Elijah Acevedo

Shenzi SS Coating Paint Trials

November 8, 2012

Shenzi Stainless Steel Coating Project; New Paint Trials


Scope
The intent of the new paint trials is to assess the performance of two alternative coating systems
(manufactured by Belzona and Chemco), for use to coat the presently uncoated stainless steel piping at
the Shenzi facility. The systems trialed will be compared to the regularly used Carboline system and
recommendation made for a path forward.

The two trial coating systems were applied, together with the Carboline system, alongside each other on
parallel piping. The systems were all applied using the same surface preparation and under comparable
conditions. Two areas were selected for the trial, a vertical section which allows the pipe to be viewed
at deck level, and an at height horizontal piping section which is more representative of the typical
stainless steel piping arrangement at Shenzi. Both trial areas are on the Production Deck on the South
side of the Facility. The trial areas are illustrated in the photographs below.

1|Page

Elijah Acevedo

Shenzi SS Coating Paint Trials

November 8, 2012

2|Page

Elijah Acevedo

Shenzi SS Coating Paint Trials

November 8, 2012

3|Page

Elijah Acevedo

Shenzi SS Coating Paint Trials

November 8, 2012

Coating System Specifications and Field Trial Results


Belzona 5841

Chemco-RL 500

Carboline

Surface Prep

SP1 SP2 SP3: Hand Sand, SS Wire

SP1 SP2 SP3: Hand

SP1 SP2 SP3: Hand Sand, SS

Method

brush and DA Sanders

Sand, SS Wire brush

Wire brush and DA Sanders

and DA Sanders
Application

Brush only

Brush and roller

Brush and roller

2 Coat System with total DFT of

1 Coat system with

3 coat System with strip coat

16

total DFT of 4-8

with total DFT of 9-14

60 to 90 minutes

1 coat:30 to 80 minutes

Method
Number of Coats

Working Pot life

30 to 60 minutes

st

nd

2 coat: 4 hours
rd

3 coat: 4 hours
Overcoat Times

Minimum of 2.5 hours

st

Minimum 5 hrs to

1 coat: 9-18hrs depending on

maximum unlimited

steel temperature
nd

2 coat: 4-8hrs depending on


steel temperature

Humidity/Dew

Max: 85% with steel temp 5

There are no humidity

Max: 85% with steel temp 5

Point Limits

higher than dew

or dew point

higher than dew

restrictions
Temperature

Steel temp min and max: 86F to

Limit

176F
st

nd

1 Coat: 40

2 Coat: 45

of 40 foot section

mins

mins

to Application

Average 50 to 135 for all


coats

Application time

Overall Time; Mix

No restrictions

1 hr for 40 ft section combined

25 mins

45 mins (same time for all 3


coats)

45 minutes for 40 ft

1 hr for each coat on a 40 ft

section

section

4|Page

Elijah Acevedo

Ease of

Shenzi SS Coating Paint Trials

November 8, 2012

Very thick paint and hard to apply

Easy to apply.

All coats are easy to apply.

compared to Carboline. Belzona

Comparable to

Three coats are needed to

recommends brush application

Carboline. Can brush,

achieve recommended DFT.

only which makes application

roll and spray if

Can brush, roll and spray if

time longer.

needed.

needed.

Application

Recommendations
From quantitative assessment of product specification and qualitative feedback from coating
applicators, the product recommended for further use at this stage in the assessment is
Chemco Epo-chem RL 500. It is a primer and finish all in one coat. The system is a
moisture/surface tolerant coating where water, rain, and high humidity have no detrimental
effect on paint application or finish.

A determination must be made of the long term in-service performance of the coating. It is
further recommended to allow six months for observation of coating performance to assess its
performance in field conditions, before deciding to move to an alternative paint system.

5|Page