Design Class Detail

Utilities Fuel Systems

PROJECT

Date

Capacity
Design Class

Design
Item

Class 1

Class 2

Fuel gas
producers,
consumers and
the FG system
design basis flows

Design flow based on


the highest credible
expected flows for
each of the respective
units.

Design flow based on the


highest credible
expected flows for each
of the respective units
+ 10% margin.

Design flow based on


the highest credible
expected flows for
each of the respective
units + 20%.

FG make up
system sizing

Make up size based


on maximum credible
expected make up
flow.

Make up size based on


maximum credible
expected make up flow
+ 10%.

Either of:
1. Make up size based
on maximum credible
expected make up flow
+ 20%.
2. Dual makeup
systems each sized
base on maximum
expected make up flow.
(2 x 100%)

Buffer / KO vessel
sizing

Sizing based on Class


1 flow.

Sizing based on Class 2


flow.

Sizing based on Class


3 flow.

Buffer/KO vessel
sparing

No spare vessel

No spare vessel. Full


flow bypass provided
around vessel.

Vessel sparing = N+1

Fuel oil storage

12 Hrs

24 Hrs

48 Hrs

Fuel oil storage


tank sparing

One tank

Two tanks
2 x 50%

Two tanks
2 x 50%

Fuel oil pump


capacity

Design flow based on


the highest credible
expected flows for
each of the respective
consumers maximum
fuel oil requirements.

Design flow based on the


highest credible
expected flows for each
of the respective
consumers maximum
fuel oil requirements
+ 10% margin.

Design flow based on


the highest credible
expected flows for
each of the respective
consumers maximum
fuel oil requirements
+ 20% margin.

Fuel oil pump


sparing

2 x 100%
1 in operation
1 electric motor
+ 1 steam turbine or,
2 electric motors from
independent electrical
power sources.

3 x 60%
2 in operation
1 electric motor
+ 1 steam turbine in
service
3rd either electric from
independent power
source or steam turbine.

3 x 100%
2 in operation
1 electric motor
+ 1 steam turbine in
service
3rd either electric from
independent power
source or steam
turbine.

DEP 00.00.07.93-Gen. September 2011

Class 3

Page 1 of

Design Class Detail


Utilities Fuel Systems

PROJECT

Date

Expandability
Design
Item
Future expansion
provision of fuel
system

Design Class
Class 1

Class 2

No future expansion
provision in the layout
and header
extension / tie-in.

FG header sized with


extra capacity, maximum
of:
a. projected expansions.
b. 20% extra capacity.
FG headers installed
with connections for the
extra capacity above.

DEP 00.00.07.93-Gen. September 2011

Class 3
FG header sized with
extra capacity,
maximum of:
a. projected
expansions.
b. 40% extra capacity.
FG headers installed
with connections for
the extra capacity
above.

Page 2 of

Design Class Detail


Utilities Fuel Systems

PROJECT

Date

Operability & Maintainability


Design
Item

Design Class
Class 1

Class 2

Class 3

Back up fuel

No back up fuel
capability

Dual firing on selective


furnaces/boilers.
Back up fuel system
capacity based on
credible scenario of plant
in continuous operation
and the largest single FG
sources is out of service

Most furnaces/boilers
with dual fuel firing
(100% back up fuel)

Flaring of FG

No flaring at the
normal operating case
at the premised
condition.

No flaring at the
premised conditions and
all operating cases.

No flaring at the
premised conditions,
operating cases and all
credible off design
scenarios.

No additional
capacities in
power/steam
generation

LP fuel gas
system pressure
control

Control valve to
supply
Control valve to flare

DEP 00.00.07.93-Gen. September 2011

Additional capacities in
power/steam generation
to consume excess FG
to prevent flaring in all
operating cases

Control valve to supply


with a manual bypass
valve
Control valve to flare

Additional capacities in
power/steam
generation to consume
excess FG to prevent
flaring in all credible off
design scenarios
Control valve to supply
with a spare control
valve
Control valve to flare

Page 3 of

Design Class Detail


Utilities Fuel Systems

PROJECT

Date

Operability & Maintainability (Contd)


Design Class

Design
Item
FG pressure
control valve on
the make up line

Class 1
1 x 100%

Class 2
Spare manual control
valve

Class 3
HP buffer vessel
feeding to LP fuel gas
system
sized to absorb/liberate
10 % of the normal
system gas flowrate
over a 1 h period,
operating from the
middle pressure of the
operating range to the
maximum/minimum
pressure respectively.
2 x 100% control
valves

FG header

Single header

Single header
Connections installed to
facilitate installation of
second header

Dual header in the


common areas, single
header ISBL

Fuel gas quality


monitoringl

Composition analysis
by sampling.

Online Density analyser

Online Fuel gas


composition/ Wobbe
index analyser

Fuel gas quality


control

None

FG mixing vessel to limit


the rate of change of
Wobbe index within
specified range.

Inert gas mixing for


control of Wobbe Index

DEP 00.00.07.93-Gen. September 2011

Page 4 of

Design Class Detail


Utilities Fuel Systems

PROJECT

Date

Energy Efficiency
Design Class

Design
Item

Class 1

Class 2

Class 3

Flare gas recovery

Flare gas recovery not


considered.

Flare gas recovery not


considered.

Flare gas recovery


system with recovery
compressor from Flare
header

Gas turbine fuel


heating above
minimum
temperature for
energy efficiency
improvement.

None

None

Fuel heating with LP


steam for cogeneration
fuel use.

DEP 00.00.07.93-Gen. September 2011