11
56065720.00
31-May-11
56344795.00
30-Jun-11
12201693.00
31-Jul-11
22846689.00
31-Aug-11
13568666.00
30-Sep-11
26893496.00
31-Oct-11
Err:502
Err:502

549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00
549.00

602.49
597.96
597.96
602.49
597.96
597.96
597.96
602.49
607.00
607.02
634.20
634.20
634.20
634.20
643.26
643.26
656.85
656.85
656.85
665.91
679.50
684.03
688.56
693.09
688.56
679.50
688.56
688.56
688.56
688.56
702.15
706.68
738.39
738.39
738.39
742.92
756.51
761.04
806.34
810.87
806.34
806.34
815.40
824.46
847.11
838.05
842.58
860.70
865.23
878.82
887.88
878.82
874.29
874.29
874.29
883.35
901.47
906.00
910.53
910.53

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Provisonal
Total

89of 149

Percentage

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

Escalation
Amount (INR)

87,861.00
80,288.00
262,298.00
224,038.00
451,236.00
233,459.00
419,467.00
309,459.00
38,242.00
50,330.00
245,607.00
298,882.00
434,665.00
630,555.00
498,757.00
427,642.00
361,747.00
688,013.00
957,002.00
431,111.00
1,146,519.00
46,484.00
505,738.00
(322,563.00)
1,075,554.00
531,015.00
1,730,761.00
3,211,448.00
2,292,430.00
1,403,098.00
1,207,954.00
395,962.00
9,147.00
263,883.00
(145,303.00)
(82,957.00)
1,492,740.00
1,339,210.00
1,607,835.00
1,786,106.00
1,658,604.00
2,065,053.00
1,212,655.00
885,647.00
334,539.00
429,600.00
774,843.00
961,896.00
1,661,946.00
3,047,097.00
4,077,399.00
3,475,295.00
3,922,884.00
2,823,675.00
2,837,730.00
631,638.00
1,246,786.00
749,984.00
1,505,352.00
Err:502
Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Cement Component


30-Nov-06
10,609,058.00
31-Dec-06
10,591,594.00
31-Jan-07
34,602,450.00
28-Feb-07
27,052,245.00
31-Mar-07
59,527,213.00
30-Apr-07
30,798,029.00
31-May-07
55,336,234.00
30-Jun-07
37,366,604.67
30-Jul-07
4,258,555.33
31-Aug-07
5,602,747.33
30-Sep-07
18,618,960.00
31-Oct-07
22,657,569.33
30-Nov-07
32,950,987.67
31-Dec-07
47,800,976.33
31-Jan-08
34,175,537.33
29-Feb-08
29,302,621.33
31-Mar-08
21,663,993.00
30-Apr-08
41,203,073.00
31-May-08
57,312,083.00
30-Jun-08
23,817,193.00
31-Jul-08
56,744,532.00
31-Aug-08
2,223,439.00
30-Sep-08
23,405,523.00
31-Oct-08
(14,458,865.00)
30-Nov-08
49,776,516.00
31-Dec-08
26,281,449.00
31-Jan-09
80,099,448.00
28-Feb-09
148,625,501.00
31-Mar-09
106,093,454.00
30-Apr-09
64,935,263.00
31-May-09
50,943,261.00
30-Jun-09
16,219,236.00
31-Jul-09
311,937.00
31-Aug-09
8,999,269.00
30-Sep-09
(4,955,320.00)
31-Oct-09
(2,763,032.00)
30-Nov-09
46,462,061.00
31-Dec-09
40,792,865.00
31-Jan-10
40,354,084.67
28-Feb-10
44,052,942.00
31-Mar-10
41,628,326.00
30-Apr-10
51,829,525.00
31-May-10
29,400,611.00
30-Jun-10
20,766,124.00
31-Jul-10
7,248,090.00
Grey Cement (Base Year 2004-2005)
31-Aug-10
9,599,408.00
30-Sep-10
17,046,705.00
31-Oct-10
19,931,718.00
30-Nov-10
33,944,335.00
31-Dec-10
59,670,909.00
31-Jan-11
77,712,458.00
28-Feb-11
68,056,270.00
31-Mar-11
77,891,164.00
30-Apr-11
56,065,720.00
31-May-11
56,344,795.00
30-Jun-11
12,201,693.00
31-Jul-11
22,846,689.00
31-Aug-11
13,568,666.00
30-Sep-11
26,893,496.00
31-Oct-11
Err:502
Err:502

Percentage

Escalation
Amount (INR)

164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20
164.20

198.80
198.60
198.40
200.50
210.70
211.60
211.90
213.30
215.10
215.60
219.80
220.00
219.60
219.70
221.10
220.90
221.00
221.40
222.40
221.70
222.00
223.30
225.30
225.20
225.20
222.50
221.40
223.60
225.40
227.90
228.10
229.90
230.80
229.60
227.50
225.80
225.80
213.10
207.10
212.40
222.30
232.40
223.20
215.80
211.10

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

0.000
0.000
0.000
1.230
1.220
1.850
3.190
3.170
3.360
4.870
7.890
6.950
6.050
5.290
5.640
2.480
2.830
3.370
3.280
4.990
6.310
12.320
8.670
5.080
6.530
15.240
4.010
5.180
4.570
8.760
5.970
7.700
13.560
9.550
0.000
0.000
7.510
9.460
11.480
12.190
21.410
13.860
20.030
19.670
18.770

62,526.00
174,813.00
139,804.00
435,877.00
301,072.00
37,702.00
72,600.00
422,818.00
454,860.00
571,715.00
726,493.00
567,744.00
213,298.00
180,268.00
411,151.00
566,355.00
353,757.00
1,071,339.00
83,805.00
641,837.00
(231,939.00)
1,026,392.00
1,208,784.00
951,077.00
2,367,311.00
1,536,038.00
1,875,728.00
1,006,023.00
424,749.00
14,583.00
290,961.00
1,112,666.00
976,855.00
1,028,804.00
1,339,897.00
2,680,572.00
2,536,125.00
1,798,602.00
1,091,077.00
330,298.00

101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60
101.60

151.60
150.30
151.50
148.30
147.80
147.90
150.90
153.70
154.40
155.30
153.60
153.00
151.70
151.10
154.00

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

17.650
17.020
19.640
15.980
7.300
5.450
10.640
10.360
11.480
12.800
15.800
14.190
10.710
Err:502
Err:502
Err:502

708,736.00
1,182,100.00
1,634,225.00
2,119,269.00
1,683,653.00
1,640,565.00
2,986,633.00
3,517,312.00
2,843,141.00
3,240,136.00
838,698.00
1,394,100.00
609,101.00
Err:502
Err:502

Total
90of 149

Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Steel Component


30-Nov-06
10,609,058.00
31-Dec-06
10,591,594.00
31-Jan-07
34,602,450.00
28-Feb-07
27,052,245.00
31-Mar-07
59,527,213.00
30-Apr-07
30,798,029.00
31-May-07
55,336,234.00
30-Jun-07
37,366,604.67
30-Jul-07
4,258,555.33
31-Aug-07
5,602,747.33
30-Sep-07
18,618,960.00
31-Oct-07
22,657,569.33
30-Nov-07
32,950,987.67
31-Dec-07
47,800,976.33
31-Jan-08
34,175,537.33
29-Feb-08
29,302,621.33
31-Mar-08
21,663,993.00
30-Apr-08
41,203,073.00
31-May-08
57,312,083.00
30-Jun-08
23,817,193.00
31-Jul-08
56,744,532.00
31-Aug-08
2,223,439.00
30-Sep-08
23,405,523.00
31-Oct-08
(14,458,865.00)
30-Nov-08
49,776,516.00
31-Dec-08
26,281,449.00
31-Jan-09
80,099,448.00
28-Feb-09
148,625,501.00
31-Mar-09
106,093,454.00
30-Apr-09
64,935,263.00
31-May-09
50,943,261.00
30-Jun-09
16,219,236.00
31-Jul-09
311,937.00
31-Aug-09
8,999,269.00
30-Sep-09
(4,955,320.00)
31-Oct-09
(2,763,032.00)
30-Nov-09
46,462,061.00
31-Dec-09
40,792,865.00
31-Jan-10
40,354,084.67
28-Feb-10
44,052,942.00
31-Mar-10
41,628,326.00
30-Apr-10
51,829,525.00
31-May-10
29,400,611.00
30-Jun-10
20,766,124.00
31-Jul-10
7,248,090.00
Rebars (Base Year 2004-2005)
31-Aug-10
9,599,408.00
30-Sep-10
17,046,705.00
31-Oct-10
19,931,718.00
30-Nov-10
33,944,335.00
31-Dec-10
59,670,909.00
31-Jan-11
77,712,458.00
28-Feb-11
68,056,270.00
31-Mar-11
77,891,164.00
30-Apr-11
56,065,720.00
31-May-11
56,344,795.00
30-Jun-11
12,201,693.00
31-Jul-11
22,846,689.00
31-Aug-11
13,568,666.00
30-Sep-11
26,893,496.00
31-Oct-11
Err:502
Err:502

Percentage

Escalation
Amount (INR)

264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90
264.90

253.30
253.10
252.90
252.90
254.40
255.10
255.10
255.10
255.10
255.10
256.20
258.30
258.30
258.30
258.30
258.30
317.70
330.10
330.10
330.10
335.80
335.80
335.80
336.20
326.10
326.10
301.00
282.00
282.00
282.00
282.00
282.00
282.00
302.20
302.20
302.20
302.20
302.20
302.20
302.20
304.00
340.90
340.90
340.90
340.90

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

0.000
0.000
0.000
0.940
0.800
0.730
2.820
2.680
1.870
1.900
3.850
1.660
1.910
4.360
7.430
2.750
1.800
2.920
2.340
2.770
4.460
14.170
16.670
6.860
10.870
10.640
1.660
2.650
2.930
6.130
4.670
2.020
14.680
14.910
0.000
0.000
11.200
9.380
14.850
11.050
13.060
15.740
14.690
17.530
20.570

(9,792.00)
(16,045.00)
(7,070.00)
(49,071.00)
(31,491.00)
(2,504.00)
(3,347.00)
(20,011.00)
(7,965.00)
(13,329.00)
(44,137.00)
(53,776.00)
(17,066.00)
66,067.00
251,708.00
280,573.00
138,024.00
575,761.00
71,677.00
887,641.00
(226,926.00)
1,062,533.00
549,135.00
154,022.00
216,109.00
170,565.00
218,411.00
130,538.00
17,977.00
2,513.00
160,595.00
622,820.00
457,966.00
717,232.00
582,617.00
682,097.00
1,989,448.00
1,053,243.00
887,744.00
363,587.00

101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80
101.80

136.50
136.70
137.50
137.40
137.70
144.10
150.10
152.10
154.70
155.80
156.10
156.40
157.30
157.70
157.80

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

23.070
17.130
30.630
28.620
25.130
15.220
25.400
20.100
30.040
35.360
28.840
48.750
47.650
50.710
49.470
761.040

641,642.00
850,931.00
1,819,831.00
2,887,740.00
4,494,907.00
4,177,503.00
6,971,402.00
6,575,418.00
7,439,164.00
8,983,198.00
1,595,461.00
5,077,637.00
2,996,154.00
6,365,373.00
Err:502

Total
91of 149

Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Plant and Machinery and Spares Component


30-Nov-06
10,609,058.00
202.80
203.00
31-Dec-06
10,591,594.00
202.80
202.80
31-Jan-07
34,602,450.00
202.80
203.90
28-Feb-07
27,052,245.00
202.80
204.80
31-Mar-07
59,527,213.00
202.80
203.70
30-Apr-07
30,798,029.00
202.80
204.50
31-May-07
55,336,234.00
202.80
205.20
30-Jun-07
37,366,604.67
202.80
204.90
30-Jul-07
4,258,555.33
202.80
205.00
31-Aug-07
5,602,747.33
202.80
205.00
30-Sep-07
18,618,960.00
202.80
207.70
31-Oct-07
22,657,569.33
202.80
208.90
30-Nov-07
32,950,987.67
202.80
209.00
31-Dec-07
47,800,976.33
202.80
208.90
31-Jan-08
34,175,537.33
202.80
208.90
29-Feb-08
29,302,621.33
202.80
209.10
31-Mar-08
21,663,993.00
202.80
209.60
30-Apr-08
41,203,073.00
202.80
218.60
31-May-08
57,312,083.00
202.80
222.10
30-Jun-08
23,817,193.00
202.80
222.60
31-Jul-08
56,744,532.00
202.80
222.60
31-Aug-08
2,223,439.00
202.80
222.60
30-Sep-08
23,405,523.00
202.80
223.50
31-Oct-08
(14,458,865.00)
202.80
223.90
30-Nov-08
49,776,516.00
202.80
224.60
31-Dec-08
26,281,449.00
202.80
223.00
31-Jan-09
80,099,448.00
202.80
222.10
28-Feb-09
148,625,501.00
202.80
222.10
31-Mar-09
106,093,454.00
202.80
222.10
30-Apr-09
64,935,263.00
202.80
221.80
31-May-09
50,943,261.00
202.80
221.60
30-Jun-09
16,219,236.00
202.80
222.70
31-Jul-09
311,937.00
202.80
224.70
31-Aug-09
8,999,269.00
202.80
224.80
30-Sep-09
(4,955,320.00)
202.80
224.60
31-Oct-09
(2,763,032.00)
202.80
224.40
30-Nov-09
46,462,061.00
202.80
224.40
31-Dec-09
40,792,865.00
202.80
224.70
31-Jan-10
40,354,084.67
202.80
231.20
28-Feb-10
44,052,942.00
202.80
235.00
31-Mar-10
41,628,326.00
202.80
236.40
30-Apr-10
51,829,525.00
202.80
237.10
31-May-10
29,400,611.00
202.80
237.40
30-Jun-10
20,766,124.00
202.80
238.80
31-Jul-10
7,248,090.00
202.80
239.00
c.Construction Machinery (Base Year 2004-2005)
31-Aug-10
9,599,408.00
105.70
131.80
30-Sep-10
17,046,705.00
105.70
131.80
31-Oct-10
19,931,718.00
105.70
131.80
30-Nov-10
33,944,335.00
105.70
131.80
31-Dec-10
59,670,909.00
105.70
131.80
31-Jan-11
77,712,458.00
105.70
132.60
28-Feb-11
68,056,270.00
105.70
130.40
31-Mar-11
77,891,164.00
105.70
131.00
30-Apr-11
56,065,720.00
105.70
131.00
31-May-11
56,344,795.00
105.70
131.00
30-Jun-11
12,201,693.00
105.70
131.70
31-Jul-11
22,846,689.00
105.70
131.80
31-Aug-11
13,568,666.00
105.70
131.80
30-Sep-11
26,893,496.00
105.70
131.80
31-Oct-11
Err:502
105.70
131.80
Err:502

Escalation
Amount (INR)

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

1,779.00
31,907.00
45,354.00
44,910.00
43,889.00
111,327.00
65,778.00
7,854.00
10,332.00
76,477.00
115,857.00
171,254.00
244,426.00
174,754.00
154,749.00
123,489.00
545,717.00
927,224.00
395,309.00
941,825.00
36,904.00
406,134.00
(255,739.00)
909,624.00
445,022.00
1,295,889.00
2,404,538.00
1,716,433.00
1,034,225.00
802,834.00
270,561.00
5,727.00
165,963.00
(90,554.00)
(50,029.00)
841,266.00
748,875.00
960,698.00
1,189,082.00
1,172,490.00
1,490,227.00
852,734.00
626,670.00
219,945.00

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

402,957.00
715,575.00
836,680.00
1,424,891.00
2,504,823.00
3,362,148.00
2,703,579.00
3,169,441.00
2,281,350.00
2,292,705.00
510,232.00
959,042.00
569,576.00
1,128,916.00
Err:502

Total
92of 149

Percentage

Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Bitumen Component


30-Nov-06
10,609,058.00
31-Dec-06
10,591,594.00
31-Jan-07
34,602,450.00
28-Feb-07
27,052,245.00
31-Mar-07
59,527,213.00
30-Apr-07
30,798,029.00
31-May-07
55,336,234.00
30-Jun-07
37,366,604.67
30-Jul-07
4,258,555.33
31-Aug-07
5,602,747.33
30-Sep-07
18,618,960.00
31-Oct-07
22,657,569.33
30-Nov-07
32,950,987.67
31-Dec-07
47,800,976.33
31-Jan-08
34,175,537.33
29-Feb-08
29,302,621.33
31-Mar-08
21,663,993.00
30-Apr-08
41,203,073.00
31-May-08
57,312,083.00
30-Jun-08
23,817,193.00
31-Jul-08
56,744,532.00
31-Aug-08
2,223,439.00
30-Sep-08
23,405,523.00
31-Oct-08
(14,458,865.00)
30-Nov-08
49,776,516.00
31-Dec-08
26,281,449.00
31-Jan-09
80,099,448.00
28-Feb-09
148,625,501.00
31-Mar-09
106,093,454.00
30-Apr-09
64,935,263.00
31-May-09
50,943,261.00
30-Jun-09
16,219,236.00
31-Jul-09
311,937.00
31-Aug-09
8,999,269.00
30-Sep-09
(4,955,320.00)
31-Oct-09
(2,763,032.00)
30-Nov-09
46,462,061.00
31-Dec-09
40,792,865.00
31-Jan-10
40,354,084.67
28-Feb-10
44,052,942.00
31-Mar-10
41,628,326.00
30-Apr-10
51,829,525.00
31-May-10
29,400,611.00
30-Jun-10
20,766,124.00
31-Jul-10
7,248,090.00
31-Aug-10
9,599,408.00
30-Sep-10
17,046,705.00
31-Oct-10
19,931,718.00
30-Nov-10
33,944,335.00
31-Dec-10
59,670,909.00
31-Jan-11
77,712,458.00
28-Feb-11
68,056,270.00
31-Mar-11
77,891,164.00
30-Apr-11
56,065,720.00
31-May-11
56,344,795.00
30-Jun-11
12,201,693.00
31-Jul-11
22,846,689.00
31-Aug-11
13,568,666.00
30-Sep-11
26,893,496.00
31-Oct-11
Err:502
Err:502

11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00
11648.00

20696.00
20696.00
19593.60
19073.60
19073.60
19073.60
19073.60
19467.00
19467.00
19467.00
19467.00
19631.80
22011.10
24431.60
26574.00
26574.00
27027.20
27027.20
30117.20
29478.00
29090.40
31467.00
34261.80
36057.00
37505.40
30018.60
25744.80
25938.60
24541.20
25183.80
24490.20
23521.20
24051.60
24622.80
27183.00
30916.20
29110.80
29559.60
29590.20
28264.20
29773.80
29661.60
29661.60
28498.80
28774.20
29090.40
27927.60
27662.40
27407.40
28600.80
28764.00
28957.80
29447.40
33007.20
33394.80
35710.20
32650.20
32629.80
33874.20
35751.00

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

Percentage

28.200
22.230
3.000
0.000
0.000
0.670
0.000
0.000
0.000
0.000
2.090
2.230
0.590
4.720
2.100
9.560
12.620
27.300
32.290
33.130
26.580
29.570
42.980
10.700
14.790
26.230
34.420
19.610
15.220
14.370
20.430
28.740
33.850
16.360
0.000
0.000
14.980
16.540
3.730
0.030
0.000
4.160
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.600
24.430
23.910
18.910
14.220
12.930
1.190
5.170
0.000
0.000
8.160

Escalation
Amount (INR)

1,975,359.00
1,554,608.00
601,897.00
111,814.00
222,035.00
294,371.00
147,020.00
2,104,745.00
781,710.00
3,051,233.00
3,068,310.00
12,623,901.00
24,941,920.00
10,266,701.00
19,197,859.00
950,880.00
16,600,680.00
(2,755,723.00)
13,891,370.00
9,241,416.00
28,361,454.00
30,394,077.00
15,192,580.00
9,216,985.00
9,753,536.00
4,038,801.00
95,574.00
1,393,987.00
8,869,349.00
8,819,047.00
1,970,787.00
16,025.00
2,834,253.00
9,301,269.00
23,712,861.00
20,554,520.00
19,131,660.00
12,426,521.00
11,561,528.00
254,959.00
1,810,282.00
Err:502

675.540
Total
93of 149

Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Fuel and Lubricants


30-Nov-06
10,609,058.00
31-Dec-06
10,591,594.00
31-Jan-07
34,602,450.00
28-Feb-07
27,052,245.00
31-Mar-07
59,527,213.00
30-Apr-07
30,798,029.00
31-May-07
55,336,234.00
30-Jun-07
37,366,604.67
30-Jul-07
4,258,555.33
31-Aug-07
5,602,747.33
30-Sep-07
18,618,960.00
31-Oct-07
22,657,569.33
30-Nov-07
32,950,987.67
31-Dec-07
47,800,976.33
31-Jan-08
34,175,537.33
29-Feb-08
29,302,621.33
31-Mar-08
21,663,993.00
30-Apr-08
41,203,073.00
31-May-08
57,312,083.00
30-Jun-08
23,817,193.00
31-Jul-08
56,744,532.00
31-Aug-08
2,223,439.00
30-Sep-08
23,405,523.00
31-Oct-08
(14,458,865.00)
30-Nov-08
49,776,516.00
31-Dec-08
26,281,449.00
31-Jan-09
80,099,448.00
28-Feb-09
148,625,501.00
31-Mar-09
106,093,454.00
30-Apr-09
64,935,263.00
31-May-09
50,943,261.00
30-Jun-09
16,219,236.00
31-Jul-09
311,937.00
31-Aug-09
8,999,269.00
30-Sep-09
(4,955,320.00)
31-Oct-09
(2,763,032.00)
30-Nov-09
46,462,061.00
31-Dec-09
40,792,865.00
31-Jan-10
40,354,084.67
28-Feb-10
44,052,942.00
31-Mar-10
41,628,326.00
30-Apr-10
51,829,525.00
31-May-10
29,400,611.00
30-Jun-10
20,766,124.00
31-Jul-10
7,248,090.00
31-Aug-10
9,599,408.00
30-Sep-10
17,046,705.00
31-Oct-10
19,931,718.00
30-Nov-10
33,944,335.00
31-Dec-10
59,670,909.00
31-Jan-11
77,712,458.00
28-Feb-11
68,056,270.00
31-Mar-11
77,891,164.00
30-Apr-11
56,065,720.00
31-May-11
56,344,795.00
30-Jun-11
12,201,693.00
31-Jul-11
22,846,689.00
31-Aug-11
13,568,666.00
30-Sep-11
26,893,496.00
31-Oct-11
Err:502
Err:502

33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55
33.55

38.19
37.03
37.03
37.03
35.86
35.86
35.10
35.08
35.08
35.08
35.08
35.08
35.08
35.08
35.08
35.08
37.33
37.33
37.33
38.73
38.73
38.73
38.73
38.73
38.73
36.43
36.43
34.33
34.33
34.33
34.33
34.33
36.54
36.54
36.54
36.54
36.58
36.58
36.58
36.58
39.40
39.40
39.40
39.40
41.70
41.70
41.70
41.78
41.78
41.78
41.78
41.78
41.78
41.78
41.78
45.70
45.70
45.70
45.70
45.70

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Total

94of 149

Percentage

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

Escalation
Amount (INR)

124,716.00
93,383.00
305,079.00
238,511.00
348,381.00
180,244.00
217,304.00
144,844.00
16,507.00
21,718.00
72,173.00
87,828.00
127,728.00
185,291.00
132,475.00
113,586.00
207,471.00
394,592.00
548,864.00
312,570.00
744,698.00
29,180.00
307,167.00
(189,754.00)
653,252.00
191,764.00
584,451.00
293,707.00
209,657.00
128,322.00
100,672.00
32,052.00
2,363.00
68,172.00
(37,538.00)
(20,931.00)
356,671.00
313,151.00
309,782.00
338,177.00
616,980.00
768,174.00
435,751.00
307,778.00
149,661.00
198,211.00
351,985.00
415,596.00
707,772.00
1,244,196.00
1,620,380.00
1,419,039.00
1,624,106.00
1,169,025.00
1,174,844.00
375,598.00
703,276.00
417,676.00
827,847.00
Err:502
Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Other Local Materials


30-Nov-06
10,609,058.00
31-Dec-06
10,591,594.00
31-Jan-07
34,602,450.00
28-Feb-07
27,052,245.00
31-Mar-07
59,527,213.00
30-Apr-07
30,798,029.00
31-May-07
55,336,234.00
30-Jun-07
37,366,604.67
30-Jul-07
4,258,555.33
31-Aug-07
5,602,747.33
30-Sep-07
18,618,960.00
31-Oct-07
22,657,569.33
30-Nov-07
32,950,987.67
31-Dec-07
47,800,976.33
31-Jan-08
34,175,537.33
29-Feb-08
29,302,621.33
31-Mar-08
21,663,993.00
30-Apr-08
41,203,073.00
31-May-08
57,312,083.00
30-Jun-08
23,817,193.00
31-Jul-08
56,744,532.00
31-Aug-08
2,223,439.00
30-Sep-08
23,405,523.00
31-Oct-08
(14,458,865.00)
30-Nov-08
49,776,516.00
31-Dec-08
26,281,449.00
31-Jan-09
80,099,448.00
28-Feb-09
148,625,501.00
31-Mar-09
106,093,454.00
30-Apr-09
64,935,263.00
31-May-09
50,943,261.00
30-Jun-09
16,219,236.00
31-Jul-09
311,937.00
31-Aug-09
8,999,269.00
30-Sep-09
(4,955,320.00)
31-Oct-09
(2,763,032.00)
30-Nov-09
46,462,061.00
31-Dec-09
40,792,865.00
31-Jan-10
40,354,084.67
28-Feb-10
44,052,942.00
31-Mar-10
41,628,326.00
30-Apr-10
51,829,525.00
31-May-10
29,400,611.00
30-Jun-10
20,766,124.00
31-Jul-10
7,248,090.00
All Commodities (Base Year 2004-2005)
31-Aug-10
9,599,408.00
30-Sep-10
17,046,705.00
31-Oct-10
19,931,718.00
30-Nov-10
33,944,335.00
31-Dec-10
59,670,909.00
31-Jan-11
77,712,458.00
28-Feb-11
68,056,270.00
31-Mar-11
77,891,164.00
30-Apr-11
56,065,720.00
31-May-11
56,344,795.00
30-Jun-11
12,201,693.00
31-Jul-11
22,846,689.00
31-Aug-11
13,568,666.00
30-Sep-11
26,893,496.00
31-Oct-11
Err:502
Err:502

Percentage

Escalation
Amount (INR)

197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20
197.20

209.10
208.40
208.80
208.90
209.80
211.50
212.30
212.30
213.60
213.80
215.10
215.20
215.90
216.40
218.10
219.90
225.50
228.50
231.10
237.40
240.00
241.20
241.50
239.00
234.20
229.70
228.90
227.60
228.20
231.50
234.30
235.00
238.70
240.80
242.60
242.50
247.20
248.30
250.50
250.50
253.40
257.50
260.40
261.00
263.30

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

31.80
37.77
57.00
57.83
57.98
56.75
53.99
54.15
54.77
53.23
46.17
49.16
51.45
45.63
44.83
45.21
42.75
26.41
22.09
19.11
22.65
3.94
-8.32
37.36
27.81
7.89
19.91
32.56
37.28
30.74
28.93
21.54
-2.09
19.18
60.00
60.00
26.31
24.62
29.94
36.73
25.53
26.24
25.28
22.80
20.66

173,047.00
193,125.00
986,170.00
788,959.00
1,874,461.00
1,077,300.00
1,944,518.00
1,316,955.00
164,877.00
213,392.00
663,255.00
864,191.00
1,366,493.00
1,805,097.00
1,380,201.00
1,296,220.00
1,129,726.00
1,468,096.00
1,849,923.00
788,659.00
2,371,090.00
16,614.00
(371,841.00)
(973,261.00)
2,207,696.00
290,484.00
2,179,074.00
6,341,081.00
5,284,917.00
2,951,145.00
2,356,791.00
569,220.00
(1,166.00)
324,380.00
(581,823.00)
(323,703.00)
2,634,519.00
2,212,102.00
2,775,738.00
3,717,364.00
2,574,472.00
3,534,845.00
2,024,709.00
1,302,036.00
426,646.00

104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90
104.90

141.10
142.00
142.90
143.80
146.00
148.00
148.10
149.50
152.10
152.40
153.10
154.20
154.90
155.80
156.80

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

19.28
25.85
9.73
15.40
14.97
14.90
0.05
10.63
4.26
-1.09
14.17
-8.11
1.64
Err:502
Err:502

542,880.00
1,324,702.00
597,152.00
1,647,711.00
2,974,882.00
4,043,874.00
11,911.00
2,992,263.00
913,466.00
(236,384.00)
675,275.00
(740,175.00)
90,156.00
Err:502
Err:502

Err:502
Total
95of 149

Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II
/ C-8

Working Month

IPC-50 FOR THE MONTH OF OCTOBER -2011


RI (Portion of Total
Value of Work Done
B (Base
C (Current
Status of
Duing the Month
Index)
Index)
Indicies
Payable in INR)

Adjustment for Foreign Currency Component (Plant


30-Nov-06
100.80
19185.74
31-Dec-06
100.80
19970.74
31-Jan-07
100.80
69828.30
28-Feb-07
100.80
50069.49
31-Mar-07
100.80
74801.17
30-Apr-07
100.80
92419.16
31-May-07
100.80
122543.44
30-Jun-07
100.80
144532.71
30-Jul-07
100.80
15987.24
31-Aug-07
100.80
15447.55
30-Sep-07
100.80
71495.31
31-Oct-07
100.80
129316.83
30-Nov-07
100.80
116486.22
31-Dec-07
100.80
172773.95
31-Jan-08
100.80
167885.54
29-Feb-08
100.80
126604.76
31-Mar-08
100.80
93976.05
30-Apr-08
100.80
252596.84
31-May-08
100.80
210391.83
30-Jun-08
100.80
87890.31
31-Jul-08
100.80
61699.27
31-Aug-08
100.80
9692.76
30-Sep-08
100.80
78899.16
31-Oct-08
100.80
95667.30
30-Nov-08
100.80
194612.28
31-Dec-08
100.80
87126.24
31-Jan-09
100.80
207311.22
28-Feb-09
100.80
302607.68
31-Mar-09
100.80
326366.79
30-Apr-09
100.80
361495.27
31-May-09
100.80
350806.08
30-Jun-09
100.80
147285.72
31-Jul-09
100.80
46470.18
31-Aug-09
100.80
31712.20
30-Sep-09
100.80
238.86
31-Oct-09
100.80
238.86
30-Nov-09
100.80
137012.33
31-Dec-09
100.80
152556.76
31-Jan-10
100.80
143276.84
28-Feb-10
100.80
102335.98
31-Mar-10
100.80
159506.87
30-Apr-10
100.80
159699.25
31-May-10
100.80
105388.48
30-Jun-10
100.80
72002.66
31-Jul-10
100.80
50906.12
31-Aug-10
100.80
36593.83
30-Sep-10
100.80
51795.88
31-Oct-10
100.80
81153.95
30-Nov-10
100.80
87840.72
31-Dec-10
100.80
205163.17
31-Jan-11
100.80
264047.04
28-Feb-11
100.80
248906.41
31-Mar-11
100.80
300878.78
30-Apr-11
100.80
223441.98
31-May-11
100.80
199683.47
30-Jun-11
100.80
52516.18
31-Jul-11
100.80
83445.85
31-Aug-11
100.80
61894.15
30-Sep-11
100.80
91171.77
31-Oct-11
100.80
82560.05
7510211.57

Percentage

& Machinery & Over head)(USD)


102.30
Final
51.714
102.60
Final
51.714
102.80
Final
51.714
103.50
Final
51.714
104.10
Final
51.714
104.50
Final
51.714
104.60
Final
51.714
104.60
Final
51.714
105.00
Final
51.714
105.10
Final
51.714
105.70
Final
51.714
105.90
Final
51.714
105.90
Final
51.714
106.30
Final
51.714
106.80
Final
51.714
107.20
Final
51.714
108.20
Final
51.714
108.80
Final
51.714
109.70
Final
51.714
110.40
Final
51.714
111.20
Final
51.714
111.00
Final
51.714
111.10
Final
51.714
111.00
Final
51.714
110.70
Final
51.714
110.70
Final
51.714
110.80
Final
51.714
111.60
Final
51.714
112.40
Final
51.714
112.70
Final
51.714
112.70
Final
51.714
112.60
Final
51.714
113.00
Final
51.714
113.40
Final
51.714
113.50
Final
51.714
113.20
Final
51.714
113.40
Final
51.714
113.80
Final
51.714
114.20
Final
51.714
114.60
Final
51.714
115.00
Final
51.714
115.60
Final
51.714
115.70
Final
51.714
115.50
Final
51.714
115.90
Final
51.714
116.30
Final
51.714
117.60
Final
51.714
117.80
Final
51.714
117.10
Final
51.714
117.80
Final
51.714
118.90
Final
51.714
119.80
Final
51.714
120.40
Final
51.714
120.40
Final
51.714
120.40
Final
51.714
120.60
Final
51.714
121.40
Final
51.714
122.50
Final
51.714
122.60
Final
51.714
122.40
Final
51.714
Total
Err:502

INR

1,481,433.76

USD

96of 149

Escalation
Amount (INR)

125.00
157.00
609.00
590.00
1,076.00
1,491.00
2,031.00
2,395.00
293.00
290.00
1,528.00
2,876.00
2,591.00
4,144.00
4,393.00
3,533.00
3,033.00
8,812.00
8,166.00
3,679.00
2,798.00
431.00
3,544.00
4,255.00
8,402.00
3,761.00
9,040.00
14,252.00
16,509.00
18,759.00
18,205.00
7,579.00
2,472.00
1,742.00
13.00
13.00
7,528.00
8,649.00
8,372.00
6,158.00
9,877.00
10,307.00
6,848.00
4,616.00
3,352.00
2,473.00
3,795.00
6,016.00
6,244.00
15,209.00
20,841.00
20,623.00
25,717.00
19,098.00
17,067.00
4,534.00
7,496.00
5,857.00
8,667.00
7,777.00
400,708.00

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Working
Month

RI (Portion of
B (Base
Total Value of
conversion
Work Done Duing
Factor) 1
the Month
1USD= Korean
Payable in USD)
won
2

Exchange
Ratio of Base
C (Current
Conversion
Index)
Factor/Curren
t Conversioon
Factor)

C (current
conversion
Factor) 1
1USD=
Korean won

B (Base
Index)

7 =3/4

3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924
3292924

3716059
5791859
3580112
6465734
3713310
3668332
3639092
3915749
3783105
4390421
4402236
3739573
3515511
5625665
4535874
4535874
4535874
4242947
4242947
4242947
4049174
4049174
4049174
4122802
4122802
4122802
4138069
4138069
4138069
3978728
3978728
3978728
4211687
4211687
4211687
4369252
4369252
4369252
4891748
4891748
4891748
4410940
4410940
4410940
4481226
4481226
4481226
4222389
4222389
4222389
5701972
5701972
5701972
5348987
5348987
5348987
5348987
5348987
5348987
5348987

1.1
1.12
1.12
1.11
1.1
1.11
1.12
1.12
1.13
1.12
1.11
1.13
1.14
1.12
1.11
1.1
1.11
1.06
1.03
1.01
0.99
1.02
0.91
0.85
0.8
0.71
0.78
0.75
0.67
0.78
0.81
0.84
0.82
0.85
0.83
0.88
0.88
0.9
0.9
0.89
0.9
0.92
0.93
0.85
0.85
0.89
0.88
0.92
0.93
0.91
0.92
0.93
0.93
0.95
0.97
0.96
0.97
0.98
0.98
0.87

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Provisonal
Provisonal
Provisonal
Provisonal

48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286
48.286

Status of
Indicies

Percenta
Escalation
ge
Amount (USD)

Adjustment for Foreign Currency Component (Labour)(USD)

30-Nov-06
31-Dec-06
31-Jan-07
28-Feb-07
31-Mar-07
30-Apr-07
31-May-07
30-Jun-07
31-Jul-07
31-Aug-07
30-Sep-07
31-Oct-07
30-Nov-07
31-Dec-07
31-Jan-08
29-Feb-08
31-Mar-08
30-Apr-08
31-May-08
30-Jun-08
31-Jul-08
31-Aug-08
30-Sep-08
31-Oct-08
30-Nov-08
31-Dec-08
31-Jan-09
28-Feb-09
31-Mar-09
30-Apr-09
31-May-09
30-Jun-09
31-Jul-09
31-Aug-09
30-Sep-09
31-Oct-09
30-Nov-09
31-Dec-09
31-Jan-10
28-Feb-10
31-Mar-10
30-Apr-10
31-May-10
30-Jun-10
31-Jul-10
31-Aug-10
30-Sep-10
31-Oct-10
30-Nov-10
31-Dec-10
31-Jan-11
28-Feb-11
31-Mar-11
30-Apr-11
31-May-11
30-Jun-11
31-Jul-11
31-Aug-11
30-Sep-11
31-Oct-11

19185.74
19970.74
69828.30
50069.49
74801.17
92419.16
122543.44
144532.71
15987.24
15447.55
71495.31
129316.83
116486.22
172773.95
167885.54
126604.76
93976.05
252596.84
210391.83
87890.31
61699.27
9692.76
78899.16
95667.30
194612.28
87126.24
207311.22
302607.68
326366.79
361495.27
350806.08
147285.72
46470.18
31712.20
238.86
238.86
137012.33
152556.76
143276.84
102335.98
159506.87
159699.25
105388.48
72002.66
50906.12
36593.83
51795.88
81153.95
87840.72
205163.17
264047.04
248906.41
300878.78
223441.98
199683.47
52516.18
83445.85
61894.15
91171.77
82560.05
7510211.57

1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00
1037.00

939.000
928.600
926.100
937.100
943.000
937.300
926.900
928.400
918.000
922.900
938.300
913.900
907.100
925.000
936.600
945.500
937.800
974.700
1011.200
1022.600
1047.000
1014.600
1134.000
1223.500
1298.000
1470.000
1328.000
1379.500
1552.400
1334.500
1288.000
1241.000
1269.000
1221.500
1250.500
1174.500
1184.000
1151.000
1153.000
1168.000
1147.000
1126.000
1117.500
1227.000
1227.000
1168.500
1180.000
1126.000
1112.500
1138.500
1125.000
1117.000
1121.000
1091.000
1070.000
1079.500
1067.000
1058.000
1062.000
1193.000

Total
8 of 9

10= 0.85*(2)
*(7)*(65)/6*7/100

1,113.03
6,966.68
2,799.46
21,978.53
4,311.30
4,800.06
5,921.80
12,566.34
1,103.74
2,366.68
10,972.68
8,135.01
3,684.15
56,262.79
28,870.11
21,575.20
16,160.41
31,704.90
25,660.12
10,511.26
5,757.57
931.90
6,767.65
8,411.15
16,103.97
6,398.53
17,033.63
23,907.32
23,034.06
24,102.14
24,289.05
10,575.44
4,363.65
3,086.79
22.70
28.20
16,175.04
18,419.47
25,696.72
18,150.03
28,607.57
20,473.74
13,657.86
8,528.53
6,408.76
4,823.73
6,750.92
8,649.46
9,463.90
21,628.79
72,941.22
69,506.10
84,019.17
54,398.04
49,637.36
12,919.90
20,742.99
15,544.28
22,897.14
18,407.04
1,080,725.76

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh,
Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Summary of Escalation Indicies


Component of Escalation ( Applicable in Indian Currency) Fuel

Sl. No.

Month

IPC NO.

Base Index

Labour

Cement

549

164.2

Steel (Bar &


Rods)
264.9

Plant,
Machinery
and Spare
202.8

11648.00

and
Lubrica
nts
33.55

Bitumen

Plant,
( in USD Currency)

Other
Local
Material
s
197.2

Machin
ery and
Overhea
100.8
d

Labour
3292924

November-06

IPC-01

602.49

198.80

253.30

203.00

20696.00

38.19

209.10

3716059

102.30

December-06

IPC-02

597.96

198.60

253.10

202.80

20696.00

37.03

208.40

5791859

102.60

January-07

IPC-03

597.96

198.40

252.90

203.90

19593.60

37.03

208.80

3580112

102.80

February-07

IPC-04

602.49

200.50

252.90

204.80

19073.60

37.03

208.90

6465734

103.50

March-07

IPC-05

597.96

210.70

254.40

203.70

19073.60

35.86

209.80

3713310

104.10

April-07

IPC-06

597.96

211.60

255.10

204.50

19073.60

35.86

211.50

3668332

104.50

May-07

IPC-07

597.96

211.90

255.10

205.20

19073.60

35.10

212.30

3639092

104.60

June-07

IPC-08

602.49

213.30

255.10

204.90

19467.00

35.08

212.30

3915749

104.60

July-07

IPC-09

607.00

215.10

255.10

205.00

19467.00

35.08

213.60

3783105

105.00

August-07

IPC-09

607.02

215.60

255.10

205.00

19467.00

35.08

213.80

4390421

105.10

10

September-07

IPC-10

634.20

219.80

256.20

207.70

19467.00

35.08

215.10

4402236

105.70

11

October-07

IPC-11

634.20

220.00

258.30

208.90

19631.80

35.08

215.20

3739573

105.90

12

November-07

IPC-12

634.20

219.60

258.30

209.00

22011.10

35.08

215.90

3515511

105.90

13

December-07

IPC-13

634.20

219.70

258.30

208.90

24431.60

35.08

216.40

5625665

106.30

14

January-08

IPC-14

643.26

221.10

258.30

208.90

26574.00

35.08

218.10

4535874

106.80

15

February-08

IPC-15

643.26

220.90

258.30

209.10

26574.00

35.08

219.90

4535874

107.20

16

March-08

IPC-16

656.85

221.00

317.70

209.60

27027.20

37.33

225.50

4535874

108.20

17

April-08

IPC-17

656.85

221.40

330.10

218.60

27027.20

37.33

228.50

4242947

108.80

18

May-08

IPC-18

656.85

222.40

330.10

222.10

30117.20

37.33

231.10

4242947

109.70

Contractor Repersentive

Consultant Repersentive

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh,
Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Summary of Escalation Indicies


Component of Escalation ( Applicable in Indian Currency) Fuel

Plant,
( in USD Currency)

Other
and
Local
Bitumen
Lubrica
Material
nts
s
29478.00 F 38.73 F 237.40 F

4242947

Machin
ery and
Overhea
d
F 110.40
F

Sl. No.

Month

IPC NO.

19

June-08

IPC-19

665.91

221.70

330.10

Plant,
Machinery
and Spare
222.60
F

20

July-08

IPC-20

679.50

222.00

335.80

222.60

29090.40

38.73

240.00

4049174

111.20

21

August-08

IPC-21

684.03

223.30

335.80

222.60

31467.00

38.73

241.20

4049174

111.00

21

September-08

IPC-21

688.56

225.30

335.80

223.50

34261.80

38.73

241.50

4049174

111.10

22

October-08

IPC-22

693.09

225.20

336.20

223.90

36057.00

38.73

239.00

4122802

111.00

22

November-08

IPC-22

688.56

225.20

326.10

224.60

37505.40

38.73

234.20

4122802

110.70

23

December-08

IPC-23

679.50

222.50

326.10

223.00

30018.60

36.43

229.70

4122802

110.70

23

January-09

IPC-23

688.56

221.40

301.00

222.10

25744.80

36.43

228.90

4138069

110.80

24

February-09

IPC-24

688.56

223.60

282.00

222.10

25938.60

34.33

227.60

4138069

111.60

25

March-09

IPC-25

688.56

225.40

282.00

222.10

24541.20

34.33

228.20

4138069

112.40

26

April-09

IPC-26

688.56

227.90

282.00

221.80

25183.80

34.33

231.50

3978728

112.70

27

May-09

IPC-27

702.15

228.10

282.00

221.60

24490.20

34.33

234.30

3978728

112.70

28

June-09

IPC-28

706.68

229.90

282.00

222.70

23521.20

34.33

235.00

3978728

112.60

29

July-09

IPC-28

738.39

230.80

282.00

224.70

24051.60

36.54

238.70

4211687

113.00

30

August-09

IPC-29

738.39

229.60

302.20

224.80

24622.80

36.54

240.80

4211687

113.40

31

September-09

IPC-29

738.39

227.50

302.20

224.60

27183.00

36.54

242.60

4211687

113.50

32

October-09

IPC-29

742.92

225.80

302.20

224.40

30916.20

36.54

242.50

4369252

113.20

33

November-09

IPC-29

756.51

225.80

302.20

224.40

29110.80

36.58

247.20

4369252

113.40

34

December-09

IPC-30

761.04

213.10

302.20

224.70

29559.60

36.58

248.30

4369252

113.80

Contractor Repersentive

Labour

Steel (Bar &


Rods)

Cement

Labour

Consultant Repersentive

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh,
Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

Summary of Escalation Indicies


Component of Escalation ( Applicable in Indian Currency) Fuel

Plant,
( in USD Currency)

Other
and
Local
Bitumen
Lubrica
Material
nts
s
29590.20 F 36.58 F 250.50 F

4891748

Machin
ery and
Overhea
d
F 114.20
F

Sl. No.

Month

IPC NO.

34

January-10

IPC-31

806.34

207.10

302.20

Plant,
Machinery
and Spare
231.20
F

34

February-10

IPC-32

810.87

212.40

302.20

235.00

28264.20

36.58

250.50

4891748

114.60

35

March-10

IPC-33

806.34

222.30

304.00

236.40

29773.80

39.40

253.40

4891748

115.00

35

April-10

IPC-34

806.34

232.40

340.90

237.10

29661.60

39.40

257.50

4410940

115.60

35

May-10

IPC-35

815.40

223.20

340.90

237.40

29661.60

39.40

260.40

4410940

115.70

36

June-10

IPC-36

824.46

215.80

340.90

238.80

28498.80

39.40

261.00

4410940

115.50

37

July-10

IPC-37

847.11

211.10

340.90

239.00

28774.20

41.70

263.30

4481226

115.90

38

August-10

IPC-38

838.05

151.60

136.50

131.80

29090.40

41.70

141.10

4481226

116.30

39

September-10

IPC-39

842.58

150.30

136.70

131.80

27927.60

41.70

142.00

4481226

117.60

40

October-10

IPC-40

860.70

151.50

137.50

131.80

27662.40

41.78

142.90

4222389

117.80

41

November-10

IPC-41

865.23

148.30

137.40

131.80

27407.40

41.78

143.80

4222389

117.10

42

December-10

IPC-42

878.82

147.80

137.70

131.80

28600.80

41.78

146.00

4222389

117.80

43

January-11

IPC-43

887.88

147.90

144.10

132.60

28764.00

41.78

148.00

5701972

118.90

44

February-11

IPC-44

878.82

150.90

150.10

130.40

28957.80

41.78

148.10

5701972

119.80

45

March-11

IPC-45

874.29

153.70

152.10

131.00

29447.40

41.78

149.50

5701972

120.40

46

April-11

IPC-46

874.29

154.40

154.70

131.00

33007.20

41.78

152.10

5348987

120.40

47

May-11

IPC-47

874.29

155.30

155.80

131.00

33394.80

41.78

152.40

5348987

120.40

48

June-11

IPC-48

883.35

153.60

156.10

131.70

35710.20

45.70

153.10

5348987

120.60

49

July-11

IPC-49

901.47

153.00

156.40

131.80

32650.20

45.70

154.20

5348987

121.40

49

August-11

IPC-49

906.00

151.70

157.30

131.80

32629.80

45.70

154.90

5348987

122.50

49

September-11

IPC-49

910.53

151.10

157.70

131.80

33874.20

45.70

155.80

5348987

122.60

50

October-11

IPC-50

910.53

154.00

157.80

131.80

35751.00

45.70

156.80

5348987

122.40

Contractor Repersentive

Labour

Steel (Bar &


Rods)

Cement

Labour

Consultant Repersentive

Four Laning of Jhansi-Lakhnadon Section KM-297.000 to KM 351.000 of NH-26 in the state of Madhya Pradesh Package -ADB-II/C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011

STATEMENT OF XYZ
Month

Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-06
Jan-08
Feb-06
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11

IPC. No. CEMENT FACTOR (X)

1
2
3
4
5
6
7
8
9
9a
10
11
12
13
14
15
16
17
18
19
20
21
21
22
22
23
23
24
25
26
27
28
28
29
29
29
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
49
49
50
Total

0.000
0.000
0.000
1.230
1.220
1.850
3.190
3.170
3.360
4.870
7.890
6.950
6.050
5.290
5.640
2.480
2.830
3.370
3.280
4.990
6.310
12.320
8.670
5.080
6.530
15.240
4.010
5.180
4.570
8.760
5.970
7.700
13.560
9.550
0.000
0.000
7.510
9.460
11.480
12.190
21.410
13.860
20.030
19.670
18.770
17.650
17.020
19.640
15.980
7.300
5.450
10.640
10.360
11.480
12.800
15.800
14.190
10.710
Err:502
Err:502
Err:502

STEEL FACTOR (Y)

BITUMEN FACTOR (Z)

OTHER LOCAL MATERIAL (60-X-Y-Z)

0.000
0.000
0.000
0.940
0.800
0.730
2.820
2.680
1.870
1.900
3.850
1.660
1.910
4.360
7.430
2.750
1.800
2.920
2.340
2.770
4.460
14.170
16.670
6.860
10.870
10.640
1.660
2.650
2.930
6.130
4.670
2.020
14.680
14.910
0.000
0.000
11.200
9.380
14.850
11.050
13.060
15.740
14.690
17.530
20.570
23.070
17.130
30.630
28.620
25.130
15.220
25.400
20.100
30.040
35.360
28.840
48.750
47.650
50.710
49.470
761.040

28.200
22.230
3.000
0.000
0.000
0.670
0.000
0.000
0.000
0.000
2.090
2.230
0.590
4.720
2.100
9.560
12.620
27.300
32.290
33.130
26.580
29.570
42.980
10.700
14.790
26.230
34.420
19.610
15.220
14.370
20.430
28.740
33.850
16.360
0.000
0.000
14.980
16.540
3.730
0.030
0.000
4.160
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.600
24.430
23.910
18.910
14.220
12.930
1.190
5.170
0.000
0.000
8.160
675.540

31.80
37.77
57.00
57.83
57.98
56.75
53.99
54.15
54.77
53.23
46.17
49.16
51.45
45.63
44.83
45.21
42.75
26.41
22.09
19.11
22.65
3.94
-8.32
37.36
27.81
7.89
19.91
32.56
37.28
30.74
28.93
21.54
-2.09
19.18
60.00
60.00
26.31
24.62
29.94
36.73
25.53
26.24
25.28
22.80
20.66
19.28
25.85
9.73
15.40
14.97
14.90
0.05
10.63
4.26
-1.09
14.17
-8.11
1.64
Err:502
Err:502
Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of
Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
CALCULATION OF RI VALUE FOR ESCALATION

Total work done


Work done
(INR)
(INR) @86.207%

Work done
Material Advance Total RI value in(
(USD)
(INR) at 100%
INR)
@13.793 %

IPC
NO.

Month

Nov-06

6118907.00

5274926.00

19185.74

5334132

10609058.00

Dec-06

6369265.00

5490752.00

19970.74

5100842

10591594.00

Jan-07

22270331.00

19198584.00

69828.30

15403866

34602450.00

Feb-07

15968658.00

13766101.00

50069.49

13286144

27052245.00

Mar-07

23856329.00

20565826.00

74801.17

38961387

59527213.00

Apr-07

29475232.00

25409713.00

92419.16

5388316

30798029.00

May-07

39082766.00

33692080.00

122543.44

21644154

55336234.00

Jun-07

46095800.00

39737806.00

144532.71

-2371201

37366604.67

Jul-07

5098809.00

4395530.00

15987.24

-136975

4258555.33

Aug-07

4926684.00

4247146.00

15447.55

1355601

5602747.33

10

Sep-07

22801990.00

19656912.00

71495.31

-1037952

18618960.00

11

Oct-07

41243003.00

35554356.00

129316.83

-12896787

22657569.33

12

Nov-07

37150938.00

32026709.00

116486.22

924279

32950987.67

13

Dec-07

55102777.00

47502451.00

172773.95

298525

47800976.33

14

Jan-08

53543717.00

46158432.00

167885.54

-11982895

34175537.33

15

Feb-08

40378043.00

34808700.00

126604.76

-5506079

29302621.33

16

Mar-08

29971772.00

25837765.00

93976.05

-4173772

21663993.00

17

Apr-08

80560684.00

69448949.00

252596.84

-28245876

41203073.00

18

May-08

67100244.00

57845107.00

210391.83

-533024

57312083.00

19

Jun-08

28030847.00

24164552.00

87890.31

-347359

23817193.00

20

Jul-08

19677740.00

16963589.00

61699.27

39780943

56744532.00

21

Aug-08

3091310.00

2664926.00

9692.76

-441487

2223439.00

21

Sep-08

25163301.00

21692527.00

78899.16

1712996

23405523.00

22

Oct-08

30511163.00

26302758.00

95667.30

-40761623

-14458865.00

22

Nov-08

62067674.00

53506680.00

194612.28

-3730164

49776516.00

23

Dec-08

27787163.00

23954480.00

87126.24

2326969

26281449.00

23

Jan-09

66117746.00

56998125.00

207311.22

23101323

80099448.00

24

Feb-09

96510636.00

83198924.00

302607.68

65426577

148625501.00

25

Mar-09

104088124.00

89731249.00

326366.79

16362205

106093454.00

26

Apr-09

115291649.00

99389472.00

361495.27

-34454209

64935263.00

27

May-09

111882544.00

96450585.00

350806.08

-45507324

50943261.00

Contractor Repersentative

102 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of
Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
CALCULATION OF RI VALUE FOR ESCALATION

Month

28

Jun-09

46973818.00

40494719.00

147285.72

-24275483

16219236.00

28

Jul-09

14820729.00

12776506.00

46470.18

-12464569

311937.00

29

Aug-09

10113970.00

8718950.00

31712.20

280319

8999269.00

29

Sep-09

76179.00

65672.00

238.86

-5020992

-4955320.00

29

Oct-09

76179.00

65672.00

238.86

-2828704

-2763032.00

29

Nov-09

43697329.00

37670156.00

137012.33

8791905.00

46462061.00

30

Dec-09

48654910.00

41943938.00

152556.76

-1151073.00

40792865.00

31

Jan-10

45695266.00

39392518.00

143276.84

961566.67

40354084.67

32

Feb-10

32638002.00

28136242.00

102335.98

15916700.00

44052942.00

33

Mar-10

50871508.00

43854801.00

159506.87

-2226475.00

41628326.00

34

Apr-10

50932866.00

43907696.00

159699.25

7921829.00

51829525.00

35

May-10

33611537.00

28975498.00

105388.48

425113.00

29400611.00

36

Jun-10

22963802.00

19796405.00

72002.66

969719.00

20766124.00

37

Jul-10

16235482.00

13996122.00

50906.12

-6748032.00

7248090.00

38

Aug-10

11670865.50

10061103.00

36593.83

-461695.00

9599408.00

39

Sep-10

16519253.00

14240752.00

51795.88

2805953.00

17046705.00

40

Oct-10

25882420.00

22312458.00

81153.95

-2380740.00

19931718.00

41

Nov-10

28015032.00

24150919.00

87840.72

9793416.00

33944335.00

42

Dec-10

65432669

56407541.00

205163.17

3263368.00

59670909.00

43

Jan-11

84212494

72597065.00

264047.04

5115393.00

77712458.00

44

Feb-11

79383695

68434302.00

248906.41

-378032.00

68056270.00

45

Mar-11

95959238

82723580.00

300878.78

-4832416.00

77891164.00

46

Apr-11

71262325

61433113.00

223441.98

-5367393.00

56065720.00

47

May-11

63685028

54900952.00

199683.47

1443843.00

56344795.00

48

Jun-11

16748981

14438794.00

52516.18

-2237101.00

12201693.00

49

Jul-11

26613376

22942593.00

83445.85

-95904.00

22846689.00

49

Aug-11

19739893

17017170.00

61894.15

-3448504.00

13568666.00

49

Sep-11

29077402

25066756.00

91171.77

1826740.00

26893496.00

50

Oct-11

26330867

22699051.00

82560.05

Err:502

Err:502

2395230962.00

2064856756.00

7510211.57

Err:502

Err:502

Total

Total work done


Work done
(INR)
(INR) @86.207%

Work done
Material Advance Total RI value in(
(USD)
(INR) at 100%
INR)
@13.793 %

IPC
NO.

Contractor Repersentative

103 of 149

Consultant Repersentative

Section from Km297 to Km 351 on NH-26 in the State of


esh, Package N0. ADB-II / C-8

THE MONTH OF OCTOBER -2011


N OF RI VALUE FOR ESCALATION

Total RI value
in( USD)
19185.74
19970.74
69828.30
50069.49
74801.17
92419.16
122543.44
144532.71
15987.24
15447.55
71495.31
129316.83
116486.22
172773.95
167885.54
126604.76
93976.05
252596.84
210391.83
87890.31
61699.27
9692.76
78899.16
95667.30
194612.28
87126.24
207311.22
302607.68
326366.79
361495.27
350806.08

Contractor Repersentative

104 of 149

Consultant Repersentative

Section from Km297 to Km 351 on NH-26 in the State of


esh, Package N0. ADB-II / C-8

THE MONTH OF OCTOBER -2011


N OF RI VALUE FOR ESCALATION

Total RI value
in( USD)
147285.72
46470.18
31712.20
238.86
238.86
137012.33
152556.76
143276.84
102335.98
159506.87
159699.25
105388.48
72002.66
50906.12
36593.83
51795.88
81153.95
87840.72
205163.17
264047.04
248906.41
300878.78
223441.98
199683.47
52516.18
83445.85
61894.15
91171.77
82560.05
7510211.57

Contractor Repersentative

105 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package
N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Calculation for establishing the weighted percentage of Cement ( Overall Statement)
IPC NO

1
2
3
4
5
6
7
8
9
9
10
11
12
13
14
15
16
17
18
19
20
21
21
22
22
23
24
24
25
26
27
28 (June)
28 (July)
29 (August)
29 (September)
29 (October)
29 (Nov)
30 (Dec)
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49(July)
49(Aug)
49(Sep)
50

Material

Quantity (MT) Invoice Rate

CEMENT
0.000
CEMENT
0.000
CEMENT
0.000
CEMENT
43.830
CEMENT
64.785
CEMENT
124.391
CEMENT
264.832
CEMENT
261.254
CEMENT (July) 30.623
CEMENT (Augus 47.420
CEMENT
359.175
CEMENT
572.887
CEMENT
485.743
CEMENT
546.575
CEMENT
688.600
CEMENT
173.744
CEMENT
149.399
CEMENT
520.934
CEMENT
481.228
CEMENT
308.902
CEMENT
239.868
CEMENT
73.530
CEMENT
412.992
CEMENT
306.886
CEMENT
695.405
CEMENT
1019.438
CEMENT
583.408
CEMENT
1132.247
CEMENT
860.637
CEMENT
1627.494
CEMENT
1065.161
CEMENT
547.351
CEMENT
322.434
CEMENT
212.749
CEMENT
0.000
CEMENT
0.000
CEMENT
823.473
CEMENT
932.563
CEMENT
1001.221
CEMENT
749.138
CEMENT
1368.657
CEMENT
1509.533
CEMENT
1331.116
CEMENT
880.078
CEMENT
687.336
CEMENT
483.444
CEMENT
660.064
CEMENT
1085.311
CEMENT
1184.071
CEMENT
1335.497
CEMENT
1317.329
CEMENT
1561.880
CEMENT
1911.225
CEMENT
1485.295
CEMENT
1567.533
CEMENT
530.379
CEMENT
823.791
CEMENT
556.818
CEMENT
Err:502
CEMENT
Err:502

0.000
0.000
0.000
3877.000
3877.000
3780.000
4058.000
4827.000
4827.000
4360.000
4317.000
4315.000
3986.000
4594.000
3780.000
4960.000
4897.000
4488.000
3944.000
3900.000
4465.000
4465.000
4556.000
4351.000
5023.000
3580.000
3921.000
3810.000
4764.000
5350.000
5407.000
5693.000
5372.000
3912.000
3912.000
3912.000
3435.000
4253.000
4518.000
4578.000
6860.000
4030.000
4361.000
4424.000
3822.000
3673.000
3673.000
4038.000
3260.000
3082.000
3001.000
4661.000
4483.000
4747.000
4484.000
4300.000
3951.000
3272.000
3114.000
4427.000

Consumption
Amount

0
0
0
169929
251171
470198
1074688
1261073
147817
206751
1550558
2472007
1936172
2510966
2602908
861770
731607
2337952
1897963
1204718
1071011
328311
1881592
1335261
3493019
3649588
2287543
4313861
4100075
8707093
5759326
3116069
1732115
832274
0
0
2828630
3966190
4523516
3429554
9388987
6083417
5804998
3893466
2626998
1775690
2424415
4382486
3860071
4116002
3953304
7279923
8568022
7050697
7028818
2280631
3254798
1821908
Err:502
Err:502

Work done
(INR)
@86.207%

5274926
5490752
19198584
13766101
20565826
25409713
33692080
39737806
4395530
4247146
19656912
35554356
32026709
47502451
46158432
34808700
25837765
69448949
57845107
24164552
16963589
2664926
21692527
26302758
53506680
23954480
56998125
83198924
89731249
99389472
96450585
40494719
12776506
8718950
65672
65672
37670156
41943938
39392518
28136242
43854801
43907696
28975498
19796405
13996122
10061103
14240752
22312458
24150919
56407541
72597065
68434302
82723580
61433113
54900952
14438794
22942593
17017170
25066756
22699051
2064856756
Total

%tage of Cement component to be


applied for Escalation Calculation

0.000
0.000
0.000
1.230
1.220
1.850
3.190
3.170
3.360
4.870
7.890
6.950
6.050
5.290
5.640
2.480
2.830
3.370
3.280
4.990
6.310
12.320
8.670
5.080
6.530
15.240
4.010
5.180
4.570
8.760
5.970
7.700
13.560
9.550
0.000
0.000
7.510
9.460
11.480
12.190
21.410
13.860
20.030
19.670
18.770
17.650
17.020
19.640
15.980
7.300
5.450
10.640
10.360
11.480
12.800
15.800
14.190
10.710
Err:502
Err:502
Err:502

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package
N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Calculation for establishing the weighted percentage of Steel ( Overall Statement)
IPC NO

Material

1
2
3
4
5
6
7
8
9
9
10
11
12
13
14
15
16
17
18
19
20
21
21
22
22
23
24
24
25
26
27
28 (June)
28 (July)
29 (August)
29 (September)
29 (October)
29 (Nov)
30 (Dec)
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49(July)
49(Aug)
49(Sep)
50

Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel (July)
Steel (August)
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel

Quantity (MT) Invoice Rate

0.000
0.000
0.000
5.833
7.400
8.328
42.852
48.054
3.704
3.392
28.407
22.182
24.129
81.151
134.290
37.547
18.207
46.398
30.896
15.281
17.287
8.864
86.434
42.119
135.826
68.488
30.149
76.955
91.856
212.096
143.936
27.302
62.933
47.075
0.000
0.000
152.055
144.034
172.829
102.083
188.091
188.610
130.511
105.516
88.714
73.337
77.047
187.441
194.530
315.746
271.575
417.727
406.957
451.175
463.230
97.457
264.469
190.626
298.766
259.715

26500.000
26500.000
26500.000
22137.000
22137.000
22137.000
22137.000
22137.000
22137.000
23836.000
26611.000
26611.000
25336.000
25527.000
25527.000
25527.000
25527.000
43731.000
43731.000
43731.000
43731.000
42590.000
41828.000
42814.000
42814.000
37211.000
31392.000
28631.000
28631.000
28713.000
31291.000
29925.000
29812.000
27616.000
27616.000
27616.000
27757.000
27314.000
33853.000
30444.000
30444.000
36645.000
32612.000
32893.000
32450.000
31656.000
31656.000
36466.000
35526.000
44886.000
40692.000
41604.000
40862.000
40898.000
41908.000
42730.000
42291.000
42539.000
42550.000
43234.00

Consumption
Amount

0
0
0
129125
163814
184357
948615
1063771
81995
80852
755939
590285
611332
2071542
3428021
958462
464770
2029031
1351113
668253
755978
377518
3615361
1803283
5815254
2548507
946437
2203299
2629929
6089912
4503901
817012
1876159
1300023
0
0
4220591
3934145
5850780
3107815
5726242
6911603
4256214
3470738
2878769
2321556
2439000
6835224
6910873
14172575
11050930
17379114
16629088
18452155
19413043
4164338
11184658
8109039
12712493
11228518

Work done
(INR)
@86.207%

5274926
5490752
19198584
13766101
20565826
25409713
33692080
39737806
4395530
4247146
19656912
35554356
32026709
47502451
46158432
34808700
25837765
69448949
57845107
24164552
16963589
2664926
21692527
26302758
53506680
23954480
56998125
83198924
89731249
99389472
96450585
40494719
12776506
8718950
65672
65672
37670156
41943938
39392518
28136242
43854801
43907696
28975498
19796405
13996122
10061103
14240752
22312458
24150919
56407541
72597065
68434302
82723580
61433113
54900952
14438794
22942593
17017170
25066756
22699051
2064856756
Total

%tage of Steel component to be


applied for Escalation Calculation

0.000
0.000
0.000
0.940
0.800
0.730
2.820
2.680
1.870
1.900
3.850
1.660
1.910
4.360
7.430
2.750
1.800
2.920
2.340
2.770
4.460
14.170
16.670
6.860
10.870
10.640
1.660
2.650
2.930
6.130
4.670
2.020
14.680
14.910
0.000
0.000
11.200
9.380
14.850
11.050
13.060
15.740
14.690
17.530
20.570
23.070
17.130
30.630
28.620
25.130
15.220
25.400
20.100
30.040
35.360
28.840
48.750
47.650
50.710
49.470
761.040

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package
N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
Calculation for establishing the weighted percentage of Bitumen ( Overall Statement)
IPC NO

Material

1
2
3
4
5
6
7
8
9
9
10
11
12
13
14
15
16
17
18
19
20
21
21
22
22
23
23
23
25
26

Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen( July)
Bitumen (Augus
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen

54.940
45.083
22.893
0.000
0.000
6.771
0.000
0.000
0.000
0.000
15.806
30.633
7.316
81.377
34.140
123.812
120.645
697.057
599.572
248.226
131.839
23.056
272.806
82.518
244.379
220.124
589.057
678.975
571.512
694.386

Consumption
Amount

Work done
(INR)
@86.207%

%tage of Bitumen component to


be applied for Escalation
Calculation

27074.00
27074.00
25199.00
0.00
0.00
25199.00
0.00
0.00
25931.00
25931.00
25931.00
25931.00
25931.00
27568.00
28447.00
26884.00
27027.00
27197.00
31156.00
32256.00
34196.00
34174.00
34174.00
34103.00
32383.00
28546.00
33303.00
24035.00
23890.00
20573.00

1487446
1220577
576881
0
0
170622
0
0
0
0
409865
794344
189711
2243401
971181
3328562
3260672
18957859
18680265
8006778
4508366
787916
9322872
2814111
7913725
6283660
19617365
16319164
13653422
14285603

5274926
5490752
19198584
13766101
20565826
25409713
33692080
39737806
4395530
4247146
19656912
35554356
32026709
47502451
46158432
34808700
25837765
69448949
57845107
24164552
16963589
2664926
21692527
26302758
53506680
23954480
56998125
83198924
89731249
99389472

28.200
22.230
3.000
0.000
0.000
0.670
0.000
0.000
0.000
0.000
2.090
2.230
0.590
4.720
2.100
9.560
12.620
27.300
32.290
33.130
26.580
29.570
42.980
10.700
14.790
26.230
34.420
19.610
15.220
14.370

Quantity (MT) Invoice Rate

27

Bitumen

814.284

24197.00

19703230

96450585

20.430

28 (June)

Bitumen

472.391

24633.00

11636408

40494719

28.740

28 (July)

Bitumen

140.528

30776.00

4324890

12776506

33.850

29 (August)

Bitumen

46.306

30809.00

1426626

8718950

16.360

29 (September) Bitumen

0.000

0.000

30809.00

65672

29 (October)

Bitumen

0.000

30809.00

65672

0.000

29 (Nov)

Bitumen

160.499

35159.00

5642984

37670156

14.980

30 (Dec)

Bitumen

211.225

32850.00

6938739

41943938

16.540

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49(July)
49(Aug)
49(Sep)
50

Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen
Bitumen

44.745
0.282
0.000
59.204
0.000
0.000
0.000
0.000
0.000
0.000
0.000
235.923
590.911
540.375
491.955
245.546
189.103
3.895
25.859
0.000
41.097
41.097

32850.00
32850.00
32850.00
30854.00
31091.00
31091.00
31091.00
31091.00
31091.00
31091.00
31091.00
30124.00
30018.00
30282.00
31798.00
35571.00
37526.00
44086.00
45907.00
0.00
0.00
45086.00

1469873
9264
0
1826680
0
0
0
0
0
0
0
7106944
17737966
16363636
15643185
8734317
7096279
171715
1187109
0
0
1852899

39392518
28136242
43854801
43907696
28975498
19796405
13996122
10061103
14240752
22312458
24150919
56407541
72597065
68434302
82723580
61433113
54900952
14438794
22942593
17017170
25066756
22699051
2064856756
Total

3.730
0.030
0.000
4.160
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.600
24.430
23.910
18.910
14.220
12.930
1.190
5.170
0.000
0.000
8.160
675.540

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

GSB Consumption Statement

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Up to
Up to date
Previous
This Month As per Mix design
BOQ Item
Month
Excuted
Bulk density
Description
Unit Consumed
No.
Quantity
Consumed
Quantity
2.285MT/cum (MT)
Quantity
1

3.01

Constructions of Granular
sub-base.

Total Quantity (Cum)

Contractor Repersentative

4=5+8

cum

463627.00

463627.00

0.000

463627.00

463627.00

109 of 149

Consultant Repersentative

7 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

R THE MONTH OF OCTOBER -2011


ntract conditions clause No .60)

Consumption Statement

Total Quantity
Consumed in
(Cum)
8 = 7/1.6

0.00
0.00

Contractor Repersentative

110 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement (40 mm)

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ Item
No.

3.02

Description

Construction of Wet Mix


Macadam(WMM) MDD= 2.320
MT/Cum

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

cum

207,600.640

277,178.036

Up to
Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

207600.64

277178.036

As per Mix
Quantityof
design
40 mm
This Month
,Consumption of Aggregate
BOQ Qty
40 mm Agrregate Consumed
/Cum (MT)
(MT)

0.000

1.462

0.00

Total Quantity ( MT)

286045.35

286045.35

Gross Quantity.(Cum)

178,779.00

178,779.00

Contractor Repersentative

111 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (20 mm)

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

As per Mix
design
This Month
,Consumption of 20
BOQ Qty
mm Agrregate /Cum
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

cum

207,600.637

215,973.692

207600.637357

215973.692

0.000

0.394

cum

38,920.750

20,826.122

38920.750441

20826.122

0.000

0.564

cum

48,224.990

31,615.616

48224.99

31615.616

0.000

0.810

4.05

Providing and laying Bituminous Concrete


cum
(BC)

5,377.870

3,819.639

5066.37

3726.189

311.500

0.300

4.06

Providing and laying 25mm thick Semi


Dense Bitumenous Concrete (SDBC)

0.000

0.000

0.000

0.000

5.02

Providing and laying in position Plain


Cement Concrete in M-15 grade leveling
course.

cum

2,394.924

1,793.795

2378.444

1781.455

16.480

0.749

5.03

Providing and laying in position plain


Cement Concrete of Grade M20

cum

11,633.706

8,108.684

11633.7055395

8108.684

0.000

0.697

5.04

Providing and laying in position


Reinforced Cement Concrete grade M 25.

cum

5,861.100

3,815.585

5861.1

3815.585

0.000

0.651

5.05

Providing and laying in position


Reinforced Cement Concrete grade M25.

cum

309.770

201.656

309.77

201.656

0.000

0.651

5.08

Providing and laying 150mm thick flat rigid


apron embedded in 300mm thick concrete Cum
grade M15.

376.296

0.000

371.58

4.716

0.000

5.11

providing and laying in position Reinforced


Cement Concrete grade M 25 in approach Cum
slabs.

197.400

128.512

172.2

112.102

25.200

0.651

5.12

Providing and laying in position


Reinforced Cement Concrete grade M40
in crash barriers.

Cum

7.140

0.000

7.14

0.000

0.000

5.15

Providing and laying in position


Reinforced Cement Concrete M35.

Lm

0.000

0.000

0.000

0.736

BOQ Item
No.

Description

3.02

Construction of Wet Mix Macadam(WMM)


MDD= 2.320 MT/Cum

4.03

Providing and laying Bituminous


Macadam(BM) Marshall Density= 2.350
Mt/Cum

4.04

Providing and laying Dense Graded


Bituminous Macadam (DBM) Marshall
Density= 2.455 MT/Cum

Contractor Repersentative

cum

112 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (20 mm)

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ Item
No.

Description

As per Mix
design
This Month
,Consumption of 20
BOQ Qty
mm Agrregate /Cum
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

856.55

0.000

0.000

5.20

Providing and laying filter media.

Cum

856.550

0.000

6.05

Providing and laying in position plain


Cement Concrete of Grade M 15.

Cum

1,829.680

1,370.413

1,807.48

1353.783

22.200

0.749

Cum
Cum

3,234.900
7,708.460

2,390.593
5,673.432

3,234.90
7,708.46

2390.593
5673.432

0.000
0.000

0.739
0.736

Cum

824.390

606.751

824.39

606.751

0.000

0.736

Cum

11,609.220

8,544.388

11,609.22

8544.388

0.000

0.736

2,074.74

1350.659

0.000

0.651

163.28

106.294

0.000

0.651

6.06
6.06

(a) Grade M 30

6.09

(b) Grade M 35
P&L in position Reinforced Cement
Concrete of Grade M35.

6.10

Providing & laying in position Reinforced


Cement Concrete of Grade M35.

6.12

Providing and laying in position Plain


Cement Concrete grade M25 in bottom
Plug with 10% extra cement.

Cum

2,074.740

1,350.659

6.14

Providing and laying in position Plain


Cement Concrete grade M25 in Top /
Intermediate Plug.

Cum

163.280

106.294

6.15

Reinforced Cement Concrete grade M35


in well cap.

Cum

1,604.460

1,180.878

1,604.46

1180.878

0.000

0.736

6.16

Bored Cast-in-situ vertical piles of dia


1200mm RCC grade M-35.

Cum

8,336.370

6,135.573

8,336.37

6135.573

0.000

0.736

6.19

Reinforced Cement concrete in M35 grade


Cum
for Pile cap

4,981.040

3,666.053

4,981.04

3666.053

0.000

0.736

6.20

(a) Grade M 35

Cum

11,879.800

8,743.551

11,758.09

8653.971

121.710

0.736

Cum

1,029.695

760.950

899.65

664.84

130.050

0.739

Cum

971.240

714.840

882.10

649.23

89.140

0.736

Cum

1,035.970

486.730

936.07

431.88

99.900

0.549

Cum

3,258.314

1,788.810

2,853.07

1566.33

405.240

0.549

6.21(a)
6.21(b)
6.21(c)
6.23( a)

Contractor Repersentative

(a) T-Beam and Slab of grade M 30


(b) Box Girder of grade M 35
(c) RCC Slab over PSC girders grade M45
(a) Grade M45 in Box girder

113 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (20 mm)

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ Item
No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

6.23(b)

(b) Grade M45 in Precast Post-tensioned


Girders

Cum

2,014.996

1,106.224

6.30

Providing and laying in position


Reinforced Cement Concrete grade M 30
in approach slabs.

Cum

0.000

0.000

Cum

0.000

Cum

Up to Previous
Month
Quantity

As per Mix
design
This Month
,Consumption of 20
BOQ Qty
mm Agrregate /Cum
(MT)

949.584

285.320

0.549

0.000

0.739

0.000

0.000

0.749

84.140

0.000

45.40

38.740

0.000

Lm

0.000

0.000

0.000

0.000

Cum

0.000

0.000

0.000

0.000

Cum

0.000

0.000

0.000

0.000

cum

3,013.245

2,217.766

2217.766

0.000

0.736

Cum

0.000

0.000

0.000

0.000

7.02

Construction of open cross drains in


median on superelevated section with
PCC grade M20 including leveling course
in cement concrete M15.

Lm

2,156.550

391.699

2156.55

391.699

0.000

0.182

7.03

Cement concrete open drain in M20 grade


including execavation, dressing the sides
and bottom, proving levelling course with
cement concrete M15 grade.

Lm

0.000

0.000

0.000

0.000

6.31

6.32

6.34
6.38
6.41

6.42(a)

6.42

Contractor Repersentative

PCC M15 grade leveling course below


approach slab.
Providing and laying in position
Reinforced Cement Concrete grade M40
in crash barriers including reinforcement.
RCC M35 in kerbs/railing/median kerbs
Providing and laying filter media.
Providing and laying filter material
underneath stone pitching in slope.
(a) P& e Precast concrete facia panels of
M-35 grade including reinforcement, soil
reinforcing element.
(c) P, L in position RCC crash barriers in
M40 grade concrete with friction slab
including reinforcement.

114 of 149

1,729.68

Up to Previous
Month
Consumption
(MT)

3,013.25

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (20 mm)

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

As per Mix
design
This Month
,Consumption of 20
BOQ Qty
mm Agrregate /Cum
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

7.04

Construction of cement concrete open


drain with cover in M20 grade including
execavation, dressing the sides and
bottom, levelling course with cement
concrete M15 grade.

Lm

0.000

0.000

0.000

0.000

7.05

Providing and laying filter media 200 mm


thick beneath the stone pitching.

cum

0.000

0.000

0.000

0.000

7.07

Construction of drainage chute on high


embankment slopes in superelevated
section in cement concrete M-20 with
base concrete in M-15 grade as per
drawings and Technical Specification
Section 1500 and 1700.

Lm

0.000

0.000

0.000

0.000

7.08

Construction of Energy Dissipation Basin


at toe of Chutes in M15 cement.

Nos.

0.000

0.000

0.000

0.000

8.10

Providing and laying M20 grade cement


concrete kerb.

Lm

73,050.774

3,411.398

73050.774

3411.398

0.000

0.047

8.11

Providing and laying M20 grade cement


concrete kerb with channel.

Lm

5,270.000

382.002

5270

382.002

0.000

0.072

10.03

Carrying out repairs to pot holes.

cum

2,947.352

1,559.669

2947.352

1559.669

0.000

0.564

10.04

Providing Renewal Coat with Mix Seal.

cum

3,217.379

966.214

3217.379

966.214

0.000

0.300

cum

0.000

0.000

0.000

cum

0.000

0.000

0.000

cum

0.000

0.000

0.000

BOQ Item
No.

11.01
11.02
11.03

Description

Providing & Construction of Dry Lean


Cement Concrete Base in cement
concrete of grade M-15.
Construction M40 grade cement concrete
pavement in Toll Plaza.
Construction of M40 grade reinforced
cement concrete transition slab.

Total Quantity ( MT)

339,838.188

339,014.088

Gross Quantity.(Cum)

212,398.00

211,883.00

Contractor Repersentative

115 of 149

Consultant Repersentative

97 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
R THE MONTH OF OCTOBER -2011
ontract conditions clause No .60)

onsumption Statement- (20 mm)

Quantityof 20 mm
Aggregate
Consumed(MT)
0.000
0.000

0.000

93.450
0.000

12.340

0.000

0.000
0.000

0.000

16.410

0.000

0.000

Contractor Repersentative

116 of 149

Consultant Repersentative

97 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
R THE MONTH OF OCTOBER -2011
ontract conditions clause No .60)

onsumption Statement- (20 mm)

Quantityof 20 mm
Aggregate
Consumed(MT)
0.000
16.630
0.000
0.000
0.000
0.000

0.000

0.000

0.000
0.000
0.000
89.580
96.110
65.610
54.850
222.480

Contractor Repersentative

117 of 149

Consultant Repersentative

97 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
R THE MONTH OF OCTOBER -2011
ontract conditions clause No .60)

onsumption Statement- (20 mm)

Quantityof 20 mm
Aggregate
Consumed(MT)
156.640

0.000

0.000

0.000

0.000
0.000
0.000

0.000

0.000

0.000

0.000

Contractor Repersentative

118 of 149

Consultant Repersentative

97 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
R THE MONTH OF OCTOBER -2011
ontract conditions clause No .60)

onsumption Statement- (20 mm)

Quantityof 20 mm
Aggregate
Consumed(MT)

0.000

0.000

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
824
515

Contractor Repersentative

119 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (10 mm)


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

BOQ
Item No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

Up to
Previous
Month
Consumption
(MT)

As per Mix design


,Consumption of
Quantityof 20
This Month
20 mm
mm Aggregate
BOQ Qty
Agrregate /Cum Consumed(MT)
(MT)

3.02

Construction of Wet Mix


Macadam(WMM) MDD= 2.320
MT/Cum

cum

207600.637

119,420.124

207600.637

119420.124

0.000

0.000

0.000

4.03

Providing and laying Bituminous


Macadam(BM) Marshall Density=
2.350 Mt/Cum

cum

38920.750

31,306.331

38920.750

31306.331

0.000

1.175

0.000

4.04

Providing and laying Dense Graded


Bituminous Macadam (DBM)
Marshall Density= 2.455 MT/Cum

cum

48224.990

28,432.288

48224.990

28432.288

0.000

0.491

0.000

cum

5377.870

1,273.463

5066.370

1242.463

311.500

0.100

31.000

cum

0.000

0.000

0.000

0.000

0.000

0.000

cum

2394.924

1,795.325

2378.444

1783.325

16.480

0.749

12.000

cum

11633.706

8,108.954

11633.706

8108.954

0.000

0.697

0.000

5861.100

3,815.295

5861.100

3815.295

0.000

0.651

0.000

309.770

201.176

309.770

201.176

0.000

0.651

0.000

376.296

0.000

371.580

4.716

0.000

0.000

4.05
4.06
5.02
5.03
5.04
5.05

5.08

Providing and laying Bituminous


Concrete (BC)
Providing and laying 25mm thick
Semi Dense Bitumenous Concrete
(SDBC)
Providing and laying in position Plain
Cement Concrete in M-15 grade
leveling course.
Providing and laying in position plain
Cement Concrete of Grade M20

Providing and laying in position


Reinforced Cement Concrete grade
cum
M 25.
Providing and laying in position
Reinforced Cement Concrete grade
cum
M25.
Providing and laying 150mm thick flat
rigid apron embedded in 300mm thick Cum
concrete grade M15.

5.11

providing and laying in position


Reinforced Cement Concrete grade
M 25 in approach slabs.

Cum

197.400

128.102

172.200

112.102

25.200

0.651

16.000

5.12

Providing and laying in position


Reinforced Cement Concrete grade
M40 in crash barriers.

Cum

7.140

0.000

7.140

0.000

0.000

0.000

Contractor Repersentative

120 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (10 mm)


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

BOQ
Item No.

Description

Up to
Previous
Month
Quantity

Up to
Previous
Month
Consumption
(MT)

As per Mix design


,Consumption of
Quantityof 20
This Month
20 mm
mm Aggregate
BOQ Qty
Agrregate /Cum Consumed(MT)
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Lm

0.000

0.000

0.000

0.000

0.491

0.000

5.15

Providing and laying in position


Reinforced Cement Concrete M35.

5.20

Providing and laying filter media.

Cum

856.550

0.000

856.550

0.000

0.000

0.000

6.05

Providing and laying in position plain


Cement Concrete of Grade M 15.

Cum

1829.680

1,372.563

1807.480

1355.563

22.200

0.749

17.000

Cum
Cum

3234.900
7708.460

1,591.329
3,785.034

3234.900
7708.460

1591.329
3785.034

0.000
0.000

0.492
0.491

0.000
0.000

Cum

824.390

404.775

824.390

404.775

0.000

0.491

0.000

Cum

11609.220

5,699.933

11609.220

5699.933

0.000

0.491

0.000

6.06
6.06
6.09
6.10

(a) Grade M 30
(b) Grade M 35
P&L in position Reinforced Cement
Concrete of Grade M35.
Providing & laying in position
Reinforced Cement Concrete of
Grade M35.

6.12

Providing and laying in position Plain


Cement Concrete grade M25 in
bottom Plug with 10% extra cement.

Cum

2074.740

1,350.959

2074.740

1350.959

0.000

0.651

0.000

6.14

Providing and laying in position Plain


Cement Concrete grade M25 in Top /
Intermediate Plug.

Cum

163.280

106.554

163.280

106.554

0.000

0.651

0.000

6.15

Reinforced Cement Concrete grade


M35 in well cap.

Cum

1604.460

787.247

1604.460

787.247

0.000

0.491

0.000

6.16

Bored Cast-in-situ vertical piles of dia


Cum
1200mm RCC grade M-35.

8336.370

4,093.595

8336.370

4093.595

0.000

0.491

0.000

6.19

Reinforced Cement concrete in M35


grade for Pile cap

Cum

4981.040

2,444.430

4981.040

2444.43

0.000

0.491

0.000

6.20

(a) Grade M 35

Cum

11879.800

5,833.387

11758.090

5773.387

121.710

0.491

60.000

Cum

1029.695

507.000

899.645

443

130.050

0.492

64.000

Cum

971.240

477.000

882.100

433

89.140

0.491

44.000

(c) RCC Slab over PSC girders grade


Cum
M45

1035.970

487.000

936.070

432

99.900

0.549

55.000

6.21(a)

(a) T-Beam and Slab of grade M 30

6.21(b) (b) Box Girder of grade M 35


6.21(c)

Contractor Repersentative

121 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (10 mm)


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

Up to
Previous
Month
Quantity

Up to
Previous
Month
Consumption
(MT)

As per Mix design


,Consumption of
Quantityof 20
This Month
20 mm
mm Aggregate
BOQ Qty
Agrregate /Cum Consumed(MT)
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Cum

3258.314

1,787.000

2853.074

1565

405.240

0.549

222.000

Cum

2014.996

1,106.064

1729.676

949.064

285.320

0.549

157.000

6.30

Providing and laying in position


Reinforced Cement Concrete grade
M 30 in approach slabs.

Cum

0.000

0.000

0.000

0.000

0.492

0.000

6.31

PCC M15 grade leveling course


below approach slab.

Cum

0.000

0.000

0.000

0.000

0.749

0.000

Cum

84.140

0.000

45.400

38.740

0.000

0.000

Lm

0.000

0.000

0.000

0.000

0.000

0.000

Cum

0.000

0.000

0.000

0.000

0.000

0.000

Cum

0.000

0.000

0.000

0.000

0.000

0.000

3013.245

1,480.779

3013.245

1480.779

0.000

0.491

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Lm

2156.550

392.469

2156.550

392.469

0.000

0.182

0.000

Lm

0.000

0.000

0.000

0.000

0.000

0.000

BOQ
Item No.

6.23( a)

Description

(a) Grade M45 in Box girder

(b) Grade M45 in Precast Post6.23(b) tensioned Girders

6.32
6.34
6.38
6.41

Providing and laying in position


Reinforced Cement Concrete grade
M40 in crash barriers including
reinforcement.
RCC M35 in kerbs/railing/median
kerbs
Providing and laying filter media.
Providing and laying filter material
underneath stone pitching in slope.

(a) P& e Precast concrete facia


6.42(a) panels of M-35 grade including
cum
reinforcement, soil reinforcing
element.
(c) P, L in position RCC crash barriers
6.42 in M40 grade concrete with friction
Cum
slab including reinforcement.

7.02

7.03

Construction of open cross drains in


median on superelevated section with
PCC grade M20 including leveling
course in cement concrete M15.
Cement concrete open drain in M20
grade including execavation, dressing
the sides and bottom, proving
levelling course with cement concrete
M15 grade.

Contractor Repersentative

122 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Aggregate Consumption Statement- (10 mm)


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

BOQ
Item No.

7.04

7.05

7.07

7.08
8.10
8.11
10.03
10.04
11.01

Description
Construction of cement concrete
open drain with cover in M20 grade
including execavation, dressing the
sides and bottom, levelling course
with cement concrete M15 grade.
Providing and laying filter media 200
mm thick beneath the stone pitching.
Construction of drainage chute on
high embankment slopes in
superelevated section in cement
concrete M-20 with base concrete in
M-15 grade as per drawings and
Technical Specification Section 1500
and 1700.
Construction of Energy Dissipation
Basin at toe of Chutes in M15
cement.
Providing and laying M20 grade
cement concrete kerb.
Providing and laying M20 grade
cement concrete kerb with channel.
Carrying out repairs to pot holes.
Providing Renewal Coat with Mix
Seal.
Providing & Construction of Dry Lean
Cement Concrete Base in cement
concrete of grade M-15.

Up to
Previous
Month
Quantity

Up to
Previous
Month
Consumption
(MT)

As per Mix design


,Consumption of
Quantityof 20
This Month
20 mm
mm Aggregate
BOQ Qty
Agrregate /Cum Consumed(MT)
(MT)

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Lm

0.000

0.000

0.000

0.000

0.000

0.000

cum

0.000

0.000

0.000

0.000

0.000

0.000

Lm

0.000

0.000

0.000

0.000

0.000

0.000

Nos.

0.000

0.000

0.000

0.000

0.000

0.000

Lm

73050.774

3,412.068

73050.774

3412.068

0.000

0.047

0.000

Lm

5270.000

382.582

5270.000

382.582

0.000

0.072

0.000

cum

2947.352

2,123.139

2947.352

2123.139

0.000

1.175

0.000

cum

3217.379

321.738

3217.379

321.738

0.000

0.100

0.000

cum

0.000

0.000

0.000

0.000

0.000

11.02

Construction M40 grade cement


concrete pavement in Toll Plaza.

cum

0.000

0.000

0.000

0.000

0.000

11.03

Construction of M40 grade reinforced


cement concrete transition slab.

cum

0.000

0.000

0.000

0.000

0.000

Total Quantity ( MT)


Gross Quantity.(Cum)

Contractor Repersentative

234,428.000

233,750.000

678

146,518.00

146,094.00

424

123 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Sand Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

As per Mix
This bill
design
BOQ Qty ,Consumption of
Sand /Cum (MT)

2.10

Filling of wells

cum

6943.54

10007.34

6943.54

10007.34

0.00

0.000

5.02

Providing and laying in position Plain


Cement Concrete in M-15 grade
cum
leveling course.

2394.92

1882.41

2378.44

1870.56

16.48

0.719

11633.71

9280.47

11633.71

9280.47

0.00

0.729

5861.10

4386.07

5861.10

4386.07

0.00

0.681

309.77

230.47

309.77

230.47

0.00

0.681

5.03
5.04
5.05

Providing and laying in position plain


cum
Cement Concrete of Grade M20
Providing and laying in position
Reinforced Cement Concrete grade cum
M 25.
Providing and laying in position
Reinforced Cement Concrete grade cum
M25.

5.08

Providing and laying 150mm thick


flat rigid apron embedded in 300mm
thick concrete grade M15.

Cum

376.30

0.00

371.58

0.00

4.72

0.000

5.11

providing and laying in position


Reinforced Cement Concrete grade
M 25 in approach slabs.

Cum

197.40

146.44

172.20

129.28

25

0.681

5.12

Providing and laying in position


Reinforced Cement Concrete grade
M40 in crash barriers.

Cum

7.14

0.00

7.14

0.00

0.000

5.15

Providing and laying in position


Reinforced Cement Concrete M35.

Lm

0.00

0.00

0.00

0.00

0.039

5.19

providing and laying back filling.

Cum

8923.06

14064.65

8923.06

14064.65

0.00

0.000

6.05

Providing and laying in position plain


Cum
Cement Concrete of Grade M 15.

1829.68

1405.16

1807.48

1389.20

22.20

0.719

Cum

3234.90

2276.46

3234.90

2276.46

6.06

(a) Grade M 30

0.644

6.06

(b) Grade M 35

Cum

7708.46

5502.08

7708.46

5502.08

6.09

P&L in position Reinforced Cement


Concrete of Grade M35.

Cum

824.39

609.81

824.39

609.81

11609.22

8544.48

11609.22

8544.48

0.00

0.671

2074.74

1683.33

2074.74

1683.33

0.00

0.749

6.10

6.12

Providing & laying in position


Cum
Reinforced Cement Concrete of
Grade M35.
Providing and laying in position Plain
Cement Concrete grade M25 in
bottom Plug with 10% extra cement. Cum

0.00

0.671
-

0.671

6.13

Providing and filling clean, sieved,


approved sand in the dredge holes
of the wells.

Cum

3880.07

6070.71

3880.07

6070.71

0.000

6.14

Providing and laying in position Plain


Cement Concrete grade M25 in Top / Cum
Intermediate Plug.

163.28

120.35

163.28

120.35

0.681

Cum

1604.46

1138.77

1604.46

1138.77

0.671

Cum

8336.37

6062.31

8336.37

6062.31

0.00

0.671

Cum

4981.04

3519.79

4981.04

3519.79

0.00

0.671

Cum
Cum

0.00
1029.70

0.00
663.12

0.00
899.65

0.00
579.37

130.05

0.671
0.644

Cum

971.24

651.71

882.10

591.90

89.14

0.671

6.15
6.16

Reinforced Cement Concrete grade


M35 in well cap.
Bored Cast-in-situ vertical piles of
dia 1200mm RCC grade M-35.

Reinforced Cement concrete in M35


grade for Pile cap
6.20 (a) Grade M 35
6.21(a) (a) T-Beam and Slab of grade M 30
6.21(b) (b) Box Girder of grade M 35
6.19

Contractor Repersentative

124 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Sand Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

(c) RCC Slab over PSC girders


6.21(c) grade M45

Cum

1035.97

594.87

936.07

527.84

99.90

0.671

6.23( a) (a) Grade M45 in Box girder

Cum

3258.31

2310.15

2853.07

2022.83

405.24

0.709

(b) Grade M45 in Precast Post6.23(b) tensioned Girders

Cum

2014.99

1450.20

1729.67

1247.91

285.32

0.709

Cum

0.00

0.00

0.00

0.00

0.644

Cum

0.00

0.00

0.00

0.00

0.719

Cum

84.14

0.00

45.40

0.00

38.74

0.000

Lm

0.00

0.00

0.00

0.00

0.000

Cum

0.00

0.00

0.00

0.00

Cum

0.00

0.00

0.00

0.00

sqm

3013.25

2081.18

3013.25

2081.18

Cum

0.00

0.00

0.00

0.00

Cum

0.00

0.00

0.00

0.00

7.02

Construction of open cross drains in


median on superelevated section
with PCC grade M20 including
leveling course in cement concrete
M15.

Lm

2156.55

407.16

2156.55

407.16

0.00

0.185

7.03

Cement concrete open drain in M20


grade including execavation,
dressing the sides and bottom,
proving levelling course with cement
concrete M15 grade.

Lm

0.00

0.00

0.00

0.00

0.00

0.000

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000

0.00

0.00

0.00

0.00

0.000

0.00

0.00

0.00

0.00

0.00

73050.78

3831.17

73050.78

3831.17

0.05

BOQ
Item No.

6.30
6.31

6.32

Description

Providing and laying in position


Reinforced Cement Concrete grade
M 30 in approach slabs.
PCC M15 grade leveling course
below approach slab.
Providing and laying in position
Reinforced Cement Concrete grade
M40 in crash barriers including
reinforcement.

RCC M35 in kerbs/railing/median


kerbs
6.37 providing and laying back filling.
Providing and laying filter material
6.41 underneath stone pitching in slope.
(a) P& e Precast concrete facia
6.42(a) panels of M-35 grade including
reinforcement, soil reinforcing
element.
(b) P, L, Grading and compaction
6.42 (b) with selected earth meeting the
approved design parameters.
6.34

(c) P, L in position RCC crash


barriers in M40 grade concrete with
6.42 friction slab including reinforcement.

7.04
7.05

7.07

7.08
8.10

Construction of cement concrete


open drain with cover in M20 grade
including execavation, dressing the
Lm
sides and bottom, levelling course
with cement concrete M15 grade.
Providing and laying filter media 200
cum
mm thick beneath the stone pitching.
Construction of drainage chute on
high embankment slopes in
superelevated section in cement
Lm
concrete M-20 with base concrete in
M-15.
Construction of Energy Dissipation
Basin at toe of Chutes in M15
Nos.
cement.
Providing and laying M20 grade
Lm
cement concrete kerb.

Contractor Repersentative

125 of 149

As per Mix
This bill
design
BOQ Qty ,Consumption of
Sand /Cum (MT)

0.00
-

0.00

0.000
0.671

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Sand Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

As per Mix
This bill
design
BOQ Qty ,Consumption of
Sand /Cum (MT)

Lm

5270.00

419.00

5270.00

419.00

0.076

8.11

Providing and laying M20 grade


cement concrete kerb with channel.

11.01

Providing & Construction of Dry Lean


cum
Cement Concrete Base in cement
concrete of grade M-15.

0.00

0.00

0.00

0.00

0.000

11.02

Construction M40 grade cement


concrete pavement in Toll Plaza.

cum

0.00

0.00

0.00

0.00

0.000

11.03

Construction of M40 grade


reinforced cement concrete transition cum
slab.

0.00

0.00

0.00

0.00

0.000

Total Quantity (MT)

89340.00

88594.00

Total Quantity (Cum)

61615.00

61101.00

Contractor Repersentative

126 of 149

Consultant Repersentative

m 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
HE MONTH OF OCTOBER -2011
act conditions clause No .60)

nsumption Statement

Quantityof
Sand
Consumed
(MT)

0.00
11.85
0.00
0.00
0.00

0.00

17.16

0.00
0.00
0.00
15.96
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
83.75
59.81
Contractor Repersentative

127 of 149

Consultant Repersentative

m 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
HE MONTH OF OCTOBER -2011
act conditions clause No .60)

nsumption Statement

Quantityof
Sand
Consumed
(MT)

67.03
287.32
202.29
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00
0.00
Contractor Repersentative

128 of 149

Consultant Repersentative

m 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
HE MONTH OF OCTOBER -2011
act conditions clause No .60)

nsumption Statement

Quantityof
Sand
Consumed
(MT)

0.00

0.00

0.00

0.00
745.17
514

Contractor Repersentative

129 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Packa
N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Steel Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

BOQ
Item No.

Description

5.06

6.22

Unit

Up to date
Quantity

Up to
Previous
Month
Quantity

This
Month
BOQ
Qty

419.012

419.012

0.000

Providing & fixing in position HYSD


(TMT) Fe 415 grade reinforcement
bars in foundations, substructures,
box strucutre and crash barrier
MT
complete as per drawings and
Technical Specification Section
1600
Providing & fixing in position HYSD
(TMT) Fe 415 grade reinforcement
bars in foundations, substructures,
superstructures etc. complete as
MT
per drawings and Technical
Specifications Sections 1600
MT

2661.871

2661.411

0.460

(b)

(a) In Foundation
(b) In Sub Structure

MT

1676.755

1661.169

15.586

(c)

(c) In Super Structure

MT

2021.343

1777.674

243.669

MT

82.339
6,861.320

82.339
6,601.605

0.000

(a)

6.42(a) RE wall
Total Quantity (MT)

Contractor Repersentative

130 of 149

Consultant Repersentative

m Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package


N0. ADB-II / C-8
THE MONTH OF OCTOBER -2011
tract conditions clause No .60)

onsumption Statement

Quantity
Certified in
IPC (MT)
7

0.000

0.460
15.586
243.669
0.000
259.715

Contractor Repersentative

131 of 149

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Bitumen Consumption Statement

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item No.

Description

4.03

4.04

4.05

4.06

Unit

Density
T/Cum

Bitumen
Content in
%

Up to date
Up to date
Consumption
Quantity
(MT)
7=
(4)*(5)/100*(6)

Up to
Previous
Month
Quantity

Up to Previous
Month
Consumption
(MT)

This Month
BOQ Qty

10

Providing and laying Bituminous Macadam(BM)


cum
from Chawarapatha Plant

2.402

3.500

28,410.88

2,388.50

38,123.35

3,032.94

Providing and laying Bituminous Macadam(BM)


from Panjra Plant

2.350

3.500

10,509.87

864.44

797.40

65.59

Providing and laying Dense Graded Bituminous


cum
Macadam (DBM) Chawarapatha Plant

2.510

4.700

34,884.68

4,115.35

47,096.75

5,325.23

Providing and laying Dense Graded Bituminous


Macadam (DBM) Panjra Plant

2.455

4.600

13,305.82

1,502.63

1,128.24

127.42

Providing and laying Bituminous Concrete from


cum
Chawarpatha Plant. (BC)

2.525

5.250

4,870.37

645.63

4,870.37

623.46

Providing and laying Bituminous Concrete from


Panjara Plant. (BC)

2.513

5.250

507.50

66.96

196.00

25.86

Providing and laying 25mm thick Semi Dense


Bitumenous Concrete (SDBC)

311.50

cum

6.25

Providing and laying in position 65 mm thick


wearing coat consisting of 40 mm thick
bituminous concrete overlaid with a 25 mm thick sqm
layer of mastic asphalt.

10.03

Carrying out repairs to pot holes. from


Chawarapatha Plant

cum

Carrying out repairs to pot holes. from Panjra


Plant
10.04

Providing Renewal Coat with Mix Seal.

cum

2.402

3.500

2,613.73

219.74

2.350

3.500

333.63

27.44

2.304

4.210

3,217.38

312.08

Total Quantity

Contractor Repersentative

9,806.531

132 of 149 of Bitumen Consumption

2,947.35

221.74

3,217.38

343.21

###
-

9,765.434

Consultant Repersentative

Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
THE MONTH OF OCTOBER -2011
tract conditions clause No .60)

n Consumption Statement

Quantityof
Bitumen
Consumed (MT)
12
41.097
-

41.097

Contractor Repersentative

133 of 149 of Bitumen Consumption

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Cement Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item
No.

4.04
5.02

Description

Unit

Providing and laying Dense Graded


cum
Bituminous Macadam (DBM)
Providing and laying in position Plain
Cement Concrete in M-15 grade leveling cum
course.

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

As per Mix
Up to Previous
design
Month
BOQ Qty ,Consumpt
Consumption This bill
ion of
(MT)
Cement
/Cum (MT)

48,224.990 Err:502

48,224.990

2,685.508 0.000

0.047

2,394.924 Err:502

2,378.444

594.612 16.48

0.250

5.03

Providing and laying in position plain


Cement Concrete of Grade M20

cum

11,633.706 Err:502

11,633.706

3,606.449 0.00

0.310

5.04

Providing and laying in position


Reinforced Cement Concrete grade M
25.

cum

5,861.100 Err:502

5,861.100

2,344.440 0.00

0.400

5.05

Providing and laying in position


Reinforced Cement Concrete grade
M25.

cum

309.770 Err:502

309.770

123.908 0.00

0.400

5.08

Providing and laying 150mm thick flat


rigid apron embedded in 300mm thick
concrete grade M15.

Cum

376.296 Err:502

371.580

92.896 4.72

0.250

5.11

providing and laying in position


Reinforced Cement Concrete grade M
25 in approach slabs.

Cum

197.400 Err:502

172.200

68.880 25.20

0.400

5.12

Providing and laying in position


Reinforced Cement Concrete grade M40 Cum
in crash barriers.

7.140 Err:502

7.140

5.15

Providing and laying in position


Reinforced Cement Concrete M35.

Lm

6.05

Providing and laying in position plain


Cement Concrete of Grade M 15.

Cum

1,829.680 Err:502

1,807.480

6.06

(a) Grade M 30

Cum

3,234.900 Err:502

3,234.900

1,358.658 0.00

0.420

6.06

(b) Grade M 35

Cum

7,708.460 Err:502

7,708.460

3,330.055 0.00

0.432

6.09
6.10

Providing and laying in position Plain


Cement Concrete grade M25 in bottom Cum
Plug with 10% extra cement.

6.14

Providing and laying in position Plain


Cement Concrete grade M25 in Top /
Intermediate Plug.

6.15

6.19
6.2

Err:502

P&L in position Reinforced Cement


Cum
824.390 Err:502
Concrete of Grade M35.
Providing & laying in position Reinforced
Cum 11,609.220 Err:502
Cement Concrete of Grade M35.

6.12

6.16

824.390
11,609.220

0.00

0.00

0.00

0.432

451.870 22.20

356.136
5,015.183 0.0

0.250

0.432
0.432

2,074.740 Err:502

2,074.740

912.886 0.00

0.44

Cum

163.280 Err:502

163.280

65.312 0.00

0.400

Reinforced Cement Concrete grade M35


Cum
in well cap.

1,604.460 Err:502

1,604.460

693.127 0.00

0.432

Cum

8,336.370 Err:502

8,336.370

3,601.310 0.00

0.432

Cum

4,981.040 Err:502

4,981.040

2,151.811 0.00

0.432

Cum 11,879.800 Err:502

11,758.090

Bored Cast-in-situ vertical piles of dia


1200mm RCC grade M-35.
Reinforced Cement concrete in M35
grade for Pile cap
(a) Grade M 35

Contractor Repersentive

134 of 149

5,079.495 121.71

0.432
Consultant Repersentive

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Cement Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item
No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

As per Mix
Up to Previous
design
Month
BOQ Qty ,Consumpt
Consumption This bill
ion of
(MT)
Cement
/Cum (MT)

6.21(a) (a) T-Beam and Slab of grade M 30

Cum

1,029.695 Err:502

899.645

377.851 130.05

0.420

6.21(b) (b) Box Girder of grade M 35

Cum

971.240 Err:502

882.100

381.067 89.14

0.432

Cum

1,035.970 Err:502

936.070

312.243 99.90

0.49

Cum

3,258.314 Err:502

2,853.074

1,398.006 405.24

0.49

2,014.992 Err:502

1,729.672

847.542 285.32

0.49

6.21(c)

(c) RCC Slab over PSC girders grade


M45

6.23( a) (a) Grade M45 in Box girder

(b) Grade M45 in Precast Post6.23(b)


Cum
tensioned Girders
Providing and laying in position
6.30
Reinforced Cement Concrete grade M Cum
30 in approach slabs.
PCC M15 grade leveling course below
6.31
Cum
approach slab.
Providing and laying in position
6.32
Reinforced Cement Concrete grade M40 Cum
in crash barriers including reinforcement.
6.34
RCC M35 in kerbs/railing/median kerbs Lm
(a) P& e Precast concrete facia panels
6.42(a) of M-35 grade including reinforcement,
soil reinforcing element.

6.42

7.02

7.03

cum

(c) P, L in position RCC crash barriers in


Cum
M40 grade concrete with friction slab
including reinforcement.
Construction of open cross drains in
median on superelevated section with
PCC grade M20 including leveling
course in cement concrete M15.
Cement concrete open drain in M20
grade including execavation, dressing
the sides and bottom, proving levelling
course with cement concrete M15
grade.

Lm

Err:502

0.00

0.420

Err:502

0.00

0.25

38.74

0.000

0.00

84.140 Err:502
-

Err:502

3,013.245 Err:502

Err:502

2,156.550 Err:502

45.400
3,013.245

2,156.550

1,301.722 0.00

0.432

0.00

0.000

160.771 0.00

0.075

Lm

Err:502

0.00

0.000

7.04

Construction of cement concrete open


drain with cover in M20 grade including
execavation, dressing the sides and
Lm
bottom, levelling course with cement
concrete M15 grade.

Err:502

0.00

0.00

7.07

Construction of drainage chute on high


embankment slopes in superelevated
section in cement concrete M-20 with
base concrete in M-15 grade as per
drawings and Technical Specification
Section 1500 and 1700.

Lm

Err:502

0.00

0.000

7.08

Construction of Energy Dissipation


Basin at toe of Chutes in M15 cement.

Nos.

Err:502

0.00

0.00

Contractor Repersentive

135 of 149

Consultant Repersentive

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

Cement Consumption Statement


Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
BOQ
Item
No.

Description

Unit

Up to date
Quantity

Up to date
Consumption
(MT)

Up to
Previous
Month
Quantity

As per Mix
Up to Previous
design
Month
BOQ Qty ,Consumpt
Consumption This bill
ion of
(MT)
Cement
/Cum (MT)

8.10

Providing and laying M20 grade cement


Lm
concrete kerb.

73,050.777 Err:502

73,050.777

1,517.265 0.00

0.021

8.11

Providing and laying M20 grade cement


Lm
concrete kerb with channel.

5,270.000 Err:502

5,270.000

169.904 0.00

0.032

11.01
11.02
11.03

Providing & Construction of Dry Lean


Cement Concrete Base in cement
concrete of grade M-15.
Construction M40 grade cement
concrete pavement in Toll Plaza.
Construction of M40 grade reinforced
cement concrete transition slab.

Total Quantity (MT)

Contractor Repersentive

cum

Err:502

0.00

0.000

cum

Err:502

0.00

0.00

cum

Err:502

0.00

0.00

Err:502

136 of 149

38,998.905

Consultant Repersentive

o Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

OR THE MONTH OF OCTOBER -2011


act conditions clause No .60)

Consumption Statement

Quantityof
Cement
Consumed
(MT)

Err:502
Err:502

Err:502

Err:502

Err:502

Err:502

Err:502

Err:502

Err:502

Err:502
Err:502
Err:502
Err:502
Err:502

Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Contractor Repersentive

137 of 149

Consultant Repersentive

o Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

OR THE MONTH OF OCTOBER -2011


act conditions clause No .60)

Consumption Statement

Quantityof
Cement
Consumed
(MT)

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502

Err:502

Err:502

Err:502

Err:502

Err:502

Contractor Repersentive

138 of 149

Consultant Repersentive

o Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

OR THE MONTH OF OCTOBER -2011


act conditions clause No .60)

Consumption Statement

Quantityof
Cement
Consumed
(MT)

Err:502
Err:502

Err:502
Err:502
Err:502
Err:502

Contractor Repersentive

139 of 149

Consultant Repersentive

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E
No of
No of Panel No of Panel
No of Panel
No of Panel
Panel
BOQ
Type of
Casted in
Casted in
Casted in
Casted in
Casted in
Item No.
Panel
August
September
December
October -2010 November
-2010
-2010
-2010
-2010

RE Wall Steel Consumption Statement

No of Panel
Casted in
January
-2011

No of Panel
No of Panel No of Panel No of Panel No of Panel No of Panel No of Panel No of Panel
Casted in
Casted in
Casted in Casted in Casted in Casted in Casted in Casted in
February
March -2011 Apr-2011 May-2011 Jun-2011
Jul-2011
Aug-2011 Sep-2011
-2011

Total
Quantity
(Nos)

Consumption
of Steel/Panel
in (MT)

10

11

12

13

14

15

16

17

18

SH-4

93

211.000

155.000

66.000

258.000

210.000

0.000

0.000

0.000

88.000

222.000

77.000

0.000

0.000

1,380.000

0.016

S-4

175.000

178.000

190.000

186.000

130.000

110.000

326.000

448.000

190.000

0.000

127.000

168.000

227.000

2,455.000

0.013

PH-2

0.000

32.000

52.000

72.000

64.000

22.000

60.000

88.000

54.000

14.000

0.000

0.000

0.000

458.000

0.008

P2

74.000

34.000

0.000

12.000

0.000

0.000

0.000

0.000

0.000

24.000

37.000

26.000

16.000

223.000

0.006

TA-6

66.000

22.000

0.000

0.000

16.000

22.000

35.000

0.000

0.000

0.000

0.000

0.000

0.000

161.000

0.017

TB-6

0.000

0.000

0.000

76.000

38.000

0.000

0.000

0.000

0.000

8.000

34.000

14.000

0.000

170.000

0.016

TC-4

0.000

40.000

50.000

4.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

9.000

22.000

125.000

0.013

TD-4

0.000

0.000

0.000

0.000

0.000

0.000

20.000

85.000

54.000

30.000

0.000

0.000

0.000

189.000

0.012

FA-4

10

68.000

22.000

0.000

0.000

16.000

22.000

34.000

0.000

0.000

0.000

0.000

0.000

0.000

172.000

0.011

10

FB-4

0.000

41.000

52.000

4.000

0.000

0.000

0.000

0.000

0.000

0.000

30.000

23.000

12.000

162.000

0.009

11

FC-2

0.000

0.000

0.000

80.000

36.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

2.000

118.000

0.006

12

FD-2

0.000

0.000

0.000

0.000

0.000

0.000

20.000

85.000

54.000

36.000

0.000

0.000

0.000

195.000

0.005

13

QH160

0.000

0.000

0.000

0.000

0.000

0.000

18.000

15.000

4.000

0.000

0.000

0.000

0.000

37.000

0.005

Up to Toatl Quantity (MT)


Up to Previous Month Quantity (MT)
This Month Quantity.

Contractor Repersentative

140 of 149 of RE wall steel

Consultant Repersentative

Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
E MONTH OF OCTOBER -2011
ct conditions clause No .60)

Consumption Statement

Total
Quantity in
(MT)
19= (18)*(17)

22.080
31.915
3.664
1.338
2.737
2.720
1.625
2.268
1.892
1.458
0.708
0.975
0.185
73.565
73.565
0.000

Contractor Repersentative

141 of 149 of RE wall steel

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh,
Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)

H.T.Strant Consumption Statement

Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY


Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

BOQ
Item
No.
1

Description

2
Supplying, providing and placing in
position and profiling high tensile steel
of 19 T13(Class-ll low relaxation)
strands conforming to IS: 6006 of
specified ultimate strength including
6.24
cutting, threading, tying and providing
necessary anchorage, sheathing

Total Quantity (MT)

Contractor Repersentative

Up to
Up to
This
date
Previous
Month
Unit
Quantity
Month
BOQ Qty
(MT)
Quantity (MT)
(MT)

Quantity
Certified in
IPC (MT)

MT

161.313

147.517

13.796

13.796

161.313

147.517

142 of 149

13.796

Consultant Repersentative

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

#REF!
Variation from BOQ item.

Boq No.

Boq Item

Unit

Quantity in
BOQ

Quantity Uptodate
Executed

%age Varied

1.02

b) Stone Masonry

Cum

100

834.570

735.00%

1.02

c) Plain Cement Concrete

Cum

100

256.130

156.00%

1.02

h)( ii) Above 600mm dia

Cum

100

356.130

256.00%

1.04

b) Stone Masonry

Cum

100

834.570

735.00%

1.04

c) Plain Cement Concrete

Cum

100

256.130

156.00%

1.04

h)( ii) Above 600mm dia

Lm

100

356.130

256.00%

12.01(a)(i)

b) Double Pole (22 D.Ps) 5 center

Nos.

44

58.000

32.00%

12.01(b)(i)

b) Double Pole (22 D.Ps) 5 center

Nos.

44

58.000

32.00%

12.02(A)

)DP 4ft center 1DP

Nos.

4.000

100.00%

12.02(B)

)DP 4ft center 1DP

Nos.

4.000

100.00%

12.03(A)

(a) For 5ft center DP

Set

22

38.000

73.00%

12.03(A)

(b) For 4ft center DP

Set

22

27.000

23.00%

12.03(B)

(a) For 5ft center DP

Set

22

38.000

73.00%

12.03(B)

(b) For 4ft center DP

Set

22

27.000

23.00%

12.04(A)

a. DC cross arms 5 feet center for 33 KV DPs

Nos.

22

39.000

77.00%

12.04(B)

a. DC cross arms 5 feet center for 33 KV DPs

Nos.

22

39.000

77.00%

m Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

#REF!

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8

IPC-13 FOR THE MONTH OF DECEMBER -2007


Certificate of Percentage Check of work done during the month of December 2007

Designation : Resident Engineer

Boq Item

Unit

Quantity for
the Month

Boq Rate after


rebate

Amount

Quantity
Checked

Amount of Quantity
Checked

1.01

Ha

3.55

15281.4438

54249.12549

1.68

25610.57

2.01

Cum

56960.07

42.3801

2413973.46

18118.56

767866.38

2.02

Cum

0.00

128.51

0.00

8461.970

1087425.76

2.04

Cum

0.00

146.28

0.00

341.390

49938.43

2.10

Cum

0.00

332.21

0.00

134.630

44724.80

3.01

Cum

0.00

460.71

0.00

564.250

259957.14

3.02

Cum

0.00

831.20

0.00

448.780

373024.50

5.03

Cum

0.000

2771.11

0.00

26.140

72436.86

5.04

Cum

0.00

3108.79

0.00

21.350

66372.57

6.16(b)

Cum

418.30

6248.33

2613676.67

30.320

189449.38

Total BOQ Amount

Resident Engineer
Package-ADB-II/C-8

#REF!

2936806.39

Percentage
Check

#REF!

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-2


the State of Madhya Pradesh, Package N0. ADB-II / C-8
ROYALITY STATEMENT FOR THE MONTH OF JANUARY-2011

S. No.

Description of Material

Consumption
during the Month of
November-10

GSB (Olny Aggregate @0.7%)

0.00

44

40MM

0.00

44

20MM

515.00

44

10MM

424.00

44

SAND

514.00

53

Boulder

4.716

35

Amount to be deducted in IPC-43 January-2011)=

Rate

don on Section from Km297 to Km 351 on NH-26 in


ya Pradesh, Package N0. ADB-II / C-8

EMENT FOR THE MONTH OF JANUARY-2011

Total Royalty to
be paid in this
Month ( in Rs.)
5

0
0
22660
18656
27242
165
68723

You Queried For : PNR Number : 825-6413286

ICICI Bank
Transaction Reference Number:
241798062
Transaction Type

Funds Transfer to Non ICICI Bank Account across India

Date of Transaction

29/07/2011

Transaction Details
From ICICI Bank Account

076401000090- JAYKENDRA UPADHYAY (Narsimhapur,


Madhya Pradesh)

To Payee

SAURABH SHARMA
STATE BANK OF INDIA
SAVINGS ACCOUNT 30062090557
TRANSPORT NAGAR (AGRA), AGRA

Transaction Amount (Rs.)

5150

Transaction Remarks

pacl

Four laning of Jhansi-Lakhnadon on Section from Km297 to Km 351 on NH-26 in the State of Madhya Pradesh, Package N0. ADB-II / C-8
IPC-50 FOR THE MONTH OF OCTOBER -2011
(Ref.Contract conditions clause No .60)
Bitumen Consumption Statement
Name of Contractor : SSANGYONG ENGINEERING & CONSTRUCTION COMPANY
Name of Employer : National Highway Authority Of India
Name of Engineer : M/s Renardet S. A in J.V with I.C.T & F.T.E

Up to
As per
Up to
Quantityof
Previous
This
Contract
Up to date
Previous
Bitumen
Month
Month ,Consumption
Quantity Consumpti Month
Consumed
Consumption BOQ Qty
of Bitumen
on (MT)
Quantity
(MT)
(MT)
/Cum (MT)
4
5
6
7
4
5
6
Up to date

BOQ
Item No.
1
4.03
4.04
4.05
4.06

6.25
10.03
10.04

Description
2
Providing and laying Bituminous
Macadam(BM)
Providing and laying Dense Graded
Bituminous Macadam (DBM)
Providing and laying Bituminous
Concrete (BC)
Providing and laying 25mm thick
Semi Dense Bitumenous Concrete
(SDBC)
Providing and laying in position 65
mm thick wearing coat consisting of
40 mm thick bituminous concrete
overlaid with a 25 mm thick layer of
mastic asphalt.
Carrying out repairs to pot holes.
Providing Renewal Coat with Mix
Seal.
Total Quantity

Contractor Repersentative

Unit
3
cum

38,920.750

3,098.324 38920.75

3098.324

0.000

0.082

0.000

cum

48,190.500

5,448.820 48190.5

5448.82

0.000

0.113

0.000

cum

5,181.870

662.549 4870.37

623.456

311.500

0.126

39.093

cum

0.000

0.000

0.000

0.000

0.000

sqm

0.000

0.000

0.000

0.000

0.000

cum

2,947.352

221.736 2947.352

221.736

0.000

0.082

0.000

cum

3,217.379

343.214 3217.379

343.214

0.000

0.126

0.000

9,774.643

149 of 149 of Bitumen Consumption (old)

9,735.550

39.093

Consultant Repersentative