You are on page 1of 7

SHAKEEL AMJAD

QA/QC Inspector Piping (Mechanical)/W


Current Address:
ABIS (Abdullah Al Barak Industrial Services)
Saudi Arabia
Mobile :+966-591368150
E-mail : amjad82_shakeel@yahoo.com
Permanent Address:
Mian Town Near Gulshan-E-Usman
Rahim Yar Khan Pakistan
Mobile: +92-3016970436

CAREER OBJECTIVE
I am seeking carrier that allows me to work with people and technology. Remain calm and work well
under pressure, as part of team, alone or a team leader. I enjoy meeting targets, reaching solutions, a
dynamic environment and always committed to self-improvement. Good team player and use own
initiative to achieve company objectives. Use my initiative to build strong working relationships with
colleagues, clients & contractors.

ACADEMIC QUALIFICATION:
Matriculation (Science Group)
Government High School Bagh-o-Bahar

Diploma of Associate Engineer (DAE-Mechanical)


Government Institute Of Technology Rahim Yar Khan (Punjab Board Lahore)
Pakistan

COMPUTER SKILLS:
WINDOWS-7, MS Office 2010, Corel Draw 09, In Page (Urdu Software), Trouble
Shooting, Internet, Web Browsing.
1 Year Diploma of WWCSP(World Wide Computer Software Package) Network
Institute of Computer Education & Business Management.
6 Months Computer Hardware & Maintenance (Network Institute of Computer
Education & Business Management.)

PROFESSIONAL QUALIFICATION:
ASNT Level II in Radiography (RT)
ASNT Level II in Magnetic Particle Testing (MPT)
ASNT Level II in Panetrant Testing (PT)

CODES AND STANDARD KNOWLEDGE


ASME SEC IX
ASME /ANSI B31.1.B31.3
Also familiar with reference of various ASTM Standards

APPRICIATION AND RECOMMEDATION:


Qatar petroleum (nodco refinery) shutdown -2009 (Upgrade Retrofit of DGS 11305J Centrifugal
Compressor)
Qafco ammonia-04 and urea-04 Shutdown 2010
Page 1 of 7

PROFESSIONAL EXPERIENCE:
17 years total experience including of 08 years in Quality Control in mechanical
works which has been spent on oil & gas plant, Fertilizer, Cement Plants inspection,
implementation of QA/QC procedures in piping ,welding, NDT, Vessel, tanks and steel structure .
Fabrication, Erection ,Manufacturing , Maintenance, and plant shutdown inspection. Ability
to work both independently and in a team environment
JOB DISCRIPTION

Page 2 of 7

Project
Petro Kemya TA-2015
cleaning,Maintenanc
e and H/Testing of
Heat Exchangers
Petro Rabigh TA-2015
Equipments & Piping
IWS work
Safco (Modification of
Cooling Water line &
pre Fabrication of
Piping

Employer

Position

Duration

Client

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

19-11-15 to 08-12-15

SABIC

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

01-10-15 to 17-11-15

Petro Rabigh

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

03-06-15 to 28-09-15

SABIC

ABIS(Al Baraq
Industrial Services)
ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector
QA/QC
Inspector

01-03-15 to 15-04-15

SABIC

17-10-14 to 18-11-14

SABIC

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

07-06-14 to 06-10-14

SAUDI ARAMCO

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

20-02-14 to 03-06-14

SAUDI ARAMCO

Jeddah Refinery TA
Shutdown
HNGL (Hawaiya Gas Plant)
Piping Modification
Saudi Aramco

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

01-10-13 to 11-30-13

SAUDI ARAMCO

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

16-06-13 to 09-10-13

SAUDI ARAMCO

Albayroni (Saudi Fertilizer )

ABIS(Al Baraq
Industrial Services)
ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector
QA/QC
Inspector

01-04-13 to 15-06-13

SABIC

15-01-13 to 31-03-13

SABIC

ABIS(Al Baraq
Industrial Services)

QA/QC
Inspector

24-12-12 to 14-01-13

SAUDI ARAMCO

QA/QC
Inspector

23-03-12 to 04-04-12

CTJV (Chiyoda Technip


Joint Venture)

QA/QC
Inspector

15-02-12 to 22-03-12

Qatar Chemical

QA/QC
Inspector

05-12-11 to 14-02-12

Dolphin Energy Ltd.


Qatar

QA/QC
Inspector

02-10-11 to 04-12-11

CTJV (Chiyoda Technip


Joint Venture)

QA/QC
Inspector

07-04-11 to 01-10-11

Qatar Gas

Hadeed Turnaround 2015


Petrokemya Turnaround
2014
KAPSARC(King Abdullah
Petroleum studies
and Research
center) Riyadh
Riyadh Refinery Shutdown
Piping Modification
and pre fabrication

Saudi Kayan TA Shutdown


Abqaiq Gosp-3 Saudi
Aramco (HP Gas
compressor piping
Modification)

Qatar Gas Train-06 & 07


(Site Instruction
Work)
Q-Chem Qatar Turn Around
Shutdown -2012
Dolphin Shutdown -2012
Phase I and (pre
shutdown piping
fabrication work)
Qatar Gas Train-06 & 07
(Site Instruction
Work)
Qatar Gas Train-01,06 and
07 Shutdown

Page 3 of 7

Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C

Dolphin Shutdown -2011


Phase III and
Phase-I
Dolphin Shutdown -2011
Phase II & Pre
Fabrication Work
Qatar Gas Sea Water Intake
Combined
Modification Project
Qatar Gas Train-05
Shutdown
Fahahil (QP) Stripping Plant
Shutdown-2010
Qatar gas train-03
shutdown-2010
QAFCO Ammonia-04 and
Urea-04 shutdown2010
Rectification of Sulphur Silo
and Slug Catcher Dophin
Warranty Shutdown -2010

Page 4 of 7

Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C

QA/QC
Inspector

25-02-11 to 06-04-11

Dolphin Energy Ltd.


Qatar

QA/QC
Inspector

03-01-2011 to 24-022011

Dolphin Energy Ltd.


Qatar

QA/QC
Inspector

05-07-10 to 31-12-10

Qatar Gas

QA/QC
Inspector

11-06-10 to 04-07-10

Qatar Gas

QA/QC
Inspector

09-05-10 to 10-06-10

Qatar Petroleum

QA/QC
Inspector

29-03-10 to 08-05-10

Qatar Gas

QA/QC
Inspector

07-03-10 to 28-03-10

QA/QC
Inspector

01-01-10 to 06-03-10

QAFCO (Qatar Fertilizer

Company)
DEL(Dolphin Energy Ltd)

EP Modification Installation
of Bag Filter
Rehabilitation of LPG Tank
T1 & T2 46000M3
Shutdown -2009 (Upgrade
Retrofit of DGS
11305J Centrifugal
Compressor)

Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C

01-09-09 to 01-12-09

QA/QC
Inspector

01-05-09 to 30-08-09

Descon
Engineering Qatar
L.L.C

QA/QC
Inspector

01-03-09 to 01-04-09

Qatar Petroleum
(NODCO
Refinery)

Descon

QA/QC
01-01-09 to 25-02-09

Dolphin Energy Limited

QA/QC
Inspector

09-05-08 to 30-12-08

Ras Gas

QA/QC
Inspector

20-03-08 to 08-05-08

Qatar Gas

QA/QC
Assistant

10-10-07 to 19-03-08

Qafco (Qatar Fertilizer


Company)

Asstt.
Supervisor

August 2007

OGDCL (Oil & Gas


Development
Comp. Ltd)

01-01-07 to 30-03-07

FJFC

01-04-06 to 30-12-06

Maple Leaf Cement


Plant (Pakistan)

Engineering
Qatar

Dolphin Shutdown Train-II

Installation of new Nitrogen


Generation Plant
Qatar Gas Train-1
Shutdown
Qafco Urea 2 & 3 Shutdown
Uch Gas Processing Plant
Shutdown
(Pakistan)
Shutdown Fauji Fertilizer
Bin Qasim Karachi
(Pak)
6500 TPD New Cement
Plant Erection
(Pakistan)

L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
Descon
Engineering Qatar
L.L.C
EKL

Ins
pec
tor

QP (Qatar Petroleum)

NGL Plant

Asstt.
Descon

Sup
ervi
sor

Engineering
Asstt.
Descon
Engineering

Workshop

Shafi Reso
Chemical

Workshop

OGDCL

Workshop

Millat Mechanize
Ltd.

Workshop

Ravi Auto Eng.

Sup
ervi
sor
Asstt.Tech.
Me
cha
nica
l
Asstt.Tech.
Me
cha
nica
l
Asstt.Tech.
Me
cha
nica
l
Asstt.Tech.
Me
cha
nica
l

GENERAL:
Study scope of work
Material approval request (MAR).
Preparation of QC formats.
Page 5 of 7

QNCC (Qatar National


Cement
Company)

QA/QC
Inspector

01-02-06 to 25-03-06

Shafi Reso Chemical

(Lahore Pakistan)

01-02-04 to 30-10-05

OGDCL(Oil & Gas


Development
Company)

1996 to June1998

Millat Mechanize Ltd.


(Pakistan)

Oct.1994 to Oct.1995

Ravi Auto Engineering

Company ( Lahore Pak)

Control final documentation.

QC RESPONSIBILITIES:
All relevant codes and/or specifications are applied at Project and only current
documents are in use.
All inspection & tests are carried out as per ITPs, WPS/PQR, Method
Statements and Procedures for different activities and disciplines.
All repairs and correction of work shall be done by approved client method.
Liaison with third (3rd) party inspection agency for assuring/witnessing the
inspections and test activities.
Carry out inspection of materials/equipment received and prepares material
inspection reports.
Ensure handling, storage and maintenance of equipment and materials (in their
care, custody and control) in accordance with manufacturers suggested
procedures and relevant specifications.
Record all the inspections on project-approved formats to get these verified by
parties involved for the completed work scope. Ensure that copies are retained
and well kept.
Compile all quality records and prepare QC dossiers on completion of works and
final handover to client.

PIPING INSPECTION:

Checking for Isometric Drawing as to size, rating and material.


Prepare pipe spooling on isometric drawings by identifying shop fabrication and

field installation. Follow-up by preparing weld registration control sheets of


these spool drawings for quality control NDE records.
Check Welding Procedure Specification (WPS) & Procedure Qualification Record
(PQR).
Witness of Welder Qualification Test (WQT) according to ASME IX.
Monitoring and control of heat input through control of amperage & volts during
welding to avoid overheating.
Pneumatic test of full assembly (fitting & hot tap valves, drilling machine & Test
pack follow-up) inspection after welding
Inspection of Piping fabrication and erection according to clients specification
and Code B31.1, B31.3.
Responsible for the inspection of Pre- and Post-welding.
Control of welding material (Electrode, Filler Wire) backing of Low Hydrogen
Electrode.
Monitor welder performance and welding activities to ensure work is being
carried out in accordance with the approved welding procedure.
Visual inspection of welding.
Execute all NDT (PT, RT, and MT).
Witness water flushing, air blowing, pigging, steam blowing, hot bolting,
tightness test and conduct final line checks for final installation of piping
members including pump alignments to piping prior to mechanical completion of
the project.
Conducting piping line checking and preparation of punch list based on
engineering point of view. (e.i. considering the type of pipe supports based on
stress analysis calculation for high temperature lines. Also take into
consideration the access and operability of each piping components to meet
clients standards and requirements).
To Carry out Line punching during the Test pack internal review and assistance
for the reports preparation.
Witness of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing and
Reinstatement of Pipe line.
Preparation of Packages for commissioning.
Page 6 of 7

PLANT INSPECTION:

The coordination of inspection during shutdown activities on Boilers, pressure


vessels, Heat exchangers, columns, furnaces, coolers, Heaters, Filters, Valves,
Sea Water Pumps and process piping.
Assigned to mechanical works involving equipments internal inspections of
trays, distributor pipings, manways closing and final piping/equipment manholes
box-up prior to system tightness test.
Develop and implement repair strategies to maintain pressure equipment in safe
and serviceable operational condition
A review of inspection results to analysis inspection findings and identify
potential integrity issues and raise additional emergent work and to report any
remedial actions.
Witness of the Pressure Testing of Equipments, Exchangers.
Preparing the checklists for internal inspection of all fired heaters, vessels,
columns, tanks, reactors, etc.,
Planning and execution of the repair works.
Responsible for all QA/QC plant matters relating to release of materials
authorized on site, welding procedures, welder qualifications and review of
consumables controls.

PERSONAL INFORMATION:

Date of Birth:
May 5, 1973
Passport # AH1282862
Nationality : Pakistani
Marital Status: Married
Languages: English , Urdu , Punjabi
Address: Gulshan-E-Usman Rahim Yar Khan (Pakistan)
E-mail : amjad82_shakeel@yahoo.com
Mobile : Saudi Arabia : +966-591368150
Pakistan : +92-3016970436

TRAININGS:
Attended HSE Trainings.
Attended work at Heights & Confined Space Entry Trainings.

Page 7 of 7

You might also like