You are on page 1of 1

Federal Register / Vol. 70, No.

94 / Tuesday, May 17, 2005 / Notices 28301

original and 14 copies of the protest to its application. If the licensee of such a in accordance with Sections 385.214 or
the Federal Energy Regulatory project has not filed an application for 385.211 of the Commission’s Rules and
Commission, 888 First Street, NE., a subsequent license, then it may be Regulations. All such motions or
Washington, DC 20426. required, pursuant to 18 CFR 16.21(b), protests must be filed with the Secretary
This filing is accessible on-line at to continue project operations until the of the Commission on or before the date
http://www.ferc.gov, using the Commission issues someone else a as indicated below. Protests will be
‘‘eLibrary’’ link and is available for license for the project or otherwise considered by the Commission in
review in the Commission’s Public orders disposition of the project. determining the appropriate action to be
Reference Room in Washington, DC. If the project is subject to section 15 taken, but will not serve to make
There is an ‘‘eSubscription’’ link on the of the FPA, notice is hereby given that protestants parties to the proceedings.
Web site that enables subscribers to an annual license for Project No. 178 is Any person wishing to become a party
receive e-mail notification when a issued to Pacific Gas and Electric must file a motion to intervene. This
document is added to a subscribed Company for a period effective May 1, petition for rate approval is available for
docket(s). For assistance with any FERC 2005 through April 30, 2006, or until review at the Commission in the Public
Online service, please e-mail the issuance of a new license for the Reference Room or may be viewed on
FERCOnlineSupport@ferc.gov, or call project or other disposition under the the Commission’s Web site at http://
(866) 208–3676 (toll free). For TTY, call FPA, whichever comes first. If issuance www.ferc.gov using the ‘‘FERRIS’’ link.
(202) 502–8659. of a new license (or other disposition) Enter the docket number excluding the
does not take place on or before May 1, last three digits of the docket number
Magalie R. Salas,
2006, notice is hereby given that, field to access the document. For
Secretary.
pursuant to 18 CFR 16.18(c), an annual Assistant, call (202) 502–8222 or for
[FR Doc. E5–2476 Filed 5–16–05; 8:45 am] license under section 15(a)(1) of the TTY, (202) 502–8659. Comments,
BILLING CODE 6717–01–P FPA is renewed automatically without protests and interventions may be filed
further order or notice by the electronically via the Internet in lieu of
Commission, unless the Commission paper. The Commission strongly
DEPARTMENT OF ENERGY orders otherwise. encourages electronic filings. See, 18
If the project is not subject to section CFR 385.2001(1)(iii) and the
Federal Energy Regulatory
15 of the FPA, notice is hereby given instructions on the Commission’s Web
Commission
that Pacific Gas and Electric Company is site under the ‘‘e-Filing’’ link.
[Project No. 178] authorized to continue operation of the Comment Date: May 31, 2005.
Kern Canyon Project No. 178 until such
Pacific Gas and Electric Company; Magalie R. Salas,
time as the Commission acts on its
Notice of Authorization for Continued application for subsequent license. Secretary.
Project Operation [FR Doc. E5–2449 Filed 5–16–05; 8:45 am]
Magalie R. Salas, BILLING CODE 6717–01–P
May 11, 2005. Secretary.
On April 14, 2003, Pacific Gas and [FR Doc. E5–2479 Filed 5–16–05; 8:45 am]
Electric Company, licensee for the Kern DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Canyon Project No. 178, filed an
application for a new or subsequent Federal Energy Regulatory
license pursuant to the Federal Power DEPARTMENT OF ENERGY Commission
Act (FPA) and the Commission’s
regulations. Project No. 178 is located FEDERAL ENERGY REGULATORY South Carolina Electric & Gas
on the Kern River in Kern County, COMMISSION Company; Notice of Intent To File
California. Application for New License
[Docket No. PR05–13–000]
The license for Project No. 178 was
May 11, 2005.
issued for a period ending April 30, Regency Intrastate Gas, LLC; Notice of
2005. Section 15(a)(1) of the FPA, 16 a. Type of Filing: Notice of intent to
Petition for Rate Approval file application for a new license.
U.S.C. 808(a)(1), requires the
b. Project No.: P–516–000.
Commission, at the expiration of a May 10, 2005.
c. Date Filed: May 2, 2005.
license term, to issue from year to year Take notice that on May 2, 2005, d. Submitted By: South Carolina
an annual license to the then licensee Regency Intrastate Gas, LLC (Regency Electric & Gas Company.
under the terms and conditions of the Intrastate) filed a petition for rate e. Name of Project: Saluda
prior license until a new license is approval pursuant to section Hydroelectric Project.
issued, or the project is otherwise 284.123(b)(2) of the Commission’s f. Location: On the Saluda River, in
disposed of as provided in section 15 or Regulations. Regency Intrastate requests Lexington, Richland, Newberry, and
any other applicable section of the FPA. the Commission to approve a maximum Saluda Counties, South Carolina. The
If the project’s prior license waived the monthly reservation charge of $5.42 per project does not occupy any Federal
applicability of section 15 of the FPA, MMBtu for firm transportation service, lands.
then, based on section 9(b) of the a maximum firm commodity charge of g. Filed Pursuant to: Section 15 of the
Administrative Procedure Act, 5 U.S.C. $.0746 per MMBtu, and a maximum rate Federal Power Act; 18 CFR 16.6 of the
558(c), and as set forth at 18 CFR of $.2529 per MMBtu for interruptible Commission’s regulations.
16.21(a), if the licensee of such project transportation service under section 311 h. Effective Date of Current License:
has filed an application for a subsequent of the Natural Gas Policy Act. June 1, 1984.
license, the licensee may continue to Any person desiring to participate in i. Expiration Date of Current License:
operate the project in accordance with this rate proceeding must file a motion August 31, 2010.
the terms and conditions of the license to intervene or protest with the Federal j. The Project Consists of: (1) A 7,800-
after the minor or minor part license Energy Regulatory Commission, 888 foot-long earth-fill dam; (2) a reservoir
expires, until the Commission acts on First Street, NE., Washington DC 20426, (Lake Murray) with a full-pool surface

VerDate jul<14>2003 15:22 May 16, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1

You might also like