You are on page 1of 179

THE BARD, A JOINT DEVELOPMENT BETWEEN ERKILETIAN DEVELOPMENT

COMPANY AND THE SHAKESPEARE THEATRE, LLC

APPLICATION TO THE DISTRICT OF COLUMBIA ZONING COMMISSION FOR


CONSOLIDATED REVIEW AND APPROVAL OF A PLANNED UNIT DEVELOPMENT
AND ZONING MAP AMENDMENT

February 3, 2016

DEVELOPMENT TEAM
APPLICANT:

The Bard, a joint development between


Erkiletian Development Company and The
Shakespeare Theatre Company, LLC
c/o Erkiletian Development Company
2009 14th Street North
Suite One
Arlington, VA 22201
c/o Shakespeare Theatre Company
516 8th Street, SE
Washington, DC 20003

ARCHITECT:

Shalom Baranes Associates,


Architects
1010 Wisconsin Ave. NW, Suite 900
Washington, DC 20007

INTERIORS:

Stoiber & Associates, PC


1621 Connecticut Ave NW, #200
Washington DC 20009

LANDSCAPE ARCHITECT:

Parker Rodriguez
101 N. Union St. Suite 320
Alexandria, VA 22314

CIVIL ENGINEER:

Bohler Engineering
1301 Pennsylvania, NW #825
Washington, DC 20004

TRAFFIC ENGINEER:

Gorove/Slade Associates
1140 Connecticut Ave NW, Suite 600
Washington DC 20036

LAND USE COUNSEL:

Griffin, Murphy,
Moldenhauer & Wiggins, LLP
1912 Sunderland Place NW
Washington DC 20036

EXHIBITS

DESCRIPTION

EXHIBIT

Architectural Drawings; Elevations; Photographs of the


Subject Property and Surrounding Area; Tabulation of Development Data;
Landscape Plans; Transportation & Loading Plans; and Civil Plans

Zoning Data Development Table

Surveyors Plat of the Subject Property

Preliminary Transportation Review Letter

Agent Authorization Letter

Map Amendment and Consolidated PUD Forms

Certificate of Notice, Notice of Intent, and


List of Property Owners within 200 Feet

Proposed Public Benefits

Community Outreach Summary

PREFACE
This statement and the attached documents support the application of The Bard, a joint
development between Erkiletian Development Company and The Shakespeare Theatre, LLC, to
the Zoning Commission for the consolidated review and approval of the Planned Unit
Development and Related Map Amendment to the Zoning Map of the District of Columbia.
This Planned Unit Development and Related Map Amendment application (the
Application) is consistent with the District of Columbia Comprehensive Plan, D.C. Law 16300, 10 DCMR (Planning and Development) 100 et seq. (2006) (the Comprehensive Plan), as
well as the Southwest Neighborhood Small Area Plan, D.C. Resolution 21-128 (2015) (SW
Plan), and numerous other goals and policies of the District of Columbia. Submitted in support
of the Application are completed application forms, a notice of intent to file PUD (with property
owner list and certification of mailing), architectural drawings, plans, and elevations, and a map
depicting the Zoning District for the property impacted by the Application and the surrounding
area. As set forth below, this statement and the attached documents meet the filing requirements
for a Planned Unit Development and Zoning Map Amendment application under Chapter 24 of
the District of Columbia Zoning Regulations (Title 11, District of Columbia Municipal
Regulations).

TABLE OF CONTENTS

Development Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Exhibits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
I.

INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
A.

Summary of Requested Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 7

B.

The Applicant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

II.

DESCRIPTION OF THE PROPERTY AND THE SURROUNDING AREA . . . . . . . . . . . . .11


A.

Site Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

B.

Site History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

C.

Surrounding Area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13

D.

Transit Rich Community . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

III.

THE PROPOSED PUD PROJECT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15


A.

Project Goals and Objectives and the Benefits


of Using the PUD Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15

B.

Project Description History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16

C.

Current Project Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18

D.

Development Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26

E.

Flexibility Under the PUD Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30

IV.

PLANNING ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34


A.

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34

B.

The Applicants Proposed Zone Designation is Not Inconsistent with the Comprehensive
Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

C.

Land Use Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38


5

D.

Zoning Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39

E.

Environmental Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40

F.

Facilities Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

G.

Traffic Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

V.

PUD EVALUATION STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41


A.

The Impact of the Project under Section 2403.3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

B.

Not Inconsistent with the Comprehensive Plan Under Section 2403.4 . . . . . . . . . . . . . . 43

C.

Other Application Filing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

D.

Public Benefits and Project Amenities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44

VI.

COMPLIANCE WITH COMPREHENSIVE PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49


A.

District-Wide Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50

B.

Compliance with Area Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

C.

Compliance with Southwest Neighborhood Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57

VII.

COMMUNITY OUTREACH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

VIII. CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62

I.

INTRODUCTION
The Bard, a joint development between Erkiletian Development Company and The

Shakespeare Theatre, LLC, (the Applicant) hereby submits this application to the Zoning
Commission of the District of Columbia (Commission) for the consolidated review and
approval of a Planned Unit Development (PUD), and a corresponding amendment to the
Zoning Map of the District of Columbia. The project site, 501 I Street SW, consists of Lot 52 in
Square 498 (the Property).
The Property stands at the corner of Square 498 in Southwest Washington, D.C. The
Property is bounded by I Street SW to the south, 6th Street SW to the west, a townhome
community to the north, and Amidon-Bowden Elementary school to the east. The Property is
currently unimproved. It was previously the site of Southeastern University, but that structure
was razed in July 2015. The Property includes approximately 36,476 square feet of land area and
is located within the boundaries of Advisory Neighborhood Commission (ANC) 6D.
A.

Summary of Requested Action

The Applicant proposes to construct a mixed-use building (Proposed Development or


Project) at the Property that incorporates residential uses, non-profit offices, art studios,
educational space, and housing for the Shakespeare Theatre Companys actors and fellows. The
Proposed Development consists of approximately 136 residential units, including 93 market-rate
units, 9 Inclusionary Zoning (IZ) units, 29 actor-housing units, and 5 fellow-housing units.
The Proposed Development shall house a variety of Shakespeare Theatre Company uses,
including but not limited to rehearsal space, costume fabrication space, non-profit offices, and
education studios. The plans, elevations, and drawings of the proposed PUD project are included
in Exhibit A.
The Property is currently located in the R-3 Zone District. The Property is also located in
the Institutional category of the District of Columbia Future Land Use Map. The Institutional
category does not have a density or intensity designation. The Applicant requests a Zoning Map
amendment to map the Property within the SP-2 Zone District. The SP-2 Zone District is a
7

transitional zone, and as explained in detail in the Application, the proposed rezoning is
consistent with the overarching goals and policies of the Comprehensive Plan of the District of
Columbia.
B.

The Applicant

The Shakespeare Theatre Company (STC) was established as a program of the Folger
Shakespeare Library in 1986 as a production theatre. In 1992, STC moved from the 246-seat
theatre at the Folger Shakespeare Library to the 451-seat Lansburgh Theatre in the newly
restored Lansburgh building. In 2004, in partnership with the International Union of Bricklayers
and Allied Craftworkers, STC co-developed the final phase of the mixed-use Terrell Place
project with the Harmon Center for the Arts. In October 2007, STC opened Sidney Harman
Hall, a 774-seat theatre in Penn Quarter. Today, STC produces 6-7 theatre productions per year
and hosts dozens of performing arts programs at both Sidney Harman Hall and the Lansburgh
Theatre.
STC also provides arts education programs to more than 44 District of Columbia schools.
STCs District Shakespeare program has served more than 8,000 students from 38 schools across
all 8 wards since 2011 by inviting one grade-level from DC public and charter high schools to
see a STC production free of charge. In addition, STC offers master acting classes for teens and
adults, summer acting camps for ages 9 to 18, fellowships and apprenticeships in theatre
administration and production, and a Master of Fine Arts degree in classical acting at STCs
Academy for Classical Acting at George Washington University.
STC is committed to serving all DC residents, and endeavors to make theatre not a
privilege, but a vital, accessible centerpiece in the community. Each summer, STC presents a
series of free Shakespeare performances as part of its Free for All programming. Started in
1991 to bring free Shakespeare performances to new and diverse audiences in the Washington
metropolitan area, the Free For All presented Shakespeare under the stars at the Carter Barron
Amphitheater. In an effort to make Shakespeare accessible to all D.C. Metro area residents, the
Free For All was brought to downtown D.C. in 2009 and now resides at STCs Sidney Harman
8

Hall. To date, the Free For All has reached more than 590,000 area residents and counting. For
the 25th anniversary of Free for All, STC created the FREE WILL ticket program to ensure that
its doors are open year-round to anyone who does not, or feels they cannot, see theatre. The
program offers 1,000 free tickets to each of STCs mainstage season productions on a first-come,
first-serve basis.
STC contributes locally to enhancing the arts culture in both the Penn Quarter and
Capitol Hill neighborhoods, and helps to drive an artistic renaissance in Washington, D.C. Since
1991, STC has leased rehearsal and costume fabrication space along 8th Street SEs Barracks
Row. In 2000, STC purchased its administrative offices and education space in another
building on the same block. To house its actors (a requirement of the Actors Equity standard
contract), STC also leases approximately 18-30 apartments every season across the District. The
multiple operational space locations and varying leases have created increasingly challenging
administrative and operational problems for STC and its staff.
The most pressing challenge of leasing multiple spaces throughout the District is
adjusting and responding to the D.C. real estate market.

Since 2007, the Barracks Row

neighborhood has exploded with growth.1 Housing rents have become an increasingly significant
financial burden on STC since the mid 2000s. Rents at STCs production facilities have also
increased steadily. Consequently, STC began to strategically plan for consolidating its housing,
administration and production needs into one facility. In 2011, STC pursued collaboration on a
development project that would have included space for STC, but unfortunately, that project
could not accommodate STCs space requirements, forcing STC to pursue other options. Over
the next few years, STC continued to look for new properties and opportunities to consolidate its
rehearsal and education studios, costume shop, offices, and housing. In 2013, the owner of
STCs leased rehearsal spaces and costume shop desired to increase rents and reposition that

On December 11, 2015, the Washington Post reported that 717 8 th Street, SE, home to Roses Luxury, sold for $4.1
million, likely setting a record for price- per- square foot on Capitol Hill. See Home of Roses Luxury sells for $4.1
million in all-time historic flip, The Washington Post, December 11, 2015.

property into a restaurant and/or retail space, adding urgency to STCs need for a new
consolidated space.
In 2013, STC conducted a bid process, seeking a development partner with whom to
collaborate to develop and construct a project that would have a minimum of 30 actor-housing
units and housing for 16 fellows; new administrative offices; rehearsal spaces; costume
fabrication spaces; and education/classroom spaces.

STC selected Erkiletian Development

Company, a family-owned and -run business specializing in multifamily housing, to be its


partner on the project.
Erkiletian Development Company (Erkiletian or EDC) has been developing and
building communities throughout the Washington metropolitan area for over 45 years. Founded
in 1968 by Mike Erkiletian, EDC prides itself on developing projects that are integrated in the
fabric of the community with a respectful approach to contextual design. Erkiletian is not a
merchant developer, building and flipping projects upon completion, but rather a long-term
investor in the site and the community. For example, EDC still owns and operates an apartment
community in McLean, Virginia that it completed in 1972.
In Erkiletians commitment to the future of their communities, the company strives for
innovative urban planning, focused on limiting sprawl and creating value in already developed
areas.

Their deep roots in these communities and long-standing relationships with local

governments make them leaders in smart, sustainable development.


Erkiletian is dedicated to, and strongly emphasizes, developing residential buildings that
are sustainable with an advanced green-living approach. Erkiletian is at the forefront in LEED
rankings, being one of the first companies to achieve LEED Gold for residential developments in
Arlington and LEED Silver for residential developments in Alexandria.
Each one of the companys residential developments has a focus and philosophy on
outdoor living. In designing each building, Erkiletian works with both forward-thinking building

10

architects and landscape architects to ensure the creation of cohesive outdoor oasis/living areas
with interactive landscape features where their residents can enjoy and escape.
II.

DESCRIPTION OF THE PROPERTY AND THE SURROUNDING AREA


A.

Site Location

The Property is located at the southwest corner of Square 498, with frontage on I Street
SW and 6th Street SW in the Southwest neighborhood of Ward 6. The Property is currently
unimproved and vacant. The Subject Property consists of approximately 36,476 square feet of
land area. The Property has approximately 135 feet of linear frontage along I Street SW, and
223 feet of linear frontage along 6th Street SW. The Property is a large corner lot with an
approximately 44-foot wide by approximately 145-foot deep dogleg extending east behind the
adjacent property. As more specifically stated below, the Property was previously improved
with a large, brutalist building that was most recently home to Southeastern University (SEU).
B.

Site History

In 1948, the Property was improved with a clubhouse for the Metropolitan Police
Department Boys Club Number 4 (Boys Club).

The Boys Club included a gymnasium,

library, game room, craft rooms, kitchen, and dressing rooms. The Districts Redevelopment
Land Agency (RLA) acquired the Property as a part of the urban renewal period that involved
clearing a substantial portion of Southwest to make way for new residential and commercial
buildings.
Pursuant to the Southwest Urban Renewal Plan, the RLA acquired parcels of land to
permit redevelopment. The executive director of the RLA was the parent of a student at the
Hawthorne School, a private academic institution, then operating out of a Victorian home
scheduled for demolition in 1963.

The Hawthorne School acquired the Property in 1961,

remodeled and enlarged the building to suit the needs of their new school building, and moved
into the new structure in 1964. The newly expanded building accommodated 200 students. The
Hawthorne Schools enrollment peaked at 170 students.
11

The Hawthorne School operated on the premises until 1972, when, amid financial
turmoil, it sold the Property to SE, which was a private, not-for-profit institution. SEU served
many Federal employees pursuing degree programs or seeking to take refresher courses;
according, its proximity to nearby federal agencies was beneficial.
For nearly 40 years, SEU operated in this Southwest neighborhood, on this Property. In
1996, the Southwest Urban Renewal Plan expired, and the Zoning Commission, upon application
of the Office of Planning (OP), applied for zoning designations to the neighborhood, including
the Property. Despite the institutional use then in existence, the Property was classified in the R3 Zone District (row dwellings).
By the fall of 2008, SEUs enrollment had dwindled to approximately 645 students and
160 faculty and adjunct professors2. In 2009, SEU, facing a loss of accreditation, announced that
it would be purchased by Graduate School USA, a continuing education school created by the
U.S. Department of Agriculture. SEUs final classes were held on the Property in the summer of
2009, and the Graduate School embarked on a plan to use the Property for its courses. The
Graduate School determined shortly thereafter that the building did not meet their programmatic
needs. The Graduate School put the Property up for sale in a sealed bid process. A number of
developers participated in the sale, most of whom proposed high-rise residential development.
In 2013, the Graduate School USA entered into a contract for sale with STC and
Erkiletian for development rights of the Property. As You Like It, LLC, a limited liability
company created for the purposes of purchasing the Property closed on the Property on
September 30, 2014. As You Like It is a pastoral play by William Shakespeare believed to be
written in 1599. As You Like It follows its heroine Rosalind as she flees persecution in her
uncles court, accompanied by her cousin Celia to find safety and, eventually, love, in the Forest
of Arden. In the forest, they encounter a variety of memorable characters, notably the
melancholy traveler Jaques who speaks many of Shakespeares most famous and most oft quoted

De Vise, Daniel. Southeastern U. acquired by another school in D.C, The Washington Post, March 6, 2010.
Online Edition. http://www.washingtonpost.com/wp-dyn/content/article/2010/03/05/AR2010030503859.html.

12

speeches, such as All the world's a stage. Erkiletian and STC believed the name appropriately
reflected STCs hope of finding safety and freedom from the Districts real estate market by
placing down roots on its property in the Southwest.
C.

Surrounding Area

The area surrounding the Property is experiencing a refocused surge in development


prompted by the redevelopment of the Southwest Waterfront, known as The Wharf, as well as
the mixed-use, office, retail and residential developments adjacent to the Waterfront Metro
station. In that project, the D.C. Government leases much of the office space, while the ground
floor retail is leased to Safeway supermarket, CVS drug store and a handful of restaurants. The
area to the south, southeast and southwest of the Property has become a bustling mixed-use
town center bolstered by the presence of larger apartments (both existing and new), office
tenants and the Arena Stage Theatre.
North and northwest of the Property is a townhome community with private cul-de-sacs.
There are approximately 85 townhomes south of G Street SW.

These townhomes were

constructed in phases in the 1960s as part of the urban renewal period of development in the
Southwest. A majority of the townhouses were built when the institutional Hawthorn School
was operating. Similar in design, many of the townhomes are three-stories or two-stories plus a
cellar. Of the approximately 85 townhomes, approximately 16 have private garages, 48 have a
parking space in front of their dwelling, and the cul-de-sacs provide parking for approximately
24 vehicles. Adjacent to the Property on the east is Amidon-Bowen Elementary School.
Though the Property shares the townhouse communities R-3 zoning, its long established
institutional use buffered the townhomes from higher density zones and developments in the
immediate vicinity. Directly diagonal to the Property, across I Street SW, is one of the three 10story, 100-foot tall apartment buildings, that are a part of the Waterside Towers Complex, an
apartment and townhouse-style community located in the R-5-D Zone District. One block east
of the Property is Potomac Place Tower, a nine-story, 100 foot-tall condominium building with
over 390 residential units, located in the R-5-C Zone District. Two blocks southwest of the
Property, on the other side of the Waterside Towers Complex, is the Riverside Baptist Church,
13

which was set down by the Commission in Case No. 15-05 for a mixed-use development that
will include the new home for Riverside Baptist Church, 6,900-7,900 square feet of ground floor
community servicing retail, and a 90-foot residential building with approximately 170 units, in
the C-3-A Zone.
The properties located south of the Property, particularly the residential towers and
offices, are located in the R-5-D and C-3-C Zone Districts, respectively.

The two office

th

buildings on 4 Street were redeveloped pursuant to a PUD that rezoned the parcel from C-3-B
to C-3-C.3 Another PUD, the Mill Creek Residential PUD, rezoned the 3.1 acres bounded by 6 th
Street to the west, K Street SW to the north, and M Street SW to the south, from R-5-D to C-3C.4 The Southwest quadrant is comprised of zoning designations that promote a mix of high and
low density development, a unique and recognizable development pattern in Southwest.
D.

Transit-Rich Community

The Property is well serviced by a number of public transportation facilities and services
including Metrorail, Metrobus, Capital Bikeshare, and Zipcars. Located only 0.3 miles from the
Property is the Waterfront Metro Station, which provides access to the Green Line. The LEnfant
Plaza Metro is only 0.4 miles away and provides access to the Blue, Yellow, Orange, and Silver
Metro Lines. The Property is only 1.1 miles from the Judiciary Square Metro station, which
provides access to the Red line.
In addition to rail lines, the Property is directly accessible by bus. Metrobus V1 has a
stop in front of the Property, directly across I Street SW. Metrobus P6, A46, 74, A42, and A48
are all within 0.1 miles of the Property. Also in close proximity to the Property are a number of
the Districts bikesharing and carsharing programs. There are five Capital Bikeshare stations
located within 0.5 miles of the Property. The closest Capital Bikeshare stations are located 0.2
miles away at 6th Street SW and Water Street SW, and 4th Street SW and M Street SW. There
are six Zipcar facilities within 0.5 miles of the Property. The closest is less than one-half a block
3

Zoning Commission Order No. 02-38.


Zoning Commission Order No. 05-38.

14

away, at 502 I Street SW and has two cars available for use. Walkscore.com labels the property
as very walkable, very bikeable, and as having excellent transit.

III.

THE PROPOSED PUD PROJECT


A.

Project Goals and Objectives, and the Benefits of Using the PUD Process

The Applicant seeks to transform a currently vacant site into an active, vibrant residential
development with non-profit offices and arts-related uses for STC. The redevelopment of this
Property will complement the existing arts uses along I Street SW, serving as a bookend to the
burgeoning I Street SW arts corridor. Additionally, the proposed SP-2 development will serve as
an appropriate bridge and transition, allowing the projects height and massing to step down
towards the residential townhouse communities north of the Property, while maintaining the
high-low design and unique characteristic of the Southwest.
The Applicant envisions a new residential community that integrates well into the
existing residential community and reflects a reduction in the intensity of use from what the
neighborhood was accustomed to with the Hawthorn School and SEUs institutional uses on the
site. Further, the Applicant seeks to develop a building that will allow STC to continue to evolve
and serve the city as a whole in a greater capacity.
The Proposed Development will offer an architecturally significant building that
creatively incorporates artistic elements visually associated with the arts and Shakespearian
theatre. With the Southwest Waterfront Metro station just three blocks south of the Property, the
Project embodies the type of transit-oriented development that residents, STC employees,
fellows, and actors prefer and will heavily utilize. In addition, the construction of non-profit
office space, art studios, educational space, and actor and fellow housing will allow STC to
remain in the District and continue to provide its substantial benefits to the District as a whole
and the Districts arts and thespian community.
The PUD process ensures that this project will be a high-quality development that results
from continued and organic community input. Given the prior use and institutional designation,
15

the PUD process provides the Applicant with the necessary flexibility to rezone the site, house
STCs varied uses, and contribute quality market-rate housing to the community in a way that
aligns with the Comprehensive Plan and design guidelines articulated in the recently approved
SW Plan.
B.

Project Description History

The Applicants goal for this project has always been to develop the Property with a
residential apartment building that would enhance the local community, add to the Southwest
arts community, and benefit the Districts performing arts programs as a whole. In furtherance
of that goal, over the course of three years, the Applicant has held community meetings and met
with various community and neighborhood stakeholders. As a result of feedback and sometimes
criticism, the Applicant has improved the project in the following, substantial ways.
1.

Initial Project Design - Unbridled Expectation

In first approaching the Project, the Applicant initially mirrored the Southwests
prominent low-high design features anticipating a project similar in height to other high towers
in the vicinity. The Applicant initially proposed a nine-story, 4.63 FAR mixed-use building
containing approximately 44,965 square feet of office, educational, and artist production spaces,
including 27,405 square feet of rehearsal space located underground and not chargeable to
FAR. That proposed building was 90 feet tall and included an additional 18-foot, 6-inch amenity
penthouse. It would have contained approximately 140 market-rate housing units co-located
with 30 actor-housing units and 16 dormitory-style units for STC fellows in a three-story
attached, secondary wing on the northeast corner of the Property. Following presentations of this
preliminary massing to the Southwest Neighborhood Assembly, Inc. (SWNA), a Southwest
neighborhood leadership organization, on or about April 2014 and May 2014, the Applicant
determined modifications would be necessary.
2.

Recalibrated Project Proposal

During the summer of 2014, the Applicant engaged in community meetings regarding the
rezoning, massing, demolition, Duck Pond Programming, and community benefits.
16

After

meeting with community members and orally presenting to the June 9, 2014 ANC 6D, the
Applicant posited reducing the project height below 90 feet and welcomed specific, actionable
recommendations and suggestions.
3.

Community Negotiation

In September of 2014, the Applicant continued community outreach and entered into an
agreement with SWNA (SWNA Agreement) to, among other things, limit the programmed
uses of the building, cap the maximum FAR of the proposed building to 4.5, and to provide a
minimum of 70 on-site parking spaces. The negotiated height, density, and list of community
benefits were the result of input from more than three months of community meetings.
Following the SWNA Agreement, the Applicant worked with SWNA and Townhouse
Management I and III, to coordinate a public charrette for the Applicant to receive additional
community insight, comments, concerns, and feedback.
4.

Project Revisions

Following the above stated community meeting phase, the Applicant embarked on a sixmonth design process to incorporate the negotiated height and FAR limitations and community
comments. In June 2015, the Applicant re-engaged ANC leadership and local stakeholders to
present the updated design. The Applicant conducted community outreach through a telephone
town hall and two public kiosk presentations of the revised design, community benefits, traffic
impact diagrams, and arts programs. During these meetings, the Applicant continued to receive
support as well as localized opposition from some of the townhouse neighbors.
In response to the townhouse neighbors concerns, the Applicant re-opened the dialogue
with ANC leadership in August. The Applicant conducted small meetings to receive design
input, present alternative massing options, and welcome specific actionable recommendations
and suggestions.

Further design modifications were made over a period of three months,

including but not limited to, reductions in FAR, height, and number of units, and modification of
the unit mix to include family-size, three-bedroom units.

17

The project history illustrates the continued dialogue the Applicant has embarked on with
the Southwest community. This Application is a reflection of the above-described Projects
evolution and community input (both before and after the DC Council approved the SW Plan).
The Applicant continues to engage the community with public presentations, including those
already scheduled for February 1st and 16th, to update the community on information and details
contained in this Application.

The Applicant anticipates further engagement with SWNA,

Townhouse Management I and III, ANC 6D, other stakeholders in the local vicinity, and District
residents as a whole during the PUD process.
C.

Current Project Description

The PUD and Zoning Map Amendment application proposes the development of a sevenstory, mixed-use building with residential, artist studios, non-profit office, and educational space.
The development will include 93 market-rate and 9 IZ residential units, 29 actor and 5 fellow
housing units, as well as approximately 43,1005 square feet devoted to artist studio space, nonprofit office space, and educational uses for the STC. The plans, elevations, and drawings of the
proposed project are included in Exhibit A.
As depicted in Exhibit A, the Application proposes a project of 4.09 FAR and
approximately 73 feet, 2 inches in height, consisting of up to 148 total housing units in 131,273
square feet (3.6 FAR) and 18,025 square feet (0.49 FAR) of non-profit office, artist studio, and
educational/classroom uses.

The building will house STCs world-renowned costume

fabrication studio on the ground floor, in accordance with the SW Plan recommendations for arts
and culture uses along this corridor. STCs educational and administrative spaces will be located
within the interior of the first floor and basement levels. Four rehearsal spaces (two of which
will be primarily used for the educational programs), costume storage, two classrooms, and
additional storage/support spaces will be located below grade.
Though the Project was revised to address community concerns, the design still adheres
to the SW Plans design guidelines for a pattern of high and low structures with the seven-story
5

This figure includes the basement square footage not included in the Floor Area Ratio defined in other sections.

18

73-foot, 2-inch tower as the high, and the 41-foot, 11-inch, fellow housing as the low. As
shown on the architectural plans in Exhibit A, the tallest portion of the Project fronts on I Street
and gradually steps down towards 6th Street. The section of the building on I Street, is 3-stories
shorter than the residential building caddy-corner to the Property. The gradual stepping down is
consistent with, and sensitive to, the Propertys surrounding context. In direct response to
concerns raised regarding the height of the Proposed Development, the placement of the shorter
portion of the building on the northern part of the Property results in a structure comparable in
height to the neighboring townhomes.
A residential lobby will be located at the intersection of 6th and I Streets SW, with the
entrance on I Street SW, per the communitys request. The building is proposed to be comprised
of market-rate residential units, IZ units, fellow housing, and actor housing. The following
provides more detail regarding the different uses.
1.

Market-Rate Apartments

The Project proposes 102 rental units, of which 93 are market-rate, in approximately
95,600 square feet. These units will be designed to attract long-term, community-invested
tenants. Erkiletian prides itself on building high-quality housing developments that tenants can
call home. As a result of the community dialogue, the proposed unit number was reduced by
23%, and the unit mix was revised to incorporate additional larger units.
2.

Inclusionary Zoning Compliance

The gross floor area of the IZ units is calculated based on the above approximately
95,600 square footage of total gross residential rental area6. The Applicant proposes to offer
nine IZ units at 80% Area Median Income (AMI). The units will include 2-studios, 5-onebedrooms and 2-two-bedrooms.

The fellow and actor housing units do not meet the goals of the IZ program and are analogous to exempt housing
uses; therefore, they should be exempt from the IZ program. Accordingly, those uses were not included in the IZ
calculation.

19

3.

Fellow Housing

The STC is a non-profit theatre company committed to bringing vibrant groundbreaking,


thought-provoking, and accessible theatre in a uniquely American style to the District.

In

addition to hosting six to seven plays, STC accommodates seventeen fellows annually.
STCs professional fellowships are season-long, full-time commitments lasting
approximately ten months. Schedules are rigorous; administrative fellows work 40 hours per
week plus additional weekend and evening hours as needed, and production and artistic fellows
work 40 to 60 hours per week.
STC provides its fellows accommodations for the duration of their program pursuant to
their fellowship admission. STC currently owns a 16-bedroom apartment building on Capitol
Hill, which it uses for fellow housing and rents one additional apartment for fellow use. The cost
of housing and real estate in the District has increased dramatically over the last decade-plus. In
addition, STCs apartment building is old and becoming increasingly costly to maintain. Since
2007, STC has sought to consolidate its auxiliary operations, along with its fellow and actor
housing into one location.
In order to address this need, the Proposed Development includes five fellow housing
units that will provide four bedrooms per unit, in a modified dormitory style layout. Each unit
will be furnished. These new housing units will allow STC to expand its program to 20 fellows,
a long sought-after goal. The fellows will reside in the units for a pre-determined period, not to
exceed one year. The fellows do not pay STC any compensation for housing; rather, the
provision of accommodations is a part of their program and they receive a small stipend for
living expenses.
The fellows are a part of a class that participates in numerous STC activities and
programs. Their stays are limited to the duration of the fellowship program, and fellows cannot
choose to extend their stay beyond a pre-determined period, although STC may choose to invite
certain fellows to return for a second fellowship period. The proposed fellow housing is similar

20

in design and uses to a dormitory, US Senate Page Housing, graduate housing or other similar IZ
exempt housing types. 11 DCMR 2602.3.
The fellow selection process is highly competitive, as only 20 fellows will be selected out
of a pool of between 600 to 1,000 candidates. Those accepted into the fellowship program select
a discipline to study.

For example, management fellows assist in the daily operations of

production administration through union adherence and guest artist hospitality.

Education

fellows support the implementation of school and community training, and audience enrichment
programs. Graphic design fellows receive hands-on training in conceptualizing, creating and
preparing pieces for print. Theatre management fellows interact with all departments including
artistic, production, education, marketing, development, and business. Costume fellows assist in
costume construction, shop maintenance, and running the companys mainstage productions and
other projects.

Stage management fellows work closely with Equity and non-Equity stage

managers, assisting in all aspects of stage management, from pre-production preparation to


rehearsal and through the run of the show as part of the running crew. Fellows may have the
opportunity to stage manage special events and are eligible to receive Equity Membership
Candidate points, which are required to become a member of the Actors Equity Association.
The STC provides a unique opportunity for early career actors to perform in a full season
of plays. Acting Fellows compose the non-Equity ensemble for most or all of STCs mainstage
plays, serve as understudies, and receive training in voice, speech, and stage combat. The artistic
fellows assist the associate artistic director, artistic associate, and literary manager on casting,
script preparation, production research, and other duties related to the smooth operation of the
artistic department. The directing fellows assist the creative teams with mainstage productions
over the course of the season, which may include serving as a lead assistant director or as a
second assistant.
STCs renowned and competitive fellowship program helps to establish the District as a
national arts destination. Moreover, due to this fellowships diversity of specialties, quality, and
rigor, the fellows, upon completion of the fellowship are uniquely positioned to contribute to the
many other theatre programs in the District. Indeed, many of the graduates of the fellowship
21

program have used the opportunity to obtain employment in the District and continue to
contribute to the local art community long after the conclusion of their fellowship.
4.

Actor Housing

Every year, the theatre hosts six to seven plays, and brings a variety of talented actors and
actresses to the District. Actors are an essential part of any stage play, and their presence, though
temporary and rotational, contributes greatly to the Districts artist community. Further, actors,
through their performance, have the ability to elevate the status of a production. Additionally, as
with many short-term residents, their time in the District, while limited, can be very impactful.
The STC provides accommodations for actors during their performance run. Actors are
unionized and have negotiated national and regional contracts with theaters in the United States
through the Actors Equity Association. These Equity agreements provide minimum salaries,
benefits, job security, and numerous other protections to ensure a safe and dignified work
environment. Equity contracts cover housing for actors. Actor and theatrical salaries are often
below 50% AMI7; however, actors are entitled to out-of-pocket travel expenses and living
accommodations during their performance to help offset their salaries. STC currently contracts
with Bridgestreet, a corporate housing and serviced apartments company, to provide actor
housing in the Penn Quarter area at great expense to the theatre.
As with many jobs that require extensive travel, the provision of housing or
compensation for housing is a condition of employment for actors in STCs productions.
Typical business travelers can book at hotels or inns; and, therefore, the actor housing proposed
as part of this Project is similarly designed for a transient individual.8 The individuals occupying
these housing types may stay for a few months, or as long as the production or work assignment
is ongoing. However, just like, hotels and inns are not designed for individuals seeking a
permanent home; actor-housing units are not the permanent residence for any of the actors. And
just as hotels and inns are necessary, and a benefit to, the District because their presence permits
7

The District of Columbias Area Median Income (AMI) for fiscal year 2015 was $109,200, which equals a weekly
salary of approximately $2,100. The average high-end weekly salary for union actors working at STC is
approximately $1,020, or 48.6% AMI.
8
Hotel, motels and inn uses are exempt from the Inclusionary Zoning program. 11 DCMR 2602.3(a).

22

visitors and short-term residents to contribute meaningful time, expenditures, and ideas to the
District, actor housing is a benefit to the District because it permits a nationally-recognized
theatre to attract and host the actors that are the center of each stage production. Thus, just as the
housing built in connection with fire stations is not calculated as housing for IZ requirements,
similarly actor housing provided in connection with employment should not be calculated as
housing for the IZ requirement.
The actors only reside in the residential units for the run of a particular show, which from
rehearsals to performance may be approximately 10-12 weeks. The actors return home or move
on to the next job once the show is complete. Similar to a hotel, the actors housing will be
assigned a furnished place to stay. Further, the actors will only be permitted to stay in the actorhousing units through the end of their performance. STC does not receive compensation for
housing the actors; it is an expense of theirs and a cost of doing business with transient
employees. Though the actors are only present in the District for short periods of time, similar
to many politicians, Washington sports team athletes, and others, their presence and contribution
to the District is meaningful and tangible.
5.

Non-Profit Office

The visible benefit of the STC is the six to seven plays the theatre hosts each year.
However, STC would not be able to provide quality theatrical performances or contribute to the
artistic community of the District without the countless hours of work and support of each STC
staff person. Non-profit offices are a special exception use under the SP Zoning District. The
STC cannot function without their support staff; the addition of an art use to the I Street SW art
corridor, as suggested in the SW Plan, would not be possible without the inclusion of non-profit
office use. As the plans in Exhibit A show, over 34,056 gross square feet of floor area is
dedicated to STCs non-profit office space, which will include but is not limited to offices for
staff, a conference room, costume fabrication space, production storage, craft space, and a sound
studio.

23

6.

Art Studio Space

The Project includes two art studio spaces, specifically, two rehearsal studios. The
consolidation of STCs actor and fellow housing, rehearsal space, and costume fabrication onto
one site will dramatically improve the cohesiveness and efficiency of rehearsal time. Art studios
are a permitted use in the SP-2 Zone District.
7.

Educational Program

In addition to the six to seven stage plays STC hosts every season, STC also conducts a
number of local educational programs for students on campuses throughout the District, and
several programs/workshops for actors, directors, and production specialist at every level of
expertise. These educational programs and workshops are run all over the District of Columbia
Public Schools. These programs contribute to the artistic fabric of the District and provide an
invaluable resource for those interested in developing their talent and skills in theatre. Programs
that target students and future thespians include:
Camp Shakespeare Young actors, between the age of seven and 18, dive head first into
the world of the greatest playwright in history, William Shakespeare. Under the guidance
of theatre professionals, participants unravel his plays with text analysis; transform into
Shakespeares characters through voice, movement, and improvisation work; wage
battles against mortal enemies with stage combat; and develop fundamental acting skills
using classical theatre techniques.

To culminate each session, participants stage a

performance for friends and family at STC.


Shakespearience Matinees designed to give students and teachers access to classical
theatre on stage, deepening their study of literature, drama, and language in the classroom
and fostering appreciation for the performing arts.
Artist in the Community As an active participant in the communities it serves, STC
supports neighborhood community festivals and events by providing workshops and
performances.
24

Text Alive! An in-school program designed to help students and their teachers develop
greater knowledge, understanding, and even a love for Shakespeare. It is the STCs
oldest running program. Each semester, teaching artists visit classrooms throughout the
District to run weekly theatre workshops and an in-depth rehearsal and performance
process.
District Shakespeare As discussed above, District Shakespeare aims to provide a free,
live, classical theatre experience to every D.C. Public School and D.C. Public Charter
School serving grades 9 through 12. Participating schools receive pre-performance
workshops, tickets for all attending teachers and students, curriculum guides and bus
transportation to and from the theatre all at no cost to the school or student.
STCs adult and professional development programs include:
Academy for Classical Acting The STC and George Washington University offer a
one-year intensive, 59 credit, graduate program that culminates in a Masters of Fine Arts
degree. The curriculum focuses on the specific craft of acting Shakespeare and other
classical texts.
The Directors Studio the Directors Studio is a local and early-career directors
program that consists of a series of workshops and discussions designed to investigate the
craft of theatrical direction.

Audience Enrichment Programs Engaging audience members with the work on stage
through discussion and dialogue, STCs audience enrichment programs includes Creative
Conversations, Reflections, Happenings Happy Hour, Symposia and Post-Show
Talkbacks.

25

Professional Development for Business Professionals Building on the success of its


popular Master Acting Class, Acting for Business Professionals, STC collaborates with a
number of organizations and government agencies to provide professional development
in communication, public speaking, leadership and team-building.
As with the educational uses that previously operated at the Property, the Applicant
proposes to continue the atmosphere of learning and personal development through the
educational studios on site as managed on site with the proposed non-profit administration
office.
D.

Development Parameters

The Property is currently classified within the R-3 Zone District, and is designated
Institutional on the Comprehensive Plan Future Land Use Map. The Guidelines For Using the
Generalized Policy Map and the Future Land Use Map, Section 226.1(h) of the Comprehensive
Plan, notes that Institutional designations do not have a density or intensity recommendation.
Rather, if a change in use occurs on a site designated Institutional, the new density or intensity
designation should be comparable in density or intensity to those in the vicinity unless
otherwise stated in the Comprehensive Plan Area Elements or an approved Campus Plan. Id.
The Area Elements of the Comprehensive Plan do not include a recommendation for the
Property and the Property is not part of a Campus Plan. Therefore, the new density or intensity
designation will need to be comparable to the densities and intensities found near the Property.
And a land use change is contemplated upon a change in use.
The Property is located within the boundaries of the SW Plan, adopted by the Council for
the District of Columbia on July 14, 2015. The SW Plan specifically recommends the Property
for arts and cultural uses, stating
[I]t complements and augments the arts uses already in Southwest and further
anticipates the Plans vision for cultural uses along I Street. Convenient access
to Metro is also a plus for many of the visiting actors who would use the rehearsal
space.
26

SW Plan, p. 99. Virtually the only permitted uses allowed under the current R-3 zoning are lowdensity row dwellings. The Applicant seeks to develop the Property with arts and cultural uses,
and as also recommended by the SW Plans design guidelines, seeks to construct a higherdensity residential development adjacent to existing low-density neighborhoods to continue the
high-low design pattern that is predominant in Southwest. The Applicant seeks a rezoning to the
SP-2 (Special Purpose) Zone District as that Zone District allows both the uses outlined above
and the density recommended in the SW Plan.
1.

SP-2 Zoning

The Applicant proposes to change the zoning of the Property from R-3 (low density, row
dwellings) to SP-2 (Special Purpose). The SP District (Special Purpose) is designed to stabilize
those areas adjacent to C-3-C and C-4 Districts and other appropriate areas that contain: (a)
Existing apartments, offices and institutions; and (b) Mixed use buildings. 11 DCMR 500.1.
The major purpose of the SP District shall be to act as a buffer between adjoining commercial
and residential areas, and to ensure that new development is compatible in use, scale, and design
with the transitional function of this zone district. Id. 500.2. The SP District is designed to
preserve and protect areas adjacent to Commercial Districts that contain a mix of row houses,
apartments, offices, and institutions at a medium to high density, including buildings of historic
and architectural merit. Id. 500.3.
The Applicant proposes the SP District as an appropriate buffer zone between the lowdensity row dwellings to the north and west and the high-density apartment buildings constructed
under the Urban Renewal (thus pre-dating District of Columbia Zoning designations for this
area) to the south and east, as well as the burgeoning Town Center at 4th and I Streets SW to the
immediate southeast of the Property.

27

The SP-2 District permits a maximum height of 90 feet with no limit on the number of
stories. 11 DCMR 530. A penthouse is permitted above the maximum building height, to a
maximum of 20 feet above the roof, provided that the penthouse is setback from the floor below
at a one-to-one ratio. Id. 411, 537.
In the SP-2 District, the maximum permitted FAR is 6.0 as a matter of right, or 6.5 FAR
through a PUD. 11 DCMR 531. The rear yard required must be a minimum depth of two and
one-half inches (2 1/2 in.) per foot of vertical distance from the mean finished grade at the
middle of the rear of the structure to the highest point of the main roof or parapet wall, but not
less than twelve feet (12 ft.). Id. 534. No side yard is required, however, if one is provided,
the side yard setback required is two inches (2 in.) per foot of vertical height, with a minimum
28

width of eight feet (8 ft.). Id. 535. Closed courts must be four inches wide per foot of height,
with a minimum of 15 feet wide. Id. 536.3.
The parking and loading requirements in the SP-2 District are based on the proposed use
of the Property. One parking space per four dwelling units is required. Non-Profit office uses
are required to have one parking space per every 1,800 square feet of floor area in excess of
2,000 square feet. The art studios require one for every 600 square feet of space. The
educational uses require one space per ten classroom seats, plus two spaces for every three
teachers.

11 DCMR 2101.1. The proposed uses will require loading facilities that, at a

minimum, include one 55 loading berth, one 200 square-foot loading platform, and one
service/delivery parking space at 20 deep. 11 DCMR 2201.1
Moreover, the SP-2 Zoning District is an appropriate zone based on bulk, height, density
and uses needed to permit the programmatic needs of STC.
2.

Proposed Development Parameters

The proposed development is very appropriate for the density and height requirements of
this location. Consistent with the SWNA Agreement and the SP-2 Zone District, the total gross
floor area included in the proposed PUD is approximately 149,298 square feet for a total FAR of
approximately 4.09.

Of the 4.09 FAR, 2.70 FAR will be devoted to market-rate and IZ

residential units, and 1.39 FAR will be devoted to a variety of STC uses. The height of the
proposed building will vary. The maximum building height of the proposed building will be 73
feet, 2 inches along I Street SW, with the northwestern section of the building stepping down to
41 feet, 11 inches. The Project will include 70 below-grade parking spaces, accessible from 6th
Street SW. The Project will also include approximately 75 long-term and 10 short-term bicycle
parking spaces. The SP-2 District permits a maximum FAR of 6.0 (3.0 commercial) as a matter
of right and a maximum FAR of 6.5 (4.5 commercial) in a PUD project. The maximum height
allowed as a matter of right and for a PUD in the SP-2 Zone District is 90 feet.
Chapter 24 of the Zoning Regulations will also govern the proposed PUD. Chapter 24
requires a minimum lot area of 15,000 square feet for a PUD. 11 DCMR 2401.1. The Zoning
29

Tabulations on sheet 1.12 of Exhibit A illustrate the zoning requirements for the existing and
proposed zoning.
E.

Flexibility Under the PUD Guidelines


The PUD process was created to allow greater flexibility in planning and design than may

otherwise be possible under conventional zoning procedures. The overall goal is to permit
flexibility in property development, and other incentives, so long as the project offers a
substantial number, or quality, of public benefits and advances the publics health, safety,
welfare, and convenience. 11 DCMR 2400.2. Pursuant to 2403, the Commission may grant
such flexibility in its discretion. Accordingly, the Applicant seeks flexibility from the following
provisions of the Zoning Regulations:
1. Flexibility from the Court Requirements
The Applicant requests flexibility from 536.3 and 536.4 of the Zoning Regulations.
Section 536.3 requires that the width of closed courts for a building devoted to residential uses in
the SP-2 be a minimum of four inches per foot (4 in/foot) of height measured from the lowest
level of the court to that elevation; provided, that in no case shall the width of court be less than
fifteen feet (15 ft.). Section 536.4 of the Zoning Regulations requires that the area of a closed
court be at least twice the square of the width of the court based upon the height of the court, but
not less than three hundred fifty square feet (350 sq. ft.). As shown on the Zoning Tabulation
sheet of the Architectural Plan at Exhibit A, the required closed court width for Court #2 is 21
feet, and the required area is 882 square feet. Closed Court #2 has ample area, with 1,918 square
feet; however, it is fifteen feet wide and, thus, requires flexibility from 536.3. Given the
configuration of the building on the lot, which is driven in part by the location of the buildings
core, providing a confirming closed court would result in a loss of building efficiency. The
provided closed court satisfies the intent of the closed court requirements because it provides
sufficient air and light through its large area, particularly since the area to the east of the building
is an open field.

30

Court #1 does not meet the requirements of 536.3 with respect to court width. However,
this open court permits a visually interesting and architecturally intriguing feature. Moreover, as
this court is effectively an architectural embellishment, it does not have an impact on the
availability of air and light to the building.
2.

Flexibility from the Loading Requirements

Under 2201.1, the required loading facilities for the Project are one 55-foot berth, one
200-square-foot platform, and one 20-foot deep space. The Project will provide loading facilities
as follows: one 30-foot berth, one 100-square-foot platform, and one 20-foot deep space. The
Applicant requests relief from the requirement for a 55-foot berth and associated 200 square foot
platform. New residents in similar apartment buildings rarely use large loading vehicles given
the size of the individual apartments, and such a berth is not required to accommodate the
buildings loadings needs.
3.

Flexibility from the Penthouse Setback

The Applicant requests flexibility from 537.1 and 411.18 of the Zoning Regulations,
which require that all penthouses be set back from the exterior walls of the building a distance
equal to the height above the roof upon which it is located. In order to accommodate the
mechanical equipment in a single penthouse and to be sensitive to the surrounding area by
minimizing the bulk of the enclosure, the Applicant requests flexibility from this setback
requirement. The penthouse is set back sufficiently to provide at least a one-to-one setback from
the public street; however, the penthouse is face on-line with the floor below on the eastern side
of the Property.
4.

Flexibility from the Compact Parking Requirements

Section 2101.1 of the Zoning Regulations requires one parking space for every four
dwelling units; one for every 1,800 square feet in excess of 2,000 square feet for the nonprofit
office use; one for every 600 square feet for the art studio space; two for every three teachers and
one space for every 10 classroom seats for the education use. Thus, pursuant to the architectural
31

plans, the Proposed Development requires 70 parking spaces: 36 parking spaces for the
residential component and 34 parking spaces for the STC related uses. Section 2115.2 of the
Zoning Regulations permits parking garages containing 25 or more required parking spaces to
designate up to 40 percent of these parking spaces for compact cars. Under 2115.4, the
compact parking spaces must be in groups of at least five contiguous spaces with access from the
same aisle. In this case, 51 of the 70 parking spaces, 73% of the parking spaces provided, are
compact parking spaces. Further, as shown on sheet 3.12 of the Plans, 34 of the compact parking
spaces are tandem, and four of the compact spaces are not in a continuous row of five spaces
with access from the same aisle. The tandem parking spaces are all for the STC, which will
operate and manage those parking spaces. Although the parking configuration does not comply
with the requirements of 2115.2 and 2115.4, the Applicant is providing a sufficient number
of parking spaces for the proposed uses on site. Therefore, the Applicant requests flexibility
from the compact parking requirements.
5.

Non-Profit Office

Section 508 of the Zoning Regulations permits the construction of a new office building
in the SP District by special exception under 3104, provided that the use, height, bulk, and
design of the office is in harmony with existing uses and structures on neighboring property, and
the use does not create dangerous or other objectionable traffic conditions.
The proposed nonprofit office use satisfies the special exception requirements of 508.
The nonprofit office use is analogous to the prior institutional uses that previously operated at the
Property. This use is therefore unlikely to adversely affect the use of neighboring properties.
Further, the Projects proposed height, bulk, and design are in harmony with the surrounding
structures. As previously noted, the buildings height is 73 feet, 2 inches at the corner of 6th
Street SW and I Street SW, and appropriately compliments the 100-foot tower that is directly
across the street. The building steps down to 41 feet, 11 inches on the northwest side of the
Property, which is consistent with the height and bulk of the residential properties on the north
side of the Property. Lastly, the proposed nonprofit office uses will not draw significant crowds
to the Property, and the Projects parking and loading is strategically located away from the
32

adjacent Amidon-Bowen elementary school and will have no impact on the schools drop-off
and pick-up zones. The proposed nonprofit office will therefore have no objectionable impact on
the traffic. For these reasons, the Applicant requests flexibility from the Zoning Commission to
permit the nonprofit office use at the Property.
6.

Additional Areas of Flexibility

The Applicant has made every effort to provide a level of detail that conveys the
significance and appropriateness of the Proposed Developments design for this location.
Nonetheless, some flexibility is necessary, some of which may not be anticipated at this time.
Thus, Applicant requests flexibility in the following areas:
a) To be able to provide a range of dwelling units between 126 and 148 (a 10%
deviation from the proposed unit count of 136).

b) To vary the location and design of all interior components, including


partitions, structural slabs, doors, hallways, columns, stairways, and
mechanical rooms, provided the variations do not change the exterior
configuration of the building.

c) To vary the number, location, and arrangement of parking spaces for the
project, provided that the total parking is not reduced below the minimum
level required by this approved PUD.

d) To vary the final selection of the exterior materials within the color ranges and
material types as proposed, based on availability at the time of construction,
without reducing the quality of the materials; and to make minor refinements
to exterior details and dimensions, including curtain wall mullions and
spandrels, window frames, glass types, belt courses, sills, bases, cornices,
railings and trim, or any other changes to comply with the District of

33

Columbia Building Code or that are otherwise necessary to obtain a final


building permit.

III. PLANNING ANALYSIS


A.

Introduction

The PUD process requires the Applicant to demonstrate that the Proposed Development
will not impose unacceptable impacts on the surrounding area or on city services. 11 DCMR
2403.3. Instead, its impact must be either favorable, capable of being mitigated, or acceptable
given the public benefits of the proposed development. Id. (emphasis added). Notably, a
Proposed Development must demonstrate that it is not inconsistent with the Comprehensive
Plan. For the reasons explained below, the Project is not inconsistent with the Comprehensive
Plan.
B.

The Applicants Proposed Zone Designation is Not Inconsistent with


the Comprehensive Plan

The Project is consistent with the goals and objectives of the Comprehensive Plan. The
District has a three-tier system of city planning comprised of city-wide policies known as
Citywide Elements, Ward-level policies known as Area Elements, and Small Area policies. The
Citywide Elements and the Area Elements are both part of the Comprehensive Plan, and carry
the same legal authority. See 10A DCMR 104.6. Small Area plans are neither part of the total
Comprehensive Plan nor part of the legislatively adopted document, but serve to supplement the
Comprehensive Plan. Id. 104.2 and 104.8. The Generalized Policy Map (GPM) and Future
Land Use Map (FLUM) are part of the Comprehensive Plan. As such, the GPM and FLUM
carry the same legal weight as the text of the Comprehensive Plan, and together guide land use
decisions and land use changes in conjunction with the text of the Comprehensive Plan. Id.
223.2 and 225.1.
To determine what is not inconsistent with the Comprehensive Plan, the Citywide
Elements, Area Elements, the GPM, and FLUM should be reviewed in the aggregate. See 10A
DCMR 108 (How to use the Comprehensive Plan). The Small Area Plan should be reviewed
34

to provide guidance during the review of the Comprehensive Plan. Id. 104.2 and 104.8. In
many circumstances, a review of these resources clearly outlines the Districts intended goals for
a property future uses. The Future Land Use Map indicates the future intensity and density of
use or the zoning designation for a property, and the Small Area Plan identifies target
properties.
The Future Land Use Map identifies the Property as an institutional use, which does not
have a density or an intensity designation. The SW Plan, passed by the District Council on July
14, 2015, identifies the Property as a Key Site for future development, but provides no specific
zone change recommendation.
Pursuant to 10A DCMR 226(h), Guidelines for Using the Generalized Policy Map and
the Future Land Use Map, if a change in use occurs on [an institutional site] in the future, the
new designation should be comparable in density or intensity to those designations in the
vicinity, unless otherwise stated in the Comprehensive Plan Area Elements or an approved
Campus Plan. (emphasis added). The Property is identified as an institutional use on the GPM
and FLUM. The Proposed Development seeks a use change from the institutional designation to
the SP-2 Zone District. The Applicant submits the following, illustrating that the SP-2 Zone
District is in line with the goals of the Comprehensive Plan because the proposed designation is
appropriate and comparable in density or intensity to those designations in the vicinity.
1.

The Proposed Zoning Designation is Appropriate for the Property

The proposed SP-2 development is comparable to the density/intensity found in the


vicinity of the Property. The Comprehensive Plan does not define vicinity nor does it provide a
visual for its readers to ascertain the area encompassed under that term. The Comprehensive
Plan uses the word vicinity, and other descriptive terms such as surrounding area, adjacent
and immediate vicinity to illustrate varying levels of distance. However, a review of the
approximately 57 times the Comprehensive Plan uses the word vicinity reveals a logical
progression in the measurable area designated. Terms such as adjacent and immediate
vicinity encompass a smaller geographical range than terms such as vicinity and surrounding
area.
35

This logical progression in the area encompassed aligns with the plain meaning and
understanding for each descriptive term. Websters Dictionary defines the word adjacent as
close or near: sharing a border, wall, or point, and the term vicinity as the quality or state of
being near: proximity; a surrounding area or district: neighborhood.

As used in the

Comprehensive Plan, the term adjacent typically refers to abutting uses or zones, while vicinity
refers to a larger surrounding area.
For example, in 10A DCMR 1814.1, the Comprehensive Plan lists land uses in the
immediate vicinity of the Congress Heights Metro Station. The uses listed range in distance
from approximately 400 feet from the Metro Station to approximately 7,000 feet away, with a
majority of the uses being within 1,200 feet of the Metro Station.
Within a similar range from the Property, the following FLUM designations are found:
moderate density residential, medium density residential, high-density residential, local public
facilities, parks, recreation and open space, low-density commercial, moderate-density
commercial and high-density commercial.
The SP Zoning District, as a buffer zone, is not identified within a particular FLUM
designation; however, the Proposed Development seeks to construct a building ranging from 4stories to 7-stories, with the bulk and massing typical of buildings found in the Medium Density
Residential designation. The site plan on sheet 1.7 of the Plans in Exhibit A indicates that the
proposed SP Zoning District, while not identical to the designations that are adjacent to the
Property, is comparable to those found within 400 feet to 700 feet from the Property.
One of the goals when changing the land use designation for an institutional site to a new
designation is finding a designation that is compatible with the surrounding community. See
generally 10A DCMR 225.16. In Z.C. Case No. 08-21,9 a PUD application that proposed
changing the use and zone for an institutional site, the density and housing types that were
adjacent to the proposed development and up to 600 feet away were considered when finding
9

A review of the cases available on the Office of Zoning website returned only one case in which an institutional
site, which was not affiliated with a campus plan, proposed a new designation through the PUD process.

36

that the proposed land use designation was compatible with the community. In the present case,
even if the term vicinity was limited to the area to within 500 feet of the Property, the
proposed SP Zone remains compatible with the surrounding area, because it is comparable and
complimentary to the high-density residential and moderate density residential found in the
vicinity.
Moreover, it is readily apparent from reviewing the FLUM and the SW Plan that
Southwest contains many moderate-density residential areas abutting medium- or high-density
residential areas. The variation in density and intensity permits the Southwest to continue its
development pattern: namely, the adjacency of low-rise and high-rise structures. The SW Plan
discusses this design pattern at length on pages 81-84. The Square where the Property is located
lacks the juxtaposition of moderate to medium or high density found in the vicinity, a feature
present in nearly every other nearby Square. The proposed SP-2 Zone designation would permit
a residential development that would serve as a contextual high building in the high-low
design pattern present in the Squares in the immediate vicinity and allowing the continuation of
a signature design feature of the Southwest.

37

As the proposed SP-2 Zone Designation, a medium-density residential designation, is


comparable to the uses and heights in the vicinity, the proposed designation is not inconsistent
with the Comprehensive Plan.
C.

Land Use Impact

As detailed below, the Proposed Development is fully consistent with the goals and
policies of the Comprehensive Plan for the District of Columbia. The Project has an appropriate
massing for a development within walking distance of a Metrorail station and Metrobus routes.
38

The building scale is entirely appropriate for a mixed-use residential structure with nonprofit
office and arts-related uses in this location, and the density is well below the permitted density
for a PUD in the SP-2 Zone District. In line with the purpose of the SP-2 zone as a buffer zone,
the Proposed Development is sensitively designed as an buffer between the high-density
development one block south of the Property and the low-density townhomes to the north of the
Property.

The Proposed Development will lead to the development of an idle site while

contributing to the artistic scene of the I Street SW corridor. Moreover, the STC educational
programs proposed for the Property will continue the Propertys longstanding history of use as
place for learning and professional development. Additionally, benefits to the surrounding
neighborhoods include the following: enhanced aesthetic of the surrounding public space;
provision of new affordable housing; and activation of the ground floor and sidewalk using art.

D.

Zoning Impact

The proposed PUD-Related Map Amendment can be granted without adversely affecting
nearby and adjacent zone districts. The rezoning of the Property would allow the Applicant to
build a project that aligns with the Districts and OPs goals for Southwest, in particular, the
redevelopment of an idle site for a recognized cultural use10.
The Applicant is requesting a Zoning Map Amendment to the SP-2 Zone in order to
accommodate the varied uses of the STC while providing enough density to create a viable
private-nonprofit partnership and replicate the high-low height pattern that is prevalent
throughout the Southwest.

The proposed SP-2 Zone District is consistent with the

Comprehensive Plan as outlined below.


The SP-2 Zone District is appropriate given that many higher-density residential zones
are in very close proximity to the Property and that the Property is closely located to a Metrorail
station. The proposed density will be commensurate with, or less than, the residential towers in
10

In Z.C. Case No. 02-25, it was noted by an expert in the Modification and Further Processing of Notre Dame
Campus Plan, that trips to the Kennedy Center and the Shakespeare Theatre are organized cultural activities for
the young scholars that participate in the University of Notre Dames Semester in Washington Program.

39

the vicinity. Additionally, the permitted uses, bulk, and scale allowed in the SP-2 Zone will
facilitate a seamless transition from the higher-density residential and commercial zones near the
Property to the lower-density townhome community. Importantly, the SP-2 Zone permits the
non-profit office, art studio, educational space, and other art related uses required to ensure that
the Property can serve as a bookend to the I Street SW arts corridor as envisioned in the SW
Plan. Lastly, as the Proposed Development will not include any commercial uses; the SP-2
Zoning will not disrupt the residential nature of the adjacent properties as a result.
It is important to note that the requested SP Zone will minimize the impacts of the Project
on neighboring properties by allowing the Applicant to accommodate an appropriate massing of
the building. A lower density would render the Project unable to accommodate the required
variety of uses for the Proposed Development. Further, with any lower density it would also be
infeasible to concentrate the density away from the neighboring townhome properties, into a
seven-story tower. As currently designed, the building design steps down to 4-4 stories on the
north side of the site, where the Property abuts the 3-story and 4-story townhome community and
where the R-3 zone will remain. The Projects design with a residential tower on the southern
portion of the Property and a stepped-down lower-density portion of the residential structure to
the north follows the prevailing development pattern for the Southwest neighborhood and
complies with the recommended design guidelines of the SW Plan.
E.

Environmental Impact

No adverse environmental impact will result from the construction of the Project
Development. The Project will attain sufficient points to be LEED Silver Certified and will
incorporate a series of sustainable features that will minimize the impact of the development.
Specifically, the Project seeks to achieve the LEED credits detailed on sheet 7.1 of Exhibit A.
The Project will also meet the Green Area Ratio and storm water management requirements.

40

F.

Facilities Impact

The Proposed Development will not have adverse impacts on the public facilities on
which it will rely for services. The Property previously housed Southeastern University, which
had an enrollment of approximately 870 students and 140 faculty and staff. The proposed uses
residential units, non-profit offices, art studios, educational space, and actor and fellow housing
combined will result in fewer people on site utilizing public facilities. Therefore, the Proposed
Development will not burden the public facilities that service this Property.
G.

Traffic Impact

The Project will not have an adverse impact on pedestrians and traffic on the adjacent
streets, as described in the Preliminary Transportation Review Letter in Exhibit D.

The

sidewalks adjacent to the Project will provide acceptable levels of service for pedestrians, and
the ramp to the parking garage is located on 6th Street SW, thus reducing the interaction between
students going to Amidon-Bowen Elementary School and cars accessing the Projects garage.
Additionally, the Project is located approximately 0.3 miles from the entrance of the Waterfront
Metrorail Station, and approximately 0.4 miles from the LEnfant Metrorail Station. Multiple
Metrobus routes also serve the Property. High transit usage, as well as the promotion of other
alternatives to driving, will minimize the impact on public infrastructure. To encourage bicycle
uses, the Proposed Development will include bicycle storage for residents, as well as bicycle
storage and showers for STC employees.

IV.

PUD EVALUATION STANDARDS


In deciding a PUD application, the Commission is required to judge, balance, and

reconcile the relative value of the project amenities and public benefits offered, the degree of
development incentives requested, and any potential adverse effects according to the specific
circumstances of the case. 11 DCMR 2403.8. In order to approve a PUD application, the
Commission must find that the impact of the project on the surrounding area is either favorable,
41

capable of being mitigated, or acceptable given the quality of the public benefits in the project.
11 DCMR 2403.3. Additionally, the Commission must consider the Comprehensive Plan in its
totality, and reconcile seemingly contradictory goals, when seeking to determine whether a
proposal is not inconsistent with the Comprehensive Plan. As the DC Court of Appeals stated
in Durant v. District of Columbia Zoning Commission,
[E]ven if a proposal conflicts with one or more individual policies associated with
the Comprehensive Plan, this does not, in and of itself, preclude the Commission
from concluding that the action would be consistent with the Comprehensive
Plan as a whole. . . . The Plan is not a code of prohibitions; it is an interpretive
guide, which the Commission must consider holistically. It provides a broad
statement of policy to guide future public decision[-]making. Tenley &
Cleveland Park, supra, 550 A.2d [331,] 338 [(D.C. 1988)] (quoting Report of the
Committee of the Whole on Bill 5-282, District of Columbia Comprehensive Plan
Act of 1984 (Jan. 17, 1984)) (emphasis in original) (internal quotation marks
omitted). And [a]lthough the Plan serves as an important policy guide, its legal
mandate is more limited. Id. Except where specifically provided, the Plan is not
"binding"; it is only an interpretive tool. Id. Its discrete elements guide[,] but do
not direct the Commissions action, and it do[es] not impose specific
implementation techniques. Id. at 338-39. Accordingly, that some individual
policies may be facially at odds with a particular zoning action is not necessarily
dispositive; the Commission must still determine whether a proposed action
would be consistent with the Plan as a whole.
65 A.3d 1161,1168 (D.C. 2013) (internal citations removed)
The Proposed Development is not inconsistent with the Comprehensive Plan for the
reasons explained in full below. We respectfully submit that while the Small Area Plan may not
be definitive on a proposed land use change, the general guidelines, specific elements and city
wide goals as a whole support this PUD request.
A.

The Impact of The Project Under Section 2403.3

The Proposed Development will have a favorable impact on the District, the Southwest
quadrant, and the surrounding neighborhoods.

Further, any slight negative impacts on the

townhome properties adjacent to the Property are capable of being mitigated and are far
outweighed by the benefits being offered to the Southwest community. Moreover, the Proposed
Development satisfies a number of the Districts goals for the Southwest quadrant.
42

B.

Not Inconsistent with the Comprehensive Plan under Section 2403.4

The Proposed Development is consistent with the Comprehensive Plan and other public
policies, as detailed in Section V, and thus complies with 11 DCMR 2403.4.
C.

Other Application Filing Requirements

The Application complies with the process and requirements set forth in Chapter 24 of
the Zoning Regulations for review of a consolidated PUD application and PUD-related map
amendment application. Specifically, the Application complies with the requirements of
2401.1, 2406.11, and 2406.12 as follows:
1. Area Requirement. The Property contains approximately 36,476 square feet of land area,
which exceeds the minimum area requirement of 15,000 square feet for a PUD.
2. Notice. As stated on the certification attached as Exhibit G and as required by 2406.7
to 2406.10 of the Zoning Regulations, the Applicant provided notice of its intent to file a
zoning application to ANC 6D and the owners of all property within 200 feet of the
Property.
3. Sections 2406.11(a) and 2406.12(a). The completed application forms are included in
Exhibit F of this submission.
4. Section 2406.11(b). A map showing the location of the Property is included in the
architectural plans attached as Exhibit A.
5. Section 2406.11(d)-(e), 2406.12(c)-(f). Included in Exhibit A are plans, elevations, and
sections that includes a detailed site plan; detailed landscaping and grading plan; floor
plans, elevations, and sections of the Project; and a final detailed circulation plan.
6. Sections 2406.11(c) and 2406.12(g). This statement includes a narrative description of
the Project and its related features and impacts.
7. Section 2406.12(h). This statement addresses the consistency of the application with the
intent and purposes of the Zoning Regulations and the PUD process.

43

D.

Public Benefits and Project Amenities

The objective of the PUD process is to encourage high quality development that provides
public benefits and project amenities, by allowing applicants greater flexibility in planning and
design than may be possible under matter-of-right zoning. 11 DCMR 2400.1-2400.4. In
evaluating a proposed development, the Commission shall also evaluate the specific public
benefits and project amenities of a development. Id. 2403.5. Public benefits are superior
features of a proposed development that benefit the surrounding neighborhood or the public in
general to a significantly greater extent than would likely result from a matter of right
development. Id. 2403.6. A project amenity is one type of public benefit that adds to the
attractiveness, convenience, or comfort of the project for the occupants or the immediate
neighbors. Id. 2403.7. Pursuant to 2403.9, the Proposed Development is appropriate for a
PUD because of the numerous public benefits and amenities incorporated in the following
development features:
1.

Urban Design, Architecture, and Landscaping

Section 2403.9(a) of the Zoning Regulations lists urban design, architecture and
landscaping as a public benefit or project amenity of a proposed PUD that the Zoning
Commission should evaluate. The detailed renderings, plans, and elevations of the Project in
Exhibit A demonstrate that the Proposed Development exhibits all the characteristics of
exemplary urban design and architecture. The massing, height, and articulation of the building
have been carefully designed to honor the unique design features found in the Southwest, namely
the undulating heights culminating in a tower juxtaposed with low-rise buildings. The Proposed
Development, in light of the partnership with the STC, has also been designed using inspiration
from Shakespeare and other playwrights.
The Shakespeare-influenced design is heavily reflected in the courtyard, which includes
linear paving with in-grade lighting and textured patterning similar to a watermark, and folded
benches reminiscent of folded sheets of manuscript. Along I Street SW, the architecture includes
window glazing depicting imagery and quotations of Shakespeares works.

This artistic

treatment continues into the landscaping, which includes etched transparent panels and presents
44

imagery and quotations within the planting beds. The staggered art panels will populate I Street
SW with educational and artistic imagery, creating an intriguing and dynamic streetscape. The
educational component of the panels is particularly apropos considering the Propertys prior
educational uses and its proximity to Amidon-Bowen Elementary School.
In response to the design features across 6th Street, the plantings at the base of the
building are organized into small-scale parterre gardens that consist of low evergreen hedges
interplanted with ornamental grasses, groundcovers, and perennials.

The lush 6th Street

streetscape is very pedestrian-friendly and reinforces the Southwest neighborhoods identity as a


Green Oasis. SW Plan page 86.
2.

Site Planning, and Efficient and Economical Land Uses

The creation of a mixed-use project on the Property, with residential and artistic uses, is
an example of appropriate site planning and efficient and economical land use as a project
amenity consistent with Section 2403.9(b). The Proposed Development transforms an unutilized
parcel of land into a well-designed mixed-use structure. Further, the Proposed Development
provides a strategic transit-oriented site that appropriately focuses height and density at the south
of the site, so as not to disrupt the lower-scale residential uses to the north. In addition, the
Proposed Development aligns with and furthers the Districts goal of increasing the artistic and
cultural presence of the I Street SW corridor. SW Plan page 95.
3.

Effective and Safe Vehicular and Pedestrian Access and Transportation


Management

Pursuant to Section 2403.9(a), effective and safe vehicular and pedestrian access,
transportation management measures, connections to public transit service, and other measures
are evaluation criteria for a PUD application. Here, pedestrian access focuses on I Street SW and
is separated from the vehicular access point, which is located on 6th Street SW. The Applicants
proposed streetscape also improves the pedestrian experience along this connection area. The
Applicant will set back portions of the Proposed Development, creating a large courtyard along

45

6th Street SW designed to enhance the apparent width and feel of public space around the
Proposed Development.
Gorove Slade Associates, the transportation consultant for the Proposed Development,
has prepared a Preliminary Transportation Review Letter, Exhibit D, and will prepare a traffic
assessment prior to the public hearing. The assessment will include a proposed Transportation
Demand Management plan.
4.

Housing and Affordable Housing

Section 2403.9(f) of the Zoning Regulations states that housing and affordable housing
are public benefits that the PUD process seeks to encourage. Additionally, the Arts and Culture
Element of the Comprehensive Plan states that art professionals should be incorporated into the
affordable housing programs, thereby implying that artist housing is a type of affordable
housing. See 10A DCMR 1409.4. The Project will replace vacant parcel with a new mixed-use
residential building. The Project will provide approximately 102 residential units in an area of
the District that is rapidly growing, and

eight percent of the 102 residential units, or

approximately 9 units, will be set aside as affordable housing in connection with the Inclusionary
Zoning program, for households earning up to 80% of the area median income. The demand for
housing in the District and, in particular, the Southwest Waterfront neighborhood is increasing,
and the Project will alleviate some of the demand.
The Projects 34 actor and fellow housing units, will be provided in addition to the
above-stated affordable units, thus delivering creative and effective solutions for affordable
arts housing without diminishing the citys resources for broader affordable housing programs.
10A DCMR 1409.3.
5.

Environmental Benefits

Pursuant to Section 2403.9(h) of the Zoning Regulations, certain aspects of a PUD


applications environmental management system are considered to be public benefits. The
Applicant is fully committed to providing a high-quality development that is sensitive to the
46

natural environment. The Applicant will implement a number of strategies to enhance the
sustainable nature of the Property and to promote a healthy, desirable, and comfortable lifestyle
that will benefit the Projects residents and minimize the buildings impact on the environment.
These sustainability features include a commitment to achieve Silver certification under the
LEED 2009 rating system as indicated on sheet 7.1 of Exhibit A.
In addition, the Projects location in a transit-rich, walkable area will reduce reliance on
private vehicles by the buildings residents, employees, and visitors. People traveling to the
Project will have a full array of convenient and efficient transportation options, thus reducing
greenhouse gas emissions and local pollution generated by vehicles. The Applicant will also
provide bicycle parking for residents, employees, and visitors to the building.
6.

Uses of Special Value and Revenue for the District

Under Section 2403.9(i), uses of special value to the neighborhood or the District of
Columbia as a whole are public benefits and project amenities. In this instance, the proposed
site has sat idle for six years, providing no benefit to the community or the District. The
development of the site will infuse new life into this portion of I Street SW, and will provide a
temporary financial benefit to the District through the development and construction process and
a permanent financial benefit to the District in the form of increased property taxes on the newly
improved site. Moreover, the addition of 102 new residences will serve to provide the District
with ongoing revenue as new residents will be able to call the Southwest home.
In addition, the Proposed Development will allow STC, a nationally-recognized cultural
resource to continue to operate and thrive in the city in which it was founded.

The

Comprehensive Plan is replete with recommendations focused on retaining artists and


encouraging the arts as a cultural amenity in the District. See, 10A DCMR 1400 et seq., Arts
and Culture Element. The Proposed Development addresses those goals by providing a home to
the STCs non-profit offices, rehearsal space, costume fabrication, and actor and fellow
housinguses that are currently scattered about the District. STC expends significant financial
and human resources in order to lease and manage multiple properties across the District. The
47

financial pressure has been particularly acute, as the real estate market in the District has become
increasingly competitive. Hence, the longevity and reliability of these leased buildings is in
doubt. STC is a District theatre, and the provision of a singular site for its non-profit offices,
rehearsal space, costume fabrication, and actor and fellow housing will help the District to retain
a prized art and cultural resource.
Furthermore, the Proposed Development will include educational studios that will permit
STC to increase its educational and community outreach. An example of the programs the
Applicant intends to run on-site include Camp Shakespeare, Master Acting Classes for teens and
adults, and Teacher Professional Development programs.
7. Other Public Benefits and Project Amenities
Pursuant to Section 2403.9(j), other ways in which the proposed PUD substantially
advances the major themes and other policies and objectives of any of the elements of the
Comprehensive Plan are considered public benefits and project amenities.

The Proposed

Development project advances numerous goals of the Comprehensive Plan through the provision
of robust and substantial community and District-wide benefits (Benefits Package). See
Benefits Package at Exhibit H. The Applicant is committed to building a development that
fosters an artistic community in the District. As such, the benefits package includes numerous
arts-related benefits for the Southwest community and District residents. For example, the
Applicant has agreed to support, financially and through participation, the SW ArtsFest, a
weekend of art-centered activities designed to encourage District residents to explore the
growing Southwest quadrant and its various art producers. In an effort to ensure the accessibility
of the arts programs organized by STC, the Applicant has agreed to provide scholarship
opportunities for up to 10, low-income children ages 5-17 to attend a full-day Shakespeare
Theatre summer camp for one or two weeks,. Currently, STC does not offer any programing to
elementary schools; however, because the Proposed Development abuts Amidon-Bowen
Elementary, STC will expand its programming to include the elementary school. Specifically,
STC will invite classes from Amidon-Bowen for annual tours of the Lansburgh Theatre, Sidney
Harman Hall, and the Proposed Development once it is completed. The goal of this educational
48

programming will be to inspire a love for the arts in young children and to expose them to the
behind the scenes aspects of theatre production most people do have the chance to experience.
In addition to the arts-related benefits, the Applicant is committed to being an environmental
steward in the community. As such, the Benefits Package includes a commitment to work with
the Friends of the Southwest Duck Pond on improvements to the Duck Pond, and to coordinate
with them for arts events at the Duck Pond. As this case moves forward, the Applicant will
continue to engage with these stakeholders in refining the Projects community amenities
package.

V.

COMPLIANCE WITH COMPREHENSIVE PLAN


The proposed PUD and Zoning Map Amendment application is consistent with and

fosters numerous policies and action items enumerated in the Comprehensive Plan.

The

Comprehensive Plan includes recommendations for specific areas of the District, Area Elements,
which outline specific goals and needs that are unique and particular to different neighborhoods
and communities in the District. The Comprehensive Plan also includes District elements, which
apply to all District properties.
The purposes of the Comprehensive Plans District elements are to:
1) Define the requirements and aspirations of District residents, and
accordingly influence social, economic, and physical development;
2) Guide executive and legislative decisions on matters affecting the
District and its citizens;
3) Promote economic growth and jobs for District residents;
4) Guide private and public development in order to achieve District
and community goals;
5) Maintain and enhance the natural and architectural assets of the
District; and

49

6) Assist in the conservation, stabilization, and improvement of each


neighborhood and community in the District.
D.C. Code 1-306.01 (2006).
The Proposed Development significantly advances the purposes of the District-wide
elements and the Area Element by furthering the social and economic development of the
District through the redevelopment of an underutilized site into a new mixed-use complex with
approximately 136 residential units, arts-related uses, non-profit offices, educational space, and
numerous other public benefits.
A.

District -Wide Elements


1.

Land Use Element

The PUD project and Zoning Map Amendment application further the goals of the
following Comprehensive Plan Land Use Element policies.
Policy LU-1.4.3: Zoning of Infill Sites. Ensure that the zoning of vacant infill
sites is compatible with the prevailing development pattern in surrounding
neighborhoods. This is particularly important in single family and row house
neighborhoods that are currently zoned for multi-family development. 307.7.
Policy LU-2.1.1: Variety of Neighborhood Types. Maintain a variety of
residential neighborhood types in the District, ranging from low-density, single
family neighborhoods to high-density, multi-family mixed use neighborhoods.
The positive elements that create the identity and character of each neighborhood
should be preserved and enhanced in the future. 309.5.
Policy LU-2.2.4: Neighborhood Beautification. Encourage projects which
improve the visual quality of the Districts neighborhoods, including landscaping
and tree planting, facade improvement, anti-litter campaigns, graffiti removal,
improvement or removal of abandoned buildings, street and sidewalk repair, and
park improvements. 310.5.
Policy LU-2.3.4: Transitional and Buffer Zone Districts. Maintain mixed use
zone districts which serve as transitional or buffer areas between residential and
50

commercial districts, and which also may contain institutional, non-profit,


embassy/chancery, and office-type uses. Zoning regulations for these areas
(which currently include the SP-1 and SP-2 zones) should ensure that
development is harmonious with its surroundings, achieves appropriate height and
density transitions, and protects neighborhood character. 311.6.
The Project proposes to redevelop a property that was previously underutilized and has
sat unutilized since 2010. The Project will reinfuse life into this corner of Square 498, provide
housing near public transit, and continue the unique development pattern found in the Southwest
with the construction of a high-rise tower and low-rise fellow housing. The PUD project will
further improve the existing streetscape through landscaping, tree planting, and the addition of
visually stimulating artistic elements to the street level front faade and Shakespeare-inspired
courtyard and landscaping elements. Moreover, the development, as an SP-2-zoned project with
residential units and non-profit art related uses, provides the ideal transition between the highdensity PUD-approved, C-3-C development by Mill Creek Residential Trust, one block south of
the Property, and the low-density townhouse residential development north of the Property.
In addition to the above, the Proposed Development also aligns with other Land Use
Element goals. The Land Use Element encourages development near Metrorail stations as
anchors for economic and civic development (LU 1.3.1: Station Areas as Neighborhood
Centers), as the greatest opportunities for infill development and growth (LU 1.3.2:
Development around Metrorail Stations), and as pedestrian-oriented nodes (LU 2.4.5:
Encouraging Nodal Development). The Proposed Developments proximity to the Waterfront
Metrorail station (0.3 miles) and the LEnfant Metrorail Station (0.4 miles) perfectly represents
the sort of transit- and pedestrian-oriented infill development promoted by the Land Use
Element.
2.

Environmental Protection Element

The Comprehensive Plans Environmental Protection Element includes the following


policies furthered by this project:

51

Policy E-1.1.1: Street Tree Planting and Maintenance. Plant and maintain street trees
in all parts of the city, particularly in areas where existing tree cover has been reduced
over the last 30 years. Recognize the importance of trees in providing shade, reducing
energy costs, improving air and water quality, providing urban habitat, absorbing noise,
and creating economic and aesthetic value in the Districts neighborhoods. 603.4.
Policy E-1.1.3: Landscaping. Encourage the use of landscaping to beautify the city,
enhance streets and public spaces, reduce stormwater runoff, and create a stronger sense
of character and identity. 603.6.
Policy E-2.2.1: Energy Efficiency. Promote the efficient use of existing water supplies
through a variety of water conservation measures, including the use of plumbing fixtures
designed for water efficiency, drought-tolerant landscaping, and irrigation systems
designed to conserve water. 609.3.
Policy E-3.1.1: Maximizing Permeable Surfaces. Encourage the use of permeable
materials for parking lots, driveways, walkways, and other paved surfaces as a way to
absorb stormwater and reduce urban runoff. 613.2.
Policy E-3.1.2: Using Landscaping and Green Roofs to Reduce Runoff. Promote an
increase in tree planting and landscaping to reduce stormwater runoff, including the
expanded use of green roofs in new construction and adaptive reuse, and the application
of tree and landscaping standards for parking lots and other large paved surfaces. 613.3.
Policy E-3.1.3: Green Engineering. Promote green engineering practices for water and
wastewater systems. These practices include design techniques, operational methods, and
technology to reduce environmental damage and the toxicity of waste generated. 613.4.
Policy E-3.2.1: Support for Green Building. Encourage the use of green building
methods in new construction and rehabilitation projects, and develop green building
methods for operation and maintenance activities. 614.2.
The Proposed Development provides a quality LEED Silver building that includes green
roofs, lush landscaping, methods to reduce stormwater runoff, and green engineering practices,
and is thus fully consistent with the Environmental Protection Element and the policy goals listed
above.
3.

Urban Design Element

The Comprehensive Plans Urban Design element includes the following policies, which
are furthered by the PUD project and Zoning Map Amendment application.

52

Policy UD-2.2.1: Neighborhood Character and Identity. Strengthen the defining visual
qualities of Washingtons neighborhoods. This should be achieved in part by relating the
scale of infill development, alterations, renovations, and additions to existing
neighborhood context. 910.6.
Policy UD-2.2.5: Creating Attractive Facades. Create visual interest through welldesigned building facades, storefront windows, and attractive signage and lighting. Avoid
monolithic or box-like building forms, or long blank walls which detract from the human
quality of the street. (see Figure 9.12.) 910.12.
Policy UD-3.1.1: Improving Streetscape Design. Improve the appearance and identity of
the Districts streets through the design of street lights, paved surfaces, landscaped areas,
bus shelters, street furniture, and adjacent building facades. 913.8.
The superior architectural design and quality of materials used in the Project will set a
new standard in development for this section of I Street SW, while linking with the modern highquality architectural standard found one block south of the Property. The ground level window
art screens will activate the faade of the building and strengthen the I Street corridors
burgeoning artistic identity. Additionally, the landscaping and courtyard art installations will
enhance the pedestrian experience in the area.
In addition to the policies listed above, the Project will help to strengthen the
architectural quality of the immediate neighborhood by relating the Projects scale to the existing
neighborhood context, of both existing and approved development projects. See Policy U.D2.2.7: Infill Development. The Project is also consistent with the goals of Policy UD-3.2.5:
Reducing Crime Through Design, since the development will bring additional eyes and ears to
the street, as well as improved lighting, clear lines of sight, and visual access, all of which will
help minimize the potential for criminal activity in the immediate area.
4.

Arts and Culture Element

The Arts and Culture Element of the Comprehensive Plan recognizes the importance of
the arts to the District and identifies some of the unique challenges facing the art community.
The Arts and Culture Element is a guiding principle for the policies outlined in the
Comprehensive Plan. The Arts and Culture Element states in pertinent part:
53

The ability of arts organizations and artists to thrive in our city is dependent on
having suitable production, performance, and exhibition space. The required
facilities include studios, rehearsal halls, theaters and concert halls, dance
rehearsal and performance spaces, exhibition spaces and galleries, multipurpose
centers, classrooms, administrative offices, and art storage facilities, among
others. Many of these facilities are completely absent in large parts of the city,
especially in East of the River neighborhoods. Where they do exist, they may be
threatened by rising rents and redevelopment pressure. AC-1 Creating and
Enhancing Arts and Cultural Facilities. 1402.1.
It also states:
The city faces a persistent need for the retention and further development of
affordable neighborhood arts facilities.
A directed program of facility
development, maintenance, and expansion is needed to foster a more stable arts
community. AC-1.1 Expanding Neighborhood Arts and Cultural Facilities.
1403.1.
The above principles recognize and identify the unique challenges artist and art
organizations face in the District.

Particularly, as STC has personally experienced, it is

extremely challenging to find affordable space to operate in and utilize. The challenges the art
community faces in finding suitable space adds an additional layer of complexity in the attempts
of many District artists to establish or expand neighborhood arts and cultural facilities. The
proposed Project directly addresses the guiding principles above and furthers the policies listed
below.
Policy AC-1.1.2: Development of New Cultural Facilities. Develop new
neighborhood cultural facilities across the District, providing affordable space for
grass roots and community arts organizations. Provide technical and financial
assistance to organizations to help plan and build such facilities. 1403.3.
Policy AC-1.1.3: Distribution of Facilities. Promote improved geographic
distribution of arts and cultural facilities, including development of arts facilities
and venues east of the Anacostia River and in other parts of the city where they
are in short supply today. 1403.4.
Policy AC-1.1.5: Siting of Facilities. Support the siting of arts facilities in
locations where impacts upon nearby uses can be most easily managed. Give
preference to locations near public transit, or sites where shared parking facilities
54

are available. Conversely, ensure that appropriate parking and transit access
improvements are made when arts and cultural venues are developed. 1403.6.
Policy AC-1.1.6: Performance and Events in Non-Traditional Settings.
Encourage the provision of spaces for performances and art events in
neighborhood parks, community centers, schools, transit stations, residential
developments and public areas in private development. This can help reach new
audiences and increase access to the arts for people in all parts of the city.
1403.7.
Policy AC-3.1.1: Affordable Artist Housing. Include provisions for arts
professionals in the Districts affordable housing programs. 1409.4.
Policy AC-3.2.1: Promoting Cultural Amenities. Promote the development of
cultural amenities beyond the Mall in an effort to more fully capitalize on the
economic benefits of tourism for District residents, businesses, and
neighborhoods. 1410.4.
Policy AC-4.2.1: Private Sector Partnerships. Develop partnerships with the
private sector to encourage monetary and non-monetary support for the arts, as
well as sponsorships of arts organizations and events. 1413.4.
Policy AC-4.4.2: Partnerships with Educational Institutions. Strengthen
collaborations among artists, arts organizations, teachers, school administrators
and others to expand the resources of the arts community and broaden the reach of
arts and culture. 1415.4.
Policy AC-4.4.4: Participation of Artists. Support and increase the participation
of artists in the Districts arts education programs. 1415.6.
The Proposed Development embodies the goals and policies outlined in the Arts and
Culture Element. The Project, a joint initiative between a renowned District theatre company
and a private sector development partner, will provide STC with fellow and actor housing,
rehearsal studios, educational space, and non-profit office space. Arts and Cultural Elements
Policy and Action AC 1 and AC 1.1, referenced above, make clear that initiatives such as the
Development Project are needed to foster a more stable arts community. Furthermore, as a
part of the Proposed Development benefits package, STC will expand its educational outreach
programs to a local elementary school and financially support and participate in the annual SW
55

ArtsFest as a way to expose more community members to theatre in a nontraditional setting. The
Proposed Development is the embodiment of many of the Arts and Cultural Elements goals as
expands artistic space in the Southwest neighborhood, increases the artistic presence on I Street
SW, and increases arts awareness and education through its proposed programming.
5.

Other Elements

This PUD application is also consistent with policies in the Housing and Transportation
Elements of the Comprehensive Plan. The Housing Element calls for balanced growth, mixeduse development and for more even distribution of mixed-income housing across the District.
See H-1.1.3: Balanced Growth; H-1.1.4: Mixed Use Development; and H-1.2.3 Mixed Income
Housing. The Proposed Development advances those policies through the provision of a mixed
used residential development, which includes 9 new affordable housing units and 34 actor and
fellow housing units, which as AC-3.1.1: Affordable Artist Housing implies, is a type of
affordable housing.
The Transportation Element encourages pedestrian oriented development around transit
stations. See T-1.1.4: Transit-Oriented Development. As discussed above, the Proposed
Development is transit oriented and ideally situated with easy access to two Metrorail Stations.
B.

Compliance with Area Elements

The Property is located within the Lower Anacostia Waterfront/Near Southwest Area
Element. This Element recommends the development of new waterfront neighborhoods near the
Southwest Waterfront. One of the most notable recommendations for the Southwest Area is:
Policy AW-2.1.1: Mixed Use Development. Support the redevelopment of the
Southwest Waterfront with medium to high-density housing, commercial and
cultural uses, and improved open space and parking. The Future Land Use Map
shows high-density development and it is expected that the project will capitalize
on height opportunities to provide public spaces and, where appropriate, a mix of
medium development density in order to transition to the surrounding
neighborhoods. The development should be designed to make the most of the
waterfront location, preserving views and enhancing access to and along the
shoreline. 1911.7.
56

The Proposed Development furthers this policy goal. It will provide a transitional mixeduse development between the higher-density C-3-C to the south and the residential communities
to the north of the Property.
C.

Compliance with the Southwest Neighborhood Plan

As stated above, the SW Plan is a Small Area Plan that provides a framework for future
development in the Southwest. This plan reflects community aspirations, District-wide goals,
and market opportunities. The SW Plan is organized around a series of visions, including
continuing to serve as a model community for equity and inclusion, reinforcing the neighborhood
design as a Modernist Gem, providing a green oasis in the District, supporting the Southwest
as an arts and cultural destination, developing a thriving town center, optimizing the
development or redevelopment of District-owned parcels of land, and providing vibrant
pedestrian and other transportation connections that support an active community and attractive
environment. SW Plan, pages 5-8.
The SW Plan extends from South Capitol Street to Maine Avenue SW; from P Street SW,
north to the I-395 Freeway (Planning Area). SW Plan, page 11. The Planning Area is separated
into a focus area and a secondary area. The Property is a part of the Focus Area which contains
the Plans development opportunity sites, primary urban design issues and new development
context. Id. It should be noted, that the SW Plan does not include the Property in the secondary
area, where neighborhood conservation, neighborhood connectivity and sustainability are the
principal focus. Id.

57

The Proposed Development is specifically noted on page 97 of the SW Plan as a Key


Site; however, no specific recommendation or change to the Comprehensive Plan is made. The
Proposed Development is not inconsistent with the intentions stated in the SW Plan for this site
and furthers many of the specifically identified visions and Goals of the Southwest
Neighborhood.
1.

Southeastern University Site

The SW Plan states, [t]his site is a preferred location for an arts and cultural use as it
complements and augments the growing arts already in Southwest and further anticipated Plans
vision for cultural uses along Eye Street. The Proposed Development dedicates 35% of the
building to the arts and cultural use of STC. Moreover, the extensive public benefits include
educational and performing arts-related programs analogous to the prior institutional use. The
SW Plan notes, [t]he site itself is currently designated Institutional on the Comprehensive
Plan Future Land Use map which is in keeping with this historic educational and non-profit
uses. The proposed use will be less intensive than the 870 students and 140 staff that utilized
the SEU campus for 37 years.
The community expressed an understanding of the theaters need for additional space
and recognized the merits of having a world class theatre headquartered in Southwest. As
outlined in Section III.A herein, the Applicant has worked with the community over the past two
58

years to modify the height, massing, and design to be more compatible with the surrounding
vicinity.
The SW Plan does not make a recommendation for a land use designation change;
therefore, the Commission must reflect back to 10A DCMR 226(h) when evaluating a change
in use on an institutional site. As more specifically outlined above, the Proposed Development is
comparable in density or intensity to those in the vicinity and, as further illustrated below, is
consistent with the goals of the Small Area Plan. 10A DCMR 104.2 and 104.8.
2.

Vision and Goals: An Arts and Cultural Destination

As set forth in detail throughout this statement, the Proposed Development will further
the visions for the Southwest Neighborhood. In particular, the Proposed Development will
further the specific goals articulated in the SW Plan for the Southwest to become an art and
cultural destination. Those goals include building and marketing using existing assets and
institutions to reinforce the concept of an arts and cultural destination, strengthening I Street as
an arts and culture corridor, and growing the presence of the arts throughout the Southwest
quadrant. SW Plan, page 6.
With the above vision and goals in mind, the SW Plan specifically identifies the Property
as a Key Site and a preferred destination for an art-related use. The SW Plan states that, [t]he
Southeastern University site can be designated for redevelopment to bookend one side of the I
Street cultural corridor, remain sensitive to its context, and include an institutional/cultural
use and possibly artist housing. (emphasis added). Although the SW Plan does not designate a
change in the density or intensity of the Property, the Proposed PUD and Zoning Map
Amendment Application is appropriate for the site, as discussed at length above, and reflects the
SW Plans goal for the site. The Project furthers several of the arts and cultural goals for the
Southwest stated in the plan.

Goal: Strengthen I Street as a cultural corridor. SW Plan, page 6.


Goal: Grow the presence of the arts throughout the Southwest neighborhood. Id.
59

AC.5 Encourage the creation of incubator space for local arts organizations or
other creative entrepreneurs (e.g., web designers, film editing, production,
culinary space, etc.) or local business start-ups on the ground floors of new
buildings on M and I Streets. SW Plan, page 96.
3.

Design Guidelines

In addition to proposing a project that aligns with the preferred use for the
Property, the Project complies with the numerous Design Guidelines set forth in the SW
Plan.
Principle 1: Encourage a mix of building heights. Provide a massing and mix of defined
building heights which complement and uphold the current mixture of high-rise and lowrise buildings. Particularly on large sites, this mix should include the provision of
rowhouses and high-rise buildings, and avoidance of mid-rise building forms.
Principle 2: Achieve design excellence for high quality and timeless development.
Achieve high quality development and the creation of attractive buildings and landscapes
through design excellence by using distinguished architecture, durable high quality
materials and detailing, and advanced sustainable design.
Principle 3: Promote variation in building frontages along streets with continuous
massing. Promote cohesive building forms and design, while incorporating articulation in
the building and landscape design. This will ensure a pedestrian-scale of development
and lessen the perceived length of high-rise buildings or rowhouse groupings. Blank,
unarticulated walls should be avoided, particularly along streets and pedestrian ways
Principle 4: Enhance green space through landscaped perimeters and internal green or
amenity spaces. Support Southwests vibrant green character through the provision of
publicly visible landscaped perimeters; internal green or amenity spaces; and landscaped
setbacks appropriate to the streetscape, particularly for high-rise structures.
Principle 5: Incorporate sustainable building and site design. Employ a range of
innovative sustainable design strategies and building standards to promote a high
performing environment that encourages healthy living, energy efficiency, and
stormwater management.
Principle 6: Ensure parking is not a detractor. Locate vehicle parking underground, or in
above-grade structures that are visually buffered from the street and adjacent properties.
60

Services such as parking and loading access should avoid the interruption of street-facing
building fronts or communal open space
Principle 7: Maximize transparency and viability of ground floor uses along key
commercial corridors. For high-rise structures, provide vibrant ground-floor uses and
street-level design that promote pedestrian-oriented usage, particularly on M Street, 4th
Street and South Capitol Street. Southwest Plan, pages 81-84.
As discussed previously in this statement, the Proposed Project incorporates the SW
Plans design guidelines and clearly aligns with the SW Plans intent for development.
4.

Other SW Plan Goals

The Proposed Development also furthers other specific goals of the SW Plan:
GO.8 Increase the tree canopy in the Southwest Planning Area from 25 percent
to 37 percent with the addition of trees in all new developments, streetscape
improvements and potentially at existing parks, such as Lansburgh. The creation
of larger setbacks for new developments may allow for more tree planting
opportunities. Ensure that any diseased trees are removed and replaced at
appropriate times.
GO.11 Reduce stormwater runoff by transforming key areas of existing
impervious surfaces to pervious materials and encouraging bioretention and
landscaping.
GO.13 Maximize open spaces, vegetation and sustainable practices in new
developments achieved through Planned Unit Developments (PUDs). (See also
Design Guidelines on pages 81-83.)
The Proposed Development is an environmentally conscientious development with
thoughtful and lush greenspaces, including green roofs. Thus, the Proposed Development meets
all of the objectives listed above.

61

VI.

COMMUNITY OUTREACH
The Applicant began its outreach to the Southwest Community six months before

acquiring the Property. Since April of 2014, representatives of STC and/or EDC have met with
the following organizations:

Advisory Neighborhood Commission 6D

Near Southeast-Southwest Community Benefits Coordinating Council

Southwest Neighborhood Assembly

Residents of Townhouse Management I and Townhouse Management IV

Waterfront Gateway Neighborhood Association


Additionally, the Applicant has held five meetings open to the public and advertised via

the ANC and SWNA, all of which were well attended. Finally, the Applicant conducted a
telephone town hall meeting, during which it provided an overview of the proposed development
and took questions from residents. The Applicant advertised this telephone town hall, via a
direct mail to local residents. The Applicant has attached a comprehensive list of community
meetings and outreach as Exhibit I.

VII.

CONCLUSION
In deciding a PUD, the Commission must judge, balance, and reconcile the relative value

of the project amenities and public benefits offered, the degree of development incentives
requested, and any potential adverse effects according to the specific circumstances of the case.
11 DCMR 2403.8. We respectfully submit that any potential adverse effects of the Proposed
Development are outweighed by the high-quality amenities of the Project, including but not
limited to, the provision of affordable housing in a transit rich area, and the construction of a
Silver LEED certified building that follows the high-low design guidelines of the SW Plan.
Further, the development incentives being requested by the Proposed Development are
conservative and do not attempt to maximize the massing incentives provided through the PUD
process.
62

THE
S

BARD
T

P L A N N E D

REDEVELOPMENT
W

U N I T

D.

C.

D E V E L O P M E N T

February 3, 2016

Owner

THE BARD, A JOINT DEVELOPMENT BETWEEN ERKILETIAN DEVELOPMENT


C O M P A N Y A N D T H E S H A K E S P E A R E T H E A T R E C O M P A N Y, L L C
Land Use Counsel

G R I F F I N , M U R P H Y, M O L D E N H A U E R , & W I G G I N S , L L P
Architect

S H A L O M B A R A N E S A S S O C I AT E S , P C
Landscape Architect

PARKER RODRIGUEZ INC


Traf fic Engineer

G O R O V E / S L A D E A S S O C I AT E S , I N C
Civil Engineer

BOHLER ENGINEERING

DRAWING INDEX

THE

DI AG R A M S & DE V E L O P M E N T DATA

1.1
1. 2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17

DR AWING INDE X
AERIAL CONTE X T VIE W
NEIGHBORHOOD CIRCUL ATION
SITE PHOTOGR APHS
SITE PHOTOGR APHS
ZONE BOUNDARY SITE PL AN
NEIGHBORHOOD BUILDING HEIGHT SITE PL AN
ZONING HISTORY
NEIGHBORHOOD DE VELOPMENT
PROJECT DE VELOPMENT
DE VELOPMENT HEIGHT
DE VELOPMENT DATA
SITE PL AN
SITE CIRCUL ATION DIAGR AM
COURTS PL AN
BLOCK ELE VATIONS
BLOCK SECTIONS

IMAGES

2.1
2. 2
2.3
2.4

AERIAL VIE W FROM NW


6TH AND H STREE T VIE W LOOKING SOUTH
6TH STREE T VIE W FROM NW
6TH AND E YE STREE T VIE W FROM SW

BUILDING PLANS

3.1
3. 2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15

FLOOR PL AN - GROUND LE VEL


FLOOR PL AN - LE VEL 1.5
FLOOR PL AN - LE VEL 2
FLOOR PL AN - LE VEL 3
FLOOR PL AN - LE VEL 4
FLOOR PL AN - LE VEL 5
FLOOR PL AN - LE VEL 6
FLOOR PL AN - LE VEL 7
FLOOR PL AN - MECHANICAL PENTHOUSE
FLOOR PL AN - ROOF PL AN
FLOOR PL AN - LE VEL B1
FLOOR PL AN - LE VEL B2
BIKE PARKING - LE VEL B2
AFFORDABLE UNIT DISTRIBUTION
SHADOW STUDIES

BARD

S o u t h w e s t

LANDSCAPE

4.1
4. 2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14

BU IL DING S EC T IO N S & E L E VAT IO N S

5.1
5. 2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14

SECTIONS
SECTIONS
SECTION E
MATERIAL SELECTIONS
ELE VATIONS
ELE VATIONS
FACADE T YPE 1
FACADE T YPE 1
FACADE T YPE 2
FACADE T YPES 3 & 4
FACADE T YPES 3 & 4
FACADE T YPE 5
FACADE T YPE 6
FACADE T YPE 7

CIVIL DR AWINGS

6.1
6. 2
6.3
6.4
6.5
6.6
6.7
6.8

E XISTING CONDITIONS PL AN
SITE /GR ADING PL AN
UTILIT Y PL AN
STORMWATER MANAGEMENT/GREEN ARE A R ATIO PL AN
STORMWATER MANAGEMENT NARR ATIVE
EROSION & SEDIMENT CONTROL PL AN
TRUCK TURNING MANEUVERS
TRUCK TURNING MANEUVERS

REDEVELOPMENT
W a s h i n g t o n ,

PUBLIC L ANDSCAPE CONCEP T


COMPOSITE PL AN
GROUND LE VEL
COURT YARD L ANDSCAPE
COURT YARD MATERIAL SELECTIONS
6TH STREE T PARTERRE G ARDENS
E YE STREE T L ANDSCAPE
E YE STREE T ART PANELS
LE VEL 1 ROOF
LE VEL 4 ROOF
LE VEL 6 ROOF
LE VEL 7 ROOF
MECHANICAL PENTHOUSE ROOF
G AR SCORECARD

DRAWING INDEX
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

7.1

LEED
LEED SCORECARD

shalom baranes associates

architects

PUD SUBMISSION

1.1

7TH STREET SW

G STREET SW

SW DUCK
POND

SW

ARENA
STAGE

K STREET SW

RE A
VE S
W

EN

AWA

AV

DEL

EYE STREET SW

3RD STREET SW

IN

4TH STREET SW

SITE

6TH STREET SW

H STREET SW

L STREET SW

WATERFRONT
METRO
M STREET SW
0 25 50

100

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

AERIAL CONTEXT VIEW


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1. 2

M
SMITHSONIAN

1
CAPITOL SOUTH
M

FEDERAL CENTER
M

LENFANT PLAZA
M M

1/2 MILE
1/4 MILE

395/695

3RD ST. SW

P6

G ST. SW

EYE ST. SW

E
AV

SW

WATERFRONT
M

M METRORAIL STOP
CAPITOL BIKESHARE

M ST. SW

METRO BUS

# CARSHARE LOCATION AND


NUMBER OF VEHICLES

THE

BARD

S o u t h w e s t

NAVY YARD
M

REDEVELOPMENT
W a s h i n g t o n ,

SOUTH CAPITOL STREET

AI

KEY

A42,
A48,
A46

V1

4TH ST. SW

7TH ST. SW

74, V1,
A42,
A48,
A46

6TH ST. SW

N E I G H B O R H O O D C I R C U L AT I O N
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

250

500

1000

shalom baranes associates

architects

PUD SUBMISSION

1.3

1
2

1 6TH AND M STREET LOOKING NORTH

H
4T

W
.S
T
S


EYE

ST
.S

ST
.S


6T

3 EYE AND 4TH LOOKING WEST

4 4TH AND G STREET LOOKING SW

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

SITE PHOTOGRAPHS
D . C .


ST. S 2 DUCK POND LOOKING NW
W

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.4

1 EYE AND MAKEMIE LOOKING NW


K ST.
SW

2
2 6TH AND K STREET LOOKING NORTH

6T

.S
ST


EYE

BARD

S o u t h w e s t

3 EYE AND 6TH STREET LOOKING NE

REDEVELOPMENT
W a s h i n g t o n ,

SITE PHOTOGRAPHS
D . C .

SW

4 6TH AND H STREET LOOKING SOUTH

THE

ST.

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.5

R-5-B

R-5-B

R-5-C

7th Street SW

G Street SW

R-3

R-4
R-5-B

H Street SW

R-5-B

R-5-C

PROPOSED
SP-2 PUD

R-5-C

Eye Street SW

ai

R-3

R-5-D

W-1

R-5-D

R-5-A

awa

C-3-C

L Street SW

Del

C-3-C

C-3-C

3rd Street SW

6th Street SW

R-5-B

4th Street
SW

K Street SW

re A
ve S
W

ee

tr

ve
A

e
at
W

C-3-A

CR

R-5-B

C-3-A

S I T E B O U N D A RY

M Street SW

W-1

Z O N E B O U N D A RY
FUTURE DEVELOPMENT

R-5-B

CURRENT PUD

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

R-3

R-5-D

R-3

R-5-D

ZONE BOUNDARY SITE PLAN


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

R-3

shalom baranes associates

architects

PUD SUBMISSION

1.6

9 st

9 st

G Street SW

7th Street SW

6 st

3 st
3 st

3&4 st
9 st

H Street SW
3&4 st

3 st
3 st
3.5 st

4 st
4.5st

9 st

4st
6st

9 st
2 st

2.5 3.5 2.5 st


st st

6 st

7st

Eye Street SW

ai

M
10 st

8 st
13 st

9 st

8 st
13 st

9 st

8 ST

awa

9 st

K Street SW
3rd Street SW

8 ST

4th Street
SW

3 ST
88 ft

6th Street SW

10 st

L Street SW

Del

12 st

13 st

ee

tr

2 ST
69 FT

re A
ve S
W

10 st

ve
A

e
at
W

9 ST

9 st
11 st

11 st

M Street SW

B U I L D I N G S U N D E R 3 S T O RY S
B U I L D I N G S 6 - 1 2 S T O RY S
FUTURE DEVELOPMENT

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

NEIGHBORHOOD BUILDING HEIGHT SITE PLAN


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.7

22

VE

Mixed
SE Land Use

ST

ST

M Stadium-Armory

19TH

ST

S o u Parks,
t h w Recreation,
e s t
W
s h Space
i n g t o n ,
andaOpen
A

4
6

5
7

D . C .

S PL SE

ST SE
L
INTERSTAT E
SE

18TH

17TH

14TH

13TH

12TH

ST SE

19TH

PE
NN
SY
LV
AN
IA

29 5

N
AW
G
L
R
S
I
FA P ST SE T S
E

A
OT

E
AV

10

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

ST

SE

22ND

16TH ST SE

ES
INN

ST SE

COS
T IA

CH AVE
OL
SO
N
S

SE

NI

SE

19TH

v
i
R

er

SE

SE

ST

O ST SE

TE
WA

SE
ST

ST

SE
PARSONS

N ST SE

10TH

AVE

SE

ST

SICARD

ZONING HISTORY
8

ND

ST

SE

ST

ST
16TH

ST

SE

SE

ST

ST

ST

ST

SE

SE

SE
ST

SE

ST

ST
11TH

10TH

8TH
7TH

15TH

SE
ST

ST

SE

ST
9TH

ST

ST

SE

SE

SE
SE

ST
6TH

SE
ST
5TH

4TH

SE

SE

SE
ST
SE

SE

AN A

SE

ST SE

R ESED E V E L O P M E N T
ND

SE

BARD

Institutional
AVE

SE

THE

Local
SE Public Facilities
SE

16TH

ST

A
OM
T
PO

Potomac
Ave
AVE

ST SE

15TH

ST Federal

SE

SE

SE

NE Production, Distribution, and Repair

ST

ST

SE

ST
ST

22

M Stadium

18TH

Water

SE

SE

AVE

17TH

Medium Density Commercial

20TH

ST

1ST

Parks, Recreation, and Open Space

ST

AV

D intentional mix
A defining feature of the Southwest District is an
of moderate density and high density residential. The Design
Guidelines of the recently passed Southwest Plan encourage a mix
of high-rise and low-rise buildings, particularly on large sites, to
complement this existing design feature.

Institutional

Mixed Land Use

ST NE

O ST SE

SW

Moderate Density Commercial


C

2ND

SE
ST

HALF

SW

ST

SE

N PL SE

1ST

ETT
S

ONE BLOCK
ISAAC HULL AVE SE

CAN
AL

ST
26TH
NE

23RD

ST

Local Public Facilities

OMA
L AH
OK

21ST

17TH PL NE

ST

ST

Federal

ST

SE

SE

AVE

A
LI N
A RO

TINGEY

Production, Distribution, and Repair

NE

L ST SE

Yard

P ST SE

ST

I PL SE

Navy

NE

NE

ST

17TH ST NE

E ST NE

ST SW
ST High Density Commercial
SW
O

AVE
SE

SE

TH
SOU

Eastern
Market

High Density Commercial

SE

26TH
NE

4TH

PL N
E
24TH
ST NE

18TH

NE

High Density Residential

NE

ST

14TH PL NE
ST
NE
E

AV

ETT
S

RD

Medium Density Residential

F ST NE

AV

ST

Moderate Density
Residential
NE

ST

1ST ST

SE
ST

HALF ST

SW

A VE

ST SW

NE

ST

ING

3RD ST

ST

SW

DELAWA
RE
ST S
W
ST SW

6TH

3RD

ST
19TH

NE

2ND

IV
Y

SW

24TH ST NE

4TH

SW
RD
A

NE

ST

ST

Low Density Residential


BENN

NE

NE

NE H

NE

RD

ST

TAP
LES

AV

Medium Density Commercial

NE

SE

SE

ST SW

UR
EN
SB
BL

AD

ST
7TH

NE
ST

NE

16
TH

High Density Residential

ST

NE

NE

ST
HO
LB
RO
OK

1ST

RD

SW
ST
9TH

NE

AV
E

NE

AV

ST

Medium Density Residential

SE

SE

NE
ND ST
22

APITOL
NE

SE

N ST SE

Moderate Density Residential

ST

YOUN

ST

N ST SW

Low Density Residential

LIN
RO

INDEPENDENCE

A
ACH
US

SE

CA

ST

6
H ST S E 95

SE

AVE

MA
SS

E
AV

RD

ST

NE

Low Density Commercial

NE

NE
Map 7

Low Density Commercial

E
AV

SE

ST

ST SW

SE

I VE

F ST SE

SE

RD

SW

Moderate Density Commercial


ST MAP 7 - GENERAL
FUTURE
LAND USE
VICINITY MAP
I
N

NE

SW
NE

Map 7

CAPITOL

CRABTREE
E
AV
GALES

CRABTREE

Waterfront-SEU
LYMAN
PL NE

Comprehensive
Plan
LANG PL NE
EME ADOW
L ST NE
Future
Land Use
NE

ST

NE

SOUTH

ST

E
RD N

NST
E M

ST

NEST

ST

Z A LE

NE

SW

NE

GLE
EA

NE

NE

NE

ST

SW

PL

RD

ST

ST

E ST SW

RD

395
V IR G
Comprehensive
Plan
I NI A
ME ADOW
SW
Future
Land UseINTERSTATE

R ST NE

E
AV

GS

E ST SW

ST SE
E

RAND PL NE
INT ERSTA TE

ER
AT
W

AU
M

1/4 MILE

T ST NE

S ST NE

VET

Capitol South

H
RT
O
N

SE

A VE

O LI

Federal Center SW

ST

L'ENFANT PROMENADE SW

ST SW

VIRG
INIA
AVE
SW
M SW

E
JERS

12TH

C ST SW

NEW

TN
KS

ST

ST

L'Enfant
E
TN
Plaza
IE S
OK

WIC
FEN
NE

NE

SW

M Smithsonian

ST

Y
CK
NT U
KE

VE
DA
N
A
YL
AR
INDEPENDENCE AVE M
SW

shalom baranes associates

architects

PUD SUBMISSION

1.8

EXCERPT FROM SOUTHWEST NEIGHBORHOOD PLAN:

THE BARD COURTYARD ALONG 6TH STREET

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

NEIGHBORHOOD DEVELOPMENT
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.9

VIEW F R O M M A K E M I E P L A C E S W L OOKING NORTHWEST

VIEW FROM EYE STREET SW LOOKING WEST

VIEW FROM 6TH STREET SW LOOK I N G S O U T H

PROJECT DEVELOPMENT

FAR

FAR 6.50 4.63 4.49 4.09


ALLOWABLE APRIL
SP-2 (PUD)
2014

THE

BARD

S o u t h w e s t

JUNE
2015

HEIGHT
900 + 186

UNIT
COUNT
183

AV E R A G E
UNIT SIZE
652

4.63
4.49

163,861 SF

900 + 186

177

652

4.09

149,298 SF

732 + 186

136

776

FEBRUARY
2016

REDEVELOPMENT
W a s h i n g t o n ,

A PRIL 2014
J UNE 2015
F EB. 2016

GROSS FLOOR
AREA
169,070 SF

PROJECT DEVELOPMENT
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.10

LEVEL 4
ROOF +4111

MECH. PENT.
ROOF +186
ABOVE 732

10 STORIES
1000
+186 P.H.

LEVEL 7
ROOF +732

LEVEL 6
ROOF +624

LEVEL 4
ROOF +4111
4 STORIES
400
3 STORIES
320

M.P. 230

2.5 STORIES
272

3.5 STORIES
318
3 STORIES
318

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

DEVELOPMENT HEIGHT
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.11

ZONING TABULATIONS
DCMR
TITLE 11 ZONING
FAR

PROJECT DATA
DEVELOPMENT STANDARDS
R-3 (EXISTING)

402,531

GROSS FLOOR AREA

NONE PRESCRIBED

NONE PRESCRIBED

(FAR SF, NOTE 1)

SP-2

SP-2 PUD (DCMR CHAPTER 24)

PROPOSED DEVELOPMENT

6.0

6.5

TOTAL = 4.09

(NON-RESIDENTIAL = 3.5 MAX)

(NON-RESIDENTIAL = 4.5 MAX)

RESIDENTIAL = 3.60
NON PROFIT OFFICE = 0.49

218,856 SF

237,094 SF

TOTAL = 149,298 SF

(NON-RESIDENTIAL = 127,666 MAX)

(NON-RESIDENTIAL = 164,142 MAX)

RESIDENTIAL =131,273 SF
NON PROFIT OFFICE = 18,025 SF

RESIDENTIAL= 80%

SAME AS MATTER-OF-RIGHT

RESIDENTIAL= 77%

498
52
SP-2 PUD (PROPOSED)
36,476 SF RECORDED
36,485 SF MEASURED

NOTES
1

Gross Floor Area (GFA) includes a deduction of 2% for mechanical shafts, but does not include areas
for (1) bays projecting over the property line, (2) parking access ramps, and (3) spaces with structural
clearance less than 6'-6".
The proposed number of dwelling units is 136. The final dwelling unit count may vary by 10% per
flexibility requested. Proposed unit range = 126-148.
The proposed number of residential parking spaces is based on a unit total of 136. The final
residential parking count may vary by 10% per flexibility requested. Proposed residential parking
range = 32-37.

LOT OCCUPANCY

403, 532

(NIC GARAGE RAMP)(NOTE 9)

BUILDING HEIGHT

400, 530

40'-0
3 STORIES

90'-0

SAME AS MATTER-OF-RIGHT

73'-2" (7TH FLOOR ROOF)


62'-4" (6TH FLOOR ROOF)
41'-11" (4TH FLOOR ROOF)

For Non Profit office and Educational uses less then 30,000 GSF none is required per section 2201.

PENTHOUSE AREA

411, 537

0.37 FAR

0.37 FAR

SAME AS MATTER-OF-RIGHT

0.13 FAR (4,870 SF)

PENTHOUSE HEIGHT

530

20'-0"

20'-0"

SAME AS MATTER-OF-RIGHT

18'-6"

Educational Program Parking 2 spaces for 3 teachers. 3 spaces required for 7 teachers.
Classroom Parking 1 space for each 10 classroom seats. 6 spaces required for 60 seats.
Non Profit Office Parking in excess of 2,000 sq ft, 1 for each space for each additional 1,800 sq ft.
16 spaces required for 31,690 sq ft of office.
1 space for every 600 sq ft. 9 spaces required for 5,200 sq ft of art studio space.

PENTHOUSE SETBACK

530

1:1 RATIO

1:1 RATIO

SAME AS MATTER-OF-RIGHT

VARIES
RELIEF REQUESTED

Of the 34 spaces provided for non proffict office, art, and education uses, 11 are tandem spaces.

Ramp not included in building area, as it is below main floor. Per 11DCMR 534.4

ROW DWELLING, CHURCH OR


PUBLIC SCHOOL= 60%
ALL OTHER STRUCTURES= 40%

REAR YARD

404, 534

20'-0

2 1/2 IN/FT OF HT, 12'-0 MIN.


(15'-5" REQ'D AT 73'-2" HT)

SAME AS MATTER-OF-RIGHT

SIDE YARD

405, 535

NONE REQUIRED
(EXCEPT AS NOTED IN DCMR 405.1,
405.2 AND 405.6)

NONE REQUIRED
IF PROVIDED= 2 IN/FT OF HT, 8'-0" MIN.
(11'-10" REQ'D AT 70'-2" HT) @ MAIN TOWER,
(8'-0" REQ'D AT 47'-3" HT) @ FELLOW HOUSING

SAME AS MATTER-OF-RIGHT

COURTS
OPEN COURT

406, 536

WIDTH = 4 IN/FT OF HT
ONE FAMILY DWELLING = 6 FT MIN.
ALL OTHER STRUCTURES = 10 FT MIN.

NON - RESIDENTIAL USES


WIDTH = 3 IN/FT OF HT; 12 FT MIN.
RESIDENTIAL USES
WIDTH = 4 IN/FT OF HT; 15 FT MIN.

CLOSED COURT

406, 536

WIDTH = 4 IN/FT OF HT
ONE FAMILY DWELLING = 5 FT MIN.
ALL OTHER STRUCTURES = 15 FT MIN.

SAME AS MATTER-OF-RIGHT

AREA = 2 X THE SQUARE OF THE


REQUIRED COURT WIDTH; 350 SF MIN.

NON - RESIDENTIAL USES


AREA = 2X THE SQUARE OF THE REQUIRED WIDTH; 250 SQ FT
MIN.
RESIDENTIAL
USES

2101, 506

LOADING

2201

GREEN AREA RATIO

3400

INCLUSIONARY ZONING

2600

BIKE PARKING

802

BARD

S o u t h w e s t

RESIDENTIAL
1 PER DU

NONE REQUIRED

NOT PROVIDED

OPEN COURT #1
WIDTH = 10'-0" (RELIEF REQUESTED )
SAME AS MATTER-OF-RIGHT

AREA = 2X THE SQUARE OF THE REQUIRED WIDTH; 350 SQ FT


MIN.

CLOSED COURT #1: (IN LIEU OF REAR YARD)


WIDTH = 48'-0"
AREA = 2,571 SF

CLOSED COURT#1: WIDTH REQ'D =30'-8" AT 91'-8" HT


AREA REQ'D =1,881 SF

CLOSED COURT #2
WIDTH = 15'-0" (RELIEF REQUESTED )
AREA = 1,918 SF

CLOSED COURT#2: WIDTH REQ'D =21'-0" AT 62'-4" HT


AREA REQ'D =882 SF
PARKING

A COMPLIANT CLOSED COURT


(CLOSED COURT #1)
PROVIDED IN LIEU OF REAR YARD

20'-11" @ MAIN TOWER,


8'-1" @ ANNEX HOUSING

OPEN COURT#1: WIDTH REQ'D =24'-8" AT 73'-11" HT

THE

SQUARE:
LOT:
ZONE:
SITE AREA:

RESIDENTIAL
1 PER 4 DU
34 REQUIRED (NOTE 2)

SAME AS MATTER-OF-RIGHT

RESIDENTIAL
36 (NOTE 3)

NON PROFIT OFFICE


16 REQUIRED (NOTE 6)

SAME AS MATTER-OF-RIGHT

NON PROFIT OFFICE


16 (NOTE 8)

ART USE
9 REQUIRED (NOTE 7)

ART USE
9 (NOTE 8)

EDUCATION USE
9 REQUIRED (NOTE 5)

EDUCATION USE
9 (NOTE 8)

RESIDENTIAL
1 BERTH @ 55 FT DEEP
1 PLATFORM @ 200 SF
1 SERVICE/DELIVERY @ 20 FT DEEP

SAME AS MATTER-OF-RIGHT

RESIDENTIAL
1 BERTH @ 30 FT DEEP
1 PLATFORM @ 100 SF
1 SERVICE/DELIVERY @ 20 FT DEEP
RELIEF REQUESTED

EDUCATION USE
NONE REQUIRED (NOTE 4)

SAME AS MATTER-OF-RIGHT

EDUCATION USE
NONE PROVIDED

NON PROFIT OFFICE


NONE REQUIRED (NOTE 4)

SAME AS MATTER-OF-RIGHT

NON PROFIT OFFICE


NONE PROVIDED

NONE REQUIRED

0.3

SAME AS MATTER-OF-RIGHT

0.333 PROVIDED

NONE REQUIRED

RESIDENTIAL
1 PER 3 DU
45 LONG TERM

SAME AS MATTER-OF-RIGHT

RESIDENTIAL
75 LONG TERM

SEE PAGE 3.14

REDEVELOPMENT
W a s h i n g t o n ,

D E V E LO PM E N T DATA
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.12

(TWO WAY - 100 ROW)

6TH STREET SW

DRIVEWAY

AMIDON-BOWEN
PLAY FIELDS

NOTES:
1.
Interior partition locations, the
number, size and locations of units,
stairs and elevators are preliminary and
shown for illustrative purposes only.
Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
4. Flexibility is requested to make
refinements to parking and loading
configurations, including layout, so
long as the required parking and
loading complies with the size, location,
access, maintenance and operation
requirements of DCMR 11.

THE

BARD

S o u t h w e s t

EYE STREET SW
(TWO WAY - 90 ROW)

REDEVELOPMENT
W a s h i n g t o n ,

SITE PLAN
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

20

40

80

shalom baranes associates

architects

PUD SUBMISSION

1.13

PARKING/LOADING
ENTRANCE

BIKE
RACKS

6TH STREET SW

(TWO WAY - 100 ROW)

STC
ENTRANCE

AMIDON-BOWEN
PLAY FIELDS

NOTES:
1.
Interior partition locations, the
number, size and locations of units,
stairs and elevators are preliminary and
shown for illustrative purposes only.
Final layouts may vary.

BIKE
RACKS

2. Refer to Sheet 4.2 for landscape plan.

TO WATERFRONT
METRO STATION

PEDESTRIAN TRAVEL PATH

3. Refer to Sheet 3.10 for overall building


dimensions.
4. Flexibility is requested to make
refinements to parking and loading
configurations, including layout, so
long as the required parking and
loading complies with the size, location,
access, maintenance and operation
requirements of DCMR 11.

THE

BARD

S o u t h w e s t

RESIDENTIAL
ENTRANCE

(TWO WAY - 90 ROW)

BIKE LANE

REDEVELOPMENT
W a s h i n g t o n ,

BIKE LANE

EYE STREET SW

S I T E C I R C U L AT I O N D I AG R A M
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

20

40

80

shalom baranes associates

architects

PUD SUBMISSION

1.14

6TH STREET SW

(TWO WAY - 100 ROW)

AMIDON-BOWEN
PLAY FIELDS

NOTES:
1.
Interior partition locations, the
number, size and locations of units,
stairs and elevators are preliminary and
shown for illustrative purposes only.
Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
4. Flexibility is requested to make
refinements to parking and loading
configurations, including layout, so
long as the required parking and
loading complies with the size, location,
access, maintenance and operation
requirements of DCMR 11.

THE

BARD

S o u t h w e s t

EYE STREET SW

(TWO WAY - 90 ROW)

REDEVELOPMENT
W a s h i n g t o n ,

COURTS PLAN
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

20

40

80

shalom baranes associates

architects

PUD SUBMISSION

1.15

BLOCK ELEVATION ALONG 6TH STREET SW

50

200

100

6TH STREET SITE ELEVATION


100' = 1"

BLOCK ELEVATION ALONG EYE STREET SW

50

200

100

EYE STREET SITE ELEVATION


100' = 1"

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

B LO C K E L E VAT I O N S
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.16

BLOCK SECTION ALONG EYE STREET SW

50

200

100

W-E SITE SECTION LOOKING SOUTH


100' = 1"

BLOCK SECTION ALONG 6TH STREET SW

50

200

100

E-W SITE SECTION LOOKING NORTH


100' = 1"

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

BLOCK SECTIONS
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

1.17

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

AERIAL VIEW FROM NW


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

2 .1

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

6TH AND H STREET VIEW LOOKING SOUTH


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

2.2

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

6TH STREET VIEW FROM NW


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

2.3

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

6TH AND EYE STREET VIEW FROM SW


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

2.4

(TWO WAY - 100 ROW)

6TH STREET SW

STC
ENTRANCE

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
NOTES:
Sheet 4.2 for landscape plan.
2.
Refer to
1. Interior
partition
number,
size
3.
Refer to
Sheetlocations,
3.10 for the
overall
building
and locations of units, stairs and elevators are
dimensions.
preliminary and shown for illustrative purposes
only.
Final layouts
may vary.
4.
Flexibility
is requested
to make refinements
to parking and loading configurations,
2. Refer to layout,
Sheet 4.2
landscape
including
soforlong
as theplan.
required
parking and loading complies with the size,
3. Refer access,
to Sheetmaintenance
3.10 for overall
building
location,
and operation
dimensions. of DCMR 11.
requirements
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING

RESIDENTIAL
ENTRANCE

STC CIRCULATION
PARKING

EYE STREET SW

BUILDING SERVICES

(TWO WAY - 90 ROW)

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - GROUND LEVEL


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .1

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PL A N - LE VEL 1.5


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.2

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 2


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.3

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 3


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.4

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 4


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.5

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 5


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.6

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 6


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.7

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL 7


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.8

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Refer to Sheet 3.10 for overall building
dimensions.
KEY
RESIDENTIAL (MARKET)

Mechanical Mezzanine

RESIDENTIAL CIRCULATION /
COMMON

Level

STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - MECHANICAL PENTHOUSE


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3.9

(TWO WAY - 100 ROW)

6TH STREET SW

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Refer to Sheet 4.2 for landscape plan.
3. Flexibility is requested to make refinements
to parking and loading configurations,
including layout, so long as the required
parking and loading complies with the size,
location, access, maintenance and operation
requirements of DCMR 11.
4. Building heights are taken from the
measuring point on 6th Street (MP=+23.00).

EYE STREET SW
(TWO WAY - 90 ROW)

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - ROOF PLAN


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

16

32

shalom baranes associates

architects

PUD SUBMISSION

3 .10

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Flexibility is requested to make refinements
to parking and loading configurations,
including layout, so long as the required
parking and loading complies with the size,
location, access, maintenance and operation
requirements of DCMR 11.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL B1


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .11

PARKING NOTES:
1. The total number of Residential parking
spaces is based on a unit total of 136.
2. The final dwelling unit count may vary by
10% per flexibility requested. Proposed unit
range = 126-148.
3. The final residential parking count may vary
by 10% per flexibility requested. Proposed
residential parking range = 32-37.

STC Parking
Use
Non Profit Office
Education
Art Space
Totals

Zoning Compliant Parking

NOTES:

Handicap (HC) *6 Compact (C) Standard (S)


0
16
0
0
9
0
0
9
0
0
34
0

Total

1. Interior partition locations, the number, size


and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.

34

2. Flexibility is requested to make refinements


to parking and loading configurations,
including layout, so long as the required
parking and loading complies with the size,
location, access, maintenance and operation
requirements of DCMR 11.

Residential Parking
Totals
TOTAL

3
3

17
17

16
16

36
70

3. Parking space sizes:


Handicap = 9x19
Compact = 8x16
Standard = 9x19
4. Above 40% of required parking may be
compact spaces, relief requested.
5. Bicycle Parking detailed page 3.13
6. Handicap Parking includes one van
accessible space
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FLOOR PLAN - LEVEL B2


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .12

B2 - LONG TERM BICYCLE PARKING

8
N

BIKE PARKING
Required Provided
Residential

45

75

NOTES:
1. Interior partition locations, the number, size
and locations of units, stairs and elevators are
preliminary and shown for illustrative purposes
only. Final layouts may vary.
2. Flexibility is requested to make refinements
to parking and loading configurations,
including layout, so long as the required
parking and loading complies with the size,
location, access, maintenance and operation
requirements of DCMR 11.
3. Standard Bicycle space = 2x6
4. Stacked Bicycle parking indicated in diagram.
5. Short Term parking provided at grade.

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

BIKE PARKING - LE VEL B2


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .13

Level 1

Level 1.5

Level 2

Level 03

Level 4

Level 5

Level 6

Level 07
NOTES:
9 affordable units shown. Affordable unit mix
reflects approximate range in proportion to
market unit mix.
The designation of units for affordable housing
is schematic and intended to show general
distribution.

Affordable Unit Distribution

Total GSF

UNITS

Unit Mix

Total Market Rate Residential


8% Inclusionary Zoning
Actors Housing
TOTAL

87,952 SF
7,648 SF
33,710 SF
128,710 SF

93
9
34
136

Total Market Rate Residential


8% Inclusionary Zoning
Actors Housing
TOTAL UNITS

Studio 1 BR
18
2
3

2 BR 3 BR 4 BR

51
5
24

19
2
2

5
0
0

0
0
5

TOTAL
93
9
34
136

Final locations will be determined upon further


dwelling unit layout study as part of the final
design.
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL (AFFORDABLE)
STC HOUSING
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

AFFORDABLE UNIT DISTRIBUTION


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .14

MARCH 21 & SEPTEMBER 21

9 AM

12 PM

3 PM

JUNE 21

9 AM

12 PM

3 PM

DECEMBER 21

9 AM

12 PM

3 PM
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

SHADOW STUDIES
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

3 .15

approachability

points of
contact
access

arts
corridor

urban
theatre

STAGE +
MANUSCRIPT

ENTREE

introduction

into
a timeless world

entry
courtyard

access
shakespeare

re-live
admittance

symbolism
allusion

puns
foil
DUALITY

translucent

obscure
building
drama

iconic

dramatic
irony

vitrine

BUILDS
INTRIGUE
INVITES
EXPLORATION

silhouette

T h e p u b l i c l a n d s c a p e a l o n g 6 t h a n d Eye S t r e e t i s a n o p p o r t u n i t y to b r i n g p a s s i ve a n d a c t i ve a c c e s s to S h a ke s p e a r e . To f a c i l i t a te g e n e r a l e n t r e i n to t h i s t i m e l e s s wo r l d, t h e
6th Street courtyard and Eye Street arts corridor frontage are key areas in the landscape design. The design of these spaces highlights two motifs: the manuscript and the
stage. Shakespeares ar t endures through written word, in his manuscripts, and is reimagined through per formed works on stage. Therefore, these central themes are pulled
into the framework of the landscape design. Many of Shakespeares works have a strong sense of duality in their characters, setting and themes. This subtle and multi-faceted
likeness is brought into the landscape to build intrigue and invite exploration.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

PUBLIC LANDSCAPE CONCEPT : SHAKESPEAREAN SHADOW


D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .1

6TH STREET

EYE

STREET
0

THE

BARD

S o u t h w e s t

16

32

landscape

REDEVELOPMENT
W a s h i n g t o n ,

COMPOSITE PLAN
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.2

PARTERRE
GARDENS

3 BIKE
RACKS

TEXTURED PAVING
FOLDED SEATING
EXTRUDED

6TH STREET

PLANTERS

2 BIKE
RACKS

KEY PLAN
EYE

STREET
0

THE

BARD

S o u t h w e s t

16

32

landscape

REDEVELOPMENT
W a s h i n g t o n ,

GROUND LEVEL
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.3

The entry courtyard features a linear paving module with in-grade lights and textured patterning on the paving similar to a watermark. This watermark detail will only reveal
itself as pedestrians are close up while walking over the paving. The paving carpets the courtyard and seamlessly continues up into a folded bench feature. The lighter paving
is in contrast to dark stone plinth planters. These monolithic pieces are reminiscent of stage sets atop a manuscript and appear to be extruded from the base of the building,
like a shadow. An etched ar t panel frames the entr y to the building and relates to the fins in the architecture. This ar t panel will have a Shakespeare graphic element, such
as the quill example in the above graphic.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

C O U R T YA R D L A N D S CA PE
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.4

NOTES:

CONCRETE PAVING

STONE

LINEAR LIGHT BANDS

1. Flexibility is requested to vary the final selection of exterior


materials within the color ranges and general material types
proposed, based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor refinements to
exterior details and dimensions, to comply with the building
codes or that are otherwise necessary to obtain a final
building permit.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

M AT E R I A L S E L EC T I O N S
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.5

The plantings at the base of the building are organized into small
scale

parterre

gardens

that

respond

to

the

size

and

planting

style of the residences across 6th Street. The parterre gardens


consist of low evergreen hedges interplanted with ornamental
grasses,

groundcovers

and

perennials.

The

lush

6th

Street

streetscape is very pedestrian friendly and context sensitive.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

6TH STREET PARTERRE GARDENS


D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.6

Within the planting beds along the Eye Street landscape, etched transparent panels highlight Shakespeare and his theatrical works depicting imagery and quotations. This
artistic treatment is incorporated in panels on the glazing of the building as well so that the streetscape and architecture are integrated. Raised planters and evergreen
sculpted hedges are continued in a larger module along the more public Eye Street frontage.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

EYE STREET LANDSCAPE


D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.7

Staggered art panels peel back from the building facade, populating the Eye Street streetscape with educational and artistic imagery and quotations pertaining to Shakespeare
and his timeless works. As you walk along Eye Street, the translucent and layered nature of the panels creates an intriguing and dynamic display. Character silhouet tes,
Shakespeares por trait and quotations all overlap between the panels and building.

NOTES:
1. Flexibility is requested to vary
the final selection of art panel
materials, imagery and quotations
within the general material types
proposed.

THE

BARD

S o u t h w e s t

landscape

REDEVELOPMENT
W a s h i n g t o n ,

E YE STREET ART PANELS


D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.8

GREEN
ROOF

KEY PLAN

THE

BARD

S o u t h w e s t

16

landscape

REDEVELOPMENT
W a s h i n g t o n ,

LEVEL 1 ROOF
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4.9

GREEN

COLOR BLOCK

ROOF

PLANTINGS

PERGOLA
FRAME

ORNAMENTAL
TREES

GREEN
ROOF

KEY PLAN

THE

BARD

S o u t h w e s t

16

landscape

REDEVELOPMENT
W a s h i n g t o n ,

LEVEL 4 ROOFS
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .10

ORNAMENTAL
TREES

GREEN
ROOF

PERGOLA
FRAME

EQUIPMENT
ROOM

SHALLOW SUN
SHELF POOL

STAIR
TOWER

VINES ON
PERGOLA
FRAME

KEY PLAN

THE

BARD

S o u t h w e s t

16

landscape

REDEVELOPMENT
W a s h i n g t o n ,

LEVEL 6 ROOF
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .11

PLANTERS

SYNTHETIC
TURF

SYNTHETIC
TURF

FOUNTAIN

KEY PLAN

THE

BARD

S o u t h w e s t

16

landscape

REDEVELOPMENT
W a s h i n g t o n ,

LEVEL 7 ROOF
D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .12

GREEN ROOF

KEY PLAN

THE

BARD

S o u t h w e s t

16

landscape

REDEVELOPMENT
W a s h i n g t o n ,

MECHANICAL PENTHOUSE ROOF


D . C .

February 03, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .13

enter sq ft

Address

Green Area Ratio Scoresheet

501 Eye Street

Ward

Lot

6
Other / BZA Order

Lot size (enter this value first) *

52

498

enter sq ft of
lot

multipli

36,476

SCORE

Landscape Elements
A

Square

Square Ft.

Zoning District

Factor

Landscaped areas with a soil depth of less than 24"

0.3

Landscaped areas with a soil depth of 24" or greater

0.6

Bioretention facilities

0.4

Groundcovers, or other plants less than 2' tall at maturity

0.2

Plants, not including grasses, 2' or taller at maturity - calculated

Tree canopy for all new trees 2.5" to 6" diameter

1,353

12177

0.3

enter sq ft

Permeable paving over at least 6" and less than 24" of soil or gravel

Permeable paving over at least 24" of soil or gravel

Other

27

Enhanced tree growth systems***

Renewable energy generation

1350

0.5

0
sub-total of sq ft =

0.5

0.4

0.5

0.2

0.1

23,720

Bonuses
enter sq ft

0.6

Native plant species

0.7

Landscaping in food cultivation

0.7

Harvested stormwater irrigation

or larger or equivalent - calculated at 600 sq ft per tree

0
enter sq ft

0.1

0.1

12,483

enter sq ft

Green Area Ratio numerator =


enter number of trees

Tree canopy for preservation of all existing trees 18" to 24" dia.

Approved water features

enter number of trees

enter sq ft

675.0

or larger or equivalent - calculated at 250 sq ft per tree


Tree canopy for preservation of existing tree 12" to 18" diameter

0.4

enter sq ft

enter number of trees

Tree canopy for preservation of existing tree 6" to 12" diameter

0
enter sq ft

or equivalent - calculated at 250 sq ft per tree

8,154.4

Permeable Paving***

3,653.1

enter number of trees

Tree canopy for new trees 6" diameter or larger

or equivalent - calculated at 50 sq ft per tree

0.8

enter sq ft

Plantings (credit for plants in landscaped areas from Section A)

enter number of trees

10,193

Over at least 8" of growth medium

at 9 sq ft per plant (typically planted no closer than 18" on center)

Landscaped areas (select one of the following for each area)

enter number of plants

0.6
enter sq ft

Total

enter sq ft

Over at least 2" and less than 8" of growth medium

0.342

enter sq ft

enter sq ft

enter sq ft

0.6

Vegetated or "green" roofs

SP-1, SP-2

enter sq ft

Vegetated wall, plantings on a vertical surface

0.7

0.8

0.6

0.6

*** Permeable paving and structural soil together may not qualify for more than one third of the Green Area Ratio score.
Total square footage of all permeable paving and enhanced tree growth

or equivalent - calculated at 1300 sq ft per tree


enter number of trees

Tree canopy for preservation of all existing trees 24" diameter

or larger or equivalent - calculated at 2000 sq ft per tree

DDOE/WPD 06/2014

enter sq ft

Vegetated wall, plantings on a vertical surface

Vegetated or "green" roofs


enter sq ft

Over at least 2" and less than 8" of growth medium

Over at least 8" of growth medium

enter sq ft

THE

BARD

S o u t h w e s D
t

10,193

REDEVELOPMENT
W a s hPaving***
i n g t o n ,
Permeable

D . C .

0.8

February 03, 2016

GAR SCORECARD
sba project# 14105

enter sq ft

Permeable paving over at least 6" and less than 24" of soil or gravel

0.4

landscape

8,154.4

c 2016 Shalom Baranes A ssociates

PARKER RODRIGUEZ

architects

PUD SUBMISSION

4 .14

T.O. PENTHOUSE
91-8

MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

NOTES:

SECTION A

1. Building heights are taken from the measuring


point on 6th Street (MP=+23.00). Refer to sheet
3.1 for measuring point location.

T.O. PENTHOUSE
91-8

MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

KEY

RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

SECTION B

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

SECTIONS
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

16

32
N

shalom baranes associates

architects

PUD SUBMISSION

5 .1

T.O. MECH. PENTHOUSE


91-8

MAIN ROOF
73-2

LEVEL 6 ROOF
62-4

LEVEL 4 ROOF
4111

NOTES:

SECTION C

1. Building heights are taken from the measuring


point on 6th Street (MP=+23.00). Refer to sheet
3.1 for measuring point location.

T.O. MECH. PENTHOUSE


91-8

MAIN ROOF
73-2

LEVEL 6 ROOF
62-4

KEY

LEVEL 4 ROOF
4111

RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

SECTION D

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

SECTIONS
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

16

32
N

shalom baranes associates

architects

PUD SUBMISSION

5.2

NOTES:
1. Building heights are taken from the measuring
point on 6th Street (MP=+23.00). Refer to sheet
3.1 for measuring point location.

T.O. PENTHOUSE
91-8

MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

E
KEY
RESIDENTIAL (MARKET)
RESIDENTIAL CIRCULATION /
COMMON
STC EDUCATIONAL
STC ART STUDIO
STC NON-PROFIT OFFICE
STC HOUSING
STC CIRCULATION
PARKING
BUILDING SERVICES

16

32
N

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

SECTION E
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5.3

FIBER CEMENT PANEL


- WHITE

FIBER CEMENT PAN


- GREY BLEND

CEMENT PANEL 1A FIBER


WHITE AND OFF WHITE BLEND

PAINTED ALUMINUM PANEL


-WHITE

FIBER CEMENT PANEL


- GREY 1

FIBER CEMENT PANEL


- GREY 2

FIBER CEMENT PANEL


- WHITE BLEND

PAINTED ALUMINUM PANEL


- GREY 1

PAINTED ALUMINUM PANEL


- GREY 2

PAINTED ALUMINUM PANEL GOLD

NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.

10
THE

PAINTED METAL
PROFILE PANEL - GREY

BARD

S o u t h w e s t

11

REDEVELOPMENT
W a s h i n g t o n ,

MANGANESE
IRONSPOT BRICK

12

STONE BASE
- MEDIUM GREY

M AT E R I A L S E L EC T I O N S
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

13

CONCRETE BASE
- LIGHT GREY

shalom baranes associates

architects

PUD SUBMISSION

5.4

MATERIAL KEY

T.O. PENTHOUSE
91-8

10
GLASS RAILING

1 FIBER CEMENT PANEL - WHITE


1A FIBER CEMENT PANEL - WHITE AND OFF WHITE
BLEND
2 FIBER CEMENT PANEL - GREY 1
3 FIBER CEMENT PANEL - GREY 2
4 FIBER CEMENT PANEL - WHITE BLEND
5 FIBER CEMENT PANEL - GREY BLEND
6 PAINTED ALUMINUM PANEL - WHITE
7 PAINTED ALUMINUM PANEL - GREY 1
8 PAINTED ALUMINUM PANEL - GREY 2
9 PAINTED ALUMINUM PANEL - GOLD
10 PAINTED METAL PROFILE PANEL - GREY
11 MANGANESE IRONSPOT BRICK
12 STONE BASE - MEDIUM GREY
13 CONCRETE BASE - MEDIUM GREY

MAIN ROOF
73-2

LEVEL 4 ROOF
41-11

6
SPANDREL GLASS
1
BUTT-GLAZED
CURTAIN WALL
SYSTEM

FACADE TYPE 1
(REFER TO SHEETS 5.7-5.8)

12

FACADE TYPE 7
(REFER TO SHEETS 5.14)

South Elevation
NOTES:
1. Building heights are taken from the measuring
point on 6th Street (MP=+23.00). Refer to sheet
3.1 for measuring point location.

T.O. PENTHOUSE
91-8

PAINTED METAL
LOUVERS
1
8
2
1
8
1
2
5

MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

10
1
9
7
STOREFRONT
WINDOW SYSTEM
WITH NANA WALL
PAINTED ALUMINUM
TRIM
3
3
5
7
9
7
1
1

PAINTED ALUMINUM TRIM


7

LEVEL 4 ROOF
41-11

2. Flexibility is requested to vary the final


selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
3. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
4. For material images refer to page 5.4

11

GRADE LINE AT NORTH


PROPERTY LINE

North Elevation
NORTH ELEVATION

FACADE TYPE 6
(REFER TO SHEET 5.13)

42 TEXTURED CONCRETE WALL


AT NORTH PROPERTY LINE

THE

BARD

S o u t h w e s t

1/32" = 1'-0"

REDEVELOPMENT
W a s h i n g t o n ,

E L E VAT I O N S
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

16

32

shalom baranes associates

architects

PUD SUBMISSION

5.5

MATERIAL KEY

T.O. PENTHOUSE
91-8

MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

1 FIBER CEMENT PANEL - WHITE


1A FIBER CEMENT PANEL - WHITE AND OFF WHITE
BLEND
2 FIBER CEMENT PANEL - GREY 1
3 FIBER CEMENT PANEL - GREY 2
4 FIBER CEMENT PANEL - WHITE BLEND
5 FIBER CEMENT PANEL - GREY BLEND
6 PAINTED ALUMINUM PANEL - WHITE
7 PAINTED ALUMINUM PANEL - GREY 1
8 PAINTED ALUMINUM PANEL - GREY 2
9 PAINTED ALUMINUM PANEL - GOLD
10 PAINTED METAL PROFILE PANEL - GREY
11 MANGANESE IRONSPOT BRICK
12 STONE BASE - MEDIUM GREY
13 CONCRETE BASE - MEDIUM GREY

10
PAINTED METAL LOUVER
8
STOREFRONT WINDOW
SYSTEM WITH NANA WALL

PAINTED METAL TRIM


LEVEL 4 ROOF
41-11

5
1
3

6 T H

6
SPANDREL GLASS
BUTT-GLAZED CURTAIN
WALL SYSTEM

S T R E E T

12

FACADE TYPES 3 & 4


(REFER TO SHEET 5.10-5.11)

42 TEXTURED
CONCRETE
WALL AT NORTH
PROPERTY LINE
9
6

FACADE TYPE 2
(REFER TO SHEET 5.9)

West Elevation
STOREFRONT
WINDOW SYSTEM
BUTT-GLAZED
STOREFRONT
WINDOW SYSTEM

PAINTED METAL LOUVER


1
8

10

2
8

T.O. PENTHOUSE
91-8
MAIN ROOF
73-2
LEVEL 6 ROOF
62-4

1
7

LEVEL 4 ROOF
41-11

NOTES:
1. Building heights are taken from the measuring
point on 6th Street (MP=+23.00). Refer to sheet
3.1 for measuring point location.
2. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
3. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
4. For material images refer to page 5.4

PAINTED
METAL TRIM
5
7
11
13

FACADE TYPE 5
(REFER TO SHEET 5.12)

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

E L E VAT I O N S
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

East Elevation
42 TEXTURED
CONCRETE WALL
AT PROPERTY LINE

16

32

shalom baranes associates

architects

PUD SUBMISSION

5.6

2
7

6
NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 1
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5.7

NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 1
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5.8

10

NOTES:

1. Flexibility is requested to vary the final


selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 2
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5.9

3
5
3

TYPE 3

1
5

NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials

1
7
11
12

2. Flexibility is requested to make minor


refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

TYPE 4

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 3 & 4


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5 .10

TYPE 3

TYPE 4

NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 3 & 4


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5 .11

5
2

11
NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 5
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5 .12

5
1
1
3

3
1
13
NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 6
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5 .13

8
7
1A

11
NOTES:
1. Flexibility is requested to vary the final
selection of exterior materials within the color
ranges and general material types proposed,
based on availability at the time of construction
without reducing the quality of materials
2. Flexibility is requested to make minor
refinements to exterior details and dimensions,
including belt courses, sills, bases, cornices,
railings and trim, or any other changes to
comply with the building codes or that are
otherwise necessary to obtain a final building
permit.
3. For material images refer to page 5.4
0

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

FACADE T YPE 7
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

5 .14

DUE EAST 280.00'

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD
LOD

LOD

LOD

LOD

LOD

LOD

LOD

6TH STREET, S.W.

DUE SOUTH 44.00'


LOD

LOD

DUE WEST 145.00'

LOD

DUE SOUTH 178.93'

LOD

LOD

LOD

LOD = 1.07 AC
(46,934 SF)

REFERENCES:
A.

BOUNDARY & TOPOGRAPHIC SURVEY: ENTITLED: "BOUNDARY & TOPOGRAPHIC


SURVEY, ERKILETIAN, 501 I STREET, S.W. LOT 52 SQUARE 498, DISTRICT OF
COLUMBIA", PREPARED BY: BOHLER ENGINEERING, PROJECT NUMBER: DC132204,
DATED: 3/25/14.

B.

DIGITAL ARCHITECTURAL FILES: ENTITLED: "Ground Level.DWG", PREPARED BY: SHALOM


BARANES, DATED: 01/05/16.

C.

DIGITAL LANDSCAPE FILES: ENTITLED: "PRI-Base Ground.DWG", PREPARED BY: PARKER


RODRIGUEZ, DATED 01/05/16.

LOD

LOD

LOD

1. THE PLAN IS BASED ON THE FOLLOWING DOCUMENTS AND INFORMATION

LOD

N0000'00"E 222.93'

LOD

LOD

LOD

LOD

LOD

LO

2. LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. ALL LOCATIONS AND SIZES
ARE BASED ON UTILITY MARK OUTS, ABOVE GROUND STRUCTURES THAT WERE VISIBLE &
ACCESSIBLE IN THE FIELD, THE MAPS AS LISTED IN THE REFERENCES AVAILABLE AT THE
TIME OF THE SURVEY, AND INFORMATION FROM DC WATER COUNTERMAPS. AVAILABLE
AS-BUILT PLANS AND UTILITY MARK OUT DOES NOT ENSURE MAPPING OF ALL
UNDERGROUND UTILITIES AND STRUCTURES. BEFORE ANY EXCAVATION IS TO BEGIN, ALL
UNDERGROUND UTILITIES SHOULD BE VERIFIED AS TO THEIR LOCATION, SIZE, AND TYPE BY
THE PROPER UTILITY COMPANIES.

LOD

LOD

LOD

LOD

LOD

LOD

I STREET, S.W.

LOD

DUE WEST 135.00'

20

40

1"= 40'

THE

BARD

civil

REDEVELOPMENT

S o u t h w e s t
EX. CONDITIONS PLAN

W a s h i n g t o n ,

C1

EXISTING CONDITIONS PLAN


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6 .1

PROJECT NARRATIVE:
PROP. ELEC.
VAULTS

LIMITS OF SUBSURFACE
BUILDING
LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD
LOD

16
15

LOD

LOD

LOD

LOD

PROP. COVERED
GARAGE ENTRANCE

LOD

GRADING NARRATIVE
THE PROPOSED GRADING WILL HONOR THE EXISTING
DRAINAGE PATTERNS. INLETS WILL BE USED TO SAFELY
CONVEY RUNOFF. EXACT SIZE AND LOCATION OF THESE
STRUCTURES WILL BE DETERMINED WITH FINAL SITE
DESIGN. THE PROJECT WILL TIE INTO THE EXISTING
GRADES WITHIN THE LIMITS OF DISTURBANCE BASED ON
FINAL ARCHITECTURE. FINISHED FLOOR ELEVATIONS
HAVE NOT BEEN ESTABLISHED AT THIS TIME.

NOTES:

23

1.

CONTRACTOR IS TO MAINTAIN CURB AND


GUTTER/STREETSCAPE IMPROVEMENTS
ON 6TH AND I STREET, S.W..

2.

FINAL LANDSCAPE PLAN IS TO BE


PROVIDED BY BOHLER ENGINEERING.

LOD

LOD

COURTYARD

196.1'

LOD

21.6'

30'

LOD
135'

115'

LOD

LOD

6TH STREET, S.W.

LOD

LOD

18
17

LOD

19

20

21

22

LOD
LIMITS OF SUBSURFACE
BUILDING AT PROPERTY LINE

LOD

24

6'
R

PROP. BIKE RACK


(TYP.)

LOD

R
6'

LOD

LOD

APPROX.
LOCATION
PROP.
CISTERN (IN
GARAGE
BELOW)

THE PROJECT INCLUDES THE CONSTRUCTION OF A NON


PROFIT OFFICE/EDUCATIONAL/ART-USE/RESIDENTIAL
BUILDING WITH UNDERGROUND PARKING AND SITE
AMENITIES. THE UTILITY IMPROVEMENTS INCLUDE DOMESTIC
WATER, FIRE, SANITARY SEWER, AND STORM DRAIN
CONNECTIONS TO EXISTING UTILITY MAINS LOCATED WITHIN
THE 6TH STREET, SW, AND I STREET, SW, PUBLIC
RIGHT-OF-WAY. THE PROJECT PROPOSES THE USE OF A
CISTERN AND VARIABLE DEPTH GREEN ROOFS TO MEET THE
STORMWATER RETENTION VOLUME (SWRv) REQUIREMENTS
AND THE GREEN AREA RATIO (GAR) REQUIREMENTS.

LOD

LOD
LOD

LOD

LEGEND

LOD

ACCENT PAVEMENT
(ENTRANCE)

D
LO

PROP. CONTOUR

15

'R

PROP. ADA
RAMPS

ACCENT PAVEMENT
(COURTYARD)

127'

LOD

8'

22
LOD

LOD

LOD

LOD

LOD

PROP. STREETLIGHT
(TYP.)

I STREET, S.W.

EX. CONTOUR

LOD

PROP. BIKE RACK


(TYP.)

20.9'

CONCRETE PAVEMENT

XX
XX

LOD
0

20

40

1"= 40'

THE

BARD

S o u t h w e s t
SITE/GRADING PLAN

civil

REDEVELOPMENT
W a s h i n g t o n ,

C2

SITE/GRADING PLAN
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6.2

PROP. ELEC.
VAULTS

LIMITS OF SUBSURFACE
BUILDING
LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD
LOD

LOD

LOD

LIMITS OF SUBSURFACE
BUILDING AT PROPERTY LINE

LOD

LOD

LOD

LOD

LOD

LOD

LOD

6TH STREET, S.W.

LOD

LOD

APPROX.
LOCATION
PROP.
CISTERN (IN
GARAGE
BELOW)

LOD

LOD

F
W

PROP. COVERED
GARAGE ENTRANCE

LOD

LOD

UTILITY KEYNOTES

LOD

LOD

COURTYARD

LOD

LOD
LOD

LOD

PROP. WATER SERVICE (WATER METER TO BE


LOCATED WITHIN GARAGE)

PROP. FIRE SERVICE

PROP. SANITARY SERVICE

PROP. STORM LATERAL

PROP. STORM INLET (INTERIOR BLDG CONNECTION)

LOD

LOD

UTILITY NARRATIVE
4

LOD

LOD

LOD

LOD

LO

LOD

THE PROPOSED PROJECT INCLUDES CONSTRUCTION


OF NEW UTILITY INFRASTRUCTURE TO SERVICE THE
DEVELOPMENT. EXISTING WATER MAINS, SANITARY
SEWER MAINS, AND STORM SEWER MAINS ARE
AVAILABLE TO SERVE THE SITE AS WELL AS
COMMUNICATION LINES, GAS MAINS, AND ELECTRIC
SERVICE. PROPOSED UTILITY LATERALS SHOWN
HEREON ARE APPROXIMATE. FINAL LOCATIONS OF
LATERALS AND CONNECTIONS WILL BE DETERMINED
DURING THE FINAL DESIGN OF THE BUILDING AND
ASSOCIATED UTILITY ROOM LOCATIONS AND POINTS
OF CONNECTION.

LOD

I STREET, S.W.

LOD

20

40

1"= 40'

THE

BARD

S o u t h w e s t
UTILITY PLAN

civil

REDEVELOPMENT
W a s h i n g t o n ,

C3

UTILITY PLAN
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6.3

LEGEND
DENOTES AT GRADE GREEN ROOF
LIMITS OF SUBSURFACE
BUILDING
LOD

LOD

LOD

LOD

DENOTES 5TH FLOOR GREEN ROOF


LOD

LOD

LOD

LOD

LOD

18

LOD

LOD

LOD

LOD

LOD

DENOTES PENTHOUSE 1 GREEN ROOF

DENOTES PENTHOUSE 2 GREEN ROOF

4
11

PROP. COVERED
GARAGE ENTRANCE

LOD

DENOTES CORRESPONDING GREEN


ROOF TABULATION IN GREEN ROOF
TABLE (SHEET C6)

LOD

LOD

NOTE: REMAINING ROOF AREA AND COURTYARD AREA


(NOT INCLUDING GREEN ROOF ITSELF OR AREA
DRAINING TO THE GREEN ROOF) WILL DRAIN TO
THE CISTERN.

11

10

DENOTES ANNEX GREEN ROOF


#

LOD

COURTYARD

DENOTES 7TH FLOOR GREEN ROOF

LOD

LOD

LOD

16

STORMWATER MANAGEMENT
SUMMARY

LOD

6TH STREET, S.W.

LOD

LIMITS OF SUBSURFACE
BUILDING AT PROPERTY
LINE
5

LOD

LOD

LOD

LOD

LOD

LOD

LOD

APPROX.
LOCATION
PROP.
CISTERN (IN
GARAGE
BELOW)

DENOTES 2ND FLOOR GREEN ROOF

12

THE VOLUME REQUIRED TO BE RETAINED ON-SITE (SWRV) IS


EQUAL TO APPROXIMATELY 3,465 CUBIC FEET. THE VOLUME
REQUIREMENT FOR THE PROW WILL BE DETERMINED ONCE
STREETSCAPE IMPROVEMENTS HAVE BEEN FINALIZED.

LOD

LOD

2
17
14

GREEN ROOF AREAS LOCATED ON VARIOUS LEVELS OF THE


PROPOSED BUILDINGS AS WELL AS A RAINWATER
HARVESTING CISTERN WILL BE USED TO SATISFY THE
ON-SITE
RETENTION
VOLUME.
SEE
STORMWATER
MANAGEMENT NARRATIVE ON SHEET C6 FOR ADDITIONAL
INFORMATION AND CALCULATIONS.

13

LOD

LOD

15
15

15

D
LO
LOD

LOD

LOD

THE SIZE AND DEPTH OF THE GREEN ROOF AREAS WILL BE


DETERMINED WITH FINAL CONSTRUCTION DOCUMENTS,
HOWEVER THE FINAL DESIGN WILL MEET THE REQUIRED
STORMWATER RETENTION VOLUME (3,465 CF).

LOD

LOD

LOD
LOD

I STREET, S.W.
0

15

'R

20

40

1"= 40'

THE

BARD

civil

REDEVELOPMENT

S o u t h w e s t
W a s h i n g t o n ,
STORMWATER MANAGEMENT/GAR PLAN
C5

S TO R M WAT E R M A N AG E M E N T/G A R PL A N
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6.4

SWM NARRATIVE

FOR EACH GREEN ROOF AREA:

I.

Sv = SWRv MAX = [1.7 X [(0.95 X 1.0) + (0.25 X 0.0) X SA]


12

SITE DESCRIPTION:

THE SUBJECT SITE IS LOCATED AT THE CORNER OF 6TH STREET AND I STREET SOUTHWEST
AND HAS A TOTAL AREA OF 36,476 SF. THIS PROJECT WILL DISTURB APPROXIMATELY 47,000
SQUARE FEET (1.07 AC).

SV = SA x[(d x n1) + (DL x n2)]


12

II.

GREEN ROOF SWRv = 1,487 CF


GREEN ROOF STORAGE = 3,483 CF *

STORMWATER RETENTION VOLUME REQUIREMENTS:

THE PRIVATE STORMWATER RETENTION VOLUME (SWRv) CALCULATIONS ARE SHOWN


BELOW:
[P x [(RvI x %I) + (RvC x %C) + (RvN x %N) x SA]
12
SWRv = [1.2 x [(0.95 x 0.97) + (0.25 x 0.03) x 36,476]
12
SWRv REQUIRED = 3,465 CF
STORAGE REQUIRED = 6,428 CF

SWRv:

SEE GREEN ROOF TABLE ON THIS SHEET FOR CALCULATIONS FOR INDIVIDUAL GREEN ROOF
AREAS.
A CISTERN IS PROPOSED TO COLLECT RUNOFF TO BE REUSED ON SITE FOR COOLING
TOWER PURPOSES. PER DOEE SIZING PROCEDURE, AN APPROXIMATE 45,000 GALLON
CISTERN WILL COLLECT RUNOFF FROM AN APPROXIMATE 15,000 SF DRAINAGE AREA (NOTE
THAT THE CISTERN SIZE AND DRAINAGE AREA ARE SUBJECT TO CHANGE. DETAILED CISTERN
INPUT AND OUTPUT RESULTS, AS WELL AS FINAL SIZING, WILL BE PROVIDED ONCE FINAL
COOLING TOWER MAKEUP HAS BEEN PROVIDED FOR THE SITE).

PUBLIC RIGHT-OF-WAY REQUIREMENTS WILL BE CALCULATED ONCE STREETSCAPE DESIGN


IS FINALIZED. THIS REQUIREMENT WILL BE TREATED TO THE MAXIMUM EXTENT
PRACTICABLE.

CISTERN SWRv = 2,019 CF *


CISTERN STORAGE = 2,985 CF *

III.

TOTAL SITE SWRv PROVIDED: 3,506 CF


TOTAL SITE STORAGE PROVIDED: 6,468 CF *

STORMWATER RETENTION VOLUME PROVIDED:

PRIVATE/ON-SITE STORMWATER RETENTION WILL BE PROVIDED THROUGH THE


IMPLEMENTATION OF MULTIPLE GREEN ROOFS AND A CISTERN. THE FOLLOWING
CALCULATIONS WERE USED TO DETERMINE THE PROVIDED STORAGE AND MAXIMUM SWRv

THE

BARD

S o u t h w e s t

C6

ON-SITE STORM SEWER NETWORK:

THE PROPOSED STORM SEWER SYSTEM CONVEYS AND FILTERS ONSITE STORMWATER
THROUGH THE GREEN ROOF. STORMWATER FLOWS ABOVE THE 1.2 STORM EVENT WILL
DISCHARGE TO A STORM LATERAL THAT CONNECTS TO THE PUBLIC STORM SEWER LINE
WITHIN I STREET SW. CISTERN OVERFLOW DRAINS WILL CONNECT TO THE INTERIOR
PLUMBING SYSTEM AND BE PUMPED OUT TO THE SAME CONNECTION POINT AS THE GREEN
ROOF OVERFLOW.
VII.

SUMMARY:

ON-SITE RUNOFF NOT ABLE TO BE STORED ON-SITE WILL BE CONVEYED TO A PROPOSED


STORM SEWER LATERAL WHICH CONNECTS INTO THE EXISTING PUBLIC STORM SEWER
WITHIN THE I STREET SW RIGHT-OF-WAY. THE TOTAL PROPOSED STORMWATER, STRATEGY
OUTLINED IN THIS NARRATIVE PROVIDES A TOTAL SWRv OF 3,506 CF. PUBLIC RIGHT-OF-WAY
SWRv REQUIREMENTS WILL BE DETERMINED ONCE STREETSCAPE DESIGN IS FINALIZED. THIS
REQUIREMENT WILL BE TREATED TO THE MAXIMUM EXTENT PRACTICABLE.

* NOTE: STORAGE VALUES ARE SUBJECT TO CHANGE BASED ON FINAL GREEN ROOF
SPECIFICATIONS AND FINAL CISTERN DEMAND INPUT.

civil

REDEVELOPMENT
W a s h i n g t o n ,

VI.

S TO R M WAT E R M A N AG E M E N T N A R R AT I V E
D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6.5

DUE EAST 280.00'


END SAFETY FENCE

SF

SF LOD

SF

LOD

LOD

SF

SF

LOD

SF

LOD

LOD

SF

LOD

LOD

SF

SF

LOD

LOD

LOD

SF

LOD

SF

LOD

SF

LOD

SF

LOD

SF

SF

SCE
SF
LOD

LOD

SF

DUE SOUTH 44.00'

SF

LOD

CIP

SF

DUE WEST 145.00'


AGIP

SF

LOD

DUE SOUTH 178.93'

SF
LOD

SP

SAF

SAF

SF
LOD

SCE

SCE

LOD = 1.07 AC
(46,934 SF)

SF

LOD

SF
LOD
SF
LOD

SF

SAF

SP

LOD

6TH STREET, S.W.

SF LOD
AGIP

AGIP

SAF

N0000'00"E 222.93'

SF LOD

SF
LOD

LOD

LOD

TIE SILT FENCE SECURELY


INTO MOUNTABLE BERM

SF

SP

PST

LOD

SF
LOD
SF
LOD

NOTE: SPOIL MATERIAL SHALL BE DISCARDED AT A SITE WITH AN


ACTIVE GRADING PERMIT AND APPROVED SEDIMENT
CONTROL PLAN. BORROW MATERIAL SHALL BE OBTAINED
FROM AN APPROVED SITE WITH AN ACTIVE GRADING
PERMIT AND AN APPROVED SEDIMENT CONTROL PLAN.

SF

CIP

LOD

PST

BEGIN SAFETY FENCE

SF
LOD

SF
LOD

SF
LOD

SF
LOD

LOD

SF

SFD
LO

SF

SF
LOD

SAF

SAF

I STREET, S.W.

LOD

CIP

PROVIDE INLET PROTECTION


AT NEXT DOWNSTREAM
INLET

BARD

CUT VOLUME = TBD


FINAL VOLUME = TBD

20

40

1"= 40'

civil

REDEVELOPMENT

S o u t h w e s t
W a s h i n g t o n ,
EROSION & SEDIMENT CONTROL PLAN
C6

LOT AREA = 36,476 SF


DISTURBED AREA = 46,934 SF

DUE WEST 135.00'

THE

SITE TABULATION

EROSION & SEDIMENT CONTROL PLAN


D . C .

February 3, 2016

sba project# 14105

c 2016 Shalom Baranes A ssociates

TM

BOLHER DC

engineers

PUD SUBMISSION

6.6

ELEC VAULT
1

SLOPE 4.5% (5.16')

ELEC VAULT

SLOPE 4.5% (5.16')

18.83'

18.83'

12'x30'

12'x30'

LOADING

DN

LOADING

DN

10'x24'

10'x24'

RAMP DN 7.5%

COSTUME/CRAFT

DN

RAMP DN 7.5%

COSTUME/CRAFT

DN

RAMP DN 15%

+/-23.50'

RAMP DN 15%

+/-23.50'

M.P.
23.00'

M.P.
23.00'
COURTYARD

COURTYARD

NON-PROFIT OFFICE

NON-PROFIT OFFICE

FITNESS
CENTER

FITNESS
CENTER

LEASING

GARAGE
EXHAUST

LEASING

TOILET
OA

OA

PACKAGE
MAIL

BUSINESS
CENTER

GARAGE
EXHAUST

TOILET

PACKAGE

22.45'

STC
HOUSING

22.45'

MAIL

BUSINESS
CENTER

+/-22.25'

+/-22.25'

+/-23.50'

+/-23.50'

LOBBY

LOBBY
21.75'

21.75'

22.70'

22.70'

PROPERTY
LINE
22.54'

22.03'

PROPERTY
LINE

21.95'

22.54'

22.03'

21.95'

501 Eye Street: 24' Truck Turning Maneuvers


Design Vehicle: 24' Truck

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,


D . C .

501 Eye Street SW


TRUCK TURNING MANEUVERS
February 3, 2016

sba project# 14105

c 2015 Shalom Baranes A ssociates

1" = 40'

GOROVE / SLADE
PUD SUBMISSION

transportation
engineers

6.7

ELEC VAULT
1

SLOPE 4.5% (5.16')

ELEC VAULT

SLOPE 4.5% (5.16')

18.83'

12'x30'

12'x30'
LOADING

DN

10'x24'

10'x24'

RAMP DN 7.5%

COSTUME/CRAFT

DN

RAMP DN 7.5%

COSTUME/CRAFT

DN

RAMP DN 15%

+/-23.50'

RAMP DN 15%

+/-23.50'

M.P.
23.00'

M.P.
23.00'
COURTYARD

COURTYARD

NON-PROFIT OFFICE

NON-PROFIT OFFICE

FITNESS
CENTER

FITNESS
CENTER

LEASING

LEASING

GARAGE
EXHAUST

TOILET

GARAGE
EXHAUST

TOILET
OA

OA

PACKAGE

22.45'

STC
HOUSING

18.83'

LOADING

DN

STC
HOUSING

PACKAGE
MAIL

BUSINESS
CENTER

22.45'

MAIL

BUSINESS
CENTER

+/-22.25'

+/-22.25'

+/-23.50'

+/-23.50'

LOBBY

LOBBY
21.75'

21.75'

22.70'

22.70'

PROPERTY
LINE
22.54'

22.03'

PROPERTY
LINE

21.95'

22.54'

22.03'

21.95'

501 Eye Street: SU-30 Turning Maneuvers


Design Vehicle: 30' Truck

THE

BARD

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

501 Eye Street SW


TRUCK TURNING MANEUVERS

D . C .

February 3, 2016

sba project# 14105

c 2015 Shalom Baranes A ssociates

1" = 40'

GOROVE / SLADE
PUD SUBMISSION

transportation
engineers

6.8

LEED

TM

2009 for New Construction and Major Renovations

January 15, 2016

The Bard 501

TARGET
LEED
SILVER

50

11

48

Total Project Score

Possible Points
Certified: 40 to 49 points

21

Y
1
5

SSp1
SSc1
SSc2
SSc3
SSc4.1
SSc4.2
SSc4.3
SSc4.4
SSc5.1
SSc5.2
SSc6.1
SSc6.2
SSc7.1
SSc7.2
SSc8

Water Efficiency

1
6
1
3
2
1
1
1
1
1
1

Y
2

Sustainable Sites

WEp1
WEc1
WEc2
WEc3

Construction Activity Pollution Prevention


Req'd
Site Selection
1
Development Density and Community Connectivity
5
Brownfield Redevelopment
1
Alternative Transportation: Public Transportation Access
6
Alternative Transportation: Bicycle Storage and Changing Rooms
1
Alternative Transportation: Low-Emitting and Fuel-Efficient Vehicles 3
Alternative Transportation: Parking Capacity
2
Site Development: Protect or Restore Habitat
1
Site Development: Maximize Open Space
1
Stormwater Design: Quantity Control
1
Stormwater Design: Quality Control
1
Heat Island Effect: Nonroof
1
Heat Island Effect: Roof
1
Light Pollution Reduction
1

23 Energy and Atmosphere

12
7
2
2

Req'd
4
2
4

EAp1
EAp2
EAp3
EAc1
EAc2
EAc3
EAc4
EAc5
EAc6

Req'd
Req'd
Req'd
19
7
2
2
3
2

1
1
1
1
1
1
1
1
1
1
1
1

Yes - Credit points to be achieved

Maybe - Credit points possibly pursued

No - Credit points not pursued

S o u t h w e s t

REDEVELOPMENT
W a s h i n g t o n ,

IDc1.1
IDc1.2
IDc1.3
IDc1.4
IDc1.5
IDc2

3
M

February 3, 2016

sba project# 14105

Possible Points

Minimum Indoor Air Quality Performance


Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction IAQ Management Plan, During Construction
Construction IAQ Management Plan, Before Occupancy
Low-Emitting Materials: Adhesives and Sealants
Low-Emitting Materials: Paints and Coatings
Low-Emitting Materials: Flooring Systems
Low-Emitting Materials: Composite Wood and Laminate Adhesives
Indoor Chemical and Pollutant Source Control
Controllability of Systems: Lighting
Controllability of Systems: Thermal Comfort
Thermal Comfort: Design
Thermal Comfort: Verification
Daylight and Views: Daylight
Daylight and Views: Views

Possible Points

Innovation in Design: Green Cleaning Program


Innovation in Design: Education and Awareness
Innovation in Design: Walkable Project Site
Innovation in Design: Exeplary Perfromance - SSc2
Innovation in Design: Exeplary Perfromance - SSc4.1
LEED Accredited Professional

14
Req'd
3
1
2
2
2
2
1
1

15
Req'd
Req'd
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Regional Priority

Possible Points

1
1
1
1
1
1

1
1

RPc1.1

Regional Priority: EAc1

RPc1.2

Regional Priority: SSc5.1

RPc1.3
RPc1.4
RPc1.5
RPc1.6

Regional Priority: SSc6.1


Regional Priority: WEc2
Regional Priority: EAc2
Regional Priority: MRc1.1

1
1
1
1

LEED SCORECARD
D . C .

Possible Points

1
1
1

Prepared by Paladino and Company Inc., Copyright 2016

BARD

1
1
1
1
1
1

EQp1
EQp2
EQc1
EQc2
EQc3.1
EQc3.2
EQc4.1
EQc4.2
EQc4.3
EQc4.4
EQc5
EQc6.1
EQc6.2
EQc7.1
EQc7.2
EQc8.1
EQc8.2

110

Platinum: 80 to 110 points

Storage and Collection of Recyclables


Building Reuse: Maintain Existing Walls, Floors, and Roof
Building Reuse: Maintain Interior Nonstructural Elements
Construction Waste Management
Materials Reuse
Recycled Content
Regional Materials
Rapidly Renewable Materials
Certified Wood

Innovation and Design Process

THE

Possible Points 35

Fundamental Commissioning
Minimum Energy Performance
Fundamental Refrigerant Management
Optimize Energy Performance
On-Site Renewable Energy
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement and Verification
Green Power

Indoor Environmental Quality

1
1

Y
Y
1

Materials and Resources

1
1

2
1
2

Gold: 60 to 79 points

MRp1
MRc1.1
MRc1.2
MRc2
MRc3
MRc4
MRc5
MRc6
MRc7

3
1

2
1

Possible Points 10

Water Use Reduction


Water-Efficient Landscaping
Innovative Wastewater Technologies
Water Use Reduction

2
2
1

Y
Y
Y
3

Possible Points 26

Silver: 50 to 59 points

c 2016 Shalom Baranes A ssociates

shalom baranes associates

architects

PUD SUBMISSION

7.1

Exhibit B
TABLE OF ZONING DATA
DCMR, Title 11
Zoning

Development Standards
R-3 (Existing)

SP-2

SP-2 PUD (DCMR


Ch. 24)

Proposed Development

FAR
402, 531

None prescribed

6.0 (non-residential max


of 3.5)

6.5 (non-residential
max of 4.5)

Total: 4.09
Residential: 3.60
Non-Profit Office: 0.49

Gross Floor Area1

None prescribed

218,856 sq. ft. (nonresidential max of


127,666)

237,094 sq. ft. (nonresidential max of


164,142)

Total: 149,298 sq. ft.


Residential: 131,273 sq. ft.
Non-Profit Office: 18,025
sq. ft.

Lot Occupancy
403, 532

Row Dwelling, Church, or


Public School: 60%
All Other Structures: 40%

Residential: 80%

Same as matter-ofright

Residential: 77%2

Building Height
400, 530

40 ft.
3 stories

90 ft.

Same as matter-ofright

73 ft., 2 in. (7th floor roof)


62 ft., 4 in. (6th floor roof)
41 ft. 11 in. (4th floor roof)

Penthouse Area
411, 537

0.37 FAR

0.37 FAR

Same as matter-ofright

0.13 FAR (4,870 sq. ft.)

Penthouse Height
530

20 ft.

20 ft.

Same as matter-ofright

18 ft., 6 in.

Penthouse Setback
530

1:1 ratio

1:1 ratio

Same as matter-ofright

Varies; relief requested

Rear Yard
404, 534

20 ft.

2 in. per ft. of height,


12 ft. minimum
(15 ft., 5 in. required at
73 ft., 2 in.)

Same as matter-ofright

A compliant closed court


(Closed Court #1) provided
in lieu of rear yard

Gross Floor Area (GFA) includes a deduction of 2% for mechanical shafts, but does not include areas for (1) bays projecting over the property line, (2) parking
access ramps, and (3) spaces with structural clearance less than 6 ft., 6 in.
2
Garage ramp not included in building area, as it is below its main floor. See 11 DCMR 534.4

Side Yard
405, 535

Courts
Open Court
406, 536

Closed Court
406, 536

None required (except as


noted in 405.1, 405.2,
and 405.6)

None required
If provided, 2 in. of
height, 8 ft. minimum
(11 ft., 10 in. required at
70 ft., 2 in. of height for
Main Tower)
(8 ft. required at 47 ft., 3
in. of height for Fellow
Housing

Same as matter-ofright

20 ft., 11 in. for Main


Towner
8 ft., 1 in. for Annex
Housing

Width: 4 in. per ft. of


height
One-family dwelling: 6 ft.
min.
All other structures: 10 ft.
min.

Non-residential uses:
Width: 3 in. per ft. of
height, 12 ft. min.
Residential uses:
Width: 4 in. per ft. of
height 15 ft. min.
Open court #1: width
required: 24 ft., 8 in. at
73 ft. 11 in. of height

Same as matter-ofright

Not provided

Width: 4 in. per ft. of


height
One-family dwelling: 5 ft.
min.
All other structures: 15 ft.
min.
Area: 2x the square of the
required court width; 350
sq. ft. min.

Non-residential uses:
Area: 2x the square of
the required width; 250
sq. ft.
Residential uses:
Area: 2x the square of
the required width: 350
sq. ft.
Closed court #1: width
required: 30 ft., 8 in. at
91 ft. 8 in. of height
2

Open court #1: width: 10


ft. (relief requested)

Same as matter-ofright

Closed court #1 (in lieu of


rear yard):

Parking
2101, 506

Residential
1 per dwelling unit

Parking (contd)

Loading
2201

None required

Area required: 1,881 sq.


ft.

Width: 48 ft.
Area: 2,571 sq. ft.

Closed court #2: width


required: 21 ft. at 62 ft.,
4 in. of height
Area required: 882 sq.
ft.

Closed Court #2
Width: 15 ft. (relief
requested)
Area: 1,918 sq. ft.

Residential
1 per dwelling unit
34 required3

Same as matter-ofright

Residential
367

Non-Profit Office
16 required4

Same as matter-ofright

Non-Profit Office
168

Art Use
9 required5

Art Use
9 (see fn. 8)

Education Use
9 required6

Education Use
9 (see fn. 8)

Residential
1 berth at 55 ft. deep
1 platform at 200 sq. ft.

Same as matter-ofright

Residential
1 berth at 30 ft. deep
1 platform at 100 sq. ft.

The proposed number of dwelling units is 136. The final dwelling unit count may vary by 10% per flexibility requested. Proposed residential parking range:
3237.
4
Non-profit office parking in excess of 2,00 sq. ft., 1 for each space for each additional 1,800 sq. ft., 16 spaces required for 31,690 sq. ft. of office.
5
One 1 space for every 600 sq. ft. Nine spaces required for 5,200 sq. ft. of art studio space.
6
Educational program parking: 2 spaces for 3 teachers. Three spaces required for 7 teachers.
7
The proposed number of residential parking spaces is based on a unit total of 136. The final residential parking count may vary by 10% per flexibility
requested. Proposed residential parking range: 3237.
8
Of the 34 spaces provided for non-profit office, art, and education uses, 11 are tandem spaces.

1 service/delivery at 20
ft. deep

Green Area Ratio


3400

None required

1 service/delivery at 20 ft.
deep
(relief requested)

Education Use
None required9

Same as matter-ofright

Education Use
None provided

Non-Profit Office
None required (See
fn. 9)

Same as matter-ofright

Non-Profit Office
None required

0.3

Same as matter-ofright

0.333 provided
See Page 3.14 of the plans

Inclusionary Zoning
2600
Bike Parking
802

None required

Residential:
1 per dwelling unit
45 long-term

Same as matter-ofright

For non-profit office and educational uses with less than 30,000 gross sq. ft., no loading facilities are required. See 11 DCMR 2201.

Residential:
45 long-term

LOT 61
LOT 89

LOT 88

LOT 90

LOT 85

LOT 84

LOT 82

A&T LOT 886

LOT 83

SOUTH 44.00' (REC)


43.96' (SUR)

EAST 280.00' (REC) 280.13' (SUR)

SOUTH 178.93' (REC & SUR)

NORTH 222.93' (REC) 222.89' (SUR)

WEST 145.00' (REC & SUR)

WEST 135.00' (REC) 135.13' (SUR)

LOT 52 SQUARE 498


LOT FIFTY-TWO (52) IN SQUARE FOUR HUNDRED NINETY-EIGHT (498) IN THE SUBDIVISION
MADE BY DISTRICT OF COLUMBIA REDEVELOPMENT LAND AGENCY, AS PER PLAT RECORDED
IN LIBER NO. 141 AT FOLIO 118 AMONG THE RECORDS OF THE OFFICE OF THE SURVEYOR FOR
THE DISTRICT OF COLUMBIA.

1.

AREA LOT 52:

36,476 SQ. FT. (RECORD)


36,493 SQ. FT. (SURVEYED)

2.

HORIZONTAL DATUM: D.C. SURVEYOR'S OFFICE MERIDIAN (DCSO)

3.

PROPERTY SHOWN AMONG THE RECORDS OF THE D.C. SURVEYOR'S OFFICE IN


SUBDIVISION BOOK 141 - PAGE 118

4.

PROPERTY ZONED: R-3

5.

THE PROPERTY SHOWN HEREON DOES NOT LIE WITHIN ANY SPECIAL FLOOD PLAIN
HAZARD AREA AS ESTABLISHED BY THE U. S. DEPARTMENT OF HOMELAND
SECURITY, FEDERAL EMERGENCY MANAGEMENT AGENCY, NATIONAL FLOOD
INSURANCE PROGRAM, FLOOD INSURANCE RATE MAPS, COMMUNITY PANEL NO.
110001 0019C, MAP REVISED SEPTEMBER 27, 2010.

6.

PROPERTY CORNER MARKERS NOT INSTALLED BY THIS SURVEY.

7.

BOUNDARY INFORMATION SHOWN HEREON WAS OBTAINED FROM OFFICIAL CITY


RECORDS AND VERIFIED IN THE FIELD INSOFAR AS POSSIBLE. PROPERTY LINE
DIMENSIONS FROM OFFICIAL RECORDS MAY NOT NECESSARILY AGREE WITH
ACTUAL MEASURED DIMENSIONS. ALL PROPERTY LINES IN THE DISTRICT OF
COLUMBIA ARE SUBJECT TO CHANGE BY THE OFFICE OF THE SURVEYOR, D.C.

8.

THE LOCATION OF ALL UTILITIES SHOWN HEREON ARE FROM VISIBLE FIELD
EVIDENCE AND CANNOT BE GUARANTEED. SUBSURFACE INVESTIGATION WAS NOT
PERFORMED. FOR MARKING OF UNDERGROUND UTILITY LINES, CALL MISS UTILITY
AT 1-800-257-7777 AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION OR
CONSTRUCTION.

9.

SURVEY WAS PERFORMED AT TIME OF HEAVY SNOWFALL AND IS SUBJECT TO


FURTHER SITE VISITATION TO CONFIRM SITE IMPROVEMENTS.

A&T LOT 886

1140 Connecticut Avenue NW


Suite 600
Washington, DC 20036
202.296.8625

TECHNICAL MEMORANDUM
To:

From:

Meridith Moldenhauer

GMMW

Bill Denton

Erkiletian

Patrick Burkhart

Shalom Baranes Associates

Tim Fowler

Shakespeare Theatre Company

Maris E. Fry, EIT


Robert B. Schiesel, P.E.
Daniel B. VanPelt, P.E., PTOE

Date:
Subject:

February 1, 2016
501 Eye Street Preliminary Transportation Review

INTRODUCTION
This memorandum presents a Preliminary Transportation Review of the transportation aspects of the 501 Eye Street
development. A Comprehensive Transportation Review (CTR) is being performed and is currently being scoped with the
District Department of Transportation (DDOT), and a full CTR report will be issued prior to the Zoning Commission hearing.
The development is located in the Southwest quadrant of Washington, DC as shown in Figure 1. The site is currently vacant,
but formerly served as the home of Southeastern University, consisting of a two-story building, a small 32-space surface
parking lot, and 6 parking spaces under the building. The redevelopment plan proposes a mixed-use building that includes
facilities to serve the Shakespeare Theatre Company (STC) and residential uses. The STC facilities will primarily include
nonprofit administrative office space, educational space, rehearsal space, and production space. The residential component
will include 136 units, 93 of which will be general market rate apartments, 9 of which will be inclusionary zoning apartments,
and 34 of which will act as actor and fellow housing for STC. Access will be from an existing curb cut on 6 th Street and will
serve both parking and loading activity.
The purpose of this Preliminary Transportation Review is to:

Provide a summary of major transportation features near and adjacent to the site including reviewing roadways,
transit facilities, bicycle facilities, and pedestrian facilities;

Evaluate the overall transportation demand of the site in comparison to its previous uses; and

Review the transportation elements of the development site plan and demonstrate that the site promotes nonautomobile modes of travel and sustainability.

This Review concludes that:

The site is well-served by existing public transit service and has access to well-connected pedestrian and bicycle
facilities;

Transportation Planners and Engineers

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 2

February 1, 2016

The site is expected to generate a manageable amount of auto and non-auto trips, with a much lower vehicular trip
generation than that of former uses on the site;

The site design takes advantage of the existing curb cut for both parking and loading access;

The proposed parking supply meets zoning requirements and although the Applicant is requesting loading relief, the
proposed loading plan is expected to accommodate all loading demand; and

A pick-up/drop-off area is proposed along 6th Street that will serve STC during the day and residents in the evening
and overnight.

SITE LOCATION & MAJOR TRANSPORTATION FEATURES


The proposed development is located at 501 Eye Street in the Southwest quadrant of Washington, DC. The site is served by
many regional roadways and arterials including Interstate 395, Interstate 695, Maine Ave SW, M Street SW/SE, and South
Capitol Street. The site is accessible via these roadways, along with a network of collector and local streets.
The site is well-served by public transportation, including Metrorail and Metrobus service. The project site is also served by a
pedestrian network consisting of sidewalks and crosswalks along the local streets and surrounding the project site. In addition
to pedestrian accommodations, the site is served by a bicycle network, which consists of mixed-use trails and bike lanes.

Car Sharing
Three car-sharing companies serve the District: Zipcar, Enterprise Carshare, and Daimlers Car2Go. All three services are
private companies that provide registered users access to a variety of automobiles. Both Zipcar and Enterprise Carshare have
locations adjacent to the project site. Table 1 lists the car-sharing locations within a quarter-mile of the site and the number
of vehicles available at each location.
Table 1: Car Share Locations and Vehicles
Carshare Location

Number of Vehicles

Zipcar
Waterside Towers (907 6th Street SW)

1 Vehicle

502 I Street SW (on-street)

2 Vehicles

rd

3 /K Street SW

3 Vehicles

Enterprise Carshare
Waterfront Metro Station (1100 4th Street SW)

5 Vehicles

Total Number of Car Share Vehicles near Site

11 Vehicles

Car-sharing is also provided by Car2Go, which provides point-to-point car sharing. Unlike Zipcar, which requires two-way
trips, Car2Go can be used for one-way rentals. Car2Go currently has a small fleet of vehicles located throughout the District.
Car2Go vehicles may park in any non-restricted Metered curbside parking space or Residential Parking Permit location in any
zone throughout the defined Home Area. Members do not have to pay the meter or pay stations. Car2Go does not have
permanent designated spaces for their vehicles; however availability is tracked through their website, which provides an
additional option for car-sharing patrons.

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 3

February 1, 2016

Figure 1: Site Location

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 4

February 1, 2016

Transit
The development site is well served by heavy rail, commuter bus, and local bus service. Combined, these transit services
provide local, city wide, and regional transit connections and link the site with major cultural, residential, employment, and
commercial destinations throughout the region. Figure 2 identifies the major transit routes, stations, and stops in the area.
Metrorail and Metrobus services connect the site with other District neighborhoods and the Washington Metropolitan region.
The site is primarily serviced by Metrobus along the M Street, Eye Street, 4th Street, and 7th Street corridors. The routes serving
this area connect the site to various locations throughout the District and the downtown business core. Table 2 shows a
summary of the bus route information for the Lines that serve the site vicinity, including service hours, headway, and walking
distance to the nearest bus stop.
The Waterfront Metrorail station is located approximately 0.3 miles of the site and the LEnfant Plaza Metrorail station and
LEnfant VRE station are just under half a mile from the site. Waterfront station serves the Green Line while LEnfant Plaza
station serves the Green, Yellow, Blue, Orange, and Silver Lines. The Green Line connects the development with major
downtown connections such as Chinatown/Gallery Place, as well as Fort Totten and Greenbelt, Maryland to the north and
Branch Avenue station in Maryland to the South. The Yellow, Blue, Orange, and Silver Lines provide service to additional
major destinations within the District, Maryland, and Virginia, including Arlington, Alexandria, and Tysons. Metrorail trains
run approximately every three minutes during the morning and afternoon peak hours. They run about every 5-6 minutes
during weekday non-peak hours, every 10-15 minutes on weekday evenings after 7:00 pm and 6-15 minutes on the weekends
Table 2: Bus Route Information
Route
Route Name
Number

Service Hours1

Headway1

Walking Distance to
Nearest Bus Stop

74

Convention Center-Southwest
Waterfront Line

Weekdays: 5:03AM 12:03AM

15 min 20 min

0.1 miles, 1 minutes

735

Charlotte Hall/Waldorf to
Washington DC

Weekdays: Northbound 4:20AM 7:00AM


Southbound 12:15PM 5:25PM

20 30 min

0.2 miles, 4 minutes

A9

Martin Luther King Jr. Ave.


Limited Line

Weekdays: Northbound 5:55AM 8:50AM


Southbound 3:35PM 6:52PM

15 min

0.1 miles, 3 minutes

A42,46,48

Anacostia-Congress Heights Line

Weekdays: 4:00AM 12:00 AM


Weekends: 4:04AM 12:40 AM

15 30 min

0.1 miles, 1 minutes

D300

Dale City-Washington Navy Yard

Weekdays: Inbound: 4:36AM 6:43 AM


Outbound: 12:13PM 7:42PM

30 90 min

0.1 miles, 1 minutes

P6

Anacostia-Eckington Line

Weekdays: 5:05AM 2:04 AM


Weekends: 8:27AM 11:56 PM

15 30 min

0.3 miles, 6 minutes

V7, V8, V9

Minnesota Avenue-M Street Line

Weekdays: 4:38AM 2:01 AM

30 min

0.2 miles, 5 minutes

W9

South Capitol Street Limited Line

Weekdays: Southbound: 6:15 AM 9:07 AM


Northbound: 3:15 PM 6:15 PM

15 30 min

0.1 miles, 3 minutes

WMATA route schedules, http://wmata.com/bus/timetables/

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 5

February 1, 2016

Bicycle Facilities
Near the development site bicycles have access to multi-use trails, on-street bike lanes, signed bike routes, and local and
residential streets that facilitate cycling. The bicycle network provides good conditions for local trips and there are several
routes for trips between the site and other areas within the District.
The site is located directly along the Eye Street SE/SW bike lanes and less than a block from the 4 th Street SW bike lanes.
These bicycle lanes provide connectivity to areas around the site and link cyclists to other bicycle facilities in the District.
Additionally, the Anacostia Riverwalk Trail is conveniently located near the site and accessible from on-street bicycle facilities.
Although the trail has some breaks from end to end, signed bike routes lead users along safe routes back to the trail. A map
of the existing and proposed bicycle facilities in the vicinity of the site is shown in Figure 3.
Although there is bicycle parking near the Waterfront Metrorail Station and other new developments nearby, there is little
to no dedicated short-term bicycle parking directly surrounding the site. This results in many cyclists using street signs, parking
meter, or similar objects to secure their bicycles. This indicates that there is a demand for additional bicycle parking facilities
in the area.
In addition, the Capital Bikeshare program allows for an additional cycling option. Users can choose to join the program for
one day, three days, a month, or a year. Therefore this program is perfect for both visitors and residents of the area. Users
can rent a bike from the nearest docking station, ride the bike to their destination, and return the bike to a different docking
station, making the system convenient for one-way and two-way trips. The Capital Bikeshare program has placed over 350
bicycle-share stations across Washington, DC, Arlington and Alexandria, VA, and Montgomery County, MD with over 3,000
bicycles provided. There are two stations within a quarter-mile radius of the site located at 6th and Water Street SW / SW
Waterfront and at 4th and M Street SW contributing to a total of 42 docking stations as summarized in Table 3.
Table 3: Bikeshare Locations and Docking Stations
Bikeshare Location
6th and Water Street SW / SW Waterfront
4th and M Street SW
Total Number of Bikeshare Docking Stations

Gorove/Slade

Number of Docking Stations


19 docking stations
23 docking stations
42 docking stations

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 6

February 1, 2016

Figure 2: Existing Transit Facilities

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 7

February 1, 2016

Figure 3: Existing Bicycle Facilities

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review


January 1, 2016

Page 8

Pedestrian Facilities
This section provides an inventory of the existing pedestrian facilities and deficiencies. Overall, the pedestrian facilities near
the development site provide a good walking environment. Pedestrian access to the site is provided along all adjacent streets.
The site has good pedestrian access to nearby transit. The Waterfront-SEU Metrorail station is located approximately 0.3
miles from the site, with a portal located on 4th Street SW just north of M Street SW. Additionally, the LEnfant Plaza Metrorail
station is located just under a half-mile from the site and provides access to the Yellow, Blue, Silver, and Orange lines as well.
The site is also within walking distance to many bus routes along M Street, I Street, 4 th Street, and 7th Street that provide local
and commuter service between the area and additional destinations within the District.
There are a few barriers or areas of concern near the site that negatively impact the quality and attractiveness of walking,
including walking distances between the site and some major destinations, manmade and natural barriers that increase
walking distances, and roadway conditions that reduce the quality of walking conditions, including narrow sidewalks, lengthy
freeway overpasses, and lengthy crossings at some intersections. These are primarily due to the sites proximity to Interstate
395. Figure 4 illustrates major walking routes and pedestrian barriers in the vicinity of the site.
A detailed review of pedestrian facilities near the site shows that most facilities meet DDOT standards, and provide a quality
walking environment. Figure 5 shows a detailed illustration of the existing pedestrian infrastructure within a quarter-mile
walkshed of the development site. Sidewalks, crosswalks, and curb ramps are evaluated based on the guidelines set forth by
DDOTs Public Realm Design Manual in addition to ADA standards. Sidewalk width and buffer requirements for the District
are shown below in Table 4. Within the quarter-mile walkshed, most roads are considered residential with a moderate to
high density due to the proximity to the Waterfront-SEU and LEnfant Plaza Metrorail stations, the presence of multiple
elementary and middle schools, and the frequency of commercial buildings that serve the neighborhood. The majority of
sidewalks comply with an 8 foot sidewalk width and most have a 4 to 6 foot buffer. Even if no buffer exists between the edge
of the sidewalk and the roadway, most roadways allow on-street parking which creates an additional buffer between
pedestrians and vehicular traffic. ADA standards require that all curb ramps be provided wherever an accessible route crosses
a curb and must have a detectable warning. Additionally, shared curb ramps between two crosswalks is not desired. As
shown in the figure, under existing conditions there are occasional issues regarding curb ramps and for the most part, these
issues are due to a lack of detectable warning strips.
Table 4: Sidewalk Requirements
Street Type

Minimum Sidewalk Width

Minimum Buffer Width

Residential (Low to Moderate Density)

6 ft

4 ft (6 ft preferred for tree space)

Residential (High Density)

8 ft

4 ft (6 ft preferred for tree space)

Commercial (Non-downtown)

10 ft

4 ft

Downtown

16 ft

6 ft

Gorove/Slade
www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 9

February 1, 2016

Figure 4: Pedestrian Pathways

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 10

February 1, 2016

Figure 5: Pedestrian Infrastructure

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 11

February 1, 2016

SUMMARY OF TRANSPORTATION DEMAND


This section provides a summary of the transportation demand for the 501 Eye Street development. It summarizes the
proposed trip generation of the site by land use and by mode, including vehicular, transit, bicycle, and walking.

Mode Split & Trip Generation Assumptions


Weekday peak hour trip generation for the market rate residential component of the 501 Eye Street development was
calculated based on the methodology outlined in the Institute of Transportation Engineers (ITE) Trip Generation, 9th Edition.
This methodology was supplemented to account for the urban nature of the site (Trip Generation provides data for nonurban, low transit use sites) and to generate trips for multiple modes. Residential trip generation was calculated based on ITE
land use 220, Apartment, splitting trips into different modes using assumptions derived from census data for the residents
that currently live near the site.
Transportation demand for the Shakespeare Theatre Company (STC) was determined based on survey information provided
by STC in March of 2015. Demand was broken up into several user groups to accommodate for varying arrival/departure
times and expected mode splits. Based on this information, the highest vehicle-trip generation numbers occur in August,
when STC population is at its highest. Of note, apartments allocated to STC actors are not expected to generate any vehicular
trips as actors are not likely to have a car on-site unless there are available parking spaces in the garage.
A summary of mode splits for both STC and market rate residential uses are shown in Table 5. A summary of the trip
generation for the development is shown in Table 6.
Table 5: Mode Split Summary
Mode Split
User Group

Auto

Transit

Walk

Bike

Housed On-Site

Shakespeare Theatre Company (per STC Survey)


Full-Time Staff

30%

45%

4%

4%

17%

Part-time staff

50%

50%

0%

0%

0%

Call Center

40%

50%

10%

0%

0%

Volunteers

60%

40%

0%

0%

0%

Summer Camp

67%

25%

8%

0%

0%

MAC

70%

20%

10%

0%

0%

Shakespeare Salon

20%

80%

0%

0%

0%

Home School

80%

20%

0%

0%

0%

After School Class

0%

100%

0%

0%

0%

Workshops & Training

25%

50%

10%

15%

0%

STC Actors

10%

20%

0%

20%

50%

ACA Rehearsals

10%

80%

5%

5%

0%

Ford Theater Rehearsals

20%

60%

8%

12%

0%

10%

0%

Non-STC Component (per census data)


Apartments

Gorove/Slade

55%

33%

2%

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 12

February 1, 2016

Table 6: Multi-Modal Trip Generation Summary


Mode

Auto

Transit

Bike

Walk

Land Use

AM Peak Hour

PM Peak Hour

In

Out

Total

In

Out

Total

Residential

6 veh/hr

23 veh/hr

29 veh/hr

26 veh/hr

14 veh/hr

40 veh/hr

STC

34 veh/hr

6 veh/hr

40 veh/hr

28 veh/hr

11 veh/hr

39 veh/hr

Total

40 veh/hr

29 veh/hr

69 veh/hr

54 veh/hr

25 veh/hr

79 veh/hr

Residential

4 ppl/hr

16 ppl/hr

20 ppl/hr

17 ppl/hr

10 ppl/hr

27 ppl/hr

STC

47 ppl/hr

2 ppl/hr

49 ppl/hr

8 ppl/hr

15 ppl/hr

23 ppl/hr

Total

51 ppl/hr

18 ppl/hr

69 ppl/hr

25 ppl/hr

25 ppl/hr

50 ppl/hr

Residential

0 ppl/hr

1 ppl/hr

1 ppl/hr

1 ppl/hr

1 ppl/hr

2 ppl/hr

STC

3 ppl/hr

0 ppl/hr

3 ppl/hr

0 ppl/hr

1 ppl/hr

1 ppl/hr

Total

3 ppl/hr

1 ppl/hr

4 ppl/hr

1 ppl/hr

2 ppl/hr

3 ppl/hr

Residential

1 ppl/hr

5 ppl/hr

6 ppl/hr

5 ppl/hr

3 ppl/hr

8 ppl/hr

STC

3 ppl/hr

0 ppl/hr

3 ppl/hr

4 ppl/hr

1 ppl/hr

5 ppl/hr

Total

4 ppl/hr

5 ppl/hr

9 ppl/hr

9 ppl/hr

4 ppl/hr

13 ppl/hr

Southeastern University Comparison


The 501 Eye Street site has historically been home to institutional uses. Although the site is currently a vacant lot, the site
served Southeastern University (SEU) until 2009 and contained a two-story building with approximately 38 parking spaces.
During its final semester SEU had an enrollment of 870 students (including 648 undergraduate students and 222 graduate
students) with approximately 140 faculty and staff members and primarily served District residents.
As stated above, trip generation is calculated based on the methodology outlined in ITEs Trip Generation Manual. Trip
generation for the university was calculated based on ITE land use 550, University/College. Typically, Trip Generation results
are supplemented to account for the urban nature of the site; however, universities and colleges typically operate more like
an urban environment because so many students live on-campus and some universities provide private transit services. For
this reason, and because SEU did not house students on campus and primarily functioned as a commuter school, mode split
percentages were not applied to the base trip generation values. It is assumed that these values are already a more accurate
representation of vehicular trip generation given the typical nature of colleges and universities.
Based on these assumptions, a vehicular trip generation summary for the former SEU is shown in Table 7.
Table 7: SEU Vehicular Trip Generation
Land Use
SEU

AM Peak Hour

PM Peak Hour

In

Out

Total

In

Out

Total

115 veh/hr

33 veh/hr

148 veh/hr

47 veh/hr

101 veh/hr

148 veh/hr

As shown, the estimated trip generation for the former SEU is much greater than that proposed for 501 Eye Street
development. Additionally, and discussed in more detail in the following section, the proposed development will be including
a parking supply that more adequately serves all uses of the site. Due to the large trip generation of SEU and the limited
parking supply, it is assumed that many students were forced to park in the neighborhood.

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 13

February 1, 2016

DESIGN REVIEW
This section provides an overview of the on-site transportation features of the proposed 501 Eye Street development. 501
Eye Street is located on the northeast corner of Eye Street and 6 th Street in the Southwest quadrant of the District. The site
is currently vacant, but formerly served as the home of Southeastern University, consisting of a two-story building, a 32-space
surface parking lot, and 6 parking spaces under the building. The redevelopment plan proposes a mixed-use building that
includes facilities to serve the Shakespeare Theatre Company (STC) and residential uses. These facilities will primarily include
nonprofit administrative office space, educational space, rehearsal space, and production space. The residential component
will include 136 dwelling units, 93 of which will be market rate, 9 of which will be inclusionary zoning, and 34 of which will be
designated for housing STC actors and fellows. Figure 6 shows the proposed site plan. Parking and loading access to the site
will be from an existing curb cut along 6th Street.

Loading
According to DC zoning requirements, the residential use is required to provide (1) 55 loading berth and one (1) 20
service/delivery space. No loading is required for the STC uses. Alternatively, the development proposed to include one (1)
30 loading berth and one (1) 20 service/delivery space.
Based on the experience of residential building managers that manage buildings with the District and previous studies
performed by Gorove/Slade, rental apartments have an average turnover of 18 months, with two trucks per turnover (one
move out and one move in). Based on this information and the proposed development program of 136 apartment style
residential units, there will be approximately 181 deliveries per year or less than one delivery per day for the residential land
use. The specific loading needs of STC will vary from day to day, but the majority of the loading activity can be accommodated
in the 20 service/delivery space. Therefore the proposed amount of loading facilities will be sufficient to accommodate all
loading and service demand. Additionally, the size of the residential units will not require deliveries from trucks larger than
the 30 loading berth can accommodate (i.e. large box trucks). Of note, a detailed loading management plan will be assembled
for the CTR that will outline the specific operations of the site, particularly in regards to STC.
As shown in the Technical Attachments, 30 truck maneuvers into and out of the loading docks can be easily made from 6th
Street and based on the orientation of the docks, can accommodate head-in/head-out maneuvers. 20 trucks are also shown
easily maneuvering into the service/delivery space even when the 30 bay is occupied by a truck.

Parking
The parking proposed for this project includes 70 parking spaces in a below-ground parking structure accessed from 6th Street.
Based on the current District zoning laws, and assuming the STC space can be allocated as a mixture of institutional and office
space, the following outlines the parking requirements for all land uses of the development:

Residential 34 spaces

Non Profit Office 16 spaces

Art Space 9 spaces

Education Space 9 spaces

By supplying 70 spaces the development will satisfy zoning requirements. The development proposes to allocate 36 of these
spaces to residential uses and 34 of these spaces to STC uses. Of the 34 spaces allocated to STC, there will be 22 spaces (11

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 14

February 1, 2016

in each row) that will be in tandem. It should be noted that although the apartments allocated for STC actors are included in
the zoning requirements, no parking will be allocated to these units unless excess parking is available. Therefore, the 102
rental apartments will be using the 36 parking spaces. This amounts to a parking ratio of 0.35 which is slightly lower than
typical parking demand observed in the District, but expected to be sufficient given the proximity of the site to Metrorail and
Metrobus.

Pick-Up/Drop-Off
The largest pick-up/drop-off demand for the site comes from the Summer Camp offered by STC from June to August. There
are designated pick-up/drop-off times from 9:45 to 10:15 AM and 4:45 to 5:15 PM. Based on information provided from STC,
it is assumed that approximately 49 campers will need to be dropped off and picked up over each half hour period. Other
classes/events offered by STC may also require pick-up/drop-off spaces but to a much lesser degree and not at the same time
as the Summer Camp.
The existing curbside management of the roadways surrounding the site were collected as shown on Figure 7. The portion of
6th Street adjacent to the site is zoned as RPP and the portion of Eye Street adjacent to the site is zoned as enhanced RPP.
Further down Eye Street there is a Metrobus zone and pick-up/drop-off zones used by the adjacent Amidon-Bowen
Elementary School. Sharing the adjacent schools pick-up/drop-off zone was evaluated as an option, but was deemed
unfeasible because the loading zone is only in effect on school days and because a pick-up/drop-off zone in this location
would be located too far from the STC building access. Because this pick-up/drop-off zone is catered to children attending a
summer camp, safety concerns arise from dropping off and picking up too far from the entrance.
Based on this knowledge and the proposed STC building access, it is proposed that pick-up/drop-off activity take place along
6th Street. This would require the RPP spaces along the east side of 6th Street to be converted to STC use on either a permanent
or temporary basis, depending on further analysis of the needs of the site. Regardless of whether or not the curbside is
permanently dedicated to STC uses, parking would be available to residents in the evenings and overnight.

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 15

February 1, 2016

Figure 6: Site Plan

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 16

February 1, 2016

Figure 7: Existing and Proposed Curbside Management

Gorove/Slade

www.goroveslade.com

501 Eye Street Preliminary Transportation Review

Page 17

February 1, 2016

CONCLUSIONS
This Review concludes that:

The site is well-served by existing public transit service and has access to well-connected pedestrian and bicycle
facilities;

The site is expected to generate a manageable amount of auto and non-auto trips, with a much lower vehicular trip
generation than that of former uses on the site;

The site design takes advantage of the existing curb cut for both parking and loading access;

The proposed parking supply meets zoning requirements and although the Applicant is requesting loading relief, the
proposed loading plan is expected to accommodate all loading demand; and

A pick-up/drop-off area is proposed along 6th Street that will serve STC during the day and residents in the evening
and overnight.

Gorove/Slade

www.goroveslade.com

PROPOSED BENEFITS

BENEFIT RECIPIENTS

SHARED SPACES
1.

2.

Allow the free use of the assembly spaces/conference


rooms for community meetings during reasonable
weekday evening, and weekend daytime hours for
community meetings free of charge so long as STC
staff is available to open and close the space and the
space is not in use by STC.

Southwest
Community

Host an open house at the Property (to include


evening tours of costume fabrication shop and
rehearsal facilities with activities for families) in
coordination with SW ArtsFest

Southwest
residents
SW ArtsFest

SUPPORT FOR SOUTHWEST COMMUNITY


3.

For a period of five years following PUD approval,


STC shall provide an annual monetary contribution
to SW ArtsFest equal to the lesser of (1) Twenty
Percent (20%) of the annual budget of SW ArtsFest,
or (2) $2,500.00

SW ArtsFest

4.

Reserve tickets and gift certificates for adult Master


Acting Classes and Camp Shakespeare for Southwest
Community special events and raffles. The tickets
and gift certificates will be provided upon
appropriate request made by organizers of such
events to STC and subject to availability

Southwest
residents

5.

Provide scholarships to sponsor up to 10 low-income


children ages 5-17 to attend the two-week, full-day
Shakespeare Theater summer camp

Children in the
Southwest

6.

Reserve a number of discounted tuition spots for


Adult Master Acting Classes for members of the
Southwest Community who apply for such
discounted tuition by the advertised deadline

Adults in the
Southwest
Community

7.

Coordinate with Friends of the Southwest Duck Pond


for programming of arts events at the Duck Pond,
including participating in the Friends of the
Southwest Duck Pond Community Day.

Southwest Duck
Pond
Southwest
Community

8.

STC will participate in and financially support the


annual SW ArtsFest

Southwest
Community

9.

Reserve free tickets for Southwest residents to the


Academy
of
Classical
Acting
showcase
performances

Southwest
Residents

10.

STC will advertise in The Southwester with four onehalf page advertisements for at least one year

The Southwester

11.

Host tours of STC facilities for local schools and


community associations

Southwest
Community
Amidon Bowen ES
Jefferson Academy
MS
Others

ARTS EDUCATION
12.

Offer free tickets for special STC events that can be


raffled off at Southwest Community events

13.

Distribute free tickets to Ward 6 Night Free For All


performances at Sidney Harman Hall

14.

Invite classes from Jefferson Academy Middle


School and Amidon-Bowen Elementary School, as
well as community associations, for annual tours of
the Lansburgh Theatre, Sidney Harman Hall, and
Development, once operational

Offer to perform in-school performances of A


Midsummer Nights Dream and The Tiny
Tempest at Jefferson Academy Middle School and
Amidon-Bowen Elementary School

15.

16.

Provide Jefferson Academy Middle School with


District Shakespeare events and activities

17.

Provide Southwest Community educators priority


invitation to Teacher Appreciation Night at Sidney
Harman Hall

Southwest
Community
District Residents
Others
Ward 6 Residents
Southwest
Community
Amidon-Bowen
Elementary
Jefferson Academy
Southwest
Community
Amidon-Bowen
Elementary
Jefferson Academy
Southwest
Community
Jefferson Academy
Teachers in the
Southwest
Community

501 EYE STREET SW


The Bard, a joint development between Erkiletian Development Company and The Shakespeare Theatre Company
Community Outreach
Public and Community Meetings
MEETING
DATE
April 24,
2014

ORGANIZATION

ATTENDEES

INFORMATION SHARED/NOTES

Southwest Neighborhood
Kael Anderson,
Assembly (SWNA) leadership SWNA
Cecile Chen, SWNA
Dat Ngo, STC
Dan Stuver, SBA
Kinley Bray, AF
SWNA Board
Chris Jennings, STC
Dat Ngo, STC
Dan Stuver, SBA
Kinley Bray, AF
Kael Anderson,
SWNA
Cecile Chen, SWNA
Donna Purchase,
SWNA
Saadia Athias, SWNA
Kenneth Prater,
SWNA
Thelma Jones, SWNA

Discussion of preservation/demolition issues, program for


STC, market rate housing, shared early massing concept

June 9, 2014

ANC 6D

Kinley Bray, AF

Attend ANC 6D meeting and participate in discussion


regarding raze permit, timeline for development of STC
plans and pursuit of project

June 19,
2014

ANC SMD

Chris Jennings, STC


Elizabeth Wilcox,
JMZ

Discussion of STC program, needs, site constraints,


demolition/preservation issues, preliminary community
benefits from STC (not including developer contributions)

May 14,
2014

Discussion of demolition/preservation issues, building


design, shared first massing concept, discussion of
parking, number of units, height and density; adjourned
with commitment to return to talk about building design
and community benefits

Dan Stuver, SBA


Sam Marrero , SMD
Commissioner 6D01
Tim Fowler, STC
Presentation by OP of Draft SW Small Area Plan
Stefanie Erkiletian,
recommendations, small group conversations with SWNA
EDC
and ANC members
Kevin DeSouza, EDC
Kinley Bray, AF
Office of Planning SW
Small Area Plan Team
Over 100 neighbors in
SW, including:
Roger Moffatt, ANC
6D Chair
Andy Litsky, ANC 6D
Vice Chair
SWNA Board

June 25,
2014

Office of Planning & SW


Neighbors

July 15,
2014

SWNA leadership

Kael Anderson,
SWNA
Kinley Bray, AF

Discussion regarding landmark nomination, potential


withdrawal of same in consideration for negotiated
community benefits package, STC/EDC participation in
SWNA community forum, schedule in-person meeting
with SWNA

July 21,
2014

Near Southeast/Southwest
Community Benefits
Coordinating Council

Ruth Hamilton, Chair


Felicia Couts
Barbara Ehrlich
Rick Bardach
Debra Frazier
Carolyn Mitchell
Chris Jennings, STC
Bill Denton, EDC
Kinley Bray, AF

General introduction, discussion of timeline & process for


development, impact of landmark

July 24,
2014

SWNA

Kael Anderson,
SWNA

Meeting to discuss coordination on community forum


7/28/14, potential withdrawal of landmark nomination in
2

Cecille Chen, SWNA


Chris Jennings, STC
Bill Denton, EDC
Kinley Bray, AF
Coordinated by
SWNA

exchange for negotiated community benefits package,


including funding for SW Historic District study &
application ($90K)
Presentation by SWNA on sites history, Presentation by
STC and EDC on potential development, STC program,
development process; Q&A by neighbors

July 28,
2014

Public Meeting

August 4,
2014

Waterfront Gateway
Neighborhood Association,
WGNA
Townhouse Management I
(TMI), Townhouse
Management IV (TMI IV),
SWNA

All WGNA Board


Members invited

General introduction, discussion of timeline & process for


development, impact of landmark

Leadership &
interested neighbors in
townhouses across 6th
street

Discussion of SWNA Agreement terms, communication,


charrette

November
21, 2014

General Community

Open forum

Listening session to discuss height, density, community


benefits concerns in advance of finalizing plans

June 4, 2015

ANC Commissioners

Meeting to outline process for moving forward, strategy


for working together on new design

July 1, 2015

Telephone Town Hall

Andy Litsky, SMD


6D04
Marjorie Lightman,
SMD 6D01
Bill Denton, EDC
Chris Jennings, ETC
PUBLIC Invited

July 9, 2015

PUBLIC KIOSK Mtg.

Public Invitation

Present Updated Plans

July 11,
2015

PUBLIC KIOSK Mtg.

Public Invitation

Present Updated Plans

September
11, 2014

Explain Project and hear from community

August 10,
2015

Small Group Meeting

Community
Stakeholders
and Design Team

Open Dialogue

September
24, 2015

Small Group Meeting

Discussion regarding massing, present multiple design


options and receive feedback

February 1,
2016

Public Meeting

Community
Stakeholders and
Design Team
Public Invitation

February 16,
2016

Public Meeting

Public Invitation

Introduce the new design and discuss the Project

Introduce the new design and discuss the Project

Key:
AF: Arent Fox
EDC: Erkiletian Development Company
JMZ: JM Zell Partners, Ltd.
SBA: Shalom Baranes
STC: Shakespeare Theatre Company

You might also like