SECTION 1

GENERAL REQUIREMENTS
MC 1
NHNG YU CU CHUNG

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

1.1 GENERAL

1.1 TNG QUT

This Specification describes the standards,


performance, materials, manufacture, supply,

Phn tiu chun k thut ny m t v cc tiu


chun, cng tc vn hnh, vt t, ch to, cung cp,

installation, testing, commissioning, operation

lp t, kim tra v chy th, vn hnh v bo tr ca

and maintenance of all systems described in this


document and shown on the Drawings.

tt c h thng c cp n trong h s ny v
th hin trn cc bn v nh km.

The Sub-Contract specification and drawings

Cc c im k thut v bn v c bn th hin

fundamentally show a design intent and a


performance specification to be met by the Sub-

tng thit k v tiu chun vn hnh ph hp


vi s la chn ca nh thu v cc loi, cc nhn

Contractor using makes and types of equipment

mc vt t v thit b theo ph duyt ca Qun l K

and materials selected by him and approved by


the Engineer. The performance and safe

thut. Cng tc vn hnh v an ton h thng s do


nh thu hon ton chu trch nhim.

operation of the system shall be the full


responsibility of the Sub-Contractor.
The Sub-Contractor shall furnish all labour,

Nh thu phi cung cp ton b nhn cng, cng tc

superintendent,

tools, equipment,

qun l, vt t, dng c, thit b, kho bi, cc giy

storage,
permits,
certificates,
drawings,
temporary work, inspection, testing and all

php, cc giy chng nhn, bn v, cc cng vic


tm thi, cng tc gim st, kim tra v tt c cc

accessories,

incidentals

loi ph kin thit b h tr v pht sinh khi cn thit

necessary to complete the Sub-Contract Works


in a proper, safe thorough and skillful manner to

hon tt cc cng tc c thu trong s an ton


v chuyn nghip hon thnh yu cu ca Qun

the satisfaction of the Engineer.

l K thut.

All details and requirements specified in this


Section are to be read as being additional to the

Cc chi tit v yu cu c quy nh trong phn


ny c xem nh b sung vo nhng yu cu

requirements of the relevant sections of the Main

trong cc mc c lin quan trong nhng iu kin

Contract Preliminaries and the Sub-Contract


Preambles. In the case of any conflict/

chung ca hp ng v Nhng iu kin c th


ca hp ng v Bn tha thun hp ng. Trong

materials,

auxiliaries

and

contradiction between the requirements of this

trng hp c bt k s mu thun no gia nhng

Specification, the Main Contract Preliminaries

yu cu ca phn c im ny v nhng iu

and Sub-Contract Preambles, the requirements


of the Main Contract Preliminaries and Sub-

khan s b ca hp ng chnh, th s u tin theo


nhng yu cu ca nhng iu kin chung ca hp

Contract Preambles shall take precedence.

ng v Nhng iu kin c th ca hp ng v
Bn tha thun hp ng.

In the case of any conflict/ contradiction between

Trong trng hp c s mu thun gia nhng yu

the requirements of this Specification and the


Drawings, the Sub-Contractor shall be obliged to

cu ca phn tiu chun k thut ny v cc bn v,


nh thu s tun theo s phn quyt ca Qun l K

comply with the decision of the Engineer with NO

thut m khng c iu chnh gi tr hp ng.

financial adjustment to the Sub-Contract value.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/1

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

Where the following terms are used, they refer to

Nhng thut ng c s dng sau y ni v

the authorised representatives of the following

cc cng ty l cc n v i din php quyn i vi

companies:-

cng trnh:

Employer

Ch u t

Capitaland Thien Duc Co., Ltd

Capitaland Thien Duc Co., Ltd

th

8 Floor Vista Tower, 628C Hanoi Hight Way,

Tng 8, ta nh Vista, 628C, Xa L H Ni, Phng

An Phu ward, District 2, Ho Chi Minh City,

An Ph, Qun 2, Tp. H Ch Minh, Vit Nam

Vietnam

Architect
International

Thit k Kin trc


Construction

&

Investment

International

Construction

&

Investment

Consultancy Company
No. 32-34, Street 13th, An Phu Ward, District 2,

Consultancy Company
32-34, ng 13, Phng An Ph, Qun 2, TP H

Ho Chi Minh City, Vietnam

Ch Minh, Vit Nam.

, Vietnam

CA Architects Pte Ltd

Mechanical & Electrical Engineer

Thit k C in

J. Roger Preston Vietnam Co., Ltd


40h floor Alpha Tower, 151 Nguyen inh Chieu

J. Roger Preston Vietnam Co., Ltd


Tng 4, Ta nh Alpha, 151 Nguyn nh Chiu, Qun

Street, District 3, Ho Chi Minh City, Vietnam

3, Tp. H Ch Minh, Vit Nam

Structural Engineer

Thit k Kt cu

Tham & Wong Vietnam Co., Ltd


4th Floor, Packsimex Office Building, 52 Dong Du

Tham & Wong Vietnam Co., Ltd


Tng 4, Ta nh vn phng Packsimex, 52 ng Du,

Street, District 1, Ho Chi Minh City, Vietnam

Qun 1, Tp. H Ch Minh, Vit Nam

Quantity Surveyor

Kim tra khi lng

VinaQS Co., Ltd.


23 Phung Khac Khoan Street, District 1, HCMC

Cng ty TNHH VinaQS


23 ng Phng Khc Khoan, Qun 1, HCMC

1.2 WHERE THE FOLLOWING TERMS ARE USED, 1.2 MT S NH NGHA SAU S C S DNG
DEFINITIONS GIVEN BELOW SHALL APPLY

M T CC IU DI Y

Contractor

Nh thu

Shall mean the Building Contractor.

Nh thu xy dng ta nh.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/2

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

Sub-Contractor

Nh thu ph

Shall mean the nominated Sub-Contractor


whose tender for this sub-contract is awarded

Nh thu ph c ch nh trng gi thu cho hp


ng thu ph c chp thun gi thu ca h.

following acceptance of their Tender.


Contract

Hp ng

Shall mean the documents forming the Main

L nhng h s hnh thnh nn hp ng thu chnh

Contract tender together with the documents

c a ra cng vi nhng h s km theo nh

referred to therein including the Conditions of


Contract,
Standard
and
Supplementary

nhng iu kin ca hp ng, cc tiu chun k


thut v iu kin b sung, cc bn v v danh mc

Specifications, Drawings and Schedule of Rates.

cc loi.

Sub-Contract
Shall mean the documents forming the tender

Hp ng ph

and acceptance thereof, together with the


documents referred to therein including the

L nhng h s hnh thnh nn gi thuv chp


nhn trc, c a ra cng vi nhng h s km

Conditions

and

theo nh nhng iu kin ca hp ng, cc tiu

and

chun k thut v iu kin b sung, cc bn v v

of

Supplementary

Sub-Contract,
Conditions,

Standard
Drawings

Schedule of Rates.

danh mc cc loi.

Sub-Contract Drawings

Bn v hp ng

Shall mean the Drawings referred to in the


Schedule of Drawings.

Nhng bn v c cp n trong danh mc bn


v.

Works

Cng vic

All plant, equipment, material and labour to be


provided and work to be done by the Sub-

Tt c cc h thng, thit b, vt t v nhn cng


c cung cp v cng vic c thc hin bi nh

Contractor as required and shown, indicated

thu nh c yu cu, hng dn, ch dn

and/ or described in the Sub-Contract


Documents including all utilities required for the

v/hay din t trong h s hp ng , bao gm tt c


nhng yu cu thit thc cho cng vic vi chi ph

work at the Sub-Contractors expense.

ca nh thu.

Authority/ Authorities
Government or statutory bodies who have any

C quan c thm quyn


Chnh ph hoc c quan php lut, c quan c thm

jurisdiction with regard to the Works or to whose

quyn i vi cc cng vic hoc nhng c quan

system the same are or will be connected either


temporarily or permanently.

tng t thng xuyn hoc khng thng xuyn


lin h cng tc.

Site
The area within which the Works are to be

Cng trng
khu vc m trong tt c cng vic c thc hin

executed and any other area provided or

v bt k khu vc khc no c cung cp hoc ch

designated by the Employer for the purpose of

nh bi ch u t vi mc ch thc hin hp

executing this Sub-Contract.

ng.

1.3 SCOPE OF WORK

1.3 PHM VI CA CNG VIC

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

1/3

u tin s dng ting Anh khi c tranh chp

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

The Sub-Contract Works comprises the design,

Cng vic hp ng bao gm thit k, cung cp, vn

supply, delivery to site, installation testing,


commissioning and maintenance of the

chuyn n cng trng, lp t, kim tra, chy th


v bo tr cho cng tc lp t hon chnh h thng

complete Electrical Installation including all

in bao gm tt c cc cng vic v vt t cn thit

work and material necessary to accomplish this


complete installation.
The scope of work

hon chnh vic lp t. Phm vi cng vic bao


gm, nhng khng gii hn bi cc mc sau:

comprises, but is not limited to the following


major items:-

H.V. Installation

H thng in trung th

L.V. Installation

H thng in h th

Standby Generator Installation

My pht in d phng

Power Earthing Installation

Ni t an ton cho h thng in

Lightning Protection Installation

H thng chng st

Telecommunication Installation

H thng thng tin lin lc

PA/BGM Installation

H thng thng bo/ nhc hn

MATV/CATV Installation

H thng truyn hnh trung tm/ SCV

Building Intercom Installation

Lp t lin lc ni b cm tay cho to nh

Audio/ Video Intercom Installation

H thng lin lc ni b bng hnh nh/ m


thanh

Security Installation

H thng an ninh

Car-parking Barrier Installation

H thng qun l xe ra vo

Testing and Commissioning

Kim tra v nghim thu h thng

All accessories required for the safe and

efficient operation of the systems.

Tt c cc yu cu cn thit cho s vn hnh


an ton v hiu qu ca cc h thng.

all as hereinafter described more fully and as

Tt c s c din t y hn di y cng

shown on the Sub-Contract Drawings, also

nh c th hin trn cc bn v ca hp ng, v

including such minor works as are necessary for

cng bao gm lun nhng cng vic ph cn thit

the proper carrying out of the installation and


operation of the systems, whether or not such

thc hin cng tc lp t v vn hnh cc h thng


ng cch thc, cho d cc cng vic ny c c

works

cp c th hay khng trong cc c im k thut

are

specifically

called

for

in

the

Specification and Sub-Contract Drawings.


The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

v bn v ca hp ng.
u tin s dng ting Anh khi c tranh chp
1/4

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

1.4 STATUTORY OBLIGATIONS AND OTHER

1.4 CC LUT NH V CC QUY NH KHC

REGULATIONS
The Work included in this Section of the Sub-

Cc cng vic c cp n trong phn ny ca

Contract Specification shall fully comply with all


statutory obligations and regulations together

tiu chun k thut trong hp ng phi tun th


theo php lut v cc quy nh, cc quy lut thc t

with any amendments made thereof as required

v nhng ch dn cng nh vi bt k s thay i

by the following bodies:-

no cng phi theo yu cu ca nhng c quan sau:

Local Fire Protection Department

Phng Cnh st PCCC Thnh ph

Local Power Supply Company

Cng ty in lc Thnh ph

Local Construction Department

S xy dng Thnh ph

Any other authority having jurisdiction over

any part of the Work

Cc c quan hu quan khc c lin quan n


cng vc

The Sub-Contractor shall arrange for all


submissions and pay the cost of statutory

Nh thu ph phi sp xp trnh duyt cho tt c


v phi tr chi ph cho vic kim tra v cp giy

inspections and certificates.

chng nhn.

The Installation shall comply with the following

Vic lp t in phi tun th ng cc quy nh

statutory obligations and regulations which shall

nhng khng b gii hn bi nhng mc sau:

include but not limited to the following:-

CP 5: 1998: Electrical Installation.

Tiu chun CP 5: 1998 cho lp t in

Vietnamese Standards (TCVN).

Tiu chun xy dng ca Vit Nam

British Standardss.

Tiu chun ca Anh

In case of conflicts between the authorities


requirement and the specification requirements,

Trong trng hp xy ra mu thun gia nhng quy


nh php ch v yu cu k thut, th s tun theo

whichever

nhng quy nh no c yu cu nghim ngt hn.

is

more

stringent

shall

take

precedence.
1.5 INSPECTION OF CONDITIONS

1.5 KIM TRA IU KIN LM VIC CA CNG


TRNG

The

Sub-Contractor

shall

examine

site

Nh thu ph phi kim tra cc iu kin lm vic ti

conditions before starting their work and report to

cng trng trc khi bt u cng vic v bo co

the Engineer, in writing, conditions which prevent


the proper execution of his work.

bng vn bn cho Qun l K thut nhng yu t


ngn cn cng vic ca h.

Commencing

Bt u cng vic m khng c bo co cho Qun l

of

works

without

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

reporting

u tin s dng ting Anh khi c tranh chp


1/5

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

unsuitable conditions to the Engineer constitutes

K thut v cc iu kin bt li c ngha l Nh thu

acceptance of conditions by the Sub-Contractor.

ph chp nhn nhng iu kin lm vic hin hnh.

Any required removal, repair or replacement of

Bt c s loi b, sa cha hay thay th cho nhng

defective work caused by existing conditions and

h hng gy nn bi cc iu kin lm vic hin ti

not reported shall be done at no additional cost


to the Employer.

m khng c bo co s khng c tnh


thm chi ph cho ch u t.

1.6 CONTRACTOR'S PROGRAMME

1.6 LCH LM VIC CA NH THU


to the

Nh thu ph phi xc nhn thi gian lm vic bao

include

gm mi th cn thit hon tt trn vn cc cng

everything necessary to complete the works


within the programme and in a sequential

vic cp trong lch lm vic v phi theo nhng


cch c th chp nhn c n nh thu chnh.

The

Sub-Contractor

construction

shall

programme

conform
and

shall

manner acceptable to the Contractor.


The attention of the Sub-Contractor is drawn to

D tham d ca nh thu ph s c a vo

the Preliminaries in the Specification of the Main

phn s b ca Tiu chun k thut ca Hp ng

Contract and the Sub-Contract Conditions.

chnh v iu kin hp ng ph.

1.7 CO-ORDINATION AND LIAISON BETWEEN

1.7 PHI HP V QUAN H GIA CC BN

TRADES
The

Sub-Contractor

shall

liaise

with

the

Nh thu s phi phi hp cht ch vi cc nh thu

Contractor and other Sub-Contractors and

khc trong cc gi thu C in v nhng ngi

tradesmen who will be carrying out other trades

thuc cc ngnh khc thc hin cc cng vic ca

on the site including all trades within the scope of


the Sub-Contract works, prior to the

h trn cng trng. Vic ny phi c thc hin


trc khi bt u cng tc lp t thc t, bo

commencement of actual installations, so as to

m rng cng vic ca tt c cc cng an s

ensure that the works of all trades will be coordinated. No claims shall be entertained for

c phi hp vi nhau cht ch. Khng c mt


khan chi ph no s c tr thm cho nhng pht

expenses arising from compliance with this

sinh do khng phi hp cht ch.

clause.
The Mechanical and Electrical services for the

Cc dch v v in v c cho ta nh bao gm:

Building consists of the following items:a)

Mechanical Ventilation and Air

a)

Conditioning Installation

H thng thng gi c kh v iu ha
khng kh

b)

Electrical Services Installation

b)

H thng in.

c)

Fire Services Installation

c)

H thng phng chy cha chy.

d)

Plumbing and Sanitary Installation

d)

H thng cp thot nc.

e)

Lifts and Escalators Installation

e)

H thng thang my & thang cun.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/6

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

f)

Building Automation System Installation

f)

H thng t ng iu khin ta nh.

g)

Building Security Installation

g)

H thng an ninh ta nh.

h)

Gondola Installation

h)

H thng my lau knh.

i)

Pool Filtration Installation

i)

H thng h bi

j)

Any other M & E related services.

j)

Cc cng vic khc c lin quan n M&E

Overall coordination of the works shall be carried

Tt c cng tc phi hp s c thc hin bi nh

out by the Contractor. However it is the


responsibility of the Sub-Contractor to ensure

thu. Tuy nhin Nh thu c trch nhim vi thu


ph bo m rng h trnh tt c cc bn

that the Contractor is afforded all necessary

v cn thit, cc chi tit v cc thng tin ng lc

drawings, details and information in a timely


manner to enable them to perform their

trong nhm lm cho chng c th thc hin c


trong sut thi gian phi hp n cng tc xy dng

coordination

hay lp t ca bt c hng mc no bi tin trnh

installation of

prior

to

the

construction

or

any items affected by the

phi hp.

coordination process.
In particular, it is the responsibility of the Sub-

C th l, n l trch nhim ca thu ph chc

Contractor to ensure that they are in possession


of all information directly related to their works or

chn rng h c tt c cc thng tin trc tip 1lin


quan trc tip c lin quan n cng vic ca h hay

to other trades to enable them to design and set

cc b phn lin quan khc m bo cho h thit

out their works in a manner which takes full

k v hiu chnh cc cng vic trong nhm bng

account of the works being undertaken by the


Contractor, Direct Contractors and other

cch lit k tt c cc cng vic c lm bi nh


thu, nh thi trc tip v cc nh thu khc.

Contractors.
It shall be necessary for the Sub-Contractor to

N s cn thit cho nh thu ph thc hin hon

work in close cooperation with other trades prior

tt cng vic vi chuyn ngnh ca h v sut qu

to and during the installation of this work and the

trnh lp t ca cng tc ny v cc cng tc khc.

work of others. In designing the work the SubContractor shall take account of other trades and

Trong cng tc thit k ca nh thu ph s lit k


cc chuyn ngnh khc v cng tc lp t trnh

installations to avoid interference with the work of

xa s can thip vi cc chuyn ngnh khc trong

other trades either during the installation or in the


operation of the Systems. The Sub-Contractor

sut qu trnh lp t hay hot ng ca cc h


thng. Nh thu ph s cng c th chu trch nhim

shall also be responsible for moving around his

cho vic di chuyn cc thit b ca h nu nh c

equipment as required so as not to be in the way


of the construction or any other works.

yu cu nu n lm cn tr cng tc xy dng hay


cc cng tc khc.

All materials and equipment are to be installed in

Tt c vt t v thit b c lp t theo trnh t

the correct sequence to ensure that all services


may be accommodated. Where works by other

hp l bo m rng tt c dch v s c cung


cp. Ti nhng ni m cc cng vic ca nhiu n

trades are to occupy the same pipe, duct or

v khc nhau s c thc hin trong cng mt

plant-room space the Sub-Contractor shall take

ng ng, ng gen hay trong khng gian cc

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/7

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

care to leave clear access for sequential or

phng my, nh thu phi c trch nhim cha cc

future provision of these services within shafts,

khang trng cn thit cho cc cng vic tip theo

plant rooms, suspended ceilings and voids.

hay trong tng lai cho cc dch v trn trong cc


ng ng, phng my, trn treo hay cc khang
khng khc.
1.8 CC IU CHNH

1.8 SETTING OUT


The arrangement of the various equipment and

Vic sp xp cc tht b khc nhau v kt hp cc

associated services shown on the Sub-Contract


Drawings are indicative only. The Sub-

b phn c trnh by trong cc bn v hp ng


ch l chung chung. Nh thu c trch nhim iu

Contractor shall set out the specific materials

chnh cc thng s ca vt t v thit b c cung

and equipment to be provided, to fit in with the


latest available information on the building

cp t ti nhng thng s cui cng thch hp


vi cc chi tit xy dng ca ta nh. Nh thu

construction details. The Sub-Contractor shall

phi kt hp cht ch nhng yu cu ca cc b

coordinate the requirements of other services


and equipment and to incorporate improvements

phn v thit b khc nhau v phi hp cht ch vi


nhng chnh sa khc c hng dn bi Qun

and such other modifications as directed by the

l K thut.

Engineer.
The Sub-Contractor shall be responsible for the

Nh thu c trch nhim iu chnh cc thit b v

setting out of the equipment and associated

dch v nh km ph hp vi nhng yu cu ca

services to meet the requirements of the


Specification.

tiu chun k thut.

The setting out and design shall be in

Vic iu chnh v thit k phi c thc hin bi

accordance with best engineering and trade


practice and that of the various equipment and

nhng k thut tt nht v nhng n v chuyn


nghip bo m cho cc thit b v h thng khc

systems shall be such as to allow for proper

nhau c th lm vic tng thch nhau v to d

operation and ease in servicing and


maintenance of the installation. All controls and

dng cho cc hat ng vn hnh v bo tr sau ny.


Tt c h thng iu khin v vn hnh phi trong

operating devices shall be readily accessible;

trng thi sn sng hat ng; cc thit b ch th v

and indicating and warning devices visible.

cnh bo phi nm trong tm quan st ni nhiu

Where unavoidable access platforms shall be


provided.

ngi thng c th tip cn.

All services run (pipes, conduits, ducting, etc.)


shall be fixed clear of each other and shall be

Tt c h thng ng dn phi c c nh tch bit


nhau r rng v xa to iu kin d dng cho

arranged so far as is reasonably possible to

cng tc sa cha bo tr sau ny. Khng c lp

afford easy access for maintenance and repair.


No service run shall be installed or fixed behind

t bt k ng dn no pha sau ng dn khc v


phi bo m cc ng dn c th thay th c vi

other

readily

ton b chiu di ca n. nhng ni no vic lp

replaceable along its full length. Where difficulty

t kh t c yu cu i hi th vn phi

is experienced in setting out to meet these


requirements, the problems shall be brought to

c tun th theo quyt nh ca Qun l K thut.

services

run

and

shall

be

the Engineer for his decision.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/8

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

1.9 CLIMATIC CONDITIONS

1.9 IU KIN THI TIT


Tt c thit b v vt t c cung cp v ch to
phi chu ng c cc iu kin lm vic sau:

All equipment and materials supplied and


forming part of the work shall be capable of
achieving the specified performance under, and
be capable
conditions:

of

withstanding

the

following

Maximum ambient air temperature

- 400C db

Maximum ambient wet bulb

- 30 C wb

Nhit mi trng ti a

- 400C db

m xung quanh ti a

- 30 C wb

The Sub-Contractor shall take account of the

Nh thu phi tnh ton n nh hng ca vn

proximity of the site to the sea and the presence


of salinity within the atmosphere in the design

cng trng gn bin v mn trong khng kh


c th c thit k v la chn vt liu thch hp.

and choice of materials for the work.


1.10 TROPICALISATION, FUNGUS AND RUST

1.10 S CHNG NM MC V N MN

PROOFING
All equipment shall be protected against the
formation of fungus and rust from the time it is

Tt c thit b phi c bo v chng nh hng


ca nm mc v n mn trong thi gian t lc chng

delivered to the time it is put into operation.

c cung cp n khi a vo s dng. Cng tc

Fungus and rust proofing shall be accomplished


in a recognised and approved manner which

chng nm mc v n mn phi c thc hin y


theo phng php c cng nhn v ph

could be by means of protective varnishes

duyt c ngha l lp vec-ni c ch to c bit v

manufactured specially for the purpose and

c thc hin ti nh my trc khi phn phi, l

applied at the factory prior to the delivery,


whichever method is adopted the system will

phng php c chp nhn bi h thng m


bo cht lng. Tt c thit b c cung cp phi

have total protective qualities. All equipment

c nhit i ha v thch hp vi hu ht cc iu

supplied shall be tropicalised and suitable for the


most onerous condition to be encountered.

kin khc nghit m chng s phi i mt vi.

1.11MATERIALS AND WORKMANSHIP

1.11 VT LIU V TAY NGH NHN CNG


Tt c vt t thit b c cung cp cho hp ng

All materials and equipment supplied for this


Sub-Contract shall be new and un-used. All such

ny phi l mi v cha s dng. Tt c vt t thit

materials and equipment shall be of the best


type for each particular purpose and of the best

b phi l loi tt nht cho cc cng dng lin quan


v c cht lng tt nht theo thit k, ch to v thi

quality as regards design, manufacture and

cng. Tt c cng vic phi c thc hin vi

performance. All Works shall be carried out in


accordance with best engineering practice by

nhng k thut tt nht v bi nhng n v c tay


ngh cao, chuyn nghip.

fully

competent

tradesmen

of

appropriate

grades.
No substitution

for specified

or

approved

Khng cho php c s thay i v tiu chun k

materials will be permitted.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

thut hay ph duyt vt t.

u tin s dng ting Anh khi c tranh chp


1/9

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

1.12 CNG TC HN V CT

1.12 WELDING AND CUTTING


All welding work undertaken as part of the work
shall be carried out by welders who have, within

Tt c cng tc hn trong cng vic ti cng trng


phi c thc hin bi nhng th hn chuyn

six months of the performance of the welding

nghip, c kinh nghim thc t t nht 6 thng, c

work, undertaken a welding test and obtained a


welding certificate from a testing agency

kim tra v c c giy chng nhn t mt n v


c Qun l K thut chp nhn.

acceptable to the Engineer.


Where more than one welder is engaged in the
work then each weld shall be capable of being

nhng ni c trn mt th hn cng lm vic th


tng mi hn phi do mt th hn ring l m

identified as the work of an individual welder.

nhim.

Under no circumstances shall the welding or

Khng c php hn hoc ct bng ngn la hn

flame cutting of galvanised steel be permitted.

i vi thp trng km.

No welding or flame cutting shall be undertaken

Khng c php hn hoc ct bng ngn la hn

by the Sub-Contractor unless satisfactory fire

khi khng c cc phng tin phng chy cha

protection and safety measures are in force.

chy bt buc.

1.13 GALVANISING AND STAINLESS STEEL

1.13 THP TRNG KM V THP KHNG G

Unless otherwise stated all references to


galvanising shall be hot dipped galvanisation in

Tr khi c quy nh khc, cn th tt c vt t trng


km phi l loi c lp trng km nng theo tiu

accordance with BS 729: 1994 - Specification for

chun BS 729: 1994 tiu chun k thut quy nh

hot dip galvanized coatings on iron and steel

cho cc lp v trng km trn kt cu st v thp.

articles.
All references to stainless steel shall be 304

Tr khi c quy nh khc, cn th thp khng g phi

Grade stainless steel unless otherwise stated.

l loi 304.

1.14 BUILDING PROVISIONS

1.14 CC IU KHON LIN QUAN N XY DNG

Certain building provisions will be made for the


accommodation of the Works. These provisions

Cc iu khan lin quan n xy dng s c


thc hin to thun tin cho cng vic. Cc hng

will include space allocation, holes/openings

mc ny bao gm cc khan khng gian c

through structural slabs, walls and beams,


plinths, etc.

ch nh, cc l v ming m xuyn qua cc vch,


tng v cc dm, b

The major provisions so made are shown in the


Contract Documents and before proceeding with

Cc hng mc chnh phi c th hin trong hp


ng v trc khi tin hnh cng vic, nh thu phi

the Works, the Sub-Contractor shall confirm in

thng bo bng vn bn cc hng mc lin quan n

writing that the provisions are satisfactory for the

cng vic v nhng im cn thit, nh thu phi

Works and, where necessary,


information shall be provided

cung cp thm thng tin b sung.

additional
by the

Sub-Contractor.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/10

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

It is the Sub-Contractor's responsibility to ensure

Nh thu phi m bo vic thng bo cho nh thu

that the Contractor is informed of all holes/

xy dng tt c nhng l/ ming m c yu cu

openings required in the structure prior to the


pouring of concrete. Where additional holes/

trn cu trc trc khi vic b tng c tin


hnh. Sau khi b tng, tt c yu cu b sung

openings are required, after pouring of concrete,

v l/ ming m s c tnh chi ph cho nh thu.

they shall be provided at the Sub-Contractor's


cost.
Structural bases and/ or foundations required for

Cc kt cu b hay khung c yu cu cho gi

the support or anchoring of mechanical


equipment to be installed in the Sub-Contract

hay bu lng m lp cc thit b c kh theo nh


cng vic hp ng s c cung cp ti cng

Works shall be provided on Site by the Main

trng bi nh thu xy dng. Nh thu phi cung

Contractor except where otherwise specified.


The Sub-Contractor shall provide the Main

cp kch thc v v tr ca cc b nn vo nhng


lc thch hp. nhng ni bu lng m s c

Contractor with the dimensions and locations of

chn trong kt cu dm hay nn, , nh thu s

the bases in adequate time. Where anchor bolts


are to be set in the structural beams, bases etc.,

cung cp v b tr bu lng v, nhng b nn c


cu trc bng b tng, cc bu lng m phi c b

the Sub-Contractor shall furnish and set the bolts

tr v c nh tm thi, buc cht bng dy in,

and, where the structural base is to be

trc khi b tng c .

constructed of concrete, the anchor bolts shall


be set and held in place by a template, secured
by wires, before concrete is poured.
All structural and supporting steelworks required

Tt c kt cu st v cc cng tc lin quan n

for the installation of the Sub-Contract Works

cng vic lp t ca hp ng s do nh thu cung

shall

cp v lp t.

be

supplied

and

fixed

by

the

Sub-Contractor.
All painting of equipment or materials supplied

Nh thu s chu trch nhim cho cng tc sn tt

under the Sub-Contract shall be carried out by


the Sub-Contractor.

c thit b hay vt t do mnh cung cp.

All materials and fixings for services, through

Nh thu phi cung cp tt c vt t v cng tc lp

walls, slabs, beams or columns shall be provided


by the Sub-Contractor.

t cho cc dch v, xuyn tng, vch, dm hay


ct.

The following Works will be carried out by others


and are therefore excluded from this Sub-

Cc cng vic sau y s c thc hin bi cc


nh thu khc v n khng bao gm trong hp ng

Contract.

all

thu ph ny. Tuy nhin iu kin ny, tt c cc s

necessary co-ordination, provision of shop


drawings and other information necessary for the

phi hp cn thit, s cung cp cc bn v thi cng


v cc thng tin cn thit choc ho s thc thi cn

satisfactory execution of Works to be carried out

thit ca cc cng vic s c thc hin bi ngi

by others shall be furnished at the correct time

khc s c hon thin cng mt lc s c nh

and in the prescribed manner by the SubContractor.

thu cung cp ng thi im v quy nh..

a)

a)

Notwithstanding

this

Clause,

Reinforced concrete structure, internal

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

Kt cu b tng ct thp, cc vch ngn bn


u tin s dng ting Anh khi c tranh chp

1/11

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

trong.

partitions.
b)

Provision of concrete equipment plinths.

b)

B b tng cho cc thit b.

c)

Provision of fire stop materials through

c)

Cung cp cc l m xuyn tng hay sn ngn


la (chng chy) cho dch v M&E ngai tr
cc bao ng, mng in,

wall & floor openings for M & E services


except within pipe sleeves, cable trunking,
etc.
1.15 ELECTRICAL

1.15 CUNG CP IN

A 400 volt, 3 phase, 50Hz electrical supply shall

Mt ngun in 400 V, 3 pha, 50Hz s c cung

be provided by others through a Distribution


Board at their locations shown on the Sub-

cp bi n v khc thng qua mt b ngt in ti v


tr c ch nh trn bn v lp t in. Nh

Contractor Drawings. The Sub-Contractor shall

thu c trch nhim thi cng tt c phn lp t in

be responsible for all other electrical installations


forming part of the works.

khc theo quy nh ca cng vic.

1.16 LIMITED ACCESS

1.16 KHU VC GII HN

The Sub-Contractor shall note the limited access

Nh thu s lu nhng khu vc hn ch thch hp

available on site for storage of materials and

trn cng trng cho kho vt t v cng tc lp t

installation work and of the need to arrange


suitable off site storage, if required and the Sub-

v nhu cu thip lp kho thch hp (bn) ngoi cng


trng nu c yu cu v nh thu phi tr chi ph

Contractors expense.

All materials and equipment are to be installed in


the correct sequence to ensure that all services

Tt c vt t v thit b phi c lp t theo ng


trnh t hp l m bo rng tt c dch v khp

may be accommodated. Where works by other

vi nhau. Ti nhng ni m cng vic ca nhiu

trades are to occupy the same pipe, duct or plant


space the Sub-Contractor shall take care to

ngnh khc nhau thc hin trn cng ng ng,


ng gen hay khu vc ca h thng my mc, nh

leave clear access for sequential on future

thu phi ch cha nhng khng gian hay ch

provision of these services within shafts, plant

trng dnh cung cp cho nhng dch v trn bao

rooms and voids.

gm cc l thng, phng my v ch trng.

1.17 PROTECTION

1.17 CNG TC BO V

The Sub-Contractor shall be responsible for the

Nh thu phi c trch nhim bo v tt c thit b

protection of all equipment and materials both in

vt t trong kho cng nh c lp t trn cng

storage and installed on site.

trng.

Damaged

or

deteriorated

equipment

and

Cc vt t thit b h hng khng c php s

materials shall not be permitted to be used as

dng trong lp t. Nh thu phi c trch nhim

part of the installation. It is the responsibility of


the Sub-Contractor to remove from site and

mang ra khi cng trng v thay th ci mi m


khng c php tnh thm chi ph cng nh thi

replace such items at no additional cost or time

gian vi ch u t.

to the Employer.
The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/12

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

The

Sub-Contractor

shall

ensure

MC 1 - NHNG YU CU CHUNG

all

Nh thu phi bo m p dng nhng bin php

necessary measures are taken to avoid


damaging other construction and installation

that

cn thit trnh lm h hng cho cc kt cu


xy dng cng nh cc cng tc lp t khc

work during the course of their installation

trong sut qu trnh thi cng ca h, cng nh kim

testing, commissioning or operation of the


systems forming part of the Works. The cost of

tra chy th hoc vn hnh tng phn ca h thng.


Chi ph cho vic sa cha hay thay th cc h hng

repairing or replacing any damage caused to

cho nhng cng vic khc l trch nhim ca nh

other works shall be the Sub-Contractors

thu.

responsibility.
1.18 STANDARDISATION

1.18 TIU CHUN

Materials, equipment and fittings shall be

Cc loi vt t, thit b, v ph kin phi theo tiu

standardised as far as possible throughout the

chun ti a c th c trong sut qu trnh lp t.

installation. In particular, every attempt shall be


made to achieve standardisation in the following

C bit, mi th nghim phi t c tiu chun


theo cc tiu ch di y)

respects:
-

All major units of equipment shall be


supplied by a single manufacturer.

Tt c cc phn quan trng ca thit b phi


c cung cp bi cng mt nh ch to.

All electric motors shall be of the same


make and have the maximum interchange

Tt c m-t in phi cng mt kiu v c tnh


c th thay th cho nhau cao.

ability of components.
-

Tt c cc mc c bn cht tng t nhau


trong tng trng hp phi c giao cho
cng mt nh ch to.

All items which are of a similar nature shall


be obtained in each case from a single
manufacturer.
-

All items for similar duties shall be the

Cc sn phm c cng chc nng nhim v th


phi cng model v chng loi.

same make and model.


1.19 THIT B

1.19 EQUIPMENT
Each item of equipment shall generally be a

Mi chng loi thit b thng phi tun theo mt

standard proprietary design manufactured in


quantity by an established manufacturer of such

thit k chun c sn xut vi s lng nhiu


bi cng mt nh sn xut, v phi ph hp vi

equipment and shall incorporate all the features

nhng c im thng thng c chp nhn

customarily accepted as being essential to


equipment of its type and for the service

ca chng loi sn phm v khng mu thun vi


cc tiu chun k thut c cung cp.

intended

where

inconsistent

with

such

features

are

not

the

provisions

of

this

Specification.
1.20 METRIC UNITS

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

1.20 N V O LNG H MT

u tin s dng ting Anh khi c tranh chp


1/13

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

The Sub-Contractor shall provide all information,

Nh thu phi cung cp thng tin, s liu ca nh

manufacturer's data and materials in metric (SI)

ch to v vt t vi n v o lng v kch thc

units and dimensions.

theo h mt (SI).

1.21 LOADING CALCULATION

1.21 TNH TON TI TRNG

The Sub-Contractor shall submit equipment

Nh thu phi trnh cc tnh ton tt c ti trng m

loading calculations including any and all loads

thit b s tc ng n cu trc ta nh. Vic tnh

imposed

on

the

building

structure.

ton phi do c n v qun l k thut thc hin

The

calculations shall be prepared and certified by a


Engineer.
1.22 DUTIES AND SIZES OF PLANT AND
EQUIPMENT

v ph duyt.

1.22 CHC NNG V KCH THC CA CC H


THNG V THIT B

The duties of plant and equipment described in


the Sub-Contract are minimum duties and the

Trong hp ng ch cp n nhng chc nng ti


thiu m cc thit b v h thng phi c, v nh

Sub-Contractor shall confirm them with the

thu phi thng bo vi Qun l K thut cp nht

Engineer taking into account any variations

nhng thay i c th c trong sut qu trnh thi

which may be made to the systems during the


progress of the Sub-Contract Works.

cng.

The Sub-Contractor shall be required to


demonstrate at site that the duties required of

Nh thu phi chng minh ngay ti cng trng


rng cc thit b c th t c nhng chc nng

the equipment are obtainable.

yu cu.

Physical sizes of all plant and equipment are to


be suitable for the spaces allocated for the

Kch thc ca cc h thng v thit b phi ph hp


vi khng gian c ch nh cho tng loi, c

accommodation of such plant and equipment,

tnh ton n cc yu cu cho cng tc bo tr sau

taking into account the requirement of access for


maintenance purposes.

ny.

Before ordering equipment, the Sub-Contractor

Trc khi t hng cc thit b, nh thu phi cung

shall provide the Engineer with full details of the


weights of equipment for purposes of

cp cho Qun l K thut y chi tit v trng


lng ca thit b xc nh mc chu ti ca sn.

determining floor loading, etc.


1.23 VN NHIU SNG RADIO

1.23 RADIO INTERFERENCE


The Sub-Contractor shall ensure that the entire
installation shall not be a source of radio

Nh thu ph phi bo m cc thit b c lp t


khng lm nhiu ngun sng radio v trong trng

interference

hp cn thit phi lp thm thit b chng nhiu.

and

whenever

necessary

suppression devices shall be installed.


1.24 SILENCE OF OPERATION
The

work

included

in

1.24 VN TING N KHI VN HNH


the

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

Sub-Contract

Cc thit b c lp t theo tiu chun k thut


u tin s dng ting Anh khi c tranh chp
1/14

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

Specification as installed shall be reasonably

ca hp ng ch c php c ting n khi hat

silent in operation having regard to the conditions

ng trong phm vi chp nhn c trong nhng

under and locations in which they will be called


upon to operate.

iu kin cng nh v tr hat ng c quy nh


trc cho chng.

The Sub-Contractor shall take all necessary


steps to ensure that the equipment supplied by

Nh thu phi tin hnh nhng bc thch hp


bo m cho cc thit b do h cung cp c n

him is reasonably silent and shall include for

khi hat ng mc hp l. bao gm c cc vt

such sound absorbing, or anti-vibration, material

liu cch m, chng rung, chng va p nc v cc

and anti-water hammer or devices as are


necessary to ensure a satisfactory degree of

thit b cn thit bo n hp l mc hp l
v chng rung cho cu trc ca cng trnh.

silence and absence of vibration in the structure


of the Works.
The Engineer's decision as to what constitutes

Qun l K thut s c quyt nh cui cng trong

satisfaction in this respect shall be final.

vn ny.

If on completion the system is not, in the

Nu theo kin ca Qun l K thut m thit b

Engineer's opinion, sufficiently silent, the Sub-

khng t c ting n cho php th Nh thu ph

Contractor shall, without additional charge, carry


out such modifications or additions as may be

c trch nhim b sung thit b hoc thc hin chnh


sa cho n khi t yu cu ca Qun l K thut

required, until the system is made silent to the

m khng c tnh thm chi ph no.

Engineer's satisfaction.
1.25 S C Y2K

1.25 YEAR 2000 COMPLIANCE


All micro-processor based hardware and software
product supplied by the Sub-Contractor to

Tt c cc b x l vi mch v phm mm c
Nh thu cung cp vn hnh bt k phn no cu

operate any part of the Installation shall be

vic lp t u phi khng b s c Y2K.

certified Year 2000 Compliant.


The operating software shall be designed to
used prior to, during, and after the

be

Phm mm vn hnh phi c lp trnh c th

calendar

s dng uc vi thi gian trc, trong v sau nm

year 2000. The software shall


operate
during each such time period without error
relating to data, specifically including any
relating to, or the product of date
represents or references different

2000. Phn mm phi vn hnh trong sut tng giai


on thi gian c cp trn m khng b

error

li d liu, c th l bt k li d liu no lin quan

data which
centuries

n d liu ngy thng cu sn phm c m t


hay chuyn i gia cc th k khc nhau hay nhiu

or more than one century.

1.26 SUBMISSIONS

hn 1 th k.

1.26 TRNH DUYT

All submissions to the Engineer for checking

Tt c vic trnh duyt ln Qun l K thut kim

must be made prior to the ordering of any

tra phi c thc hin trc khi t hng bt k

materials or equipment. All submissions by the

thit b vt t no. Tt c vic trnh duyt ca nh

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/15

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

thu phi bao gm y cc chi tit hon chnh v

Sub-Contractor shall be in full and complete in all


details and shall be forwarded to the Main

phi c kim tra v xc nhn ph hp vi nhng

Contractor who shall check and verify the SubContract requirements prior to his submission to

yu cu ca hp ng trc khi trnh ln Qun l K


thut.

the Engineer.
All submissions must be made early enough in

Tt c vic trnh duyt phi c thc hin sm

the Sub-Contract to enable the Engineer to fully

trong hp ng thu ph Qun l K thut c

check each item prior to the Sub-Contractor

thi gian kim tra cn thn tng hng mc trc khi

ordering the submitted materials/ equipment.


The Sub-Contractor shall ensure that his

nh thu t mua cc thit b vt t trnh duyt.


Nh thu phi phi m bo vic trnh duyt ca h

submissions are made in sufficient time to meet

phi ph hp vi lch lm vic ca nh thu.

the Main Contractors programme.


The Sub-Contractor is reminded of the need to

Nh thu s b nhc nh khi cn thit thc hin

make all submissions in a clear and precise


manner together with all valid documentation in

tt c vic trnh duyt cho r rng v chnh xc cng


vi cc h s c c s vng chc da trn cc tiu

support

specified

chun hp l.

in

of

compliance

with

the

standards.
strict

Tt c ni dung trnh duyt phi tun th nghim

compliance with the Sub-Contract requirements

ngt theo nhng tiu chun v yu cu ca hp

and standards and any delays caused through


improper submissions shall be at the

ng thu, v nh thu phi chu chi ph cho bt k


s chm tr no do nguyn nhn trnh duyt tr.

All

submissions

must

be

made

Sub-Contractors costs.
No claims for extensions of time or additional
costs shall be entertained as a result of the Sub-

Nh thu s khng c tnh thm thi gian cng


nh chi ph pht sinh nu nh mc sai lm v thi

Contractors failure to make his submission in

gian trnh duyt.

adequate time.
the

Qun l K thut s ch kim tra nhng ni dung

Sub-Contractor's submission for the compliance

trnh duyt ca nh thu cho ph hp vi mc ch

with the design intent. The final responsibility for


meeting the Sub-Contract requirements in detail

thit k ban u. Cn nh thu c trch nhim cui


cng trong vic chn la ph hp vi cc chi tit

are deemed to be vested in the Sub-Contractor.

c yu cu trong hp ng. Qun l K thut s

The Engineer will not issue any approval to the


Sub-Contractor's submission.

khng xem xt bt c trnh duyt no ca nh thu


ph.

Replies
from
the
Engineer
to
the
Sub-Contractor's submission will not absolve the

Cc tr li ca Qun l K thut cho cc ni dung


trnh duyt ca nh thu s khng ph nhn trch

Sub-Contractor's

ensure

nhim ca nh thu trong vic bo m rng cc ni

suitability of application and conformance to the

dung trnh duyt phi c ng dng ph hp vi

Sub-Contract document.

h s thu .

The

Engineer

will

only

responsibility

1.27 SAMPLES

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

check

to

1.27 VT MU

u tin s dng ting Anh khi c tranh chp


1/16

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

The Sub-Contractor shall submit to the Engineer,

Nh thu phi trnh cho Qun l K thut cc mu

samples of materials and/ or workmanship. Such

vt t v/hoc tay ngh km theo. Cc mu trn phi

samples shall be reviewed and commented on in


writing before the appropriate equipment or

c xem xt v ghi ch cn thn trc khi tin


hnh mua hoc lp t thit b.

installation work is carried out.


Such samples are subsequently to be retained

Cc mu ny sau s c Qun l K thut gi

by the Engineer as the criteria of the standard of

li nh l cc tiu chun nh gi nhn cng hay vt

the workmanship or material to be supplied and

t c cung cp, v bt k hng mc no khng

any items not so complying may forthwith be


rejected by the Engineer and shall be replaced

t s b Qun l k thut loi b ngay v nh thu


phi thay th m khng c tnh chi ph v thi

by the Sub-Contractor without cost and time

gian pht sinh.

implication to the Contact.

1.28 SHOP DRAWINGS

1.28 BN V THI CNG

The Sub-Contractor shall, at times specified and

Ti nhng thi im c quy nh v tt hn l

well before the relevant work proceeds, prepare

trc khi tin hnh cc cng vic lin quan, nh thu

and submit for review, detailed, fully co-ordinated


shop drawings based on the Working Drawings,

phi chun b v trnh cc v thi cng tng th, chi


tit cn c trn cc bn v hp ng, cp nht bt

taking into account any modification either to the

c s thay i no v cng vic c lin quan n cc

work or to the installation which may have taken


place and correctly related to the details of the

v tr v cc chi tit thc t ca h thng hay thit b


c lp t.

actual items of plant and equipment to be


installed.
Details of Shop Drawings submitted shall be

Chi tit bn v thi cng phi theo tiu chun bn v

prepared in accordance to Singapore Standards

xy dng ca Singapore CP 6: 1978 Bn v thi

Code of Practice CP 6: 1978 - Building drawings.

cng.

The Sub-Contractor shall similarly prepare all

Tng t nh thu phi chun b bn lit k tt c

necessary schedules of equipment, etc., and

cc thit b cn thit, vv, cng nh cc s in

also all necessary wiring diagrams for items of


electrical equipment and diagrams showing the

ca tng phn trong cc thit b in v s u


ni gia cc b phn khc nhau.

interconnections between different items.


To assist the Sub-Contractor in the preparation

h tr nh thu trong vic chun b cc bn v thi

of his shop drawings, one set of Working

cng, mt b bn v cng vic s c cung cp

Drawings shall be provided after the award of the


Sub-Contract. The Sub-Contractor shall be fully

sau khi k hp ng. Nh thu s c trch nhim


cp nht cc bn v thi cng da trn bt k s thay

responsible for updating his shop drawings

i no ca bn v cng vic theo tng thi im

based on any changes to the Working Drawings

c yu cu.

which may from time to time be required.


Six (6) sets in prints and one (1) set in sepia of

Su b bn v in trn giy (kh A1) v 1 a CD-

full shop drawings (i.e. installation drawings) for

ROM ton b bn v thi cng (v d nh bn v lp

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/17

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

each systems shall be provided as specified, on

t) cho mi h thng theo nh quy nh vi cng t

the same scales as for the as-built drawings.

l vi bn v hon cng.

Shop drawings shall be submitted within two

Bn v tng th phi c trnh trong vng hai thng

months of the award of the Sub-Contract.

sau khi hp ng c hiu lc.

In particular before beginning fabrication of the

c bit trc khi ch to thit b, yu cu phi trnh

equipment, the submission of scaled shop

bn v thi cng c th hin y cc cng vic v

drawings shall be required of all work and

thit b, v tr lm vic ca thit b, b tr tng th ca

equipment showing the equipment working


positions, the general arrangement of all plant

h thng v b cha, b tr ca cc thit b in v


h thng in.

and tank rooms, electrical equipment and


electrical installations.
All shop drawings shall be submitted through the

Tt c bn v thi cng c trnh duyt phi c

Main Contractor and shall contain the Main


Contractors endorsement that he has

chng thc ca nh thu chnh xc nhn rng h


xem xt v kim tra nhng bn v .

coordinated and checked the shop drawings.


1.29 BUILDER'S WORK DRAWINGS

1.29 BN V XY DNG

The Sub-Contractor shall furnish to the Main

Nh thu s cung cp bn v v danh mc cng vic

Contractor for approval and subsequent


distribution, builder's work drawings and

chi tit lin quan n cc vn xy dng c yu


cu trong cng tc lp t c phi hp v ph

schedules showing details of builder's work

duyt.

required in connection with the installation of the


Works for co-ordination and approval.
In cases where preliminary builder's work

Trong trng hp cc thng tin s b c cung

information has already been given on the


Drawings, such information is to be checked and

cp trn bn v, nh thu c trch nhim kim tra v


xc nhn cc thng tin ny.

confirmed by the Sub-Contractor.


It is the intention that all holes, chases, etc. shall
be left in the structural building work as it

Tt c cc loi l, rnh c d nh l u phi c


t trc vo khung ct st trc khi b tng v

proceeds and not cut out subsequently.

sau khng c ct c b tng.

The Sub-Contractor shall acquaint

himself

Nh thu phi t thng sut tt c giai an lm vic

throughout the period of the Works, with the

vi cc lch xy dng chi tit. Nh thu phi chun b

Main
Contractors
detailed
construction
programme. The Sub-Contractor shall prepare

cc bn v lin quan n cc cng vic xy dng


cng vi thi gian thc hin ca chng m bo

the builder's work drawings in such order and at

chng lun c theo di xem xt v xc nhn thi

such times as to enable them to be reviewed

gian btng khng nh hng n qu trnh

and subsequently issued to the Main Contractor


without
jeopardising
the
Construction

xy dng.

programme.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/18

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

S khng c mt khan chi ph no c tr cho cc

No claims will be entertained in respect of


additional holes, chases, etc., required after the

vn pht sinh vic t thm l, rnh sau khi cc

structure has been constructed.

kt cu c b tng.

1.30 REJECTION OF UNSUITABLE MATERIALS

1.30 LAI B NHNG VT T KHNG THCH HP

The Engineer shall be at liberty to reject any

Qun l K thut s c ton quyn trong vic loi b

plant, materials and workmanship not complying

bt k h thng, vt t v nhn cng no khng tun

with the requirements of the Sub-Contract


specification or which are in any way unsuitable

theo cc quy nh v tiu chun k thut trong hp


ng thu ph hoc bt c g khng thch hp v

and to order their removal and replacement

Nh thu khng c tnh thm chi ph cng nh

without time and cost implication to the Contract.

thi gian cho cng tc loi b v thay th.

The Engineer's decision as to what constitutes

Quyt nh ca Qun l K thut v vic ph hp vi

compliance with requirements and suitability


shall be final and binding; the true intent and

yu cu ca hp ng l quyt nh cui cng, thc


cht ca vic u thu v ngha ca hp ng l

meaning of the Sub-Contract being that the

lm tha mn cho nhng yu cu ca Qun l K

whole of the Sub-Contract Works shall be

thut.

completed to the satisfaction of the Engineer.


No rejected item shall be considered as a reason

Khng c hn mc b loi b no c xem l

for failure to meet the completion date.

nguyn nhn chnh ng gy nn s chm tr thi


hn hon tt thc t.

1.31 SUPERVISION

1.31 GIM ST

The entire electrical installation shall be carried

Ton b qu trnh lp t h thng in s c

out under the supervision of Professional

gim st bi cc k s in chuyn nghip.

Engineer (Electrical).
1.32 TESTING AND COMMISSIONING

1.32 KIM TRA V NGHIM THU H THNG

All testing, balancing and commissioning


procedures and documentation shall be

Tt c qu trnh kim tra, cn chnh v chy th


cng vi h s ca n phi c trnh trc t nht

submitted at least four weeks prior to the

l 4 tun trc khi tin hnh k hoch kim tra v

commencement of the testing/ commissioning


period scheduled in the construction programme

chy th trong k hoch xy dng Qun l K


thut kim tra ph duyt.

for approval by the Engineer.


The Sub-Contractor shall notify the Engineer at

Nh thu phi bo trc cho Qun l K thut t nht

least seven days in advance of his application for

7 ngy cng phi hp vi cc c quan hu quan

the Authorities tests and inspections. On receipt

xem xt kim tra. Khi nhn c hi p t c quan

from the Authorities of a confirmed date for test


and inspection, the Sub-Contractor shall, without

hu quan v ngy kim tra th Nh thu khng c


chm tr phi bo ngay cho Qun l K thut.

delay, inform the Engineer.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/19

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

After having satisfied himself of the performance

Sau khi hon tt cng tc lp t, Nh thu phi gii

of the installation, the Sub-Contractor shall

trnh cho Qun l K thut chp thun kt qu l tt

demonstrate to the satisfaction of the Engineer


that the installation or part thereof as the case

c thit b c lp t ph hp vi yu cu i hi
v tiu chun k thut.

may be, complies with all the requirements of the


Specification.
Tt c my mc, thit b v h thng phi c kim

All plant, materials and systems shall be tested,


balanced and commissioned as specified in this

tra, cn chnh v chy th theo quy nh trong tiu

Specification.

chun k thut ra.

The Sub-Contractor shall provide all necessary

Nh thu phi cung cp cc iu kin v cng c

facilities and instruments for the witnessing and


checking of such tests, but this shall not relieve

cn thit kim tra v i chng cc th nghim


trn, nhng iu khng c ngha l Nh thu

the Sub-Contractor of his responsibility for

khng c trch nhim t kim tra v hon thin cng

testing and satisfying himself of the adequacy of


the installation beforehand.

tc lp t ca mnh.

complete

Nh thu phi thc hin vic ghi ch tt c cc vic

records of the tests as carried out and when the


tests have been successfully completed, he shall

kim tra ang thc hin cng nh hon tt thnh


cng, v phi cung cp bn ghi ch trn cho Qun l

provide the Engineer with test records in

K thut vi 3 bn copy theo nhng mu c

triplicate in an agreed form. Once agreed by the


Engineer, one set of record documents shall be

duyt. Khi c Qun l K thut ng , mi bn


ca h s lu phi km vi bn hng dn vn

incorporated into each set of O & M manuals.

hnh v bo tr tng ng.

All tests shall be carried out at the direction of


the Engineer.

Tt c cc cuc kim tra phi c thc hin theo


s ch dn ca Qun l K thut.

All the equipment and systems shall be


examined and tested after completion of the

Tt c thit b v h thng ch c xem xt v kim


tra sau khi hon tt cng tc thi cng lp t.

The

Sub-Contractor

shall

make

installation work.
Nh thu phi cung cp cho Qun l K thut 3 bn
sao cc giy chng nhn cht lng ca tt c h

The Sub-Contractor shall furnish the Engineer


with copies, in triplicate, of test certificates in
respect of all plant, equipment, materials and

thng, thit b, vt t v ph kin theo tiu chun ca

accessories showing compliance with tests to


British or Singapore or any other comparable

Anh hay Singapore hay bt c tiu chun tng


ng no v vi bt c kt qu kim tra b sung

and

no c cp y.

acceptable

standards

and

with

any

additional tests specifically called for herein.


The Sub-Contractor shall be responsible for and

Nh thu c trch nhim thanh ton tt c chi ph

bear all the costs in connection with any

lin quan n vic thanh tra, kim tra v cc loi giy

inspection, tests and permits for the installation


and shall make such tests as are called for by

php cho cng tc thi cng lp t v phi thc hin


cc cng tc kim tra ca cc c quan hu quan.

any regulations or authorities. These tests shall

Cc cuc kim tra ny phi c thc hin di s

be made in the presence of the authorized

kim tra ca i din cc c quan hu quan.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/20

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

representative of any such authority.


1.33 CC CH V AN TON

1.33 SAFETY NOTICE


The Sub-Contractor shall supply the following in

Nh thu phi cung cp cc phn sau trong tt

all electrical switchrooms:-

phng in:

a. A frame electrical single-line diagram.

a.

Mt s nguyn l in.

b. A First Aid diagram and fire extinguisher.

b.

Bng tiu lnh cha chy v bnh cha chy.

c.

c.

Bng hiu cnh bo nguy him bng 4 ngn

Danger sign in the four official languages


mounted on the door entrance.

ng thng dng gn bn ngoi ca ra vo.

d. Rubber mat of 2mm thick x 600mm wide


extending
the
switchboards.

full

length

of

d.

the

1.34 "AS-NEW" CONDITION

Tm lt chn bng cao su ( cch in) dy


2mm, rng 600mm lt dc theo sut chiu di
ca t in.

1.34 IU KIN MI

At the time of handover of the Sub-Contract

Vo thi im bn giao cc cng vic hp ng

Works

Practical

c xc nhn hon tt, tt c thit b u phi trong

Completion, the whole installation shall be in


"As-new" condition. The Sub-Contractor shall, in

iu kin mi. Theo iu kin hp ng trong sut


qu trnh thc hin hp ng chnh, nh thu phi

accordance with the Sub-Contract conditions

bo v gn gi tt c my mc, thit b v s sa

prior

to

Certificate

of

during the course of the Main Contract, protect

cha/sn li hay thay th nu cn thit trc khi

all plant and equipment, and shall restore/


repaint or replace as necessary before

hon tt hp ng.

completion of the Sub-Contract.


1.35 BN GIAO

1.35 HANDING OVER


Up to and including the Date of Practical

Cho n tn ngy hon tt thc t, nh thu phi c

Completion the Sub-Contractor shall be


responsible for both maintaining and operating

trch nhim trong c hai vic bo tr v vn hnh cc


dch v c lp t bao gm c vic cung cp

the

nhng vt dng cn thit. iu khan trn c quy

building

services

installation

including

provision of consumables. The Sub-Contractor is


deemed to have included the above in the Sub-

nh cho nh thu trong hp ng.

Contract.
1.36 "AS-BUILT DRAWING

1.36 BN V HON CNG

Before the Date of Practical Completion, the

Trc ngy hon tt thc t, nh thu phi cung cp

Sub-Contractor shall provide As-built drawings


as specified for all equipment and systems for

bn v hon cng theo quy nh cho tt c thit b v


h thng c lp t hon chnh, bao gm tt c

the

nhng thay i chnh sa trong sut qu trnh thc

complete

installation,

incorporating

all

amendments made during the course of the


The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

hin hp ng thu.
u tin s dng ting Anh khi c tranh chp
1/21

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

Sub-Contract.
As-built drawings shall be developed by
competent
draughtsmen
throughout
the

Bn v hon cng phi c thc hin bi nhng


ngi thit k c kinh nghim lun theo di st v

installation

c cp nht lin tc trong sut qu trnh thi cng

programme

and

shall

form

continuously updated record of the Sub-Contract


Works installed.

lp t.

The Sub-Contractor shall ensure that the As-

Nh thu phi bo m rng cc bn v hon cng

built drawings shall conform in layout to the


latest Architectural As-built plans.

phi ng vi mt bng thc t sau cng ca cng


trnh.

The Sub-Contractor shall submit As-built


drawings of the equipment and systems installed

Nh thu phi trnh bn v hon cng cc thit b v


h thng c lp bn trong trn gi trc khi thi

within false ceilings prior to installation of false

cng trn gi.

ceilings.
Drawings shall be prepared on the following

Bn v s c chun b theo t l bn v theo h

metric scales:-

mt:-

Floor plans and sections

1 : 100

Mt bng sn v mt ct

1 : 100

Plantroom layouts and sections

1 : 50

B tr phng my v cc mt ct

1 : 50

Details

1 : 20

Chi tit

1 : 20

Three paper prints of all as-built drawings


together with one CD-ROM in Autocad format of

Ba b in ca cc bn v hon cng cng vi 1 b in


trn giy v b a lu cc bn v di dng file

each drawing shall be submitted to the Engineer

Autocad phi c trnh cho Qun l K thut trong

within two months of the date of issue of the


Certificate of Completion. As-built drawings shall

vng hai thng k t ngy c chng nhn hon


cng. Cc bn v hon cng phi c bc trong

be bound in hard cover.

cc ba cng.

1.37AS-BUILT DRAWINGS FOR AUTHORITIES'


EXAMINATION & CERTIFICATION

1.37 BN V HON CNG TRNH NH CHC


TRCH KIM TRA V CP CHNG NHN

The Sub-Contractor shall prepare As-Built


Drawings and certify on these drawings that the

Nh thu ph phi chun b cc bn v hon cng


v xc nhn trn nhng bn v ny rng nhng bn

drawings reflect the actual works installed. Two

v th hin cc cng vic thc t c lp t.

sets of these drawings (2 paper sets) and 1 set


of CD-R in Autocad format shall be submitted to

Hai b bn v in trn giy v mt b file bn v lu


trn a CD di dng file Autocad s c trnh

the Authorities, through the Engineer, for

cho nh chc trch, thng qua Qun l K thut hay

examination by the Authorities where required.

c quan chc nng nu c yu cu.

The Sub-Contractor shall ensure that the

Nh thu ph phi bo m rng cc bn v hon

As-Built

cng c trnh cho c quan chc trch phi ng

Drawings

to

be

submitted

for

examination and certification by the Authorities


The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

vi mt bng thc t sau cng ca cng trnh.


u tin s dng ting Anh khi c tranh chp
1/22

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

shall conform in layout to the latest Architectural


As-built Plans.
The As-Built Drawings shall be submitted to the

Cc bn v hon cng phi trnh cho Qun l K

Engineer for checking before submission.

thut duyt trc khi trnh.

The Sub-Contractor shall ensure that this

Nh thu phi bo m rng vic trnh duyt cc bn

submission of As-Built Drawings will not delay

v hon cng khng chm tr hn cc cng tc xem

subsequent inspections and tests of authotities;

xt v kim tra ca cc c quan hu quan, mt khc

otherwise he shall be fully responsible for any


consequence due to his delay.

nh thu cng phi chu trch nhim hon ton v


nhng hu qu do s chm tr ca h.

1.38 GUARANTEE

1.38 VN BO HNH

The Sub-Contractor in providing a specific piece

Nh thu, trong vic cung cp thit b hay dng c

of equipment or apparatus, whether specified


herein by name or whether of a make selected

cng loi, cho d y l bng tn hay chng loi


c chn bi nh thu, s c giao trch nhim

by the Sub-Contractor, shall be deemed to

bo hnh cho chng hat ng tt trong tt c cc

warrant its satisfactory performance under all

iu kin hat ng m n gp phi.

working conditions which may be encountered.


Unless otherwise stated in Specification, the

Ngai tr cc trng hp khc trong c im k

Sub-Contractor's guarantee for the Sub-Contract


Works shall extend for a period of 18 months

thut, Cng tc bo hnh ca nh thu cho hp


ng phi ko di trong 18 thng k t ngy xc

from the Date of the Practical Completion

nhn hon tt thc t. Ngi c bo hnh, trong

Certificate. The guarantee, in an agreed form,

mu thng nht, s l tn ca ch u t.

shall be vested in the name of the Employer.


In the event that any manufacturers guarantees

Trong trng hp s bo hnh ca nh sn xut

are still within their term of validity at the Date of


Practical Completion for the works, then all such

vn c hiu lc n ngy hon cng thc t ca


cng vic, th sau vic bo hnh trn s t ng

manufacturers guarantees shall automatically

c chuyn qua cho ch u t. Tt c quyn li

be assigned to the Employee. All subsequent

v ngha v theo nh giY bo hnh s thuc v ch

rights and liabilities under the manufacturers


guarantees shall be the Employers.

u t.

In the event of anything described in the


Specification or shown in the Sub-Contract

Trong trng hp c bt c vn g c cp
n trong c im k thut hay c th hin trong

Drawings,

Sub-Contractors

bn v hp ng, m theo kin ca nh thu b

opinion, unsuitable or inconsistent with his


guarantee or responsibilities, the Sub-

mu thun hay khng ph hp vi trch nhim bo


hnh, nh thu phi a ra nhng hng dn b

Contractor shall draw attention thereto at the

sung vo thi im b thu.

being,

in

the

time of tendering.
Neither the time limit imposed on the Sub-

Vic thi gian bo hnh c hn - Vic chng nhn

Contractor's guarantee, nor the final Practical

hon tt cng tc thc t - vic ch u t chp

Completion Certificate issued by the Engineer,

nhn cng tc lp t - Vic kim tra tnh tng

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/23

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

nor the acceptance of the installation by the

thch vi thit k ban u vi bt k vt liu hay

Employer, nor the checking for compliance with

phng php thi cng no, tt c nhng ni dung

the design intent of any material or method shall


in any way absolve the Sub-Contractor from his

trn s khng th ph nhn trch nhim ca nh


thu cho bt k khuyt im tim n no trong cng

responsibility for any latent defects in the Sub-

tc thi cng v c th biu hin ra ngoi trong tng

Contract Works which may become apparent in


the future and which are, in the opinion of the

lai, theo kin ca Qun l K thut, l do li ca


nh thu trong vic s dng vt t v phng php

Engineer, due to the Sub-Contractor's failure to

khng theo tiu chun k thut v bn v ca hp

use materials and methods which comply to this

ng thu .

Specification and the Sub-Contract Drawings.


1.39 OPERATION AND MAINTENANCE

1.39 TI LIU HNG DN VN HNH V BO TR

MANUALS
Two months before the Date of Practical

Hai thng trc ngy hon tt thc t, nh thu ph

Completion, the Sub-Contractor shall prepare


the complete Maintenance and Operating

phi chun b b ti liu hng dn hon chnh cho


cng tc vn hnh v bo tr cho cc hng mc lp

Instructions which are to be printed in bilingual

t bng song ng (bng ting Anh v Vit). Sau khi

(English and Vietnamese) for the installation.

cc h s ny c Qun l K thut duyt chi tit,

When these instructions have been agreed in


detail with the Engineer, the Sub-Contractor shall

nh thu phi trnh cho Qun l K thut 3 bn copy


c ng ba cng v dn nhn y . Cc b h

submit to the Engineer, three (3) copies thereof

s hng dn vn hnh phi c bn giao trc

suitably bound in hard cover, properly labelled


and identified. The Operating Instructions must

ngy hon tt thc t.

be handed over before the Date of Practical


Completion.
The Operation and Maintenance manuals shall

Ti liu hng dn vn hnh v bo tr phi bao gm

contain the following (properly ordered and

cc ni dung sau:

indexed):
1.39.1 INDEX
Comprehensively list all elements
sub-elements of the subject matter.

1.39.1 MC LC
and

1.39.2 DESCRIPTION OF ALL SYSTEMS AND


EQUIPMENT

Danh sch y tt c cc mc chnh v ph


ca cc ch
1.39.2 M T TT C CC H THNG V THIT B

Comprehensively describe

M t ton din

- scope of work executed

Phm vi cng vic thc hin.

- description of each system, including

M t tng h thng bao gm chc nng v

function and composition


1.39.3 METHOD OF OPERATION OF ALL

cu to.
1.39.3 PHNG PHP VN HNH TT C CC H

SYSTEMS
The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

THNG
u tin s dng ting Anh khi c tranh chp
1/24

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

Comprehensively describe

M t ton din

- The correct method of operating all

Phng php vn hnh bng tay ton b h

manually controlled items of plant for all

thng tt c cc ch , bao gm khi

specified modes of operation, including


start-up, shutdown and emergency

ng, tt h thng, trng hp khn cp.

procedures.
- The operation of all automatic control
systems.
1.39.4 METHOD OF MAINTENANCE AND
OVERHAULING ALL EQUIPMENT

Vn hnh theo ch t ng.

1.39.4 PHNG PHP BO TR V KIM TRA TT


C THIT B

Comprehensively describe all procedures


necessary to undertake the operational,

M t tt c tin trnh cn thit thc hin cng


tc bo tr trong khi vn hnh, theo nh k v khi

cyclic and breakdown maintenance of all

c h hng cho tt c hng mc ca h thng.

items of plant. Such instructions shall include

Cc ch dn ny phi nh km s din t mi

enlarged diagrams of the components of


each
plant
items.
Manufacturer's

lin quan gia cc b phn ca tng h thng.


Cc ch dn ca nh sn xut v thi gian nh

recommendation of frequency and method

k v phng php kim tra cng phi c

of overhauling shall be included.

nh km.
1.39.5 DANH MC THIT B

1.39.5 EQUIPMENT SCHEDULES


Comprehensively list details of all items of
equipment installed and the equipment

Danh sch y chi tit tt c cc hng mc


ca thit b c lp t cng nh nhng

suppliers and/ or agents, shall include

nh/i l cung cp cc thit b . Cc chi tit

manufacturer's warranty period extending


beyond the expiry of the Defect's Liability

trn phi c nh km thi gian bo hnh ca


nh sn xut cng nh thi im ht bo hnh

Period.

ca thit b.

1.39.6 MANUFACTURERS LITERATURE AND


PERFORMANCE DATA ON ALL

1.39.6 TI LIU CA NH SN XUT V D LIU


HIU SUT TRN TT C THIT B.

EQUIPMENT
Original copies of all technical literature shall

Cc ti liu bn chnh cng vi cc d liu/ th

be supplied with performance data/ curves

v hiu sut lm vic ca thit b phi c cung

(e.g. pressure against flow rates, etc. for


pumps) and each shall have appropriate

cp ti a im vn hnh thit b.

operating point indicated thereon.


1.39.7 LIST OF SPARES
Comprehensively

1.39.7 DANH MC LINH KIN D PHNG


parts

Danh sch linh kin v bt c dng c chuyn

required and any special tools to be

list

the

dng no cng phi c cung cp cng vi

provided, together with a description of their

nhng hng dn s dng ca chng.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

spare

u tin s dng ting Anh khi c tranh chp


1/25

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

use.
1.39.8 KT QU KIM TRA CNG SUT V NGHIM
THU

1.39.8 COMMISSIONING AND CAPACITY TEST


RESULT
Include all information, such information
having been accepted by the Engineer:-

Phi bao gm tt c thng tin c chp nhn


ca Qun l K thut:

- commissioning and capacity test result

Kt qu kim tra cng sut v chy th.

- factory test result.

Kt qu kim tra ca nh my.

of

Cc bng tnh ton hiu sut yu cu.

- Schedules of control set points and


balancing settings.

Danh mc cc im iu chnh v cn
bng.

- calculations verifying achievement


specified performance requirements.

Where commissioning tests have not been

Ti nhng v tr cha th nghim thu c trong

undertaken at the time of Practical


Completion, provision shall be allowed in the

thi gian hon thin th s c php trnh cc


kt qu ny sau khi nghim thu.

manual to include these results after the


tests have been carried out.
1.40 MAINTENANCE PERIOD

1.40 THI GIAN BO TR

The Sub-Contractor shall provide, without


charge, labour and materials including

Nh thu ph phi cung cp, khng tnh ph nhn


cng v vt t cn thit bo tr tt c cc hng

consumables to properly maintain all the Works

mc trong hp ng trong sut thi gian bo tr. Nh

included under this Sub-Contract during the


Maintenance Period. The Sub-Contractor shall

thu phi cung cp nhn vin k thut lm vic ton


thi gian ti cng trng vi trch nhim vn hnh

provide the following full time staff at site to take

v bo tr cc thit b trong vng 3 thng sau khi

responsibility for maintaining and operation of the

Qun l K thut chng nhn hon cng thc t.

Equipment for three months after issuance of


Practical Completion Certificate by the Engineer:

Bao gm:

1 general supervisor for M & E services

Mt k s gim st chung cho h thng


M&E

1 Electrical Worker

Mt cng nhn in

1 air-conditioning technician

Mt cng nhn iu ho khng kh

1 plumber

Mt cng nhn cp thot nc

Should the Employer feel that the staff on the

Nu ch u t cm thy rng cc nhn vin ti

site is too few to carry out specific work, then the

cng tng qu t c th m nhn cc cng vic

Sub-Contractor shall dispatch to site immediately

c m t th nh thu ph s gi n cng trng

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/26

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

the staff so instructed by the Employer.

ngay lp tc nhn vin c gii thiu bi ch u


t.

Such work shall include, but not limited to the

Cc cng vic trn bao gm nhng khng b hn ch

following, to satisfy this requirement of the Sub-

bi cc ni dung sau, hon thnh cc yu cu

Contract:-

ny ca nh thu ph:

a) Repair or replace switchgear, fuse, pipe,

a)

pumps

seals,

valve

packing,

etc.

Sa cha hoc thay th cc b ng ngt, cu


ch, ng, bm, van,.v.v cn thit, bao gm s

as

necessary, including the provision of all


equipment.

cung cp cc thit b ny.

b) Provide and replace all malfunctioning or


burnout motors, control gear.

b)

Sa cha hoc thay th tt c cc trc trc hay


cc m t b h, cc b iu khin.

c) Repair of water leak and malfunction of


water services.

c)

Sa cha hoc thay th ch b dt nc v cc


h hng ca h thng cp nc.

d) Inspect conditions of equipment operating

d)

Kim tra cc iu kin hat ng hng ngy ca

on site on a daily basis, or as otherwise


directed.

thit b hoc theo cc hng dn khc.

e)

e) Shutdown, inspect, clean and test all


services at least twice during the period,

Ngng, kim tra, v sinh v chy th tt c h


thng t nht l 2 ln trong sut ti gian bo tr,

once at the end of six months and the

ln 1 l cui 6 thng, ln 2 vo lc kt thc thi

second time, close to the end of the

hn gian bo tr. Nh thu c trch nhim chi

Maintenance Period. Any parts required to


be replaced during these inspections, and

tr cho bt c linh kin no cn thay th trong


cc ln kim tra ny hoc trong sut thi gian

during any other period of the Maintenance

bo tr.

Period are to be met at the Sub-Contractor's


expense.
f)

f)

Prepare a daily log of all maintenance repair,

Chun b v thc hin nht k ghi ch tt c


cng tc sa cha bo tr, thay th, kim tra
thc hin tng ngy, bao gm c bo co tnh

replacement,
inspection
carried
out,
including a status report of all equipment.
The daily log shall be kept up-to-date and

trng ca thit b. Nht k ny phi c cp

located in such a place that the Employer


can inspect it at any time.

nht tng ngy v t v tr m ch u t c


th xem xt bt c lc no.
g)

g) The Sub-Contractor shall provide labour and


materials to properly maintain and rectify all

Trong thi hn bo tr nh thu phi cung cp


nhn cng v vt t thc hin tt cng tc

the Works both within normal working hours

bo tr sa cha bt k trong hay ngoi gi lm

and outside working hours included under

vic bnh thng.

this Sub-Contract for the Maintenance


Period.
h)

h) Upon instruction by the Employer, whether


The English language version prevails
SECTION 1/VISTA VERDE SPECS/ELECT

Theo hng dn ca ch u t, cho d bng


u tin s dng ting Anh khi c tranh chp

1/27

J. Roger Preston Vietnam Co., Ltd


SECTION 1 - GENERAL REQUIREMENTS

MC 1 - NHNG YU CU CHUNG

verbal or written, in case of fire or when

li ni hay vn bn, trong trng hp xy ra

there are operation defects discovered in

chy hay c li trong vn hnh c khm ph

any of the systems, the Sub-Contractor shall


provide qualified engineers and technicians

bt k h thng no, nh thu ph phi cung


cp nhng k s v k thut vin gii trong

on

take

vng 24 gi c trch nhim sa cha bo tr

responsibility
for
the
maintenance/
rectification and operation of the installation

v vn hnh cc h thng. 24 gi y c
ngha l k c ngy cui tun v cc ngy l.

24-hour-on-call

basis

to

works. This 24-hour on call service shall


include weekends and public holidays.
i)

i)

The Sub-Contractor shall have at time of

Vo lc b thu, nh thu phi trnh thng tin

tender submission provide information as

c yu cu v trnh v tay ngh cn thit

may be required in respect of the proposed


staffing levels and grades for the

ca nhn vin cho cng tc bo tr.

maintenance work.
During the Maintenance Period, the Sub-

Trong sut thi gian bo tr, Nh thu ph phi cung

Contractor shall provide the equipment and

cp thit b v vt t k c nhng th cn thit khc

materials including consumables necessary to

bo tr, vn hnh, sa cha h thng hng ngy.

maintain, operate, repair and overhaul the plant


on a routine basis. The materials provided shall

Vt t c cung cp phi l nhng loi c b


sung theo tiu chun c cp trong h s thu

be in addition to the spares provided as specified

ny.

elsewhere within this document.


During the Maintenance Period provide a call out

Trong sut thi gian bo tr, mt cuc gi cho dch v

service which shall:-

bo tr phi:

a) Be available and able to be contacted by

a)

Sn sng v c th gi 24 gi mi ngy, 7 ngy/


tun; v

telephone 24 hours per day, 7 days a week;


and
b)

b) Be no more than 2 hours response time to

n cng trng khng qu 2 gi sau khi nhn

investigate on site the cause of equipment

cuc gi v tm ra nguyn nhn thit b b h,

failures, breakdowns, an alarm, false alarm


or fault from the installation when informed

ngng t ngt, chung bo ng, bo ng


gi hay li do lp t khi c thng bo v s

of such an occurrence; notify the Employer

vic xy ra, thng bo cho ch u t bng vn

in writing on the circumstances surrounding


each call out on the first working day after

bn tng tnh hung xy ra ca mi cuc gi


n ngay ngy hm sau.

the call out.


At the end of the Maintenance Period carry out

Vo cui thi hn bo tr phi thc hin nhng cuc

tests as per Acceptance Tests.

kim tra xc nhn.

The English language version prevails


SECTION 1/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


1/28