Date: 14th June 2016

Expressway Programme Management, Doha, Qatar


Project No:
P059
Agreement Title:
Design & Construct Service Road Enhancement to North Road Corridor
Agreement No:
C2012/28
Budget Ref:
11320/1440913
Project ID:
IA 11-12 C 159 G
Contractors Name: Tekfen Construction & Installation Co., Inc.
Recommendation Report for Interim Payment Certificate No. 61 (May 2016)

1.

Purpose

This report narrates the basis on which the above named Contractors Interim Payment
application has been reviewed, and agreed by all parties i.e. Tekfen Construction & Installation
Co., Inc. (Contractor) and KEO (Supervising Consultant). It further indicates the jointly agreed
Gross and Net certifiable amount to Tekfen Construction & Installation Co., Inc. (Contractor) for
the month of May 2016 (Period ending 25th May 2016)
2.

Assessment and Evaluation

The Contractor M/s Tekfen Construction and Installation Co.INC has submitted his Application
for Payment No. 61 under letter reference EXW-P059-0000-CO-TEK-LT-02372 dated 08th June
2016. We have reviewed the said Payment Application and have ensured that the supporting
documentation is complete and that the quantity calculations have been correctly prepared and
presented.
As the Contract has now been converted to a Lump Sum, and following the procedure already
being followed on an Expressway Project, the recommendation for all Structures together with
some civils and utilities items have been calculated on the percentage (%) based against the
Shop Drawing and this percentage (%) has then been applied to the quantity within the Lump
Sum.
The gross cumulative and net period amounts recommended for payment include the following:

1) Amounts for Preliminaries to 25th May 2016. Only applicable Fixed Time and
Progress related Prelims are included in this interim certificate.
2) Amounts for Original and Revised Contract Measured Works executed to 25th May
2016.
3) Amounts for Original and Revised Contract Design and Supervision Works executed to
25th May 2016.
4) Amounts for Materials on Site to 25th May 2016.
5) As the Contractor is unable to demonstrate the payment to Qatar Armed Forces
preferred supplier (Ericsson) related to damaged cable, we have recommendation that
this amount is deducted from the Contractor ($86,368.00 at the exchange rate of 3.65
USD to 315,243.20 QAR+ 99,570.00 QAR =414,813.20 QAR as per QAF letter).
Page 1 of 3

6) Due to some areas of Asphalt not complying with the IRI requirements (as contained
within IAN 019 Rev. 01) various Non Conformance Reports were issued to the
Contractor. These were closed with the agreement of the Contractor under letter EXWP059-0000-CM-KEO-LT-02075 dated 18th May 2016, for the deductive amount of QAR
109,914.13.
The differences in the gross amount claimed by the Contractor and the certified amount are
summarized as follows:

Description
Value of executed Works
Value of executed Variation
Works
Materials on Site
Total Value of Work Done
to date
Unrecovered Advance
Payment
Retention
Deduction for QAF Cable
Damage
Deduction for Asphalt IRI
Test
Net Value to date

TEKFEN Claim Amount


(QAR)

KEO Certified
Amount (QAR)

Difference
Amount (QAR)

1,312,106,848.85

1,312,106,848.85

0.00

770,717,295.90

770,717,295.90

0.00

73,385,269.13

73,385,269.13

0.00

2,156,209,413.88

2,156,209,413.88

0.00

113,433,943.58

113,433,943.58

0.00

124,042,261.22

124,042,261.22

0.00

414,813.20

414,813.20

0.00

109,914.13

109,914.13

48,755,537.57

48,755,537.57

0.00

Executed Measured Works


The Value of work to date in the Contractors IPA was QAR 1,312,106,848.85. The Supervision
Consultant has recommended the same amount.
Executed Variation Works
Works under Site Instructions are assessed based on the actual Works done by Contractor and
approved by the Supervision Consultant up to the month of May 2016.

Revised Bill of Quantities (VO# 2/ SI #56) has been recommended 67.84 % of the
approved amount

Site Instruction #58 (VO#3) has been recommended 55.02% of the approved SI amount
We have adjusted the work done quantities in the Bill of Quantities to reflect that the Contract is
now a Lump Sum rather than a re-measureable Contract.

Page 2 of 3

Total amount certified by this certificate included the amount paid to KEO, which has been
approved.
Please note that this IPC covers the works carried out during the month of May 2016.
Materials on Site
Materials on Site are assessed based on the availability of submitted delivery notes and
invoices for verification of quantity and rates respectively and as agreed with the Contractor.
3.

Recommendation

Pursuant to Contract C2012/28 Clause 13.3 to 13.7 (Conditions of Contract part 1 General
Conditions) and Clause 13-B (Conditions of Contract Part II Conditions of Particular
Application), Section B Contract Document Vol. 4 of 8, KEO recommends that IPC No. 60 for
Works executed by the Contractor to end May 2016 (period ending 25th May 2016), in the net
cumulative amount of QAR 2,168,850,642.03 and period net amount of QAR 48,755,537.57 be
approved by the Authority and subsequently paid to the Contractor.

Thank you and regards,

Prepared and Recommended


By:

Approved By:

Lee Boyd, KEO


Senior Quantity Surveyor

Stuart Horne, KEO


Senior Resident Engineer

Page 3 of 3