Description of works.
Rate
Rs. p
Earth work:
a) Earth work excavation for all kinds of loose soils upto 500depth.
b) Same as above 500depth.
c) Excavation in column pits upto 500depth.
d) Same as above 500depth.
e) Earth work excavation in hard strata using chisel and hammer.
6.50
7.00
7.00
7.50
11.50
2.
4.50
b) filling with basement and foundation using quarry dust or gravel sand 14.00
consolidation ramming complete.
3.
Plain cement concrete using 11/2 blue metal for foundation base
including leveling and ramming complete.
90.00
4.
55.00
5.
95.00
6.
b) Plinth beams.
230.00
c) Lintels.
275.00
d) Sunshades.
e) One way slab
155.00
270.00
270.00
72.00
Precaste slab casting , laying and finishing.
8.
27.50
23.50
25.50
27.50
30.00
1.00
35.00
13. Weathering course with lime surki concrete for an average tk.3
including chipping beating.
33.00
27.00
15. Weathering course top tiles laying and pointing including tiles.
47.00
16. Weathering tiles skirting laying and pointing including wall cutting.
37.00
17. Haunch finishing in parapet wall corner.
25.00
18. Lath plastering using chicken mesh with both side finishes.
80.00
250.00
35.00
50.00
1800.00
Fabrication of reinforcement cutting bending laying and tying in position 51.00
te;
1. The above rates are excluding elevation and decorative works.
2. lifting charges 10% extra in each floor.
3. The rate will be valid for one year only.
4. Debries removal will be extra as per actual.
5. Water and electricity supplied by client.
6. All tools and accessories will be supplied by contractor.
7. Work will be done as per the customer satisfaction.
8. Once the work is started it will not be withhold for any petty reasons.
9. All designing and drawing will be supplied by the engineer.
10. Work supervision will be arranged by the contractor and will supervise the work
continuously and regularly.
16. All the above rates are excluding Service tax,and Sales tax,.
(Any government tax Extra.)
Basic rate of materials
5% rate increase is allowed ,cost difference above 5% will be settled by client as
per actuals.
River sand:
jelly
.1 metal
Bricks
Cement
Steel