Ref No: MEC/11/S2/Q71T/PQP

PROJECT SPECIFIC QUALITY PLAN


1

Project Description

Environmental Impact Assessment and Environmental


Management Plan (EIA / EMP) study for the proposed
expansion of Steel Plant to 1.5 MTPA along with waste
gas based CPP (17 MW) at Wardha, Maharashtra

MECONs Work Item No.

Q71T

Contract Reference No. & Date

(i) W.O No: Nil, dated 01.05.2013

Customers Name & Address

Uttam Galva Metallics Limited (UGML)


Anuj Miglani Dy. Managing Director
Uttam Galva Steels Limited
Uttam House, 69. P. DMELLO ROAD
Mumbai 400 009
Phone: (022) 6656 3500
Fax: (022) 2348 1598

Customers Project Coordinators Name alongwith


Contact Phone / Fax / E-mail No

Shri Shankar Ramakrishna


Director (Technical & Engineering)
Uttam Galva Metallics Limited
Uttam House, 69. P. DMELLO ROAD
Mumbai 400 009
Email: srk@uttamgalva.com
Phone: (022) 6633 6444
Fax: (022) 2348 5025

MECONs Project Coordinators name alongwith


Contract Phone / Fax / E-mail
No. etc.(As applicable)

Dr. Vikas Kumar, DGM, Env. Engg., MECON Ltd. Ranchi


Extn 3382
Phone:0651-2481314
Fax: 0651-2482189/248224
Email: envenggranchi@meconlimited.co.in

Commercial coordinator

Shri T.P.Chopra,
DGMI/C (Mktg)
MECON, Ranchi.

Brief Project Overview

Uttam Galva Metallics Limited is expanding existing steel


plant to 1.5 Mtpy along with waste gas CPP (17 MW) at
Wardha, Maharastra. MECON will prepare EIA/EMP report
based on Techno-economic feasibility report being prepared
by MECON, Bangalore. The base line data and SODAR
data is supplied by the client based on the approved TOR.
The Project Involves the following activities:

Requirement of Deliverables
and Project Objectives

Secondary data collection including ecological, socioeconomic & hydrological study


Preparation of draft EIA / EMP report
Assisting UGML in public hearing
Preparation of final EIA / EMP report
Presentation of EIA/EMP report to MOE&F

Details of Deliverables are:


Zero date will be considered from the date of receipt of
down payment or kick-off meeting whichever is later.

Submission of Draft EIA/EMP report along with


executive summary in five copies within six weeks after
completion of one full season monitoring -- expected
tentatively by 15th July 2013.
Submission of final EIA/EMP report along with executive
summary in 20 copies after incorporating all comments
(from client) within two weeks from date of receiving
comments from client on draft report -- expected
tentatively by 30th July 2013.
Public hearing (assistance) by 7th September, 2013
Submission of final EIA/EMP report along with executive
summary in 15 copies after incorporating all comments
(from client, Public comments & SPCB comments) within
four weeks from date of public hearing & receiving
comments from SPCB and client on draft report -expected tentatively by 7th October,2013.
The above time schedule assumes that all inputs / data /
reports / other information as required from client shall
be made available by client are duly fulfilled in time &
Time period required by statutory authorities for different
interfaces of the Environmental clearance of the project.
Presentation of EIA/EMP report to MOE&F & Grant of
Environmental Clearance by 7th Nov. 2013

Objective of the work is to obtain environmental clearance


for the project

10

Schedule of Implementation

Start Date
End Date
Duration

18.05.2013
31.03.2014
10 months

Bar chart showing activity wise plan & progress is shown in


11

Specific exclusions from scope

12

Extra contractual work


authorisation by
Client to MECON

: None

13

Customers responsibility

Annexure 1

Rehabilitation & Resettlement Plan.


Detailed Engineering of measures suggested in EMP.
Any services not specifically mentioned in the scope of
services of MECON in the work order.

Furnish latest DPR/FR for the proposed steel plant as a


whole and individual major shop, layout of plant, project
report, proposed plant water balance, etc as required for
the EIA/EMP study report.
Carry out liaison work with concerned Government
agencies

14

Customers property

Input technical data for the work is FR & DPR

15.

Project Progress Reporting : Specimen format is enclosed as Annexure 2


Periodicity of reporting is once after completion of each deliverables as given in section
Requirement of Deliverables and Project Objectives" of this document. The progress report
format will be updated once after achieving each deliverable and will be sent to Customer in the
prescribed format (Annexure 2).

16.

Billing Schedule

17.

Down payment along with placement of order (70%)


After submission of draft EIA/EMP report (25%)
After submission of final EIA/EMP report (05%)

= Rs. 16,80,000 + ST
= Rs. 6,00,000 + ST
= Rs. 1,20,000 + ST

Broad Resource Planning


Environmental Engineering section has Engineers/scientists having adequate qualification and
expertise to execute the project.
However, outsourcing has been planned in the following areas:
1. Colour photocopying of drawing and report.
2. Upper Air Data & Collection of IMD Data if required.

18.

Drawing / Document Numbering System :

Drawing : MEC/11/S2/Q71T/#
Reports : 11.S2. [Year of submission]. [Report serial received from central TIC]

Enclose specimen copy of master list of drawing / document. : Enclosed as Annexure 3


Fund Flow statement format indicating:

Enclosed as Annexure 4

Specimen drawing title template :

Enclosed as Annexure 5

Specimen report page template :

Enclosed as Annexure 6

Specimen cover page of reports to be submitted :

Enclosed as Annexure 7

Drawing / document approval / release flow :

Design
Drawing preparation
Drawing checking
Drawing approval

19. Customer Satisfaction :

Customer complaint hierarchy & logging form:


Customer satisfaction measurement form:

Enclosed as Annexure 8
Enclosed as Annexure 9

Quality Management System Audit : Internal audit: Once in three months


Post MoEF clearance deliverables to Customer, identify e.g. : NA
Prepared by :

Project Coordinator
(Dr. Vikas Kumar)
DGM,
Pl.No. 61474
Env. Engg., MECON Ltd.
Ranchi,
Extn 3382

Reviewed & approved by:

Controlling Officer