BILL OF QUANTITY

Project : SOMALILAND DEVELOPMENT FUND


WATER ENGINEER: MOHAMOUD ABDILAHI
CONSULTANT: HAYD ENGINEERING CONSULTANT
Location: Laanod Hospital, Sool, Somaliland
S.No
DESCRIPTION
1
Supply of Pipes and Fittings
A. HDPE PIPES AND FITTINGS FOR TRANSMISSION LINE AND EXPANSION
WORKS
Supply of HDPE materials-All Polyethylene material include for supply
and delivery to the work site of all pipes, fittings & specials including all
other associated accessories required for complete installation.
1.1
1.1.1
1.1.2
1.1.3
1.1.4

1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8

1.2.9
1.2.10
1.2.11
1.2.12

Pressure pipes of standard 6m length for pure and brackish water


DN50mm
DN25mm
DN20mm
DN15mm
Sub total
1.70*total
Fittings
Bends
DN50mm 90 degree bends
DN50mm 45degree bends
DN25mm 90 degree bends
DN25mm 45 degree bends
DN20mm 90 degree bends
DN20mm 45degree bends
DN15mm 90 degree bends
DN15mm 45 degree bends
Sub total
1.70*total
Unions
DN50mm unions
DN25mm unions
DN20mm unions
DN15mm unions

Package: Supply,Installation,Testing and


Commissioning of Water supply and Rain
Water Harvesting system
Date: 28-Aug-2015
RATE (USD) Total (USD)

UNIT

QTY

m
m
m
m

24
20
200
200

30
16
13
9

720
320
2600
1800
5440
9248

No
No
No
No
No
No
No
No

7
7
26
26
39
39
39
39

3
3
1
1
0.75
0.75
0.5
0.5

21
21
26
26
29.25
29.25
19.5
19.5
191.5
325.55

No
No
No
No

4
40
50
50

5
3
2
0.5

20
120
100
25
265
450.5

No
No
No
No

4
15
15
20

5
2
1
0.5

20
30
15
10
75
127.5

No

28

Sub total
1.70*total

1.2.13
1.2.14
1.2.15
1.2.16

Tee's
DN50/50/50mm 90 degree Tee
DN50/50/25mm 90 degree Tee
DN50/50/20mm 90 degree Tee
DN50/50/15mm 90 degree Tee
Sub total
1.70*total

Reducers
1.2.17 DN50/60.3mm

1.2.18 DN25/60.3mm
1.2.19 DN20/33.4mm
1.2.20 DN15/33.4mm

No
No
No

30
30
13

2
1
0.5

60
30
6.5
124.5
211.65

No
No
No
No

4
30
30
13

7
1.5
1
0.5

28
45
30
6.5
109.5
186.15

NO

Sub total
1.70*total
1.2.21
1.2.22
1.2.23
1.2.24

Externally threaded nipples


DN50mm
DN25mm
DN20mm
DN15mm
Sub total
1.70*total

Pumps
Ceterafugal pump,Cast iron, complete with threaded ports in
1.2.25 compliance with
ISO 228/1 Model: HFm 50B

140
140

Sub total
1.70*total
Reverse Osmosis
1.2.26 3000BW Brackish Water Reverse Osmosis

140
238
NO

NO

12000

Sub total
1.10*total

12000
12000
13200

Float valve
1.2.27 Storage tank and float switch arrangement with two way float switch

40

1.70*total
Construction & Installations
Earth Works & Pipe Laying - Earth work rate shall include for back filling,
shoring,compaction as per the specifications and disposal of surplus
excavated material elsewhere as directed by the Engineer. Pipe laying
1.2.28 rate shall include for local transportation within the site, handling,
welding, and all other associated works required for complete
installation Excavation for pipe trenches in any materialLaying and
Jointing or Fixing in Open Trench HDPE pipes

Installation of HDPE Fittings,


The rate shall include excavation, shoring, dewatering,etc. necessary for
1.2.29
the complete installation
Installation of Valves including supply and installation of HDPEpipe
works
Installation of 250 mm dia control Sluice Valve on the branch line as
1.2.29
depicted in drawings or directed by the Engineer.
1.2.30 Rainwater Harvest material, fitting and pipes
Gutter:150*130*120mm, 1.7mm in thickness

40
68

390

1560

Downspout:100*80mm, 1.9mm in thickness


Collection Pipe DN114,141,161 mm

M
M
Sub total
1.70*total
Storage tank 50^3
1.10*total
Total
Grand total

100
1460

4
4

400
5840
7800
13260
20,000
22000
46,115