You are on page 1of 46

NEELUM JHELUM CONSULTANTS

[JV between MWH-Int, NORPLAN, NESPAK, ACE & NDC]


Malik House, Lower Chatter
Muzaffarabad

Tel: (+92) 58224 33653


Fax: (+92) 58224 32978
e-mail: njc@njproject.com

Date:

12 June 2015

Our ref:
Your ref:

PO-18078
GZBZJ-NJC-8478 (R-15709) dated 30 April 2015

Authorized Project Manager


CGGC-CMEC Consortium
(Office at Site C3), Chatter Kalas,
Muzaffarabad

DELIVERY: BY HAND

ATTENTION: MR HU QUANGUANG
NEELUM JHELUM HYDRO-ELECTRIC PROJECT
C3/E1: HEADWORKS/DIVERSION DAM 2X400KN GANTRY CRANE ELECTRICAL DRAWINGS

Dear Sir
This is with reference to your letter mentioned above under Your Ref.
We have reviewed your submittal and our comments are indicated on the various drawing which are
indicated in the following table. Further the status of each drawing is also indicated in the table:
Sr.
No.

Drawing No.

278E66-01-3-8.00

278E66-01-3-8.01

278E66-01-3-8.02

4
5

278E66-01-3-8.03
Page 1
278E66-01-3-8.03
Page 2

278E66-01-3-8.04

278E66-01-3-8.05

278E66-01-3-8.06

278E66-01-3-8.07

10

278E66-01-3-8.08

11
12

278E66-01-3-8.09
Page 1
278E66-01-3-8.09
Page 2

Title

Rev.

2x400kN Gantry Crane Electrical Drawing


Sheet List
Headworks/Diversion Dam 2x400kN Gantry
Crane Main Power Supply Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Main Hoist Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Crane Travelling Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Crane Travelling Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Trolley Traversing Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Lift Beam Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Lighting and Accessorial Control
Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Aux. Hoist Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane Hydraulic Gripper Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Slave Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Slave Station Control Diagram

Filing
Owner:
Printed:
Author:

130, 560
Neelum Jhelum Consultants
12 June 2015
PE Electrical

Status:

Final

Distribution:

1
1
1
1
1
1
1
1
1
1
1
1

Status
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted

Addressee
CEO(NJHPC); CE&PD
PM / DTL
CRE-E&M / CRE-C3
Electrical
CMEC Group
File
Doc ref: PO 18078 C3-E1 Headworks-Diversion Dam 2x400KN Gantry
Crane

NEELUM JHELUMCONSULTANTS
Sr.
No.
13
14
15
16
17
18
19
20
21

Drawing No.

Title

278E66-01-3-8.09
Page 3
278E66-01-3-8.09
Page 4
278E66-01-3-8.09
Page 5
278E66-01-3-8.09
Page 6
278E66-01-3-8.10
Page 1
278E66-01-3-8.10
Page 2
278E66-01-3-8.10
Page 3
278E66-01-3-8.11
Page 1
278E66-01-3-8.11
Page 2

Headworks/Diversion Dam 2x400kN Gantry


Crane PLC Slave Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Slave Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Slave Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Slave Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Master Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Master Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane PLC Master Station Control Diagram
Headworks/Diversion Dam 2x400kN Gantry
Crane List of Main Electrical Elements
Headworks/Diversion Dam 2x400kN Gantry
Crane List of Main Electrical Elements
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Power and PLC Slave Station
Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Power and PLC Slave Station
Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Power and PLC Slave Station
Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Main Hoist Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Main Hoist Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Crane Travelling Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Crane Travelling Control Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Aux. Hoist and Trolley Control
Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Aux. Hoist and Trolley Control
Cabinet
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Operating Cabin Lighting Box
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Terminal Box on Main Beam

22

278E66-01-3-8.12
Page 1

23

278E66-01-3-8.12
Page 2

24

278E66-01-3-8.12
Page 3

25

278E66-01-3-8.13
Page 1

26

278E66-01-3-8.13
Page 2

27

278E66-01-3-8.14
Page 1

28

278E66-01-3-8.14
Page 2

29

278E66-01-3-8.15
Page 1

30

278E66-01-3-8.15
Page 2

31

278E66-01-3-8.16

32

278E66-01-3-8.17

Rev.

Page 2

1
1
1
1
1
1
1
1
1

Status
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Doc ref: PO 18078 C3-E1 Headworks-Diversion Dam 2x400KN


Gantry Crane

NEELUM JHELUMCONSULTANTS
Sr.
No.

Drawing No.

33

278E66-01-3-8.18
Page 1

34

278E66-01-3-8.18
Page 2

35
36
37
38

278E66-01-3-8.19
Page 1
278E66-01-3-8.19
Page 2
278E66-01-3-8.19
Page 3
278E66-01-3-8.19
Page 4

39

278E66-01-3-8.20
Page 1

40

278E66-01-3-8.20
Page 2

41

278E66-01-3-8.20
Page 3

42

278E66-01-3-8.20
Page 4

43

278E66-01-3-8.21

Title
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Console of Operating Cabin
Headworks/Diversion Dam 2x400kN Gantry
Crane Elements Arrangement and Wiring
Diagram for Console of Operating Cabin
Headworks/Diversion Dam 2x400kN Gantry
Crane Cable List
Headworks/Diversion Dam 2x400kN Gantry
Crane Cable List
Headworks/Diversion Dam 2x400kN Gantry
Crane Cable List
Headworks/Diversion Dam 2x400kN Gantry
Crane Cable List
Headworks/Diversion Dam 2x400kN Gantry
Crane Electrical System and Cabling
Arrangement
Headworks/Diversion Dam 2x400kN Gantry
Crane Electrical System and Cabling
Arrangement
Headworks/Diversion Dam 2x400kN Gantry
Crane Electrical System and Cabling
Arrangement
Headworks/Diversion Dam 2x400kN Gantry
Crane Electrical System and Cabling
Arrangement
Headworks/Diversion Dam 2x400kN Gantry
Crane Operating Cabin Cabling Arrangement

Rev.

Status

Approved
Except as Noted

Approved
Except as Noted

1
1
1
1

Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted
Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Approved
Except as Noted

Please revise your drawings and incorporate our comments and resubmit for our further review and the
earliest.
Please treat the matter as urgent.

Yours faithfully
for NEELUM JHELUM CONSULTANTS

(for)WILLIAM B. DOBBS, P.E.

Project Manager

Encl:

As stated

Page 3

Doc ref: PO 18078 C3-E1 Headworks-Diversion Dam 2x400KN


Gantry Crane

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Comment:
Refer to comments given on
the various drawings.

Add these
(Typical))

Issued for obtaining Approval

Please write Fuse


rating.

Please write contact no. for forward


and backward referencing.
(Typ.)

Please write contact no. for


contactors and relays.
(Typ.)

Please provide contact plan for


contactors and CB.
(Typ.)

@C2

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please write Fuse


rating.

Please write contact no. for forward


and backward referencing.
(Typ.)

- Please provide details of calculation how


motors are selected for Main hoist & Brakes.
- Please provide detailed calculations for
selection of power cables.

APPROVED EXCEPT
AS NOTED

Please write kW rating


for all motors.
(Typ.)

Reviewed

___________

Checked

___________

Date

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please write contact Plan for


contactors.
(Typ.)

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

Please write corresponding


cross-reference.
(Typ.)

@A4

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

@=8.09/41

Please write corresponding


reference.
(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

=8.08/11

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on DWG


no. 278E66-01-3-8.02 REV.1

=8.07/B4

=8.07/B4

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

_12.06.15
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please write
Contact no.
(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on page 1 of 6 of


DWG no. 278E66-01-3-8.09 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on page 1 of 6 of


DWG no. 278E66-01-3-8.09 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

DISCLAIMER
Not found at specified
location.
(Typ.)

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Please provide
Contact plan.
(Typ.)

Refer. PO # 18078

Same comments as on page 4 of 6 of


DWG no. 278E66-01-3-8.09 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Use Bigger font size


for easy reading
(Typical).

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on page 1 of 6 of


DWG no. 278E66-01-3-8.09 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Same comments as on page 1 of 6 of


DWG no. 278E66-01-3-8.09 REV.1

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please translate in
english.
(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please provide catalog cuts.


(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

-XK1 ~ -XK4
-EL1 ~ -EL4

Please provide catalog cuts.


(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Please write specs for
motors and brakes.

Add following motors with specs:


- 1M3, -1M5, -1M9
-2M9, -2M10, -2M12, -2M14 ~ -2M17
- 3M14, -3M15
- 4M1, -4M3, -4M7 ~ -4M9 etc.
brakes:
-4YB1
and electromagnet of rail clamp etc

Add:
- 3SPL3
Add:
- 2SPL3,4,7 & 8.
Add:
- SPL1 ~ 4,1a.

Add:
- 1SPL4,5 & 1a.
Add:
- 4GDC

not found in
schematics ??

Add:
- 1TA1 ~ 2
- 1TA4
- 4P1

Add:
- 9FT01
- 1BR1,2
- 4BR1,2

These switches not


found in schematics ??

Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please provide/add following for all Panels:


- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

Please locate ?

DISCLAIMER

- Please explain/clarify how panels are ventilated or extra heat is extracted out from
panels?
- Please indicate/explain method that how Panels of different types are placed and fixed
on the angle iron metal base on cable trenches.
- Please provide schematic layouts and terminal connections inside cabinets.
- Since Gantry Crane will be employed and operating in
open with frequent chances of lightning. Please provide the means of protection e.g
SPD's, if not included, for protection of complete system against surges due to lightning.

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please label terminal


strip
(Typ.)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
Use Bigger font size
(Typical).

Please provide/add following for all Panels:


- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
DISCLAIMER
- Please explain/clarify how panels are ventilated or extra
heat is extracted out from panels?
- Please indicate/explain method that how Panels of different
types are placed and fixed on the angle iron metal base on
cable trenches.
- Please provide schematic layouts and terminal connections
inside cabinets.
- Since Gantry Crane will be employed and operating in
open with frequent chances of lightning. Please provide the
means of protection e.g SPD's, if not included, for protection
of complete system against surges due to lightning.

5. Color of Power wire: Red, Yellow, Blue and Black.

CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
Use Bigger font size
for easy reading
(Typical).

Please provide/add following for all Panels:


- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078
- Please explain/clarify how panels are ventilated or extra
heat is extracted out from panels?
- Please indicate/explain method that how Panels of different
types are placed and fixed on the angle iron metal base on
cable trenches.
- Please provide schematic layouts and terminal connections
inside cabinets.
- Since Gantry Crane will be employed and operating in
open with frequent chances of lightning. Please provide the
means of protection e.g SPD's, if not included, for protection
of complete system against surges due to lightning.

3. Color of Power wire: Red, Yellow, Blue and Black.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
3. Color of Power wire: Red, Yellow, Blue and Black.

Please provide/add following for all Panels:


- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
- Please explain/clarify how panels are ventilated or extra
heat is extracted out from panels?
- Please indicate/explain method that how Panels of different
types are placed and fixed on the angle iron metal base on
cable trenches.
- Please provide schematic layouts and terminal connections
inside cabinets.
- Since Gantry Crane will be employed and operating in
open with frequent chances of lightning. Please provide the
means of protection e.g SPD's, if not included, for protection
of complete system against surges due to lightning.

5. Color of Power wire: Red, Yellow, Blue and Black.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED

Please label and locate


valves in schematics.

Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please provide/add following for all Panels:


- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
Please provide/add following for all Panels:
- Protection class(not less than IP-54).
- Dimensions(LxWxH)
- Color(RAL??).
- Weight(Kg)
- Cable entry method(from bottom or top)

3. Color of Power wire: Red, Yellow, Blue and Black.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please locate HMI


in schematics.

Use Bigger font size


for easy reading
(Typical).

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked

Use Bigger font size


for easy reading
(Typical).

Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

(m) or ??

Please locate these cables on Gantry


Crane Electrical system and cabling
arrangements.

W034

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

(m) or ??

Since kW rating of motors is not given. Therefore it is not


justified to select power cable without calculations taking
into account motors rating. Please provide calculations
justifying selection of power cables.

Please locate these cables on Gantry


Crane Electrical system and cabling
arrangements.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

(m) or ??

W213
Please locate these cables on Gantry
Crane Electrical system and cabling
arrangements.

Since kW rating of motors is not given. Therefore it is not


justified to select power cable without calculations taking
into account motors rating. Please provide calculations
justifying selection of power cables.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

(m) or ??

Since kW rating of motors is not given. Therefore it is not


justified to select power cable without calculations taking
into account motors rating. Please provide calculations
justifying selection of power cables.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Please locate these cables on Gantry


Crane Electrical system and cabling
arrangements.

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

Use Bigger Font size


(Typical).

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

Indicate size of tray


(Typical).

_12.06.15
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed
Checked
Date

___________
___________

12.06.15
___________

Clause SP 6.2.4 refers

Comment # 1:
Use Bigger Font size
for easy reading
(Typical).

Identify these
(Typical).

Refer. PO # 18078

Comment # 2:
Indicate Drawing Scale, and it should one which is
usually used, for example 1:2, 1:25, 1:50 etc.
(Typical).

Comment # 3:
Give full detail of this piece.
Indicate as to how much is its
life. Also give Manufacturer's
name and Post Number
(Typical).

Comment # 2:
Follow comment # 2 given on Drawing 278E66-01-3-8-20
(Typical).

Cable
Comment # 1:
Use Bigger Font size
for easy reading
(Typical).

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
_
__________

Clause SP 6.2.4 refers

Refer. PO # 18078

Comment # 4:
Regarding "Technical requirement", the English is not
proper. Re-write all the 8 notes in proper English.
(Typical).

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078
Follow comment # 2 given on Drawing 278E66-01-3-8-20
(Typical).

APPROVED EXCEPT
AS NOTED
Reviewed

___________

Checked

___________

Date

12.06.15
___________

Clause SP 6.2.4 refers

Refer. PO # 18078

DISCLAIMER
CHECKING IS ONLY TO CONFORMANCE WITH THE ELECTRICAL DESIGN CONCEPT OF THE PROJECT AND
COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS AND SUBSEQUENT
AMENDMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EQUIPMENT SIZING AND SELECTION IN
ACCORDANCE WITH TECHNICAL GUARANTEES, APPLICABLE IEC STANDARDS, AND ITS OWN CALCULATIONS;
FOR LOGIC AND ACCURACY OF SCHEMATIC AND WIRING DIAGRAMS; FOR PHYSICAL DIMENSIONS TO BE
CONFIRMED AND CORRELATED AT THE JOB SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE
FABRICATION PROCESS AND TO TECHNIQUES OF CONSTRUCTION; AND FOR COORDINATION OF
ELECTRICAL DESIGN WITH OTHER DISCIPLINES.