REPORT OF REPAIRING TANK VALVE


1. PROCESS

PLANNIN
G

ITT

AIR
PURGE

GAS
FREE

CHECK
LEAKA
GE

REPAIR

CHECK
LEAKA
GE

DONE

2. Equipment to be used
No.
1
2
3
4

Air fan
Air duct
Air hose
BA mask

5
6
7

BA set
EEBD
Multi gas detector

8
9
10
11
12
13
14
15

Personal gas detector


Rope
Saw dust
Cotton rag
Bucket
Kerosene
Oil drum
Touch light( intrinsically
safe )
Air light
Boots
Hydraulic jack
PPE

16
17
18
19

Equipment

Remark
For ventilation
For ventilation
For ventilation

For Backup
For Emergency

For Cleaning
For Cleaning
For Cleaning

Making by 3O.Rattanopat Autsada - Page 1 of 9

M.T AMITY STAR


3. Manning team

Manning Team
General
Commander
Officer on site
Deck Team
Repair Team

Master Capt. Hou Deqi


C/O Guo Xiao wei
Duty Officer
Bosun
** Team Leader **
Duty AB /OS
Cheng guoen
** Team Leader **
P/M : Wang yuchen
P/M : Wang jinde
BSN : Tuantong N
AB : Wang dawei
FTR : Lin chao xiong

4. During repair

1. All valve on all pipelines serving the space been secured to prevent their
accidental opening.
2. The COT to be continuously ventilated.
3. Keep good communication & reporting interval of 10 minutes.
4. Atmosphere test to be taken every hour by multi gas meter.
5. If ventilation failure or atmosphere tests change from agreed safe criteria,
STOP WORK & EVACUATION immediately!
5. Reason of COT Slop/S and 1S Leakage

Slop/S

1S

Making by 3O.Rattanopat Autsada - Page 2 of 9

M.T AMITY STAR


6. Working time sheet
Date/Time
24/1624 25/1854
25/0454
25/1900 - 1942
25/1954
26/0630
26/0636-0706
26/0718-0900

26/0912-0936

Remarks
ITT
Start Air purge & Gas free in 5C & Slop/S
Stripping Line & 1C & 1S & 5C & Slop/S By Eductor
Stop deck stream due to reduce temperature in COT
Stop Air purge & Gas free in 5C & Slop/S
Start Air purge & Gas free in 1C & 1S
P/M : Wang yu cheng
Entering Slop/S for Check leakage by air in Slop/S
Riding gang : Chen guo en
P/M : Wang jin de
P/M : Wang yu cheng
Entering COT 5C for change seat ring
BSN & C/O Entering COT 1S for Check leakage by air in 1S

27/0636-0830

Riding gang : Chen guo en


P/M : Wang jin de
P/M : Wang yu cheng
Entering COT 1C for change seat ring

27/0936-1036

Riding gang : Chen guo en


P/M : Wang jin de
P/M : Wang yu cheng
Entering COT 1C for continue change seat ring
BSN : Tuantong N. , AB : Wang , FTR : Lin chao xiong
Entering COT 1C for continue change seat ring
Riding gang : Chen guo en
P/M : Wang jin de
P/M : Wang yu cheng
Entering COT 1C for continue change seat ring

27/1118-1200
27/1212-1312

Making by 3O.Rattanopat Autsada - Page 3 of 9

M.T AMITY STAR


27/1300-2000
Cleaning & Secure All equipment
**During Gas free : Hourly check gas , During repair : Continue check gas**

Making by 3O.Rattanopat Autsada - Page 4 of 9

M.T AMITY STAR


Example of hourly multi gas record
7. Problem during repair
.1 Bottom tank still have much cargo.
.2 Gas in COT very strong smell so repair team become vomit.

Making by 3O.Rattanopat Autsada - Page 5 of 9

M.T AMITY STAR


8. Example of Enclosed space permit & Risk Assessment

Making by 3O.Rattanopat Autsada - Page 6 of 9

M.T AMITY STAR

Making by 3O.Rattanopat Autsada - Page 7 of 9

M.T AMITY STAR

Making by 3O.Rattanopat Autsada - Page 8 of 9

M.T AMITY STAR

Making by 3O.Rattanopat Autsada - Page 9 of 9