Harsha Abakus Solar

IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Location

: Inverter Block : 1 to 4

Equipment

: 0.315 / 33kV Step Up 2.2 MVA Inverter Duty Transformer

Relay Make

Setting Range

CT Ratio

: 40

Load Current

: 38.49

Fault Current

: 0.59

kA

Over Current Setting

: 110%

Relay Characteristics

: Normal Inverse

/1

Fault Current of Transformer

A00
Rev.

Current on 33kV Side


Impedence (Ohm)

38.49

0.065

= 592.17 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting

Multiples of Plug Setting Current

=
Relay Operation Time

13.46

Fault Current
CT Primary x Current Setting
592.17
40 x 110%
13.46 PS
Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.05337
2.62

Sec
Page 1 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
2.62
0.095

= Relay Operartion time x TMS


=

2.62

0.250 Sec

0.095

Recommended Setting (51):


Current Setting

= 110%

Plug Setting Multiplier

= 13.46

Time Multiplier Setting

= 0.095

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

=
Relay Operation Time

14.80

Fault Current
CT Primary x Current Setting
592.17
40 x 100%
14.80 PS
Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.05538
2.53

Sec
Page 2 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
2.53
0.099

= Relay Operartion time x TMS


=

2.53

0.253

0.10

Recommended Setting (51N):


Current Setting

= 100%

Plug Setting Multiplier

= 14.80

Time Multiplier Setting

= 0.10

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 3 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

A00
Rev.

OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of 0.59
kA at 33kV Side.

The minimum fault current for the relay to operate


(Considering 20% margin)

Fault Current of X'mer x 1.20

Multiples of Plug Setting Current

710.606 Amps

Fault Current
CT Primary x Current Setting
710.61
40 x 100%
17.77 PS

Recommended Settings (50) :


Current Setting

= 17.77

Time Delay

= 0.1

E/F Relay Setting (Highset)(50N)


Relay Setting range

= 0.05 - 4

Recommended Settings (50N) :


Current setting

0.1

Time delay

0.1

The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 4 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Location

: Inverter Block : 3

Equipment

: 0.315 / 33kV Step Up 1.1 MVA Inverter Duty Transformer

Relay Make

Setting Range

CT Ratio

: 30

Load Current

: 19.25

Fault Current

: 0.296

kA

Over Current Setting

: 110%

Relay Characteristics

: Normal Inverse

/1

Fault Current of Transformer

A00
Rev.

Current on 33kV Side


Impedence (Ohm)

19.25

0.065

= 296.09 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting

Multiples of Plug Setting Current

=
Relay Operation Time

8.97

Fault Current
CT Primary x Current Setting
296.09
30 x 110%
8.97

PS

Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.04486
3.12

Sec
Page 5 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
3.12
0.080

= Relay Operartion time x TMS


=

3.12

0.250

0.080

Recommended Setting (51):


Current Setting

= 110%

Plug Setting Multiplier

= 8.97

Time Multiplier Setting

= 0.08

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

=
Relay Operation Time

9.87

Fault Current
CT Primary x Current Setting
296.09
30 x 100%
9.87

PS

Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.04685
2.99

Sec
Page 6 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
2.99
0.084

= Relay Operartion time x TMS


=

2.99

0.269

0.090

Recommended Setting (51N):


Current Setting

= 100%

Plug Setting Multiplier

= 9.87

Time Multiplier Setting

= 0.084

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 7 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

A00
Rev.

OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
0.296 kA at 33kV Side.

The minimum fault current for the relay to operate


(Considering 20% margin)

Fault Current of X'mer x 1.20

Multiples of Plug Setting Current

355.303 Amps

Fault Current
CT Primary x Current Setting
355.30
30 x 100%
11.84 PS

Recommended Settings (50) :


Current Setting

= 11.84

Time Delay

= 0.1

E/F Relay Setting (Highset)(50N)


Relay Setting range

= 0.05 - 4

Recommended Settings (50N) :


Current setting

0.1

Time delay

0.1

The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 8 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Location

: Inverter Block : 4 to 7

Equipment

: 0.315 / 33kV Step Up 2.8 MVA Inverter Duty Transformer

Relay Make

Setting Range

CT Ratio

: 60

Load Current

: 48.99

Fault Current

: 0.75

kA

Over Current Setting

: 110%

Relay Characteristics

: Normal Inverse

/1

Fault Current of Transformer

A00
Rev.

Current on 33kV Side


Impedence (Ohm)

48.99

0.065

= 753.67 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting

Multiples of Plug Setting Current

=
Relay Operation Time

11.42

Fault Current
CT Primary x Current Setting
753.67
60 x 110%
11.42 PS
Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.04991
2.80

Sec
Page 9 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
2.80
0.089

= Relay Operartion time x TMS


=

2.80

0.250

0.09

Recommended Setting (51):


Current Setting

= 110%

Plug Setting Multiplier

= 11.42

Time Multiplier Setting

= 0.09

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

=
Relay Operation Time

12.56

Fault Current
CT Primary x Current Setting
753.67
60 x 100%
12.56 PS
Plug Setting and 1.0 TMS

=
18MW-RTR1 SPV Plant at Virudhunaar, TN.

(PSM) - 1
0.14
0.05191
2.70

Sec
Page 10 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Operating time of downstream O/C relay


Allowing a grade margin of 250 msec,

Time Multiplier Setting (TMS)

Sec

Operating time required

Operating time required


Relay operation time

=
Actual Operation time

Rev.

0.25

Sec

0.25
2.70
0.093

= Relay Operartion time x TMS


=

2.70

0.250

0.093

Recommended Setting (51N):


Current Setting

= 100%

Plug Setting Multiplier

= 12.56

Time Multiplier Setting

= 0.093

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 11 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

A00
Rev.

OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
0.754 kA at 33kV Side.

The minimum fault current for the relay to operate


(Considering 20% margin)

Fault Current of X'mer x 1.20

Multiples of Plug Setting Current

904.41 Amps

Fault Current
CT Primary x Current Setting
904.41
60 x 100%
15.07 PS

Recommended Settings (50) :


Current Setting

= 15.07

Time Delay

= 0.1

E/F Relay Setting (Highset)(50N)


Relay Setting range

= 0.05 - 4

Recommended Settings (50N) :


Current setting

0.1

Time delay

0.1

The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 12 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Location

: MCR Room

Equipment

: 33kV MV Panel (Incommer - 1)

Relay Make

Setting Range

CT Ratio

: 175 /1

Load Current

: 155.72

Fault Current

: 2.396

kA

Over Current Setting

: 120%

Relay Characteristics

: Normal Inverse

Rev.

Feeder overcurrent relay will be selected by 30% of over current.


IDMT Over Current Relay Setting

Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


2396

175 x 120%
11.41 PS

=
Relay Operation Time

11.41

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.04989
2.81

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,

18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.25

Sec

Sec

Operating time required

0.5

Sec

Page 13 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required

Relay operation time

0.5

2.81
0.18

=
Actual Operation time

Rev.

= Relay Operartion time x TMS


=

2.81

0.500

0.18

Recommended Setting (51):


Current Setting

= 120%

Plug Setting Multiplier

= 11.41

Time Multiplier Setting

= 0.18

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


2396

175 x 100%
13.69 PS

=
Relay Operation Time

13.69

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.05373
2.61

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.25

Sec

Sec

Operating time required

0.5

Sec
Page 14 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required


Relay operation time

=
Actual Operation time

A00
Rev.

0.5
2.61
0.192

= 0.23

= Relay Operartion time x TMS


=

2.61

0.60

0.230

Recommended Setting (51N):


Current Setting

= 100%

Plug Setting Multiplier

= 13.69

Time Multiplier Setting

= 0.230

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 15 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

A00
Rev.

OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
2.396 kA at 33kV Side.

The minimum fault current for the relay to operate


(Considering 20% margin)

Fault Current of X'mer x 1.20

Multiples of Plug Setting Current

2.8752 Amps

Fault Current
CT Primary x Current Setting
2.88
175 x 100%
0.02

PS

Recommended Settings (50) :


Current Setting

= 0.02

Time Delay

= 0.1

E/F Relay Setting (Highset)(50N)


Relay Setting range

= 0.05 - 4

Recommended Settings (50N) :


Current setting

0.1

Time delay

0.1

The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 16 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Location

: MCR Room (Incommer-2)

Equipment

: 33kV MV Panel

Relay Make

Setting Range

CT Ratio

: 175 /1

Load Current

: 136.46

Fault Current

: 2.1

kA

Over Current Setting

: 110%

Relay Characteristics

: Normal Inverse

Rev.

Feeder overcurrent relay will be selected by 30% of over current.


IDMT Over Current Relay Setting

Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


2100

175 x 100%
12.00 PS

=
Relay Operation Time

12.00

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.05095
2.75

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,

18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.25

Sec

Sec

Operating time required

0.5

Sec

Page 17 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required

Relay operation time

0.5

2.75
0.18

=
Actual Operation time

Rev.

= Relay Operartion time x TMS


=

2.75

0.500

0.18

Recommended Setting (51):


Current Setting

= 100%

Plug Setting Multiplier

= 12.00

Time Multiplier Setting

= 0.18

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


2100

175 x

15.00 PS

=
Relay Operation Time

15.00

80%

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.05565
2.52

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,

18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.25

Sec

Sec

Operating time required

0.5

Sec

Page 18 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required


Relay operation time

=
Actual Operation time

A00
Rev.

0.5
2.52
0.199

0.2

= Relay Operartion time x TMS


=

2.52

0.503

0.200

Recommended Setting (51N):


Current Setting

= 80%

Plug Setting Multiplier

= 15.00

Time Multiplier Setting

= 0.200

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 19 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

A00
Rev.

OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of 2.1
kA at 33kV Side.

The minimum fault current for the relay to operate


(Considering 20% margin)

Fault Current of X'mer x 1.20

Multiples of Plug Setting Current

2.52

Amps

Fault Current
CT Primary x Current Setting
2.52
175 x 100%
0.01

PS

Recommended Settings (50) :


Current Setting

= 0.01

Time Delay

= 0.1

E/F Relay Setting (Highset)(50N)


Relay Setting range

= 0.05 - 4

Recommended Settings (50N) :


Current setting

0.1

Time delay

0.1

The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer

18MW-RTR1 SPV Plant at Virudhunaar, TN.

Page 20 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Location

: MCR Room Outgoing

Equipment

: 33kV MV Panel

Relay Make

Setting Range

CT Ratio

: 350 /1

Load Current

: 292.17

Fault Current

: 4.5

kA

Over Current Setting

: 110%

Relay Characteristics

: Normal Inverse

Rev.

Feeder overcurrent relay will be selected by 30% of over current.


IDMT Over Current Relay Setting

Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


4500

350 x 100%
12.86 PS

=
Relay Operation Time

12.86

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.0524
2.67

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,

18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.5

Sec

Sec

Operating time required

0.75

Sec

Page 21 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

A00

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required

Relay operation time

0.75

2.67
0.28

=
Actual Operation time

Rev.

= Relay Operartion time x TMS


=

2.67

0.750

0.28

Recommended Setting (51):


Current Setting

= 100%

Plug Setting Multiplier

= 12.86

Time Multiplier Setting

= 0.28

IDMT Earth Fault Relay Setting


Multiples of Plug Setting Current

Fault Current

CT Primary x Current Setting


4500

350 x

16.07 PS

=
Relay Operation Time

16.07

80%

Plug Setting and 1.0 TMS

(PSM) - 1
0.14
0.05711
2.45

=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
18MW-RTR1 SPV Plant at Virudhunaar, TN.

0.5

Sec

Sec

Operating time required

0.75

Sec
Page 22 of 23

Harsha Abakus Solar


IN-15-0065-EE-26

Relay Setting Chart

Doc. No.
Date: 01.28.16

Time Multiplier Setting (TMS)

Operating time required


Relay operation time

=
Actual Operation time

A00
Rev.

0.75
2.45
0.306

= 0.34

= Relay Operartion time x TMS


=

2.45

0.833

0.340

Recommended Setting (51N):


Current Setting

= 80%

Plug Setting Multiplier

= 16.07

Time Multiplier Setting

= 0.340

18MW-RTR1 SPV Plant at Virudhunaar, TN.