You are on page 1of 1

Federal Register / Vol. 70, No.

166 / Monday, August 29, 2005 / Notices 51033

The filings in the above proceedings Commission, 888 First Street, NE., Energy, One West Third Street, Tulsa,
are accessible in the Commission’s Room 1–A, Washington, DC 20426. Oklahoma 74103, (918) 595–6696,
eLibrary system by clicking on the Please affix ‘‘Orono Project No. 2710’’ to gene.reeves@swpa.gov.
appropriate link in the above list. They all comments. Comments may be filed SUPPLEMENTARY INFORMATION: The U.S.
are also available for review in the electronically via Internet in lieu of Department of Energy was created by an
Commission’s Public Reference Room in paper. The Commission strongly Act of the U.S. Congress, Department of
Washington, DC. There is an encourages electronic filings. See 18 Energy Organization Act, Pub. L. 95–91,
eSubscription link on the web site that CFR 385.2001(a)(1)(iii) and the dated August 4, 1977. Southwestern’s
enables subscribers to receive e-mail instructions on the Commission’s Web power marketing activities were
notification when a document is added site under the ‘‘eFiling’’ link. For further transferred from the Department of the
to a subscribed docket(s). For assistance information, contact Patrick Murphy Interior to the Department of Energy,
with any FERC Online service, please e- (202) 502–8755. effective October 1, 1977. Guidelines for
mail FERCOnlinSupport@ferc.gov. or preparation of power repayment studies
Linda Mitry,
call (866) 208–3676 (toll free). For TTY, are included in DOE Order No. RA
call (202) 502–8659. Deputy Secretary.
[FR Doc. E5–4703 Filed 8–26–05; 8:45 am] 6120.2 entitled Power Marketing
Linda Mitry, Administration Financial Reporting.
BILLING CODE 6717–01–P
Deputy Secretary. Procedures for Public Participation in
[FR Doc. E5–4705 Filed 8–26–05; 8:45 am] Power and Transmission Rate
DEPARTMENT OF ENERGY Adjustments of the Power Marketing
BILLING CODE 6717–01–P
Administrations are found at Title 10,
Southwestern Power Administration part 903, Subpart A of the Code of
DEPARTMENT OF ENERGY Federal Regulations (10 CFR part 903).
Robert D. Willis Power Rate Procedures for the confirmation and
Federal Energy Regulatory approval of rates for the Federal Power
AGENCY: Southwestern Power
Commission Marketing Administrations are found at
Administration, DOE.
title 18, part 300, Subpart L of the Code
[Project No. 2710–035–ME] ACTION: Notice of public review and of Federal Regulations (18 CFR part
comment. 300).
PPL Maine, LLC; Notice of Availability
of Environmental Assessment SUMMARY: The Administrator,
Southwestern markets power from 24
Southwestern Power Administration multi-purpose reservoir projects, with
August 19, 2005.
(Southwestern), has prepared Current hydroelectric power facilities
In accordance with the National and Revised 2005 Power Repayment constructed and operated by the U.S.
Environmental Policy Act of 1969 and Studies that show the need for an Army Corps of Engineers. These projects
the Federal Energy Regulatory increase in annual revenues to meet cost are located in the states of Arkansas,
Commission’s regulations, 18 CFR part recovery criteria. Such increased Missouri, Oklahoma, and Texas.
380 (Order No. 486, 52 FR 47879), the revenues are required primarily due to Southwestern’s marketing area includes
Office of Energy Projects has reviewed significant increases in expected U.S. these States plus Kansas and Louisiana.
the application for a new license for the Army Corps of Engineers’ generation The costs associated with the
Orono Hydroelectric Project, located on investment and increases in operations hydropower facilities of 22 of the 24
the Stillwater Branch of the Penobscot and maintenance expenses at the projects are repaid via revenues
River, in Penobscot County, Maine, and project. The Administrator has received under the Integrated System
has prepared an Environmental developed a proposed Robert D. Willis rates, as are Southwestern’s
Assessment (EA). In the EA, rate schedule, which is supported by a transmission facilities that consist of
Commission staff analyze the potential power repayment study, to recover the 1,380 miles of high-voltage transmission
environmental effects of relicensing the required revenues. Beginning January 1, lines, 24 substations, and 46 microwave
project and conclude that issuing a new 2006, the proposed rates would increase and VHF radio sites. Costs associated
license for the project, with appropriate annual revenues approximately 43.1 with the Robert D. Willis and Sam
environmental measures, would not percent from $452,952 to $648,096. Rayburn Dams, two projects that are
constitute a major federal action that isolated hydraulically, electrically, and
DATES: The consultation and comment
would significantly affect the quality of financially from the Integrated System
the human environment. period will begin on the date of are repaid by separate rate schedules.
A copy of the EA is on file with the publication of this Federal Register Following Department of Energy
Commission and is available for public notice and will end October 28, 2005. guidelines, the Administrator,
inspection. The EA may also be viewed 1. Public Information Forum— Southwestern, prepared a Current
on the Commission’s Web site at September 13, 2005, 1 p.m. central time, Power Repayment study using the
http://www.ferc.gov using the Tulsa, OK. existing Robert D. Willis rate. The Study
‘‘eLibrary’’ link. Enter the docket 2. Public Comment Forum—October indicates that Southwestern’s legal
number excluding the last three digits in 13, 2005, 1 p.m. central time, Tulsa, OK. requirement to repay the investment in
the docket number field to access the ADDRESSES: If forums are requested, the power generating facility for power
document. For assistance, contact FERC they will be held in Southwestern’s and energy marketed by Southwestern
Online Support at offices, Room 1402, Williams Center will not be met without an increase in
FERCOnlineSupport@ferc.gov or toll- Tower I, One West Third Street, Tulsa, revenues. The need for increased
free at 1–866–208–3676, or for TTY, Oklahoma 74103. revenues is due to expected increases in
(202) 502–8659. FOR FURTHER INFORMATION CONTACT: Mr. generation investment and operations
Any comments should be filed within Forrest E. Reeves, Assistant and maintenance power-related
30 days from the issuance date of this Administrator, Office of Corporate expenses. The Revised Power
notice, and should be addressed to the Operations, Southwestern Power Repayment Study shows that an
Secretary, Federal Energy Regulatory Administration, U.S. Department of increase in annual revenue of $195,144

VerDate Aug<18>2005 15:17 Aug 26, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\29AUN1.SGM 29AUN1