Name of the Work:- Construction of High Level Bridge on Local Vage at Km 3/0 to 3/2 on

the Road from Kalavalla (V) to Viswanadhapuram (V) Via V.R.Kota of Lingasamudram
Mandal of Prakasam District.
Bridge Abstract Estimate
S.No
Description
1 Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH,
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete in Oridinary
soils up to 3 m depth excluding dewatering.

Quantity unit
1950.00 cum

Rate per
cum

2 Earthwork in excavation for structures as per


drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH,
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete in Oridinary
soils from 3 m to 6 m depth including
dewatering.

1460.00 cum

cum

3 Providing concrete for plain concrete M 10 grade


in open foundations using 40 mm nominal size
Graded hard stone aggregate (HBG),
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH ,including
contractors profit & Over head charges, VAT and
Seigneorage etc., complete For levelling course

87.00 cum

cum

1014.00 cum

cum

4 Plain cement concrete M 15 grade using 40,20 &


10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and
technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH ,including contractors profit &
Over head charges, VAT and Seigneorage etc.,
completeFor Raft, footings of abutments, piers, wings

S.No
Description
5 Plain cement concrete M 15 grade using 40,20 &
10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and
technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH ,including contractors profit &
Over head charges, VAT and Seigneorage etc.,
complete-

Quantity unit
235.00 cum

Rate per
cum

21.00 cum

cum

366.00 cum

cum

8 P.C.C. M 15 ordinary grade (1:2.5:5) leveling


course below approach slab complete as per
drawing and technical specifications Clauses 800
and 1211 MORD & 2700 MORTH including
overhead charges & Contractors profit, VAT and
seigneorage charges etc. complete

8.00 cum

cum

9 Vibrated reinforced cement concrete M30 grade


(Design Mix) using 20 & 10mm metal
mechanically mixed for approach slab as per
drawing and technical specifications Clauses 800
and 1211 MORD / Sections 1500, 1600 & 1700 &
2704 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete.

18.00 cum

cum

substructure of abutments, piers, wings


6 Providing and laying reinforced cement concrete
M20 grade (Design Mix) using 20 & 10mm metal
mechanically mixed in sub structure as per
drawing and technical specifications Clauses 800,
1205.4 and 1205.5 MORD / Sections 1500, 1600
& 1700 MORTH including overhead charges &
Contractors profit, VAT and Seigniorage but
excluding cost of steel etc., complete. For Bed
Blocks/ Backing walls
Height upto 5m
7 Vibrated reinforced cement concrete M20 grade
(Design Mix) using 20 & 10mm metal
mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800,
1205.4 and 1205.5 MORD / Sections 1500, 1600
& 1700 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete. For
Deck slab
as per M.O.T DRG No BD/12-74A & BD/13-74

S.No
Description
10 Providing and laying cement concrete wearing
course M 30 (Design Mix) grade using 20 & 10mm
metal mechanically mixed excluding reinforcement
complete as per drawing and technical
specifications Clauses 800 and 1206.3 MORD
and 2702 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete.

Quantity unit
35.00 cum

Rate per
cum

as per M.O.T.Drg.No.BD/1-69A
11 Construction of R.C.C. railing of M 25 grade
excluding reinforcement in cast-in-situ with 20
mm nominal size aggregate, true to line and
grade, tolerance of vertical railing post not to
exceed 1 in 500, centre-to-centre spacing
between vertical posts not to exceed 2000 mm as
per drawing and technical specifications Clauses
800, 900 and 1208.3 MORD including overhead
charges & Contractors profit, VAT and
seigneorage charges but excluding cost of steel
etc. complete.

124.00 Rm

Rm

12 Supplying, fitting, and placing HYSD bar


reinforcement in foundation complete as per
drawing and technical specifications Clauses 1000
and 1202 MORD / 1100, 1600 MORTH, for Bars
below 36 mm dia including over laps and wastage,
where they are not welded including overhead
charges & contractors profit and VAT etc.
complete.

9.00 MT

MT

13 Supplying, fitting, and placing HYSD bar


reinforcement in sub structure complete as per
drawing and technical specifications Clauses 1000
and 1202 MORD / 1100, 1600 MORTH, for Bars
below 36 mm dia including over laps and wastage,
where they are not welded including overhead
charges & contractors profit and VAT etc.
complete.

5.00 MT

MT

14 Supplying, fitting, and placing HYSD bar


reinforcement in super structure complete as per
drawing and technical specifications Clauses
1002, 1010 and 1202 MORD / 1600 MORTH, for
Bars below 36 mm dia including over laps and
wastage, where they are not welded including
overhead charges & contractors profit and VAT
etc. complete.

30.00 MT

MT

HAND RAILS WITHOUT FOOT PATHS

S.No
Description
15 Providing and laying pitching on slopes laid over
prepared filter media/ gravel backing as per
drawing and technical specifications Clause 1302
MORD / 2504 MORTH including cost and

Quantity unit
12.00 cum

Rate per
cum

16 Construction of toe walls for protection of slopes


using dry random rubble masonry as per drawing
and technical specifications Clause 1302.5 MORD
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete.

8.00 cum

cum

17 Gravel Backing for Revetments as per APSS

6.00 cum

cum

18 Backfilling behind abutment, wing wall and return


wall complete as per drawings & technical
specification Clause 1204.3.8 MORD / 710.14 of
IRC, 78 & 2200 MORTH including overhead
charges & Contractors profit, VAT and
seigneorage charges etc. complete.

57.00 cum

cum

19 Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause
1204.3.8 MORD / 710.14 of IRC, 78 & 2200
MORTH, including contractors profit & Over head
charges, VAT and Seigneorage etc., complete

43.00 cum

cum

20 Providing weep holes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia PVC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 MORD /
2706 & 2200 MORTH including contractors profit
& Over head charges, VAT and Seigneorage etc.,
complete

42.00 cum

cum

conveyance of all materials and all labour charges etc.,


complete including contractors profit & Over head
charges, VAT and Seigneorage etc., complete

including cost and conveyance of all materials and all


labour charges and contractors profit & Over head
charges, VAT and Seigneorage etc., complete

S.No
Description
21 Providing drainage spouts made 0.15 sqm of 6
mm thick MS plate 210 x 210 mm water spout at
top with 100 mm dia GI drain spout and 5 Nos MS
plate 12 mm x 40 mm x 210 mm long inluding cost
of all materials and labour charges, over heads &
contractors profit and VAT etc., complete.

Quantity unit
12.00 no

22 Providing and laying boulder apron for bed


protection with stone boulders of minimum size
and weight as per Table 1300.1, no fragment
weighing less than 25 / 40 kg laid dry complete as
per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors
profit & Over head charges, VAT and Seigneorage
etc., complete - For Protection Work

586.00 cum

cum

18.00 sqm

sqm

294.00 sqm

sqm

23 Cost, supply and fixing of Bituminous Mastic pad


25.4 mm including cost and conveyance and all
labour charges and including contractors profit &
Over head charges, VAT etc., complete
24 Painting two coats including primer coat after
filling the surface with synthetic enamel paint in all
shades on new, plastered / concrete surfaces as
per drawing and Technical Specification Clause
1701MORD. including contractors profit & Over
head charges, VAT etc., complete

25 Provision for presurvey estimates for taking bores


and soil investigation and soil testing
26 Provision for Expansion joints
27 Rounding off
Rupees one hundred and sevety seven lakhs only

Rate per
no

LS
LS
LS

at Km 3/0 to 3/2 on
of Lingasamudram

Amount
0

Amount
0

Amount
0

Amount
0

Amount
0

0
300000
50000
118829
468829

Name of the Work:- Construction of High Level Bridge on Local Vage at Km 3/0 to 3/2 on the Road
from Kalavalla (V) to Viswanadhapuram (V) Via V.R.Kota of Lingasamudram Mandal of Prakasam
District.
Bridge Detailied Estimate
S.No
Description
1 Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH,
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete in Oridinary
soils up to 3 m depth excluding dewatering.

depth upto 3m
Raft
aprons on U/s
aprons on D/s
wing walls
Toe walls (3.14*3.3*2/4)

No Length

1
1
1
4
4

Bredth Depth

Avg.depth
56.058 10.795 1.500
56.058 4.300 1.500
56.058 7.300 1.500
3.000 2.900 1.650
5.186 0.600 0.600
or say

Quantity

unit

907.72
361.57
613.84
57.42
7.47
1948.02
1950.00 cum

2 Earthwork in excavation for structures as per


drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH,
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete in Oridinary
soils from 3 m to 6 m depth including
dewatering.

Raft
cutoff walls on U/S
cutoff walls on D/S
aprons on U/s
aprons on D/s

1
1
1
1
1

56.058 10.795 1.350


56.058 0.600 0.850
56.058 0.600 0.850
56.058 4.300 0.900
56.058 7.300 0.900
or say

816.95
28.59
28.59
216.94
368.30
1459.37
1460.00 cum

S.No
Description
3 Providing concrete for plain concrete M 10 grade
in open foundations using 40 mm nominal size
Graded hard stone aggregate (HBG),
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH ,including
contractors profit & Over head charges, VAT and
Seigneorage etc., complete For levelling course

under Raft
wing walls

No Length

1
4

56.058
3.500

Bredth Depth

9.595 0.150
2.900 0.150
or say

Quantity

unit

80.68
6.09
86.77
87.00 cum

4 Plain cement concrete M 15 grade using 40,20 &


10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and
technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH ,including contractors profit &
Over head charges, VAT and Seigneorage etc.,
completeFor Raft, footings of abutments, piers, wings
Raft
cutoff walls on U/S
cutoff walls on D/S
abutment trep.footing (2.8+1.8)/2
Pier footing I
Pier footing II
wing walls
trep.footing (1.1+2.1)/2

1
1
1
2
5
5
4
4

56.058 10.795 1.200


56.058 0.600 1.000
56.058 0.600 1.000
8.748 2.300 1.000
10.141 3.200 0.500
10.141 2.200 0.500
3.500 2.900 0.500
3.500 1.600 1.000
or say

726.18
33.63
33.63
40.24
81.13
55.78
20.30
22.40
1013.29
1014.00 cum

5 Plain cement concrete M 15 grade using 40,20 &


10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and
technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH ,including contractors profit &
Over head charges, VAT and Seigneorage etc.,
completesubstructure of abutments, piers, wings
Abutments (1.80+0.70)/2
wing walls (0.45+1.10)/2
Piers (1.20+0.76)/2
cut waters (3.14*(0.76^2+1.20^2)/2/4)

2
4
5
5

8.748
3.500
8.641
0.792

1.250 2.970
0.775 2.950
0.980 2.970
1.000 2.970
or say

64.95
32.01
125.75
11.76
234.47
235.00 cum

S.No
Description
6 Providing and laying reinforced cement concrete
M20 grade (Design Mix) using 20 & 10mm metal
mechanically mixed in sub structure as per
drawing and technical specifications Clauses 800,
1205.4 and 1205.5 MORD / Sections 1500, 1600
& 1700 MORTH including overhead charges &
Contractors profit, VAT and Seigniorage but
excluding cost of steel etc., complete. For Bed
Blocks/ Backing walls
Height upto 5m
Bed blocks
Abutment
Backing wall
Abutment
kerbs over wings
Piers
cut waters (3.14*0.86*0.86/4)

No Length

Bredth Depth

8.748

0.750

0.300

2
-2
4
5
5

8.748
7.765
3.811
8.641
0.581

0.300
0.300
0.475
0.860
1.000

0.700
0.300
0.275
0.300
0.300

Quantity

unit

3.94

or say

3.67
-1.40
1.99
11.15
0.87
20.22
21.00 cum

or say

365.16
366.00 cum

7 Vibrated reinforced cement concrete M20 grade


(Design Mix) using 20 & 10mm metal
mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800,
1205.4 and 1205.5 MORD / Sections 1500, 1600
& 1700 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete. For
Deck slab
as per M.O.T DRG No BD/12-74A & BD/13-74
Height upto 5m

60.86

each

8 P.C.C. M 15 ordinary grade (1:2.5:5) leveling


course below approach slab complete as per
drawing and technical specifications Clauses 800
and 1211 MORD & 2700 MORTH including
overhead charges & Contractors profit, VAT and
seigneorage charges etc. complete
under approach slab

3.500

7.500

0.150
or say

7.88
8.00 cum

3.811

7.500

0.300
or say

17.15
18.00 cum

9 Vibrated reinforced cement concrete M30 grade


(Design Mix) using 20 & 10mm metal
mechanically mixed for approach slab as per
drawing and technical specifications Clauses 800
and 1211 MORD / Sections 1500, 1600 & 1700 &
2704 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete.

approach slab

S.No

Description

No Length

Bredth Depth

Quantity

unit

10 Providing and laying cement concrete wearing


course M 30 (Design Mix) grade using 20 & 10mm
metal mechanically mixed excluding reinforcement
complete as per drawing and technical
specifications Clauses 800 and 1206.3 MORD
and 2702 MORTH including overhead charges &
Contractors profit, VAT and seigneorage charges
but excluding cost of steel etc. complete.

as per M.O.T.Drg.No.BD/1-69A
Deck
Approach slab

6
2

9.049
3.811

7.500
7.500

0.075
0.075
or say

30.54
4.29
34.83
35.00 cum

11 Construction of R.C.C. railing of M 20 grade


excluding reinforcement in cast-in-situ with 20
mm nominal size aggregate, true to line and
grade, tolerance of vertical railing post not to
exceed 1 in 500, centre-to-centre spacing
between vertical posts not to exceed 2000 mm as
per drawing and technical specifications Clauses
800, 900 and 1208.3 MORD including overhead
charges & Contractors profit, VAT and
seigneorage charges but excluding cost of steel
etc. complete.
HAND RAILS WITHOUT FOOT PATHS
over deck slabs
over wing walls

6
2

9.049
3.811

2.00
2.00
or say

108.59
15.24
123.83
124.00 Rm

12 Supplying, fitting, and placing HYSD bar


reinforcement in foundation complete as per
drawing and technical specifications Clauses 1000
and 1202 MORD / 1100, 1600 MORTH, for Bars
below 36 mm dia including over laps and wastage,
where they are not welded including overhead
charges & contractors profit and VAT etc.
complete.
Skin reinforcement for Raft
2*(56.058*10.795)+2*(56.058+11.176)*1.2
Skin reinforcement for abutments
(8.748*(1+1*1.414)+1*(2.899+1.864))
Skin reinforcement for wing walls
3.5*(1+0.9+2.9+0.9+1)+2.9+1*(2.174+1.139)
Skin reinforcement for Piers
(10.141*(2+2)+3.313+2.278)

1371.65

5.00 Kgs/sqm

6.86

25.88

5.00 Kgs/sqm

0.26

29.66

5.00 Kgs/sqm

0.59

46.16

5.00 Kgs/sqm

1.15

Say

8.86
9.00 MT

S.No
Description
13 Supplying, fitting, and placing HYSD bar
reinforcement in sub structure complete as per
drawing and technical specifications Clauses 1000
and 1202 MORD / 1100, 1600 MORTH, for Bars
below 36 mm dia including over laps and wastage,
where they are not welded including overhead
charges & contractors profit and VAT etc.
complete.
Bed blocks & backing walls, kerbs
Skin reinforcement for abutments
(2*8.748*2.97+2.97*(1.8+0.7))
Skin reinforcement for wing walls
(2*3.5*2.95+2.95*(1.139+0.466))
Skin reinforcement for Piers
(2*8.641*2.97+2.97*(22/7*(0.76+1.2)/2))

No Length

Bredth Depth

Quantity

1
2

20.22 100.00 Kgs/cum


59.39
5.00 Kgs/sqm

2.02
0.59

25.38

5.00 Kgs/sqm

0.51

60.48

5.00 Kgs/sqm

1.51

unit

4.64
5.00 MT

Say
14 Supplying, fitting, and placing HYSD bar
reinforcement in super structure complete as per
drawing and technical specifications Clauses
1002, 1010 and 1202 MORD / 1600 MORTH, for
Bars below 36 mm dia including over laps and
wastage, where they are not welded including
overhead charges & contractors profit and VAT
etc. complete.
Super structure
Approach slab
Wearing coat
Hand Rails

1
1
1
1

6.00
17.15
34.83
123.83

4355 Kgs/span
85 Kgs/cum
35 Kgs/cum
9 Kgs/Rm
or say

26.13
1.46
1.22
1.11
29.92
30.00 MT

15 Providing and laying pitching on slopes laid over


prepared filter media/ gravel backing as per
drawing and technical specifications Clause 1302
MORD / 2504 MORTH including cost and
conveyance of all materials and all labour charges etc.,
complete including contractors profit & Over head
charges, VAT and Seigneorage etc., complete

quadrants :3.14*3*1.414*3/4

9.990

0.30

11.99
12.00 cum

0.60

7.47
8.00 cum

Say
16 Construction of toe walls for protection of slopes
using dry random rubble masonry as per drawing
and technical specifications Clause 1302.5 MORD
including contractors profit & Over head charges,
VAT and Seigneorage etc., complete.
Toe walls (3.14*3.3*2/4)

5.186

0.60
Say

S.No
Description
17 Gravel Backing for Revetments as per APSS

No Length

Bredth Depth

Quantity

unit

including cost and conveyance of all materials and all


labour charges and contractors profit & Over head
charges, VAT and Seigneorage etc., complete

quadrants :3.14*3*1.414*3/4

9.990

0.15

5.99
6.00 cum

3.545

56.34
57.00 cum

4.545

42.35
43.00 cum

1.300

41.60
42.00 Rm

Say
18 Backfilling behind abutment, wing wall and return
wall complete as per drawings & technical
specification Clause 1204.3.8 MORD / 710.14 of
IRC, 78 & 2200 MORTH including overhead
charges & Contractors profit, VAT and
seigneorage charges etc. complete.
behind abutments

2x1/2

7.765

2.047
Say

19 Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause
1204.3.8 MORD / 710.14 of IRC, 78 & 2200
MORTH, including contractors profit & Over head
charges, VAT and Seigneorage etc., complete
behind abutments

7.765 0.600
Say

20 Providing weep holes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia PVC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 MORD /
2706 & 2200 MORTH including contractors profit
& Over head charges, VAT and Seigneorage etc.,
complete
Abutments

8.000

2.00
Say

21 Providing drainage spouts made 0.15 sqm of 6


mm thick MS plate 210 x 210 mm water spout at
top with 100 mm dia GI drain spout and 5 Nos MS
plate 12 mm x 40 mm x 210 mm long inluding cost
of all materials and labour charges, over heads &
contractors profit and VAT etc., complete.

Drainage spouts

2.00

12.00 no

S.No
Description
22 Providing and laying boulder apron for bed
protection with stone boulders of minimum size
and weight as per Table 1300.1, no fragment
weighing less than 25 / 40 kg laid dry complete as
per drawing and technical specifications Clause
1301 MORD / 2503 MORTH including contractors
profit & Over head charges, VAT and Seigneorage
etc., complete - For Protection Work

aprons on U/s
aprons on D/s

No Length

1
1

56.058
56.058

Bredth Depth

Quantity

4.300 0.900
7.300 0.900

unit

or say

216.94
368.30
585.25
586.00 cum

or say

3.11
4.56
9.47
17.13
18.00 sqm

23 Cost, supply and fixing of Bituminous Mastic pad


25.4 mm including cost and conveyance and all
labour charges and including contractors profit &
Over head charges, VAT etc., complete
Flat footing (2.90-0.40-1.00)x1.0353
trep.footing
sub structure (1.139+0.466)/2

4
4
4

1.553
1.139
0.803

0.500
1.000
2.950

24 Painting two coats including primer coat after


filling the surface with synthetic enamel paint in all
shades on new, plastered / concrete surfaces as
per drawing and Technical Specification Clause
1701MORD. including contractors profit & Over
head charges, VAT etc., complete
kerbs
over deck slab (6*2)
over wing walls (4*1)
Hand posts (end)
over deck slab (12*2)
over wing walls (4*2)
Hand posts (intermediate)
over deck slab (12*4)
over wing walls (4*1)
hand rails
over deck slab (12*2)
over wing walls (4*2)

12
4

9.049
3.811

0.98
0.98

105.87
14.86

24
8

1.000
1.000

0.77
0.77

18.48
6.16

48
4

0.760
0.760

0.77
0.77

28.09
2.34

24
8

7.420
3.182

0.58
0.58

103.29
14.76
293.86
294.00 sqm

or say
25 Provision for presurvey estimates for taking bores
and soil investigation and soil testing
26 Provision for Expansion joints
27 Rounding off

LS
LS
LS

0 to 3/2 on the Road


andal of Prakasam