You are on page 1of 27

Ivar Aasen Field Development Project pdQ

24/03/2015

Terry Snaith

03L

27.02.15

As Built

ShTh

FrLe

HFO

02L

23.01.15

As Built

ShTh

FrLe

HFO

01E

16.07.14

Issued for Review

ShTh

FrLe

HFO

Rev.

Date

Prepared
by

Reviewed
by

Approved

by

Reason for Issue

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM FEEDER

TO SEA WATER LIFT PUMP A

Package Title:

EICT Package

Area
Code:

System

Code:

M120

80

Project Tag Numbers:

80EH0011A

No. of

Pages :

27

Project No.:

Supplier Document Number:

Rev.

C-00011

51PO-04193.220-K-123-00

03L

Purchase Order No:

Project Document Number:

Proj Rev.

DN02-S09011-E-XK-2123-00

03L

S09011

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

INDEX

Ivar Aasen 11kV


11kV
K23

2
ITEM

DESCRIPTION

Changes after FAT can be found in the below pages :

SHEET

1.

TABLE OF CONTENT

2.

SINGLE LINE DRAWING

3.

MAIN CIRCUIT PRIMARY PARTS

age 12 : Aux Terminal Interchanged for Failsafe operation. Aux contacts of ESD

4.

MAIN CIRCUIT CURRENT TRANSFORMERS

relay removed from loop and connected directly

5.

CURRENT TRANSFORMERS, SIPROTEC CURRENT INPUT

6.

SIPROTEC VOLTAGE INPUT

7.

CAPACATIVE VOLTAGE INDICATOR

8.

230V AC LIGHT&HEATING INCOMER

9.

230V AC UPS INCOMER, CHANGEOVER, FEED TO RING LOOP

10.

110VDC POWER SUPPLY TO RING LOOP, CONTROL POWER MCB

10

11.

CONTROL POWER DISTRIBUTION

11

12.

CIRCUIT BREAKER OPERATION CLOSING AND TRIP

12

13.

SIPROTEC SUPPLY , BINARY INPUTS/OUTPUTS

13

14.

SIPROTEC BINARY OUTPUTS

14

15.

SIPROTEC BINARY INPUTS

15

16.

SIPROTEC BINARY INPUTS

16

17.

SIPROTEC BINARY INPUTS

17

18.

CB, DISCONNECTOR, EARTHING SWITCH INTERLOCKING COILS

18

19.

EXTERNAL SIGNALS PSD, LOAD SHEDDING

19

20.

FEEDER STATUS SIGNALS, MOTOR TEMP HIGH HIGH, EMCY STOP

20

21.

SPARE TERMINALS

21

22.

CIRCUIT BREAKER OVERVIEW SYMBOL

22

23.

3-POSITION SWITCH DISCONNECTOR OVERVIEW SYMBOL

23

24.

3-POSITION SWITCH EARTH SW OVERVIEW SYMBOL

24

25.

SIPROTEC 7SK85 OVERVIEW SYMBOL

25

26.

SIPROTEC 7SK85 OVERVIEW SYMBOL

26

27.

27

28.

28

29.

29

gaPe 2 : Protection functions implemented are added

aPe 8 : Heater supply wired via Aux contacts of ESD relay removed and connected

directly (as ESD Relay is unplugged)

Acceptance Code:

03L

As Built

27.02.1 5
ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE

As Built

23.01 .1 5
ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4
ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Area:

Wood Group

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

Scale

M120
NA

Appr. by

Tag no.

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM

FEEDER TO SEA WATER LIFT PUMP A

CONTENT

HFO

02L

Signature:

S09011

=80EH001 1A

Siemens Dwg. No.:

51PO-04193.220-K-123-00

+K23

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

Sheets:

26

Copyright (C) Siemens AS All rights reserved

<1>

<>

No. / Text

11 kV, 2500 A, 40 kA

Bus A

-Q1

Single Line Drawing

-Y5

-Y5 earth switch

interlock magnet

-Y1 isolator switch


interlock magnet
-Y1

B
A

Bus A - VT
-Y1 shunt coil
-Q0
-Y7 undervoltage coil

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

1250A

V F

74
50BF 27
TCS

46

66

50
51

48

81

50N

49
51N

VOIS+
-A51

-T1
3

L1 ,L2,L3:

100A/1A/1A/1A

Core-1 2,5VA Cl.1FS10

Core-2 2,5VA Cl.5P20

Core-3 2,5VA Cl.5P20

Ivar Aasen 11kV


11kV
K23

-F5

E
-T90

100A/1A

Core-1 1,25VA Cl.1FS10

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SINGLE LINE

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51 PO-041 93.220-K-1 23-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Main Circuit

L2.

L3.

3. Pos Switch

-Q0

-Q1

Off

Earth

Iso

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

No. / Text

L1.

Circuit Breaker

Input for
Capacitive

Voltage indicator
-A51, LRM

Ivar Aasen 11kV


11kV
K23

<>

MAIN BUSBAR - 11kV 60Hz

Copyright (C) Siemens AS All rights reserved

<1>

L1

L2

L3

L1
/4.3

L2
/4.4

L3

/4.4

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

MAIN CIRCUIT

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Copyright (C) Siemens AS All rights reserved

<1>

11kV 60Hz

/3.2

/3.3

1
L1

L2

No. / Text

Main Circuit

L3

Current transf. Core 1

metering values

-T1

-T1L1

-T1L2

1S1

1S1
/5.5

-T1L3

1S2

Current transf. Core 2

protective values

1S1
/5.5

1S2

/5.5

1S2
0-1

Current transf. Core 3

protective values

Toroidal earth fault trafo

2S1

2S1
/5.3

2S1
/5.3

2S2

2S2

/5.6

/5.6

3S2

3S2

Cable to Slave Bustie

/5.3

2S2

3S1

3S1
This drawing was produced electronically
and requires no signature.
It may not be amended manually.

<>
/3.3

0-1 A

3S1

/5.6

3S2

0-1 A

S1

/5.2

-T90

+K21
L1

L3

YARD CABLES

L2

L1

Ivar Aasen 11kV


11kV
K23

S2

+K21
L2

+K21

L3

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

OVERVIEW CURRENT TRANSFORMERS

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

-T1 L2

/4.4

/4.4

/4.4

-T1L3

-T1 L3

-T1L3

/4.4

/4.4

/4.4

310PE

-XT1

331

332

322

312

110PE

111

121

131

-XT1

132

122

210PE

211

231

232

222

212

221

Current Transformer

Toroidal earth fault trafo

100/1A 1,25 VA Cl. 1Fs10

Current Transformer

Protective current, Core 2

100/1A 2,5VA Cl. 5P20

Current Transformer

Measuring current, Core 1

100/1A 2,5VA Cl. 1FS10

Current Transformer

Protective current, Core 3

100/1A 2,5VA Cl. 5P20

3S2

3S1

1S1

1S2

2S1

2S2

S1

3S1

3S2

1S1

1S2

2S1

2S2
B

No. / Text

1
3S1

3S2

1S1

1S2

2S1

2S2

-T1L2

std 2,5 sq mm

std 2,5 sq mm

110PE

111

121

std 2,5 sq mm

A1

A3

A5

I 1

I 2

I 3

A4

A6

IO202

A2

A8

I 4

-F21.1

/25.5

A7

Ivar Aasen 11kV


11kV
K23

Yard Cable

-XT90

std 2,5 sq mm

/4.3

-T1L2

S1
A

<>

B
-T1L1

311

/4.3

/4.3

-XT1

/4.3

-XPE

-T1L1

-T90

S2

-XPE

-T1L1

L2

L3

7
<4>

L1

-XPE

S2

Copyright (C) Siemens AS All rights reserved

<3>

-XPE

MAIN 1 1 kV

-XT90

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

4
<2>

321

<1>

112

Acceptance Code:

1
-

03L

As Built

27.02.1 5
ShTh

.
FrLe

Drawing Title:

Supplier

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM

FEEDER TO SEA WATER LIFT PUMP A

SIPROTEC CURRENT INPUT

HFO

DET NORSKE

02L

As Built

23.01 .1 5
ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4
ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Area:

Wood Group

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A
Scale

M120
NA

Appr. by

Tag no.

Signature:

S09011

=80EH0011A

Siemens Dwg. No.:

51PO-04193.220-K-123-00

+K23

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

Sheets:

26

BUSBAR VOLTAGE 11kV - 110V 60Hz

BUSBAR VOLTAGE 11kV - 110V 60Hz

<>

No. / Text

BUSBAR Voltage 110V AC

Open Delta measurement

BUSBAR Voltage 110V AC

14
22

13
21

I >

I >

/1 7.4

I >

I >

A 1A

13
21

-F159

A 1A

14
22

-F158

/1 7.3

B7

B1

B3

B5

U4

U1

U2

U3

B2

B4

B6

Ivar Aasen 11kV


1 1 kV
K23

-F21.1

/25.5

B8

IO202

Acceptance Code:

1
-

XR1_54

=RING_A/4.2

=RING_A/4.2

=RING_A/4.2

XR1_53

XR1_51

XR1_56

Common Bus

Multicable for panel

connection mounted

at top of Cubicle

XR1_52

Detail shown in document

DN02-S09011-E-XK-2127-00

L3

L2

=RING_A/4.2

=RING_A/4.2

XR1_55

Detail shown in document

DN02-S09011-E-XK-2127-00

Common Bus
Multicable for panel
connection mounted
at top of Cubicle

L1

=RING_A/4.2

L1

Copyright (C) Siemens AS All rights reserved

<2>

<1>

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SIPROTEC VOLTAGE INPUT

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51 PO-041 93.220-K-1 23-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Ivar Aasen 11kV


11kV
K23

<1>

<>

L2

L1

No. / Text

Capasitive Voltage Indicator

VOIS+

L3

-A51
L3

L2

L1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

CAPACITIVE VOLTAGE SENSOR

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Detail shown in document

DN02-S09011-E-XK-2127-00

COMMON BUS

Multicable for panel


connection mounted
at top of Cubicle

<4>

L2

1
-X230

<>

No. / Text

SEAWATER LIFT PUMP A

Heating element 230V AC

230 VAC Supplied from

Ring Bus

R01: Switchboard Heating in

CB Compartment,230 V / 60 Hz

3
533

230 VAC
std 2,5 sq mm

-XQ1 D

<3>

I > I >
I
I

U20: LV Compartment Light

S20: Door switch for Light

533

X51:1
4

Heating is ON when feeder

is disconnected or earthed

534

B 6A

/1 7.3

14
22

+.D
-Q1.2

/24.1

R100: Heater in
B

LV Compartment,230 V / 60 Hz

B100: Thermostat for

LV Compartment Heater

13
21

-F230.1

16

15

14

13

A
B

X51:0

534

-X230

12

11

230 VAC

-XQ1

-X32

-X100

36

X03:3

74

32

3PE
8

-X100

X03:4

X05:6

35

-XQ0 D

+.L
-Q0

/22.1

X05:5

53

CD

73

1
A

13

-X32

-XPE

B
B

-XPE

+.L
-Q0
/22.1

A
B

-X100

X01:6

-R

PE
A

2
Heating element

230 VAC 100W

L
-U20

-B100

Heater

-R100

-R01

X01 :7

A 1 B

+.L
-Q0

/22.1

-XQ0

54

-S20

31

12

-XQ0 D

21

22

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

F230.1: MCB Heat&Light

Ivar Aasen 11kV


1 1kV
K23

XR1_6

XR1_5

=RING_A/2.2

=RING_A/2.2

<2>
L1

Copyright (C) Siemens AS All rights reserved

<1>

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

230V AC HEATING

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<1>

5
<3>

<2>

<>

XR1_2

XR1_1

No. / Text

SPARE

SPARE

SPARE

230VAC Feeded from Common Bus

13
21

14
22

I > I >

/1 7.3

14
22

C 16A

/1 7.3

COMMON BUS

Multicable for panel


connection mounted

at top of Cubicle

-F230.3

I > I >

13
21

-F230.2

C 16A

C
21

13

-K08

/.2

-X230

10

22

-K08
/.2

std 2,5 sq mm

44

32

-K08
/.2

-K08
/.2

230 VAC

31

43

13
21

14

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X230

Detail shown in document


DN02-S0901 1-E-XK-21 27-00

-X230

L2

=RING_A/2.2

SPARE (NOT CONNECTED TO ANY SUPPLY)

Copyright (C) Siemens AS All rights reserved

L1

<4>

=RING_A/2.2

D
B 6A

A2

-K08

/.2

A1

I > I >

/1 7.3

14
22

-F230.4

13

14

21
/.3

31
/.3

43
/.2

22

/.2

-S230

PE

-K08

L2

L1

Ivar Aasen 11kV


11kV
K23

-XPE

32

44

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

1 1 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

230V AC SOCKET AND CHANGEOVER

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

6
<5>

<4>

<6>

=RING_A/2.2

=RING_A/2.2

UPS B

Detail shown in document

DN02-S09011-E-XK-2127-00

I >

I >

14
24

-F1

10A C

L1

F110.1: CONTROL VOLTAGE MCB

Main 110 VDC Control

L1

14
/1 7.5

14
/1 7.5

=
+
55VDC

F110.3: CONTROL VOLTAGE MCB

1 1 0 VDC CB Operation

Undervoltage trip coil


F110.4: CONTROL VOLTAGE MCB

11 0 VDC Spring Charge Motor

110VDC Feeding to Common Bus

Type of wiring: Radox

Radox-125 2,5

Radox-125 2,5

-X1 1 0

A
B

1
-X110

Radox-125 2,5

Radox-125 2,5

Radox-125 2,5

110VDC

13
21
14
22

/1 7.2
67

2
X06:1

X06:2

22

-S22

21

-S21

22

+.L
-Q0

/22.1

3L+ 3L/1 1 .5/1 1 .5

21

2L+ 2L/1 1 .3/1 1 .3

68

I > I >

-XQ0

1L+ 1L/1 1 .1 /1 1 .1

3
C 4A

/1 7.2

I > I >
4

/1 7.2

C 2A

-F110.4

14
22

-F110.3

Radox-125 2,5

13
21

Radox-125 2,5

14
22

13
21

I > I >
2

C 2A

I >

14
22

-F110.2

/1 7.2

I >

Radox-125 2,5

Radox-125 2,5

Radox-125 2,5

13
21

Radox-125 2,5

Radox-125 2,5

-F110.1

C 2A

L2
13
/1 7.5

F110.2: CONTROL VOLTAGE MCB

1 1 0 VDC CB Operation

Shunt trip coil

-D1

230V AC UPS to 110V supply

-U2

No. / Text

QUINT-PS/ 1AC/48DC/10 - 2866682

13
/1 7.5

55VDC

Power supply 2 x 55VDC

L2

-U1

COMMON BUS
Multicable for panel
connection mounted

at top of Cubicle

<>

XR1_8

XR1_7

13
23

-X230

/1 7.1

Yard Cable

Ivar Aasen 11kV


11kV
K23

=85EL102B

=
This drawing was produced electronically
and requires no signature.
It may not be amended manually.

4
<3>

<2>

Copyright (C) Siemens AS All rights reserved

<1>

-M1

A1+

D2-

DC

Acceptance Code:

500W
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
02L

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Tag no.

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

MCBs 110V DC AND POWER SUPPLY

HFO

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

10

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Copyright (C) Siemens AS All rights reserved

<1>

<2>

<3>

<>

1L+

/1 0.2

-X30 1

A B
2
3

A
A

B
B

A B
5

A B

1/1L+

/1 2.1

2/1L+
3/1L+

/1 0.3

2L+

-X30 21

A B

1/2L+

/1 2.2

22

A B

/1 3.2

23
A

/1 7.5

/1 0.5

3L+

-X30 26

A B
27

A B

2/2L+

/1 2.2

No. / Text

1/3L+

/1 2.6

Main 110 VDC Control

2/3L+

/1 2.7

110 VDC CB Shunt Operation

Internal/eksternal

connections

110 VDC CB Undervoltage

Operation

Internal/eksternal

connections

4/1L+

/1 3.5
5/1L+

/1 5.2
6/1L+

/1 5.3

A B

8/1L+

/1 7.1

A B

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

10
A
11
A

11B/1L+

/1 8.1

/1 0.3

B A
3

B A

2L-

-X30 24

A B

1 /2L-

/1 2.3

3L/1 0.5

-X30 28

A B

25

A B

-X32 1

B A

1 /3L-

/1 2.7

29

A B

11/1L+

/1 8.3

12/1L+

/20.5

13/1L+

/20.6

B A

/1 0.2

Ivar Aasen 11kV


11kV
K23

1L-

-X30 12

A B
13
A

1 /1L-

2/1L-

14

A B

3/1L-

15

A B

4/1L-

16

A B

5/1L-

17

A B

6/1L-

18

A B

7/1L-

/1 2.1

/1 3.2

/1 3.5

/1 5.2

/1 6.2

/1 8.3

/20.5

19

A B

20

A B

11B/1L-

/1 8.1

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

CONTROL POWER DISTRIBUTION TERMINALS

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

11

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

1/2L+

2/2L+

<3>

<4>

<5>

<>

+.D

-Q1.2

/24.1

21

C3

Undervoltage release

CB Trip signal from SIPROTEC

Spare ESD Trip

PSD Trip

Load shedding

(-K03, -K04, -K05)

Spare

Failsafe from Emergency stop

573
574

22

-XQ1

-K07

/20.6

14
15

66

65

63

Trip circuit supervision

CB shunt coil -Y1

13 22

12
8
-K02.2

/1 9.4

21

41
X04:2

-XQ0

-XQ0

574

21 22
21 22

C4

First shunt release

CB Trip signal from SIPROTEC

Spare ESD Trip

PSD Trip

Load shedding

(-K03, -K04, -K05)

Spare

Failsafe from Emergency stop

-K06
/20.5

X55:0

-K05

/1 9.7

47

33

Circuit Breaker

32

31

X04:1

42

22

14

14

14

+.L
-Q0

/22.1

-K04

/1 9.6

C6

48

21

13

13

13

13
14

B11
30

-X30

-XQ0
C

-K03
-K04
-K05
-K06
-K07

/1 9.6
/1 9.6
/1 9.7
/20.5
/20.6

-K02.1
/1 9.4
4

-K01.1
/1 9.1

12
8

12
8

BO1.2

BO1.1

B12

B10

-F21 .1

/25.5

CB Close signal

from SIPROTEC

X55:1

-K03

/1 9.6

BO1.5

A1

/1 5.6

-XQ1 D

1/3L+

A3

No. / Text

2/3L+

-F21.1

/25.5

X06:3

X01:4

-Y7

A2
Man.on

X01:3

X06:5

-XQ0

16

62

64

X06:7

-XQ1 D
C

561

1 /1 L-

1 /3LX54:3

562

561

/1 1 .6

+.D

-Q1.2

/24.1

/1 1 .2

562

Acceptance Code:

1 /2L- /1 1 .4

03L

As Built

27.02.1 5
ShTh

Supplier

FrLe

HFO

02L

As Built

23.01 .1 5
ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4
ShTh

FrLe

HFO

Issue

Description

Made by

Chc. by

SMOE

Tag no.

Area:

Wood Group

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A
Scale

M120
NA

Appr. by

Drawing Title:

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM

FEEDER TO SEA WATER LIFT PUMP A

CIRCUIT BREAKER

DET NORSKE

Date

X54:2

-XQ1

A2

-Y1

A2

-Y9

X06:4

Man.off

A1

X06:6

A1

+.L

-Q0

/22.1

A1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

573

1/1L+

A2

/1 5.6

Ivar Aasen 11kV


11kV
K23

/1 5.6

/1 1 .4

/1 1 .2

/1 1 .4

<2>

B9

Copyright (C) Siemens AS All rights reserved

<1>

/1 1 .6

/1 1 .6

Signature:

S09011

=80EH0011A

Siemens Dwg. No.:

51PO-04193.220-K-123-00

+K23

System:

DWG Size Drawing No.:

Rev:

80

A3

03L
12

DN02-S09011-E-XK-2123-00

Sheet:

Sheets:

26

5
<3>

<2>

<5>

<4>

<>

No. / Text

Power supply SIPROTEC

Spare binary outputs

Spare ESD Trip from SAS

PSD Trip from SAS

/1 1 .2

/1 1 .2

Copyright (C) Siemens AS All rights reserved

<1>

2/1L+

4/1 L+

B
5

Spare Binary Input

-K02.1

/1 9.4

A
B

3
-X30

42

40

37

-X30

-K02.2

/1 9.4

-K01.2
/1 9.2

11
7

11
7

34

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-K01.1
/1 9.1

11
7

11
7

K02_41

/1 7.5

A
B

BI 2.3

B13

B14
BI 2.2

B12
B11

B3

B8

BO2.1

BI 2.1

B4

B5
BO2.2
B9

B7

B2

B
A

3/1 L-

/1 1 .2

41

39

38

35

-X30

2/1 L-

36

/1 1 .2

Ivar Aasen 11kV


1 1kV
K23

B6

B1

-F21.2

/25.1

LIFE CONTACT
B10

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

BINARY INPUTS ESD,PSD, TEMPERATURE TRIP

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

13

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<>

64

62

BO3.6

C14

C8

BO3.8

C6
BO3.5

BO3.4

BO3.3

C2

C4

C12

BO3.7

60

58

56

54

52

A
B

B14

-F21.3

/26.1

BO3.2

47

50

BO1.6

BO1.3

BO1.4

C2

B13

Spare binary outputs

C13
65

C11

C7
B

63

61

C5

C3
B

59

57

C1

B13
B

55

53

-X30

51

B11

C10

C8
B

49

48

-X30

46

C1

B14

44

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X30

B12

BO3.1

C7

-X30

45

-F21.1
/25.5

Ivar Aasen 11kV


11kV
K23

No. / Text

43

Copyright (C) Siemens AS All rights reserved

<1>

B
A

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SPARE BINARY OUTPUTS

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

14

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<3>

<2>

<4>

/1 2.2

/1 1 .2

/1 1 .2

Position Indicator Open/Close

Disconnector

Position Indicator Open/Close

Earthing switch

Trip circuit supervision

VCB shunt coil -Y1

511

513
514

512

D13

D11

D12

BI1.8

BI1.7

D8
BI1.6
D10

4/1 L-

A2

A3

/1 2.5

/1 2.2

/1 1 .2

D14

D7
BI1.5

BI1.4

BI1.3

X51:7

D6

D5

D3

514

113

512
X51 :8

D9

44
C14
BI1.2
D2

IO202

BI1.1

A6

/1 6.3

X51:9

114

112

53
54

51
52
45

-XQ1

C13

-F21.1

/25.5

+.D

-Q1.2

/24.1

X11:7

X11:8

-XQ0
C

X1 1 :9

X04:5

X04:4

511

+.D
-Q1.1

/23.1

X04:3

-XQ1

/1 6.2

114

A5

D4

CD

111

-XQ0

112

Position Indicator Open/Close

Circuit Breaker

6/1L+

111

5/1L+

No. / Text

A1

D1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

+.L
-Q0

/22.1

Ivar Aasen 11kV


11kV
K23

<>

46

Copyright (C) Siemens AS All rights reserved

<1>

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

INPUT SIGNALS POSITIONS CB AND 3POSITION SWITCH

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

15

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

2
<3>

<2>

<4>

<5>

/1 5.2

/1 5.5

-XQ0

-XQ0

+.D
-Q1.2

/24.1

X88:3

SF6 monitoring CB

Underpressure/Overpressure

Spare binary inputs

3
2

B1

A14

BI3.8

BI3.7
A13

BI3.6
A12

B2

A10

A9
BI3.5

70

A
B

A11

A6

68

66

-X30

BI3.4

A7
A5

892

891
C

BI3.3

A2
BI3.2

A3

X88:1

A8

A4

BI3.1

816

50

-XQ1
C

A1

-F21.3

/26.1

Operation key not plugged

Disconnector

X88:0

X88:2

X82:2

-XQ0
C

14
X05:9

10

X01 :9

Spring mech. not charged

Circuit Breaker

-S25

22

13

X82:3

21

13

-S42

14

-S1 6

+.D
-Q1.1
/23.1

X05:0

Operation mechanism blocked

Circuit Breaker

C
C

X01:8

No. / Text

893

890

DC

815

A6

59

A5

+.L
-Q0
/22.1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

<>

11

Copyright (C) Siemens AS All rights reserved

<1>

5/1L-

B
A

71

69

67

-X30

/1 1 .2

Ivar Aasen 11kV


11kV
K23

A4

/1 7.1

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

INPUT SIGNALS AUX FUNCTIONS CB AND 3POSITION SWITCH

HFO

DET NORSKE

02L

As Built

23.01 .1 5

ShTh

FrLe

HFO

01 E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Tag no.

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

16

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

2
<2>

<3>

<5>

<4>

<6>

<7>

<8>

8/1L+

K02_41
/1 3.5

/1 1 .2

/1 1 .2

MCB closed/not tripped

Spring charge motor

Control voltage:

signals and operation

MCB closed/not tripped

230V AC supply

MCB closed/not tripped

BUSBAR Voltage 110V AC

Open Delta measurement

MCB closed/not tripped

BUSBAR Voltage 110V AC

110V DC Power supply

-U1 and -U2 OK

Spare

Failsafe from Emergency stop

44

44

-K07

/20.6

13

13

14

14

-F230.2

/9.2

MCB closed/not tripped

230V AC to 110V supply

43

43
-K06
/20.5

-U1
/1 0.2
14

13

13

14

14

-F159
/6.4

No. / Text

13

-F158
/6.1
14

-F230.1
/8.2

13

-F230.3

/9.3

-U2
/1 0.3

13

13

14

14

14

-F110.3
/1 0.5

13

13

-F110.1
/1 0.2

14

-F1
/1 0.2

13

13

13

3/1 L+

-F110.2
/1 0.3

D12

D11

D10

BI3.16

BI3.15
D9

BI3.14
D8

BI3.13
D7

B8

D6

D5

B10
BI3.12

14
B9
B7

BI3.11

BI3.10
B6

B5

BI3.9

14
-F21.3

/26.1

-F230.4

/9.4

B4

-F110.4
/1 0.6

B3

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

<>

14

Copyright (C) Siemens AS All rights reserved

<1>

Ivar Aasen 11kV


11kV
K23

A4

/1 6.5

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

INPUT SIGNALS MCBs AND POWER SUPPLY

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

17

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<4>

/1 1 .2

<>

No. / Text

Interlocking coil

CB operation mech. blocked

Interlocking coil

Disconnector

Interlocking coil

Earthing switch

Position indicator
Disconnector open

11/1L+

-X32

553

X53:1

141

+.B
D

-XQ1

554

553

-XQ1

+.D
-Q1.1

/23.1

X1 2:3

141

554

142

X53:0

+.B

-XQ1

C
C

142

-XQ1

832

22

830

X1 2:2

+.B
D
-XQ0

-XQ1

A2

833

831

21

X85:0

X84:0

X02:8
+.B
-XQ0

-Y5

XR1_16
=RING_A/2.2

-Y1

X85:1
A1

X84:1

A2

-S1
-Y16

+.D
-Q1.2

/24.1

X02:7
123
124

A1

+.L
-Q0

/22.1

A2

-XQ1

XR1_14
=RING_A/2.2

11B/1L/1 1 .2

03L

As Built

27.02.1 5

ShTh

6/1 L/1 1 .2

Ivar Aasen 11kV


1 1 kV
K23

<3>

XR1_13
=RING_A/2.2

/1 1 .2
11B/1L+

+.D

-Q1.2

/24.1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

<2>

A1

Copyright (C) Siemens AS All rights reserved

<1>

XR1_15
=RING_A/2.2

Acceptance Code:

FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

INTERLOCK of 3POSITION SWITCH

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

18

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<3>

<2>

<5>

<4>

<>

No. / Text

Spare ESD Trip from SAS

24V DC

PSD Trip from SAS

24V DC

Load shedding relay 3

Load shedding relay 4

Load shedding relay 5

A
B

A
B

C
A1

A1

-K05

/.7

A2

-K04
/.6

A2

-K03
/.6

A1

-K02.2
/.4

-K02.1
/.4

-K01.2
/.2

-K01.1
/.1

Ivar Aasen 11kV


1 1kV
K23

Yard Cable

-K01.1
7
/1 3.5 11
8
/1 2.2 12
9
13
10
14

-K01.2
3
4
5
6

7
/1 3.5 11
8
12
9
13
10
14

-K02.2

7
/1 3.5 11
8
/1 2.3 12
9
13
10
14

4
5
6

3
4
5
6

7
/1 3.5 11
8
/1 2.6 12

9
13

10
14

13
/1 2.3

21
/1 2.7

31

43

Yard Cable

-K04
14

-K05

32

31

32

13
/1 2.4

21
/1 2.7

31

44

43

44

43

22

/1 2.3
/1 2.7

Yard Cable

-K03
3

B
A

Yard Cable

-K02.1
3

-X24

10

13

14

21

22

14

22

44

03L

As Built

27.02.1 5

ShTh

Acceptance Code:

FrLe

Drawing Title:

Supplier

DET NORSKE
02L

As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Tag no.

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

PSD and LOAD SHEDDING

HFO

32

Yard Cable

Yard Cable
5

-X24

Yard Cable

Yard Cable

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

A2

Copyright (C) Siemens AS All rights reserved

<1>

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

19

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

<4>

-X32

11

-X32

/1 1 .2

52

42

131

-XQ1

12/1L+

-XQ0

CD

-XQ0

No. / Text

SPARE

CB and Disconnector status

Calbe Disconnected/connected

to busbar

SPARE

CB and Disconnector CLOSED

Cable connected to busbar

SPARE

Failsafe from Emergency stop

(Trip if NO Voltage in coil)

/1 1 .2

<>

1 3/1 L+

Yard Cable
C

B
+.L

-Q0

/22.1

63

33

64

34

51

-XQ0

X05:8

X04:9
40

X04:8

41

-XQ1

X05:7

61
X11:2

+.L

-Q0

/22.1

X04:7

62

X11:3
131

+.D

-Q1.1

/23.1

132

-XQ0

-XQ1

13

-X32

14

143

-XQ1

133

Yard Cable

A
B

+.D
-Q1.1

/23.1

A1

-K07

/.6

1 44

A2

-K06
/.6

A1

X12:1

134

A2

X11:1

143

+.D
-Q1.1
/23.1

133

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

6
<3>

<2>

132

Copyright (C) Siemens AS All rights reserved

<1>

X11:0

X12:0

-XQ1

B
A

-X32

12

-X32

10

-X32

/1 2.4
C

/1 2.7

/1 7.5

13

14

21

22

31

32

43

44

13
/1 2.7

21
/1 2.4

31

14

22

43
/1 7.6

44

32

7/1 L-

/1 1 .2

Ivar Aasen 11kV


11kV
K23

-XQ1

144

134

-K07

-K06

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01 E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

TRANSFORMER TRIP, VOLT.FREE POSITION SIGNALS

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

20

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Ivar Aasen 11kV


11kV
K23

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

<1>

<>

No. / Text

Spare terminals

-X24 11
A

-X30 72
A

-X32 15
A

-X230 17

A B

12
A

73
A

16
A

18

A B

13
A

74
A

17
A

19

A B

14
A

75
A

18
A

20

A B

15
A

76
A

19
A

21
A

16
A

77
A

20
A

22

A B

78
A

23

A B

79
A

24

A B

80
A

25

A B

81
A

26

A B

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SPARE TERMINALS

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

21

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

F
03L

As Built

.
.

27.02.1 5
ShTh

02L
As Built

23.01 .1 5
ShTh

FrLe

HFO

01 E
Issued for review

1 6.07.1 4
ShTh

FrLe

HFO

Issue
Description

Date
Made by

FrLe

Chc. by

SMOE

Appr. by

Wood Group

Mustang

Supplier

HFO

DET NORSKE

53

B
51

B
47

43

45

B
44

B
41

Drawing Title:

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM

FEEDER TO SEA WATER LIFT PUMP A

CIRCUIT BREAKER

Installation: Ivar Aasen Field

Development Project - PDQ Platform

40

37

Area:

35

B
33

Tag no.

80EH0011A
Scale

M120
NA

/1 8.1

B
55

B
31
B

27
B

System:
DWG Size Drawing No.:

Rev:

80
A3

03L
22

DN02-S09011-E-XK-2123-00

25
B

P.O.Number

S09011

Siemens Dwg. No.:

51 PO-041 93.220-K-1 23-00

20
B

Acceptance Code:

23

A2

-S6

A1

41

51

53

61

63

71

73

81

83
91
93

101

103

111

113
121

42

52
54

62
64

72
74

82
84

92
94

102

104

112

114
122

123

33

34

124

31

32

21

22

13

13
14

14

13

14

-S13

X02:8

22

1
2

14

13

43
44

B
B
B
B
B
B
B
B
B
B
B
B
B
B
B

B
B
B

B
B
B
B
B
B
B
B

X06:0

X06:6

X06:4
X06:3
X01:0

X01 :4

X01 :5

X01 :7

X01 :8

X05:1

X05:0

X05:3

X05:5

X05:7

X04:1

X04:0

X04:3

X04:7

X03:1

X03:3

X03:5

X03:7

X02:1

X02:3

X02:5

X02:7

ON

ON

ON

ON

OFF

ON

OFF

ON

OFF

ON

OFF

OFF

ON

OFF

CB TRIPPING
SIGNAL

MECH. NOT CHARGED

MECHANISM CHARGED

CB OP.MECH. BLOCKED

HEATER

UNDERVOLTAGE RELEASE

FIRST SHUNT RELEASE

CLOSING

ANTI PUMPING DEVICE

MOTOR OP. MECH.

22 INTERLOCKING COIL
CB OP.MECH. BLOCKED

24

26

28

32

34

36

38

42

46

49

48

52

54

56

59

58

11

12

14

15

18

19

66

65

63

69

68

21

X02:6

X02:9

X02:4

X02:0

21

A1

X01 :1

X06:1

29

X02:2

X03:8

X03:6

X03:4

X03:2

X04:9

X04:8

X04:5

X04:4

X04:6

X04:2

X05:8

X05:6

X05:4

X05:9

X05:2

X01:9

X01:6

A2

23
24

-S10

21

/8.7

50

/20.3

57

/20.2

10

/1 5.2

B
13

11

12

22

/1 5.2

B
X01:3

-S11

16

X01:2

-Y7

/1 2.5

B
17

DC

-S41 -S42

/20.4

B
X03:9

21

22

/8.6

B
X03:0

A1

22

-S16
-R01

/1 6.2

B
30

A2

-Y1

39

X06:5

31

-S1

/1 6.2

B
32

-Y9

64

-K1

Man.OFF

A1

14

13

21

21

/8.2

B
A2

A1(+)

-S21

/1 2.7

A B
-XQ0

-K1

22

X06:7

A1

D2(-)

-S3

62

-S22

A2

21

-M1

X06:9

22

X06:8

22

60

21

-Q0

61

X06:2

Copyright (C) Siemens AS All rights reserved

+.L

/1 2.3

67

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

/1 2.1

/1 0.6

D
CIRCUIT BREAKER 3AH 867-2033.5C

Ivar Aasen 11kV


11kV
K23

1
8

Date:

Sheet:

-XQ0

-S7

-K1

-Y1 6

Man.ON

-R1

Signature:

=80EH0011A

+K23

Sheets:

26

F
-

03L

As Built
.

27.02.1 5

02L
As Built
23.01 .1 5
ShTh
FrLe
HFO

01 E
Issued for review
1 6.07.1 4
ShTh
FrLe
HFO

Issue
Description
Date

2
.

ShTh

Made by

134

FrLe

Chc. by

142

B
144

3
152

/1 6.3

B
132

B
154
B

162

SMOE

B
164
B

Appr. by

4
B

Supplier

HFO

DET NORSKE

Wood Group

Mustang

174
B

Drawing Title:

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

DISCONNECTOR

Installation: Ivar Aasen Field

Development Project - PDQ Platform

5
6

X82:0

21

22

-S1
13

-S25

14

173

171

B
B
B
B
B
B
B
B
B
B
B
B
B

X11:6

X11:3
X11:1

X12:3
X12:1

X13:3
X13:1

X14:3
X14:1

X15:3
X15:1

X82:3

X82:1

817

815

173

171

163

161

153

151

143

141

133

131

121

INSERTED

NOT PLUGGED

OPERATING KEY

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

B
818

X82:2

174

172

163

161

153

151

143

141

133

131

123

121

816

X1 5:0

X15:2

164

162

154

152

144

142

134

132

124

122

172

X14:0

X14:2

X13:0

X13:2

X12:0

X12:2

X11:0

X11:2

X1 1 :4

X11:5

CLOSED

OPEN

DISCONNECTOR

/20.4

124

/1 8.5

B
122

X11:7

113

111

-XQ1

/20.3

X11 :9

-Q1.1

/20.1

-XQ1
114

111

Copyright (C) Siemens AS All rights reserved

+.D

114

X1 1 :8

112

ON
OFF
EARTHED

112

D
THREE POSITION SWITCH 8DA
867-3517.5A

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

/1 5.3

/1 5.3

Ivar Aasen 11kV


11kV
K23

1
6
7

Tag no.

80EH0011A

B
B

NEXT PAGE

E
E

Acceptance Code:

Area:
Scale
Siemens Dwg. No.:

M120
NA
51PO-04193.220-K-123-00

System:
DWG Size Drawing No.:
Rev:
Sheet:

80
A3

03L
23

DN02-S09011-E-XK-2123-00

P.O.Number

S09011

Date:
Signature:

=80EH0011A

+K23

Sheets:

26

F
03L
.

As Built

1
.

27.02.1 5

02L
As Built
23.01 .1 5
ShTh
FrLe
HFO

01E
Issued for review
1 6.07.1 4
ShTh
FrLe
HFO

Issue
Description
Date

2
.

ShTh

Made by

.
.

FrLe

Chc. by

3
SMOE

Appr. by

Supplier

HFO

DET NORSKE

Wood Group

Mustang

532

B
534

B
542

B
544
B
552
B
554
B
562
B

Drawing Title:

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

EARTH SWITCH

Installation: Ivar Aasen Field

Development Project - PDQ Platform

564
B
572
B

Tag no.

80EH0011A

574
B

891

2
3

Area:
Scale
Siemens Dwg. No.:

M120
NA
51PO-04193.220-K-123-00

System:
DWG Size Drawing No.:
Rev:
Sheet:

80
A3

03L
24

DN02-S09011-E-XK-2123-00

P.O.Number

S09011

B
892

X88:1

X88:2

X55:0

X55:2

X54:0

X54:2

X53:0

X53:2

X52:0

X52:2

X51 :0

X51:2

X51 :4

574

572

564

562

554

552

544

542

534

532

524

573

571

563

561

553

551

543

541

533

531

523

521
B
B
B
B
B
B
B
B
B
B
B
B
B

X51:6

X51:3

X51:1
X52:3

X52:1
X53:3

X53:1
X54:3

X54:1
X55:3

X55:1

X88:3

X88:0

893

890

573

571

563

561

553

551

543

541

533

531

521

SF6
MONITORING
-Q0

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN

/1 6.4

B
524

X51:5

522

513

511

/1 6.4

B
522

514

X51:9

/1 8.1

B
X51:7

511

EARTHING
SWITCH

EARTHING
SWITCH

832

/8.7

B
514

X51 :8

512

-Y5

ON
OFF
EARTHED

X85:1

DISCONNECTOR

830

INTERLOCKING
COIL

/1 5.5

B
512

E1

X84:1

-XQ1

/1 5.4

-XQ1
E2

-Y1
E1

-Q1.2

X85:0

E2

Copyright (C) Siemens AS All rights reserved

+.D

833

X84:0

C
PREVIOUS

PAGE

831

D
THREE POSITION SWITCH 8DA
867-351 7.5A

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

/1 8.3

/1 8.3

Ivar Aasen 11kV


11kV
K23

1
7
8

B
B

B0

-S1

Acceptance Code:

E
E

Date:
Signature:

=80EH0011A

+K23

Sheets:

26

Copyright (C) Siemens AS All rights reserved

PS201
Siprotec 5 7SK85

-F21.2

IO202

Siprotec 5 7SK85

-F21.1

Power
Supply

Optical IEC61 850

communication port

=
+

D-sub 9 Time
synchronization

/1 3.2

B1

/1 3.2

B2

/1 3.5

B12

BI 2.1

/1 3.5

B14

BI 2.2

/1 3.5
/1 3.5

B13

BO 2.1

BI 2.3

BO 2.2

B11

B4

/1 3.4

B3

/13.4

B6

/1 3.3

B8

/5.3

A1

/5.3

A2

/5.3

A3

/5.3

A4

/5.3

A5

/5.3

A6

A8

/1 3.3

/6.4

B1

B5

/1 3.3

/6.4

B2

B7

/1 3.2

/6.4

B3

/1 3.2

/6.4

B4

B10 /13.2

/6.4

B5

/6.4

B6

/6.1

B7

/6.1

B8

/1 5.2

C13

/1 5.2

D1

/1 5.2

C14

/1 5.2

D2

/1 5.3

D3

/1 5.3

D5

/1 5.3

D4

/1 5.3

D6

/1 5.4

D7

/1 5.4

D9

/1 5.5

D8

/1 5.5

D10

/1 5.6

D11

/1 5.6

D13

/1 5.6

D12

/1 5.6

D14

B10
/1 2.1

BO 1.1

B9
F

I2

I4

U1

B11 /1 2.2

B13 /1 4.1

BO 1.3

B14 /1 4.1

BO 1.4

BO 1.5

U2

BO 1.6

/1 2.1

B12 /1 2.2

BO 1.2

/5.2

I1

I3

A7

B9

/5.2

Ivar Aasen 11kV


11kV
K23

Life contact

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

C2

/1 4.2

C1

/1 4.2

C4

/1 2.6

C6

/1 2.6

C3

/1 2.6

C8

/1 4.2

C10 /1 4.2

U3

C7

/1 4.2

U4

BI 1.1

1 )

BI 1.2

1 )

1 )

BI 1.3

1)
BI 1.4

BI 1.5

1 )

BI 1 .6

1 )

1 )

BI 1.7

1 )

BI 1.8

1) USE THESE TERMINALS TO

ROOT THE BINARY INPUTS

F : Fast Switch

Acceptance Code:

1
-

03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue

Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH0011A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SIPROTEC

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

25

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

Copyright (C) Siemens AS All rights reserved

/1 6.2

A1

/16.2

A3

/1 6.2

A2

/16.2

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

A4

/1 6.3

A5

/1 6.3

A7

1 )

BI 3.1

BO 3.1

1)

BI 3.2

BO 3.2

BI 3.3

BO 3.3

B11 /1 4.3

B14 /1 4.4

B13 /1 4.4

1)

1)

C2

/1 4.4

C1

/1 4.4

C4

/1 4.5

A6

/1 6.4

A8

C3

/1 4.5

/16.4

A9

C6

/1 4.5

/1 6.4

A11

C5

/1 4.5

C8

/1 4.6

C7

/1 4.6

BI 3.4

1)

BO 3.4

BI 3.5

BO 3.5

A10
A12

/1 6.6

A13

/1 6.6

B1

1)

BO 3.6

BI 3.6

1)

BI 3.7

BO 3.7

A14

BI 3.8

BO 3.8

/1 6.6

B2

/1 7.1

B3

/1 7.1

B5

/1 7.2

B4

/1 7.2

B6

/1 7.3

B7

/1 7.3

B9

/1 7.3

B8

/1 7.3

B10

/1 7.4

D5

/1 7.4

D7

/1 7.5

D6

/1 7.5

D8

/1 7.5

D9

/1 7.5

D11

/1 7.6

D10

/1 7.6

D12

1 )

1)

C12 /14.6

C11 /1 4.6

1)

/1 6.6

B12 /1 4.3

/1 6.4

/1 6.5

IO207

Siprotec 5 7SK85

-F21.3

/1 6.5

Ivar Aasen 11kV


11kV
K23

C14 /14.7

C13 /1 4.7

BI 3.9

BI 3.10

1)

BI 3.11

1)

1 )

1)

BI 3.12

BI 3.13

BI 3.14

1 )

BI 3.15

1)

BI 3.16

1) USE THESE TERMINALS TO

ROOT THE BINARY INPUTS

Acceptance Code:

1
03L

As Built

27.02.1 5

ShTh

.
FrLe

Drawing Title:

Supplier

DET NORSKE
As Built

23.01 .1 5

ShTh

FrLe

HFO

01E

Issued for review

1 6.07.1 4

ShTh

FrLe

HFO

Issue
Description

Date

Made by

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

80EH001 1 A

11 KV SWBD A - CIRCUIT/WIRING DIAGRAM


FEEDER TO SEA WATER LIFT PUMP A

SIPROTEC

HFO

02L

Tag no.

Signature:

S09011

=80EH0011A

Area:

Scale

Siemens Dwg. No.:

M120

NA

51PO-04193.220-K-123-00

System:

DWG Size Drawing No.:

Rev:

Sheet:

80

A3

03L

26

DN02-S09011-E-XK-2123-00

+K23

Sheets:

26

You might also like