Professional Documents
Culture Documents
Well Testing
1. Why well testing is important?
(To understand info systems enabling better completions
and well operations).
2. Name two common problem of gas well testing?
(Gas expansion hydrate problem, Erosion)
3. Give full forms of RFT, TCP, DST and BS&W.
(Repeat Formation Test, Tubing Conveyed Perforation,
Drill Stem Test, Basin Sediment and Water)
4. Name three production testing equipment.
(Flow head, choke manifold, test separator, oil and gas
manifold etc.)
5. Why initial activation of well is required during testing?
(To create sufficient differential pressure to create around
well bore for inducting formation fluid to flow)
6. What is artificial lift?
(Supply of external energy to the well, which ceases to
flow)
7. What are the different pressures measured during testing?
(Bottom hole static flowing build up
Well head static and flowing
Well completion:
1. What is the function of well completion?
(To provide conduit from subsurface reservoir to surface
through which fluid can be produced or injected)
2. What is the effect of poor completion design?
11.
What are the benefits of healthy wells?
(Maximize ultimate recovery, minimize total cost over
well life, reduce time & efforts for maintenance, easier
well completion, and aids in safe operation practices)