MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA

LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO


SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

OFICIAL

hh

S/. 1,996.43

15.93

S/. 31,803.16

5.14

S/. 10,253.34

1.60

3185.00

0.40

S/. 788.77

0.05

S/. 94.11

PEON

hh

S/. 6,822.80

14.32

S/. 97,702.48

4.62

S/. 31,499.29

1.43

9784.63

0.36

S/. 2,423.18

0.04

S/. 289.13

TOPOGRAFO

hh

S/. 14.03

17.27

S/. 242.32

5.57

S/. 78.12

1.73

24.27

0.43

S/. 6.01

0.05

S/. 0.72

OPERARIO

hh

S/. 6,563.49

19.22

S/. 126,150.24

6.20

S/. 40,670.86

1.92

12633.60

0.48

S/. 3,128.73

0.06

S/. 373.31

ASFALTO LIQUIDO RC-250

gal

S/. 139.66

15.62

S/. 2,181.45

5.04

S/. 703.30

1.56

218.47

0.39

S/. 54.10

0.05

S/. 6.46

FIERRO LISO 3/4"

S/. 1.31

10.00

S/. 13.05

3.22

S/. 4.21

1.00

1.31

0.25

S/. 0.32

0.03

S/. 0.04

PERNO HEXAGONAL DE 1/2" x 6' INCLUYE TUERCA

und

S/. 12.00

3.40

S/. 40.80

1.10

S/. 13.15

0.34

4.09

0.08

S/. 1.01

0.01

S/. 0.12

TUBO CUADRADO DE 3/4" x 3/4"

S/. 211.43

8.00

S/. 1,691.41

2.58

S/. 545.31

0.80

169.39

0.20

S/. 41.95

0.02

S/. 5.01

ARENA FINA

m3

S/. 38.08

24.00

S/. 913.94

7.74

S/. 294.65

2.40

91.53

0.60

S/. 22.67

0.07

S/. 2.70

ALAMBRE NEGRO N 16

kg

S/. 1,298.30

3.05

S/. 3,959.82

0.98

S/. 1,276.65

0.31

396.56

0.08

S/. 98.21

0.01

S/. 11.72

ALAMBRE NEGRO N 8

kg

S/. 699.86

3.05

S/. 2,134.57

0.98

S/. 688.19

0.31

213.77

0.08

S/. 52.94

0.01

S/. 6.32

TIERRA NEGRA DE CHACRA

m3

S/. 6.00

50.00

S/. 300.00

16.12

S/. 96.72

5.01

30.04

1.24

S/. 7.44

0.15

S/. 0.89

ACERO DE REFUERZO FY=4200 GRADO 60

kg

S/. 23,226.97

2.10

S/. 48,776.64

0.68

S/. 15,725.60

0.21

4884.85

0.05

S/. 1,209.74

0.01

S/. 144.34

ARENA GRUESA

m3

S/. 173.50

21.19

S/. 3,676.52

6.83

S/. 1,185.31

2.12

368.19

0.53

S/. 91.18

0.06

S/. 10.88

CLAVOS CON CABEZA DE 2 1/2", 3" Y 3 1/2"

kg

S/. 200.00

3.05

S/. 609.99

0.98

S/. 196.66

0.31

61.09

0.08

S/. 15.13

0.01

S/. 1.81

CLAVOS CON CABEZA DE 2 1/2", 3", 4"

kg

S/. 247.19

3.05

S/. 753.93

0.98

S/. 243.07

0.31

75.50

0.08

S/. 18.70

0.01

S/. 2.23

CLAVOS CON CABEZA DE 3"

kg

S/. 18.00

3.05

S/. 54.90

0.98

S/. 17.70

0.31

5.50

0.08

S/. 1.36

0.01

S/. 0.16

ABRAZADERA TIPO OREJA DE 4"

und

S/. 20.10

4.20

S/. 84.42

1.35

S/. 27.22

0.42

8.45

0.10

S/. 2.09

0.01

S/. 0.25

ESCALERA DE CARACOL SEGN DETALLE EN PLANOS

und

S/. 1.00

950.00

S/. 950.00

306.28

S/. 306.28

95.14

95.14

23.56

S/. 23.56

2.81

S/. 2.81

AFIRMADO

m3

S/. 53.14

22.03

S/. 1,170.76

7.10

S/. 377.45

2.21

117.25

0.55

S/. 29.04

0.07

S/. 3.46

AGREGADO DE CANTO RODADO ZARANDEADO

m3

S/. 0.50

21.19

S/. 10.49

6.83

S/. 3.38

2.12

1.05

0.53

S/. 0.26

0.06

S/. 0.03

TUBERIA PVC C-10 DE 1 1/4"

pza

S/. 25.09

4.00

S/. 100.34

1.29

S/. 32.35

0.40

10.05

0.10

S/. 2.49

0.01

S/. 0.30

TUBERIA PVC C-10 DE 1"

pza

S/. 57.17

3.00

S/. 171.50

0.97

S/. 55.29

0.30

17.17

0.07

S/. 4.25

0.01

S/. 0.51

TUBERIA PVC C-10 DE 1/2"

pza

S/. 4.91

1.81

S/. 8.88

0.58

S/. 2.86

0.18

0.89

0.04

S/. 0.22

0.01

S/. 0.03

TUBERIA PVC C-10 DE 3/4"

pza

S/. 9.59

1.95

S/. 18.71

0.63

S/. 6.03

0.20

1.87

0.05

S/. 0.46

0.01

S/. 0.06

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

S/. 1.67

2.70

S/. 4.50

0.87

S/. 1.45

0.27

0.45

0.07

S/. 0.11

0.01

S/. 0.01

TUBERIA PVC C-10 DE 1 1/2"

pza

TUBO PVC SAL 2" X 3M

S/. 69.83

2.29

S/. 159.90

0.74

S/. 51.55

0.23

16.01

0.06

S/. 3.97

0.01

S/. 0.47

CODO PVC S-20 2"x90

pza

S/. 69.50

1.29

S/. 89.66

0.42

S/. 28.90

0.13

8.98

0.03

S/. 2.22

0.00

S/. 0.27

CODO PVC S-20 4"x90

pza

S/. 32.40

3.50

S/. 113.40

1.13

S/. 36.56

0.35

11.36

0.09

S/. 2.81

0.01

S/. 0.34

CODO PVC S-20 2"x45

pza

S/. 11.00

1.02

S/. 11.22

0.33

S/. 3.62

0.10

1.12

0.03

S/. 0.28

0.00

S/. 0.03

CODO PVC S-20 4"x45

pza

S/. 5.00

3.50

S/. 17.50

1.13

S/. 5.64

0.35

1.75

0.09

S/. 0.43

0.01

S/. 0.05

TEE PVC S-20 4"X4"

pza

S/. 14.40

4.92

S/. 70.85

1.59

S/. 22.84

0.49

7.10

0.12

S/. 1.76

0.01

S/. 0.21

TEE PVC DE 3/4"

und

S/. 6.30

2.10

S/. 13.23

0.68

S/. 4.27

0.21

1.32

0.05

S/. 0.33

0.01

S/. 0.04

TEE PVC DE 1"

und

S/. 1.05

3.50

S/. 3.68

1.13

S/. 1.18

0.35

0.37

0.09

S/. 0.09

0.01

S/. 0.01

TEE PVC DE 1 1/4" A 1/2"

und

S/. 10.50

2.80

S/. 29.40

0.90

S/. 9.48

0.28

2.94

0.07

S/. 0.73

0.01

S/. 0.09

TEE PVC DE 1" A 1/2"

und

S/. 10.50

2.12

S/. 22.26

0.68

S/. 7.18

0.21

2.23

0.05

S/. 0.55

0.01

S/. 0.07

TEE PVC DE 1" A 3/4"

und

S/. 1.05

2.12

S/. 2.23

0.68

S/. 0.72

0.21

0.22

0.05

S/. 0.06

0.01

S/. 0.01

TEE PVC DE 1 1/2" A 1 1/4"

und

S/. 2.10

2.80

S/. 5.88

0.90

S/. 1.90

0.28

0.59

0.07

S/. 0.15

0.01

S/. 0.02

TEE PVC DE 1" A 3/4" y 1/2"

und

S/. 1.05

3.50

S/. 3.68

1.13

S/. 1.18

0.35

0.37

0.09

S/. 0.09

0.01

S/. 0.01

TEE PVC DE 4"

und

S/. 2.00

3.40

S/. 6.80

1.10

S/. 2.19

0.34

0.68

0.08

S/. 0.17

0.01

S/. 0.02

CODO CON REDUCCIN DE 3/4" A 1/2"

und

S/. 11.55

3.50

S/. 40.43

1.13

S/. 13.03

0.35

4.05

0.09

S/. 1.00

0.01

S/. 0.12

CODO CON REDUCCIN DE 1" A 1/2"

und

S/. 1.00

3.80

S/. 3.80

1.23

S/. 1.23

0.38

0.38

0.09

S/. 0.09

0.01

S/. 0.01

ADAPTADOR PVC 1/2"

und

S/. 31.00

1.70

S/. 52.70

0.55

S/. 16.99

0.17

5.28

0.04

S/. 1.31

0.01

S/. 0.16

ADAPTADOR PVC 3/4"

und

S/. 8.00

2.10

S/. 16.80

0.68

S/. 5.42

0.21

1.68

0.05

S/. 0.42

0.01

S/. 0.05

ADAPTADOR PVC 1"

und

S/. 2.00

5.90

S/. 11.80

1.90

S/. 3.80

0.59

1.18

0.15

S/. 0.29

0.02

S/. 0.03

ADAPTADOR PVC 1 1/2"

und

S/. 2.00

8.00

S/. 16.00

2.58

S/. 5.16

0.80

1.60

0.20

S/. 0.40

0.02

S/. 0.05

UNION UNIVERSAL PVC SAP 1/2"

und

S/. 4.00

2.96

S/. 11.84

0.95

S/. 3.82

0.30

1.19

0.07

S/. 0.29

0.01

S/. 0.04

UNION UNIVERSAL PVC-SAP C/R 1 1/4"

und

S/. 32.00

8.00

S/. 256.00

2.58

S/. 82.53

0.80

25.64

0.20

S/. 6.35

0.02

S/. 0.76

REDUCCION PVC 1 1/2" A 1"

pza

S/. 30.00

5.01

S/. 150.30

1.62

S/. 48.46

0.50

15.05

0.12

S/. 3.73

0.01

S/. 0.44

REDUCCION PVC 11/2" A 3/4"

pza

S/. 1.00

4.23

S/. 4.23

1.36

S/. 1.36

0.42

0.42

0.10

S/. 0.10

0.01

S/. 0.01

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

REDUCCION PVC 1 1/4" A 1 1/2"

pza

S/. 56.50

7.00

S/. 395.50

2.26

S/. 127.51

0.70

39.61

0.17

S/. 9.81

0.02

S/. 1.17

AGUA

m3

S/. 75.60

6.00

S/. 453.59

1.93

S/. 146.24

0.60

45.43

0.15

S/. 11.25

0.02

S/. 1.34

TUBERIA PVC-SAL PESADA DE 2" X 3M

und

S/. 2.64

12.50

S/. 33.00

4.03

S/. 10.64

1.25

3.30

0.31

S/. 0.82

0.04

S/. 0.10

TUBERIA PVC-SAL PESADA DE 4" X 3M

und

S/. 3.96

29.50

S/. 116.82

9.51

S/. 37.66

2.95

11.70

0.73

S/. 2.90

0.09

S/. 0.35

UNION PVC DE 1/2"

und

S/. 4.46

1.70

S/. 7.58

0.55

S/. 2.44

0.17

0.76

0.04

S/. 0.19

0.01

S/. 0.02

UNION PVC DE 3/4"

und

S/. 8.72

2.54

S/. 22.15

0.82

S/. 7.14

0.25

2.22

0.06

S/. 0.55

0.01

S/. 0.07

TEE SANITARIA DOBLE PVC DE 4" (DESAGUE)

und

S/. 6.00

15.49

S/. 92.94

4.99

S/. 29.96

1.55

9.31

0.38

S/. 2.31

0.05

S/. 0.28

YEE PVC SAL 4" x 2"

und

S/. 18.00

7.68

S/. 138.24

2.48

S/. 44.57

0.77

13.84

0.19

S/. 3.43

0.02

S/. 0.41

YEE PVC SAL 2" x 2"

und

S/. 6.00

2.11

S/. 12.66

0.68

S/. 4.08

0.21

1.27

0.05

S/. 0.31

0.01

S/. 0.04

YEE PVC SAL 4" x 4"

und

S/. 11.00

8.48

S/. 93.28

2.73

S/. 30.07

0.85

9.34

0.21

S/. 2.31

0.03

S/. 0.28

CONECTOR

S/. 2.00

4.35

S/. 8.70

1.40

S/. 2.80

0.44

0.87

0.11

S/. 0.22

0.01

S/. 0.03

CONECTOR PVC 20mm

S/. 19.50

1.07

S/. 20.87

0.34

S/. 6.73

0.11

2.09

0.03

S/. 0.52

0.00

S/. 0.06

VARILLA DE COBRE 3/4"x 2.40m C/PUNTA

S/. 2.00

140.00

S/. 280.00

45.14

S/. 90.27

14.02

28.04

3.47

S/. 6.94

0.41

S/. 0.83

PIEDRA MEDIANA DE 4"

m3

S/. 5.50

25.00

S/. 137.51

8.06

S/. 44.33

2.50

13.77

0.62

S/. 3.41

0.07

S/. 0.41

PIEDRA GRANDE DE 8"

m3

S/. 50.92

25.00

S/. 1,272.92

8.06

S/. 410.39

2.50

127.48

0.62

S/. 31.57

0.07

S/. 3.77

CONFITILLO 1/2"

m3

S/. 20.04

30.00

S/. 601.09

9.67

S/. 193.79

3.00

60.20

0.74

S/. 14.91

0.09

S/. 1.78

PIEDRA ZARANDEADA DE 3/4" - 1/2"

m3

S/. 116.27

35.00

S/. 4,069.37

11.28

S/. 1,311.97

3.51

407.54

0.87

S/. 100.93

0.10

S/. 12.04

CONDUCTOR DE Cu DESNUDO 1X16mm2

S/. 17.08

8.80

S/. 150.30

2.84

S/. 48.46

0.88

15.05

0.22

S/. 3.73

0.03

S/. 0.44

FILETE PLASTICOS RODOPLAST

S/. 78.00

0.50

S/. 39.00

0.16

S/. 12.57

0.05

3.91

0.01

S/. 0.97

0.00

S/. 0.12

HORMIGON

m3

S/. 122.01

21.19

S/. 2,585.37

6.83

S/. 833.52

2.12

258.92

0.53

S/. 64.12

0.06

S/. 7.65

MATERIAL DE RELLENO CLASIFICADO

m3

S/. 437.22

21.19

S/. 9,264.69

6.83

S/. 2,986.94

2.12

927.83

0.53

S/. 229.78

0.06

S/. 27.42

CRUCETA DE 3mm

bls

S/. 41.35

4.01

S/. 165.80

1.29

S/. 53.45

0.40

16.60

0.10

S/. 4.11

0.01

S/. 0.49

CABLE BACKBONE

S/. 22.50

5.80

S/. 130.50

1.87

S/. 42.07

0.58

13.07

0.14

S/. 3.24

0.02

S/. 0.39

MALLA ARPILLERA

rll

S/. 0.90

508.47

S/. 457.62

163.93

S/. 147.54

50.92

45.83

12.61

S/. 11.35

1.50

S/. 1.35

GRIFO LAVADERO

und

S/. 2.00

46.62

S/. 93.24

15.03

S/. 30.06

4.67

9.34

1.16

S/. 2.31

0.14

S/. 0.28

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

LLAVE DE LAVATORIO

und

S/. 11.00

54.00

S/. 594.00

17.41

S/. 191.51

5.41

59.49

1.34

S/. 14.73

0.16

S/. 1.76

LUMINARIA CON 02 FLUORESCENTES DE 36W

S/. 15.00

75.00

S/. 1,125.00

24.18

S/. 362.70

7.51

112.67

1.86

S/. 27.90

0.22

S/. 3.33

LUMINARIA HERMETICA MOD RSP-2

S/. 34.00

99.90

S/. 3,396.60

32.21

S/. 1,095.06

10.00

340.16

2.48

S/. 84.24

0.30

S/. 10.05

LUMINARIA DE EMERGENCIA C/VDC 12V-P/110W

S/. 13.00

59.32

S/. 771.16

19.12

S/. 248.62

5.94

77.23

1.47

S/. 19.13

0.18

S/. 2.28

LUMINARIA CON 02 FLUORESCENTES DE 18W

S/. 19.00

59.90

S/. 1,138.10

19.31

S/. 366.92

6.00

113.98

1.49

S/. 28.23

0.18

S/. 3.37

LUMINARIA CIRCULAR MOD TPR PRISMA 32W

S/. 31.00

30.90

S/. 957.90

9.96

S/. 308.83

3.09

95.93

0.77

S/. 23.76

0.09

S/. 2.83

TOMACORRIENTE DOBLE C/TOMA A TIERRA

S/. 55.00

10.50

S/. 577.50

3.39

S/. 186.19

1.05

57.84

0.26

S/. 14.32

0.03

S/. 1.71

TOMACORRIENTE UNIPOLAR C/TOMA A TIERRA (ALUMBRADO DE u

S/. 9.75

6.78

S/. 66.11

2.19

S/. 21.31

0.68

6.62

0.17

S/. 1.64

0.02

S/. 0.20

INTERRUPTOR UNIPOLAR SIMPLE

S/. 31.00

9.80

S/. 303.80

3.16

S/. 97.95

0.98

30.42

0.24

S/. 7.53

0.03

S/. 0.90

INTERRUPTOR UNIPOLAR DOBLE

S/. 18.00

12.80

S/. 230.40

4.13

S/. 74.28

1.28

23.07

0.32

S/. 5.71

0.04

S/. 0.68

INTERRUPTOR TERMOMAGNETICO - 2 x 20 DEL TIPO RIEL/10KA

S/. 9.00

46.89

S/. 422.01

15.12

S/. 136.06

4.70

42.26

1.16

S/. 10.47

0.14

S/. 1.25

INTERRUPTOR TERMOMAGNETICO - 3 x 30 DEL TIPO RIEL/10KA

S/. 1.00

120.00

S/. 120.00

38.69

S/. 38.69

12.02

12.02

2.98

S/. 2.98

0.36

S/. 0.36

INTERRUPTOR TERMOMAGNETICO - 2 x 15 DEL TIPO RIEL/10KA

S/. 5.00

46.89

S/. 234.45

15.12

S/. 75.59

4.70

23.48

1.16

S/. 5.81

0.14

S/. 0.69

INTERRUPTOR TERMOMAGNETICO - 3 x 25 DEL TIPO RIEL/10KA

S/. 4.00

120.00

S/. 480.00

38.69

S/. 154.75

12.02

48.07

2.98

S/. 11.90

0.36

S/. 1.42

CODO DE FIERRO GALVANIZADO DE 1/2"

und

S/. 31.00

2.12

S/. 65.72

0.68

S/. 21.19

0.21

6.58

0.05

S/. 1.63

0.01

S/. 0.19

CODO DE FIERRO GALVANIZADO DE 3/4"

und

S/. 8.00

2.50

S/. 20.00

0.81

S/. 6.45

0.25

2.00

0.06

S/. 0.50

0.01

S/. 0.06

INTERRUPTOR HORARIO -20A

S/. 1.00

84.75

S/. 84.75

27.32

S/. 27.32

8.49

8.49

2.10

S/. 2.10

0.25

S/. 0.25

REDUCCION PVC 3/4" A 1/2"

pza

S/. 0.44

4.23

S/. 1.84

1.36

S/. 0.59

0.42

0.18

0.10

S/. 0.05

0.01

S/. 0.01

S/. 21.00

4.50

S/. 94.50

1.45

S/. 30.47

0.45

9.46

0.11

S/. 2.34

0.01

S/. 0.28

CAJA RECTANGULAR GALVANIZADA PESADA DE 100 X 55 X 50MM u


CAJA DE PASE GALVANIZADA 400 x 400 x150 mm

S/. 6.00

48.00

S/. 288.00

15.48

S/. 92.85

4.81

28.84

1.19

S/. 7.14

0.14

S/. 0.85

PLACA DE SALIDA DE TELEFONO

S/. 11.00

5.50

S/. 60.50

1.77

S/. 19.51

0.55

6.06

0.14

S/. 1.50

0.02

S/. 0.18

PLACA DE SALIDA DE TV-CABLE

S/. 5.00

45.50

S/. 227.50

14.67

S/. 73.35

4.56

22.78

1.13

S/. 5.64

0.13

S/. 0.67

INTERRUPTOR DIFERENCIAL 20-A

S/. 5.00

131.71

S/. 658.55

42.46

S/. 212.32

13.19

65.95

3.27

S/. 16.33

0.39

S/. 1.95

CAJA GALV. RECTANGULAR PESADA 4" x 2" x 2 1/4"

S/. 155.70

4.50

S/. 700.65

1.45

S/. 225.89

0.45

70.17

0.11

S/. 17.38

0.01

S/. 2.07

CAJA GALV. OCTOGONAL PESADA 4"

S/. 139.20

4.50

S/. 626.40

1.45

S/. 201.95

0.45

62.73

0.11

S/. 15.54

0.01

S/. 1.85

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin
CONTACTOR 20A

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

S/. 1.00

93.22

S/. 93.22

30.05

S/. 30.05

9.34

9.34

2.31

S/. 2.31

0.28

S/. 0.28

BANCA DE DESCANSO DE CONCRETO (SALA MEDITACION), SEG u

S/. 2.00

350.00

S/. 700.00

112.84

S/. 225.68

35.05

70.10

8.68

S/. 17.36

1.04

S/. 2.07

CEMENTO PORTLAND TIPO V

bol

S/. 1,108.19

23.73

S/. 26,297.32

7.65

S/. 8,478.26

2.38

2633.60

0.59

S/. 652.22

0.07

S/. 77.82

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

S/. 1,992.12

17.80

S/. 35,459.81

5.74

S/. 11,432.25

1.78

3551.20

0.44

S/. 879.46

0.05

S/. 104.94

YESO BOLSA 28 kg

bol

S/. 43.85

7.50

S/. 328.86

2.42

S/. 106.02

0.75

32.93

0.19

S/. 8.16

0.02

S/. 0.97

FRAGUA

kg

S/. 178.92

2.54

S/. 454.45

0.82

S/. 146.51

0.25

45.51

0.06

S/. 11.27

0.01

S/. 1.34

CODO PVC DE 1"X90

und

S/. 11.55

3.50

S/. 40.43

1.13

S/. 13.03

0.35

4.05

0.09

S/. 1.00

0.01

S/. 0.12

CODO PVC DE 4" X 90 (DESAGUE)

und

S/. 6.00

8.48

S/. 50.88

2.73

S/. 16.40

0.85

5.10

0.21

S/. 1.26

0.03

S/. 0.15

CODO PVC DE 1/2"X90

und

S/. 4.20

2.12

S/. 8.90

0.68

S/. 2.87

0.21

0.89

0.05

S/. 0.22

0.01

S/. 0.03

CODO PVC DE 1 1/2"X90

und

S/. 21.00

2.80

S/. 58.80

0.90

S/. 18.96

0.28

5.89

0.07

S/. 1.46

0.01

S/. 0.17

ADAPTADOR CPVC DE 1"

und

S/. 2.00

60.00

S/. 120.00

19.34

S/. 38.69

6.01

12.02

1.49

S/. 2.98

0.18

S/. 0.36

ADAPTADOR CPVC DE 1 1/4"

und

S/. 9.00

3.50

S/. 31.50

1.13

S/. 10.16

0.35

3.15

0.09

S/. 0.78

0.01

S/. 0.09

LADRILLO PARA TECHO 8H DE 15X30X30 cm

mll

S/. 3,789.45

1.80

S/. 6,821.01

0.58

S/. 2,199.09

0.18

683.11

0.04

S/. 169.17

0.01

S/. 20.19

LADRILLO KING KONG 18 HUECOS 9 X 13 X 24 cm

S/. 26,140.27

0.59

S/. 15,422.76

0.19

S/. 4,972.30

0.06

1544.55

0.01

S/. 382.51

0.00

S/. 45.64

CANTONERA DE ALUMINIO

S/. 42.84

8.00

S/. 342.72

2.58

S/. 110.49

0.80

34.32

0.20

S/. 8.50

0.02

S/. 1.01

CABLE N2XH 1x6mm2

S/. 50.10

2.97

S/. 148.79

0.96

S/. 47.97

0.30

14.90

0.07

S/. 3.69

0.01

S/. 0.44

CABLE N2XH 1x4mm2

S/. 211.86

1.95

S/. 413.12

0.63

S/. 133.19

0.20

41.37

0.05

S/. 10.25

0.01

S/. 1.22

CABLE N2XH 1x2.5mm2

S/. 52.96

1.53

S/. 81.04

0.49

S/. 26.13

0.15

8.12

0.04

S/. 2.01

0.00

S/. 0.24

CABLE NH-80 1x4mm2

S/. 546.17

2.45

S/. 1,338.12

0.79

S/. 431.41

0.25

134.01

0.06

S/. 33.19

0.01

S/. 3.96

CABLE NH-80 1x2.5mm2

S/. 729.52

1.00

S/. 729.52

0.32

S/. 235.20

0.10

73.06

0.02

S/. 18.09

0.00

S/. 2.16

COLUMNA DE SOPORTE

und

S/. 2.01

200.00

S/. 402.00

64.48

S/. 129.60

20.03

40.26

4.96

S/. 9.97

0.59

S/. 1.19

TUBERIA DE FIERRO GALVANIZADO DE 2"

S/. 1.03

31.04

S/. 31.97

10.01

S/. 10.31

3.11

3.20

0.77

S/. 0.79

0.09

S/. 0.09

CAJA DE CONCRETO CON TAPA

S/. 2.00

65.46

S/. 130.92

21.10

S/. 42.21

6.56

13.11

1.62

S/. 3.25

0.19

S/. 0.39

PEGAMENTO PARA PVC

gal

S/. 13.09

86.75

S/. 1,135.76

27.97

S/. 366.17

8.69

113.74

2.15

S/. 28.17

0.26

S/. 3.36

PEGAMENTO PARA CERAMICA

gal

S/. 0.74

13.98

S/. 10.32

4.51

S/. 3.33

1.40

1.03

0.35

S/. 0.26

0.04

S/. 0.03

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

CERAMICA 30 cm X 30 cm

m2

S/. 43.22

25.10

S/. 1,084.77

8.09

S/. 349.73

2.51

108.64

0.62

S/. 26.90

0.07

S/. 3.21

CERAMICA RECTANGULAR DE 25 cm x 40 cm

m2

S/. 133.85

23.73

S/. 3,176.36

7.65

S/. 1,024.06

2.38

318.10

0.59

S/. 78.78

0.07

S/. 9.40

CERAMICA 45 cm x 45 cm

m2

S/. 422.06

27.00

S/. 11,395.49

8.70

S/. 3,673.91

2.70

1141.23

0.67

S/. 282.63

0.08

S/. 33.72

CINTA AISLANTE

rll

S/. 123.46

3.00

S/. 370.37

0.97

S/. 119.41

0.30

37.09

0.07

S/. 9.19

0.01

S/. 1.10

DOSIS QUIMICA THOR GEL DE 5 kg

S/. 4.00

70.16

S/. 280.64

22.62

S/. 90.48

7.03

28.11

1.74

S/. 6.96

0.21

S/. 0.83

PEGAMENTO PARA PVC AGUA FORDUIT

gal

S/. 0.05

67.80

S/. 3.40

21.86

S/. 1.10

6.79

0.34

1.68

S/. 0.08

0.20

S/. 0.01

PEGAMENTO PARA LOSETAS Y CERAMICAS

kg

S/. 2,512.47

1.20

S/. 3,014.97

0.39

S/. 972.03

0.12

301.94

0.03

S/. 74.78

0.00

S/. 8.92

PEGAMENTO PARA TUBERIA PVC (ELECT.)

gal

S/. 1.01

73.52

S/. 74.30

23.70

S/. 23.95

7.36

7.44

1.82

S/. 1.84

0.22

S/. 0.22

GABINETE METALICO CON BARRA DE COBRE PARA EMPOTRAR

S/. 2.00

847.46

S/. 1,694.92

273.22

S/. 546.44

84.87

169.74

21.02

S/. 42.04

2.51

S/. 5.02

GABINETE METALICO CON BARRA DE COBRE PARA EMPOTRAR 1 u

S/. 1.00

150.00

S/. 150.00

48.36

S/. 48.36

15.02

15.02

3.72

S/. 3.72

0.44

S/. 0.44

GABINETE METALICO CON BARRA DE COBRE PARA EMPOTRAR PAu

S/. 1.00

1047.00

S/. 1,047.00

337.55

S/. 337.55

104.85

104.85

25.97

S/. 25.97

3.10

S/. 3.10

GABINETE METALICO CON BARRA DE COBRE PARA EMPOTRAR PAu

S/. 1.00

847.00

S/. 847.00

273.07

S/. 273.07

84.82

84.82

21.01

S/. 21.01

2.51

S/. 2.51

S/. 128.78

1.27

S/. 163.55

0.41

S/. 52.73

0.13

16.38

0.03

S/. 4.06

0.00

S/. 0.48

LIJA

MADERA TORNILLO

p2

S/. 13,101.81

4.00

S/. 52,407.23

1.29

S/. 16,896.10

0.40

5248.44

0.10

S/. 1,299.78

0.01

S/. 155.09

MADERA ROLLIZO

p2

S/. 300.00

2.10

S/. 630.00

0.68

S/. 203.11

0.21

63.09

0.05

S/. 15.63

0.01

S/. 1.86

PUERTA 01 DE MADERA SEGUN PLANO INCLUYE CERRADURA

und

S/. 3.00

800.00

S/. 2,400.00

257.92

S/. 773.76

80.12

240.35

19.84

S/. 59.52

2.37

S/. 7.10

MAMAPARA 01 INCLUYE CERRADURA PARA PUERTAS PRINCIPAL Tm

S/. 11.30

508.00

S/. 5,740.40

163.78

S/. 1,850.71

50.87

574.89

12.60

S/. 142.37

1.50

S/. 16.99

MADERA PARA ENCOFRADO

p2

S/. 23.40

5.30

S/. 124.02

1.71

S/. 39.98

0.53

12.42

0.13

S/. 3.08

0.02

S/. 0.37

PANEL PARA DETECTOR DE HUMO

und

S/. 1.20

960.00

S/. 1,152.00

309.50

S/. 371.40

96.14

115.37

23.81

S/. 28.57

2.84

S/. 3.41

LIJA PARA MADERA

hja

S/. 10.49

1.27

S/. 13.32

0.41

S/. 4.29

0.13

1.33

0.03

S/. 0.33

0.00

S/. 0.04

ALQUILER DE AMBIENTES PARA OFICINA, ALMACEN Y CASETA DE mes

S/. 4.00

600.00

S/. 2,400.00

193.44

S/. 773.76

60.09

240.35

14.88

S/. 59.52

1.78

S/. 7.10

ALQUILER DEL LOCAL PARA COMISARIA PROVISIONAL

mes

S/. 8.00

3000.00

S/. 24,000.00

967.20

S/. 7,737.60

300.44

2403.53

74.40

S/. 595.24

8.88

S/. 71.02

MUEBLE PARA SEPARACIN DE AMBIENTES H=2.00m

S/. 5.37

160.00

S/. 859.20

51.58

S/. 277.01

16.02

86.05

3.97

S/. 21.31

0.47

S/. 2.54

ACCESORIOS DE FIJACION

jgo

S/. 51.91

16.95

S/. 879.83

5.46

S/. 283.66

1.70

88.11

0.42

S/. 21.82

0.05

S/. 2.60

PINTURA EPOXICA

gal

S/. 3.98

110.00

S/. 437.42

35.46

S/. 141.02

11.02

43.81

2.73

S/. 10.85

0.33

S/. 1.29

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

CINTA TEFLON

und

S/. 57.71

2.52

S/. 145.42

0.81

S/. 46.88

0.25

14.56

0.06

S/. 3.61

0.01

S/. 0.43

VIDRIO TEMPLADO DE 6mm

m2

S/. 37.60

145.00

S/. 5,452.07

46.75

S/. 1,757.75

14.52

546.01

3.60

S/. 135.22

0.43

S/. 16.13

VIDRIO TEMPLADO DE 8mm

m2

S/. 12.39

170.00

S/. 2,106.30

54.81

S/. 679.07

17.03

210.94

4.22

S/. 52.24

0.50

S/. 6.23

VIDRIO CRUDO DE 6mm

m2

S/. 19.64

94.52

S/. 1,856.37

30.47

S/. 598.49

9.47

185.91

2.34

S/. 46.04

0.28

S/. 5.49

REGLA DE MADERA

p2

S/. 76.50

4.20

S/. 321.31

1.35

S/. 103.59

0.42

32.18

0.10

S/. 7.97

0.01

S/. 0.95

PUERTA DE MADERA DE 0.70X2.60, INC. INSTALACIN

S/. 2.00

605.00

S/. 1,210.00

195.05

S/. 390.10

60.59

121.18

15.00

S/. 30.01

1.79

S/. 3.58

PUERTA DE MADERA DE 1.00X2.70, INC. INSTALACIN

S/. 3.00

825.00

S/. 2,475.00

265.98

S/. 797.94

82.62

247.86

20.46

S/. 61.38

2.44

S/. 7.32

PUERTA DE MADERA DE 1.50X2.55, INC. INSTALACIN

S/. 1.00

1106.25

S/. 1,106.25

356.66

S/. 356.66

110.79

110.79

27.44

S/. 27.44

3.27

S/. 3.27

PUERTA DE MADERA DE 0.90X2.50, INC. INSTALACIN

S/. 1.00

712.50

S/. 712.50

229.71

S/. 229.71

71.35

71.35

17.67

S/. 17.67

2.11

S/. 2.11

PUERTA DE MADERA DE 1.00X2.55, INC. INSTALACIN

S/. 7.00

852.20

S/. 5,965.40

274.75

S/. 1,923.25

85.35

597.42

21.14

S/. 147.95

2.52

S/. 17.65

PUERTA DE MADERA DE 1.15X2.60, INC. INSTALACIN

S/. 1.00

957.20

S/. 957.20

308.60

S/. 308.60

95.86

95.86

23.74

S/. 23.74

2.83

S/. 2.83

PUERTA DE MADERA DE 0.70X2.70, INC. INSTALACIN

S/. 3.00

623.40

S/. 1,870.20

200.98

S/. 602.95

62.43

187.30

15.46

S/. 46.38

1.84

S/. 5.53

PUERTA DE MADERA DE 1.50X2.70, INC. INSTALACIN

S/. 3.00

1125.20

S/. 3,375.60

362.76

S/. 1,088.29

112.69

338.06

27.91

S/. 83.72

3.33

S/. 9.99

PUERTA DE MADERA DE 1.0X2.50, INC. INSTALACIN

S/. 4.00

758.60

S/. 3,034.40

244.57

S/. 978.29

75.97

303.89

18.81

S/. 75.26

2.24

S/. 8.98

PUERTA DE MADERA DE 0.90X2.70, INC. INSTALACIN

S/. 2.00

758.60

S/. 1,517.20

244.57

S/. 489.15

75.97

151.94

18.81

S/. 37.63

2.24

S/. 4.49

PUERTA DE MADERA DE 0.80X2.60, INC. INSTALACIN

S/. 1.00

770.20

S/. 770.20

248.31

S/. 248.31

77.13

77.13

19.10

S/. 19.10

2.28

S/. 2.28

PUERTA DE MADERA DE 0.80X2.70, INC. INSTALACIN

S/. 3.00

790.00

S/. 2,370.00

254.70

S/. 764.09

79.12

237.35

19.59

S/. 58.78

2.34

S/. 7.01

PUERTA DE MADERA DE 2.20X2.55, INC. INSTALACIN

S/. 1.00

915.00

S/. 915.00

295.00

S/. 295.00

91.63

91.63

22.69

S/. 22.69

2.71

S/. 2.71

PUERTA DE MADERA DE 1.00X2.55, INC. INSTALACIN

S/. 1.00

787.50

S/. 787.50

253.89

S/. 253.89

78.87

78.87

19.53

S/. 19.53

2.33

S/. 2.33

ACONDICIONAMIENTO DE COMISARIA PROVISIONAL

glb

S/. 1.00

10000.00

S/. 10,000.00

3224.00

S/. 3,224.00

1001.47

1001.47

248.02

S/. 248.02

29.59

S/. 29.59

DESAGUE DE CANASTILLA PARA LAVADERO DE 3 X 1"

und

S/. 1.00

12.72

S/. 12.72

4.10

S/. 4.10

1.27

1.27

0.32

S/. 0.32

0.04

S/. 0.04

DESAGUE AUTOMATICO PARA OVALIN

und

S/. 11.00

12.72

S/. 139.92

4.10

S/. 45.11

1.27

14.01

0.32

S/. 3.47

0.04

S/. 0.41

DESAGUE PARA URINARIO CON NIPLE Y EMPAQUETADURA

und

S/. 3.00

12.72

S/. 38.16

4.10

S/. 12.30

1.27

3.82

0.32

S/. 0.95

0.04

S/. 0.11

SUMIDERO DE BRONCE DE 2"

und

S/. 8.00

11.17

S/. 89.36

3.60

S/. 28.81

1.12

8.95

0.28

S/. 2.22

0.03

S/. 0.26

TUBO DE ABASTO 1/2"

und

S/. 1.00

10.17

S/. 10.17

3.28

S/. 3.28

1.02

1.02

0.25

S/. 0.25

0.03

S/. 0.03

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin
UAS DE SUJECION PARA URINARIO

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

und

S/. 6.00

4.24

S/. 25.44

1.37

S/. 8.20

0.42

2.55

0.11

S/. 0.63

0.01

S/. 0.08

PERNO DE ANCLAJE PARA SUJECION DE INODORO SIN CAPUCHOund

S/. 22.00

4.24

S/. 93.28

1.37

S/. 30.07

0.42

9.34

0.11

S/. 2.31

0.01

S/. 0.28

PERNO DE TAZA DE TANQUE

und

S/. 4.00

6.78

S/. 27.12

2.19

S/. 8.74

0.68

2.72

0.17

S/. 0.67

0.02

S/. 0.08

TRAMPA P CROMADA P/LAVAT. 1 1/4"

und

S/. 11.00

4.24

S/. 46.64

1.37

S/. 15.04

0.42

4.67

0.11

S/. 1.16

0.01

S/. 0.14

TRAMPA P PVC C-5 DE 2" (DESAGUE)

und

S/. 8.00

6.78

S/. 54.24

2.19

S/. 17.49

0.68

5.43

0.17

S/. 1.35

0.02

S/. 0.16

REGISTRO ROSCADO DE BRONCE DE 4"

pza

S/. 12.00

8.57

S/. 102.84

2.76

S/. 33.16

0.86

10.30

0.21

S/. 2.55

0.03

S/. 0.30

ANILLO DE CERA PARA INODORO

und

S/. 9.00

8.39

S/. 75.51

2.70

S/. 24.34

0.84

7.56

0.21

S/. 1.87

0.02

S/. 0.22

JABONERA CON AGARRADERA PARA DUCHA H-5

und

S/. 6.00

40.00

S/. 240.00

12.90

S/. 77.38

4.01

24.04

0.99

S/. 5.95

0.12

S/. 0.71

LAVATORIO OVALIN DE LOSA VITRIFICADA SONNET

und

S/. 11.00

101.69

S/. 1,118.59

32.78

S/. 360.63

10.18

112.02

2.52

S/. 27.74

0.30

S/. 3.31

INODORO RAPID JET PLUS ESTANDAR TAZA

und

S/. 9.00

124.57

S/. 1,121.13

40.16

S/. 361.45

12.48

112.28

3.09

S/. 27.81

0.37

S/. 3.32

LAVADERO DE CONCRETO

und

S/. 2.20

900.00

S/. 1,980.00

290.16

S/. 638.35

90.13

198.29

22.32

S/. 49.11

2.66

S/. 5.86

LAVADERO DE ACERO INOXIDABLE UNA POZA CON ESCURRIDE

und

S/. 1.00

135.59

S/. 135.59

43.71

S/. 43.71

13.58

13.58

3.36

S/. 3.36

0.40

S/. 0.40

URINARIO DE LOSA

und

S/. 3.00

92.37

S/. 277.11

29.78

S/. 89.34

9.25

27.75

2.29

S/. 6.87

0.27

S/. 0.82

INODORO TURCO

und

S/. 2.00

120.00

S/. 240.00

38.69

S/. 77.38

12.02

24.04

2.98

S/. 5.95

0.36

S/. 0.71

TANQUE DE AGUA (POLIETILENO) DE 2500 LITROS INCLUYE ACC und

S/. 1.00

2000.00

S/. 2,000.00

644.80

S/. 644.80

200.29

200.29

49.60

S/. 49.60

5.92

S/. 5.92

NIPLE DE FIERRO GALVANIZADO DE 3/4" x 1"

und

S/. 2.00

4.80

S/. 9.60

1.55

S/. 3.10

0.48

0.96

0.12

S/. 0.24

0.01

S/. 0.03

NIPLE DE FIERRO GALVANIZADO DE 1"

und

S/. 2.00

5.00

S/. 10.00

1.61

S/. 3.22

0.50

1.00

0.12

S/. 0.25

0.01

S/. 0.03

NIPLE DE FIERRO GALVANIZADO DE 1 1/2"

und

S/. 2.00

7.00

S/. 14.00

2.26

S/. 4.51

0.70

1.40

0.17

S/. 0.35

0.02

S/. 0.04

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4"

und

S/. 4.00

6.85

S/. 27.40

2.21

S/. 8.83

0.69

2.74

0.17

S/. 0.68

0.02

S/. 0.08

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1"

und

S/. 6.00

8.00

S/. 48.00

2.58

S/. 15.48

0.80

4.81

0.20

S/. 1.19

0.02

S/. 0.14

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1"

und

S/. 18.00

11.00

S/. 198.00

3.55

S/. 63.84

1.10

19.83

0.27

S/. 4.91

0.03

S/. 0.59

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2"

und

S/. 2.00

15.00

S/. 30.00

4.84

S/. 9.67

1.50

3.00

0.37

S/. 0.74

0.04

S/. 0.09

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4"

und

S/. 2.00

10.15

S/. 20.30

3.27

S/. 6.54

1.02

2.03

0.25

S/. 0.50

0.03

S/. 0.06

TAPON MACHO DE FIERRO GALVANIZADO DE 1/2"

und

S/. 31.00

2.12

S/. 65.72

0.68

S/. 21.19

0.21

6.58

0.05

S/. 1.63

0.01

S/. 0.19

TAPON MACHO DE FIERRO GALVANIZADO DE 3/4"

und

S/. 8.00

2.95

S/. 23.60

0.95

S/. 7.61

0.30

2.36

0.07

S/. 0.59

0.01

S/. 0.07

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

TAPON MACHO DE FIERRO GALVANIZADO DE 1 1/4"

und

S/. 9.00

4.00

S/. 36.00

1.29

S/. 11.61

0.40

3.61

0.10

S/. 0.89

0.01

S/. 0.11

TORNILLOS 2" X 12" P/URINARIO CADET

und

S/. 18.00

4.24

S/. 76.32

1.37

S/. 24.61

0.42

7.64

0.11

S/. 1.89

0.01

S/. 0.23

ANGULO METALICO 2"X2"X1/4"

S/. 1.31

12.00

S/. 15.66

3.87

S/. 5.05

1.20

1.57

0.30

S/. 0.39

0.04

S/. 0.05

BARRA DE APOYO EN SS.HH. 1 1/2"

S/. 4.00

150.00

S/. 600.00

48.36

S/. 193.44

15.02

60.09

3.72

S/. 14.88

0.44

S/. 1.78

PLATINA METALICA 2"X41/4"

S/. 1.31

10.00

S/. 13.05

3.22

S/. 4.21

1.00

1.31

0.25

S/. 0.32

0.03

S/. 0.04

PERFILES DE ALUMINIO

S/. 311.94

7.06

S/. 2,202.30

2.28

S/. 710.02

0.71

220.55

0.18

S/. 54.62

0.02

S/. 6.52

VALVULA CHECK 1"

und

S/. 2.00

65.00

S/. 130.00

20.96

S/. 41.91

6.51

13.02

1.61

S/. 3.22

0.19

S/. 0.38

VALVULA DE PIE 1"

und

S/. 1.00

75.83

S/. 75.83

24.45

S/. 24.45

7.59

7.59

1.88

S/. 1.88

0.22

S/. 0.22

VALVULA ESFERICA DE 1 1/4"

und

S/. 9.00

80.00

S/. 720.00

25.79

S/. 232.13

8.01

72.11

1.98

S/. 17.86

0.24

S/. 2.13

VALVULA DE GLOBO DE BRONCE 3/4"

und

S/. 1.00

49.23

S/. 49.23

15.87

S/. 15.87

4.93

4.93

1.22

S/. 1.22

0.15

S/. 0.15

VALVULA FLOTADORA DE 1"

und

S/. 1.00

80.00

S/. 80.00

25.79

S/. 25.79

8.01

8.01

1.98

S/. 1.98

0.24

S/. 0.24

PORTARROLLO DE LOSA EMPOTRADA H-6

und

S/. 10.00

25.00

S/. 250.00

8.06

S/. 80.60

2.50

25.04

0.62

S/. 6.20

0.07

S/. 0.74

PINTURA LATEX LAVABLE

gal

S/. 53.92

31.35

S/. 1,690.36

10.11

S/. 544.97

3.14

169.28

0.78

S/. 41.92

0.09

S/. 5.00

RECUBRIMIENTO IMPRIMANTE

kg

S/. 325.87

2.38

S/. 775.58

0.77

S/. 250.05

0.24

77.67

0.06

S/. 19.24

0.01

S/. 2.30

IMPERMEABILIZANTE PARA CONCRETO

glb

S/. 3.30

38.98

S/. 128.73

12.57

S/. 41.50

3.90

12.89

0.97

S/. 3.19

0.12

S/. 0.38

GRIFERIA PARA LAVADERO

und

S/. 12.00

64.25

S/. 771.00

20.71

S/. 248.57

6.43

77.21

1.59

S/. 19.12

0.19

S/. 2.28

DUCHA CON GRIFERIA

und

S/. 6.00

46.62

S/. 279.72

15.03

S/. 90.18

4.67

28.01

1.16

S/. 6.94

0.14

S/. 0.83

BARRA METALICA PARA CORTINAS H-7

S/. 5.00

25.60

S/. 128.00

8.25

S/. 41.27

2.56

12.82

0.63

S/. 3.17

0.08

S/. 0.38

PUERTA PRINCIPAL DE VIDRIO TEMPLADO

und

S/. 1.00

2300.00

S/. 2,300.00

741.52

S/. 741.52

230.34

230.34

57.04

S/. 57.04

6.81

S/. 6.81

MURO CORTINA CON VIDRIO TEMPLADO 8MM CON ESTRUCTURA Dm2

S/. 6.90

220.00

S/. 1,518.00

70.93

S/. 489.40

22.03

152.02

5.46

S/. 37.65

0.65

S/. 4.49

PUERTA Y REJAS PARA EL REA DE ESTACIONAMIENTO DETALLE u

S/. 4.00

1200.00

S/. 4,800.00

386.88

S/. 1,547.52

120.18

480.71

29.76

S/. 119.05

3.55

S/. 14.20

PUERTA DE METALICA P-2

S/. 1.00

600.00

S/. 600.00

193.44

S/. 193.44

60.09

60.09

14.88

S/. 14.88

1.78

S/. 1.78

PUERTA DE METALICA P-13

S/. 2.00

750.00

S/. 1,500.00

241.80

S/. 483.60

75.11

150.22

18.60

S/. 37.20

2.22

S/. 4.44

PUERTA DE METALICA P-6 INCUIDO REJA LATERAL

S/. 1.00

1100.00

S/. 1,100.00

354.64

S/. 354.64

110.16

110.16

27.28

S/. 27.28

3.26

S/. 3.26

GIGANTOFRAFIA DE 6.00x3.60, segun diseo

und

S/. 1.00

550.00

S/. 550.00

177.32

S/. 177.32

55.08

55.08

13.64

S/. 13.64

1.63

S/. 1.63

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

PULSADOR Y ACCESORIO

und

S/. 1.00

80.00

S/. 80.00

25.79

S/. 25.79

8.01

8.01

1.98

S/. 1.98

0.24

S/. 0.24

DETECTOR DE HUMOS

und

S/. 12.00

45.00

S/. 540.00

14.51

S/. 174.10

4.51

54.08

1.12

S/. 13.39

0.13

S/. 1.60

INTERRUPTOR CONMUTACION

pza

S/. 4.00

10.20

S/. 40.80

3.29

S/. 13.15

1.02

4.09

0.25

S/. 1.01

0.03

S/. 0.12

CODO DE FIERRO GALVANIZADO DE 1 1/4" X 90

S/. 9.00

3.50

S/. 31.50

1.13

S/. 10.16

0.35

3.15

0.09

S/. 0.78

0.01

S/. 0.09

ESCALERA DE GATO

pza

S/. 2.00

750.00

S/. 1,500.00

241.80

S/. 483.60

75.11

150.22

18.60

S/. 37.20

2.22

S/. 4.44

TIRAFONES 1/4" X 2"

S/. 8.00

2.06

S/. 16.48

0.66

S/. 5.31

0.21

1.65

0.05

S/. 0.41

0.01

S/. 0.05

SEALIZACION TEMPORAL DE SEGURIDAD

glb

S/. 1.00

3500.00

S/. 3,500.00

1128.40

S/. 1,128.40

350.52

350.52

86.81

S/. 86.81

10.36

S/. 10.36

CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL

glb

S/. 1.00

2500.00

S/. 2,500.00

806.00

S/. 806.00

250.37

250.37

62.00

S/. 62.00

7.40

S/. 7.40

EQUIPO DE PROTECCION INDIVIDUAL

glb

S/. 1.00

12000.00

S/. 12,000.00

3868.80

S/. 3,868.80

1201.77

1201.77

297.62

S/. 297.62

35.51

S/. 35.51

BARANDA METALICA

glb

S/. 1.50

850.00

S/. 1,275.00

274.04

S/. 411.06

85.13

127.69

21.08

S/. 31.62

2.52

S/. 3.77

CAJA DE PASE 150X150X100 MM

und

S/. 4.00

30.00

S/. 120.00

9.67

S/. 38.69

3.00

12.02

0.74

S/. 2.98

0.09

S/. 0.36

ALARMA Y ACCESORIOS

und

S/. 1.00

300.00

S/. 300.00

96.72

S/. 96.72

30.04

30.04

7.44

S/. 7.44

0.89

S/. 0.89

CAJA PORTAMEDIDOR F1

und

S/. 1.00

280.00

S/. 280.00

90.27

S/. 90.27

28.04

28.04

6.94

S/. 6.94

0.83

S/. 0.83

CAJA PARA MEDIDOR TRIFASICO

und

S/. 1.00

150.00

S/. 150.00

48.36

S/. 48.36

15.02

15.02

3.72

S/. 3.72

0.44

S/. 0.44

CAMBIO DE ENERGIA MONOFASICA A TRIFASICA

und

S/. 1.00

1250.00

S/. 1,250.00

403.00

S/. 403.00

125.18

125.18

31.00

S/. 31.00

3.70

S/. 3.70

UNION DOBLE PVC DE 2" (DESAGUE)

und

S/. 13.30

6.78

S/. 90.18

2.19

S/. 29.07

0.68

9.03

0.17

S/. 2.24

0.02

S/. 0.27

UNION DOBLE PVC DE 4" (DESAGUE)

und

S/. 26.70

15.25

S/. 407.18

4.92

S/. 131.27

1.53

40.78

0.38

S/. 10.10

0.05

S/. 1.20

TUBO RECTANGULAR DE 1" x 3"

S/. 211.43

9.18

S/. 1,940.89

2.96

S/. 625.74

0.92

194.37

0.23

S/. 48.14

0.03

S/. 5.74

TUBERIA PVC SAL DE 4" X 3M

S/. 161.28

8.05

S/. 1,298.31

2.60

S/. 418.58

0.81

130.02

0.20

S/. 32.20

0.02

S/. 3.84

UNION SIMPLE PVC - P (ELECTRICAS), 20 mm

PZA

S/. 252.50

0.20

S/. 50.50

0.06

S/. 16.28

0.02

5.06

0.00

S/. 1.25

0.00

S/. 0.15

CURVA PVC-P (ELEC.) 20mm

S/. 564.97

0.31

S/. 175.14

0.10

S/. 56.47

0.03

17.54

0.01

S/. 4.34

0.00

S/. 0.52

TABLERO DE TRANSFERENCIA MANUAL

glb

S/. 1.00

2000.00

S/. 2,000.00

644.80

S/. 644.80

200.29

200.29

49.60

S/. 49.60

5.92

S/. 5.92

UNION SIMPLE PVC-P (ELEC.) 20mm

und

S/. 24.00

1.07

S/. 25.68

0.34

S/. 8.28

0.11

2.57

0.03

S/. 0.64

0.00

S/. 0.08

EMPALME A LA RED EXISTENTE

glb

S/. 1.00

550.00

S/. 550.00

177.32

S/. 177.32

55.08

55.08

13.64

S/. 13.64

1.63

S/. 1.63

CODO PVC SAL 4" X 45

pza

S/. 20.10

3.90

S/. 78.39

1.26

S/. 25.27

0.39

7.85

0.10

S/. 1.94

0.01

S/. 0.23

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

TEE PVC SAL 2" X 2"

pza

S/. 22.00

2.20

S/. 48.40

0.71

S/. 15.60

0.22

4.85

0.05

S/. 1.20

0.01

S/. 0.14

SOMBRERO DE VENTILACION PVC SAL 2"

pza

S/. 6.00

2.97

S/. 17.82

0.96

S/. 5.75

0.30

1.78

0.07

S/. 0.44

0.01

S/. 0.05

S/. 45.00

3.20

S/. 144.00

1.03

S/. 46.43

0.32

14.42

0.08

S/. 3.57

0.01

S/. 0.43

S/. 1,396.30

0.95

S/. 1,326.49

0.31

S/. 427.66

0.10

132.84

0.02

S/. 32.90

0.00

S/. 3.93

CURVA PVC SAP PESADO PARA INSTALACIONES ELECTRICAS DE u

S/. 10.50

4.50

S/. 47.26

1.45

S/. 15.24

0.45

4.73

0.11

S/. 1.17

0.01

S/. 0.14

UNION SIMPLE PVC SAP PARA INSTALACIONES ELECTRICAS DE pza

S/. 10.00

1.04

S/. 10.40

0.34

S/. 3.35

0.10

1.04

0.03

S/. 0.26

0.00

S/. 0.03

CONEXION A CAJA PVC SAP PARA INSTALACIONES ELECTRICAS 4 u

S/. 20.00

1.04

S/. 20.80

0.34

S/. 6.71

0.10

2.08

0.03

S/. 0.52

0.00

S/. 0.06

HOJA DE SIERRA

und

S/. 55.35

4.24

S/. 234.67

1.37

S/. 75.66

0.42

23.50

0.11

S/. 5.82

0.01

S/. 0.69

VALVULA CHECK DE BRONCE DE 1"

S/. 1.00

60.00

S/. 60.00

19.34

S/. 19.34

6.01

6.01

1.49

S/. 1.49

0.18

S/. 0.18

HIPOCLORITO DE CALCIO AL 70%

kg

S/. 7.51

10.12

S/. 76.02

3.26

S/. 24.51

1.01

7.61

0.25

S/. 1.89

0.03

S/. 0.22

CORDEL

S/. 876.95

0.10

S/. 87.70

0.03

S/. 28.27

0.01

8.78

0.00

S/. 2.17

0.00

S/. 0.26

EQUIPO DE BOMBEO

hm

S/. 1.67

35.00

S/. 58.50

11.28

S/. 18.86

3.51

5.86

0.87

S/. 1.45

0.10

S/. 0.17

ELECTROBOMBA DE 1.0 HP

und

S/. 1.00

900.00

S/. 900.00

290.16

S/. 290.16

90.13

90.13

22.32

S/. 22.32

2.66

S/. 2.66

COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP

hm

S/. 54.18

12.30

S/. 666.44

3.97

S/. 214.86

1.23

66.74

0.31

S/. 16.53

0.04

S/. 1.97

CARGADOR S/LLANTAS 125 HP 2.5 YD3.

hm

S/. 20.22

150.00

S/. 3,033.65

48.36

S/. 978.05

15.02

303.81

3.72

S/. 75.24

0.44

S/. 8.98

WINCHE DE DOS BALDES (350KG)M.E. 3.6HP

hm

S/. 38.71

9.00

S/. 348.40

2.90

S/. 112.32

0.90

34.89

0.22

S/. 8.64

0.03

S/. 1.03

VOLQUETE DE 15 M3

hm

S/. 31.49

130.00

S/. 4,093.67

41.91

S/. 1,319.80

13.02

409.97

3.22

S/. 101.53

0.38

S/. 12.11

MEZCLADORA DE CONCRETO DE 9 -11P3

hm

S/. 194.92

23.94

S/. 4,666.43

7.72

S/. 1,504.46

2.40

467.33

0.59

S/. 115.73

0.07

S/. 13.81

TANQUE ALTO 6.0LT DE AGUA PARA TURCO

und

S/. 2.00

33.90

S/. 67.80

10.93

S/. 21.86

3.39

6.79

0.84

S/. 1.68

0.10

S/. 0.20

MOVILIZACION Y DESMOVILIZACION

GLB

S/. 1.00

3000.00

S/. 3,000.00

967.20

S/. 967.20

300.44

300.44

74.40

S/. 74.40

8.88

S/. 8.88

TRANSPORTE DE INSUMOS A OBRA

glb

S/. 1.00

2500.00

S/. 2,500.00

806.00

S/. 806.00

250.37

250.37

62.00

S/. 62.00

7.40

S/. 7.40

ANDAMIO METALICO

hm

S/. 63.12

10.00

S/. 631.22

3.22

S/. 203.51

1.00

63.21

0.25

S/. 15.66

0.03

S/. 1.87

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

S/. 76.56

9.00

S/. 689.01

2.90

S/. 222.14

0.90

69.00

0.22

S/. 17.09

0.03

S/. 2.04

TEODOLITO Y MIRA

h-m

S/. 14.03

10.00

S/. 140.31

3.22

S/. 45.24

1.00

14.05

0.25

S/. 3.48

0.03

S/. 0.42

ALQUILER DE SANITARIOS PORTATILES

mes

S/. 4.00

1500.00

S/. 6,000.00

483.60

S/. 1,934.40

150.22

600.88

37.20

S/. 148.81

4.44

S/. 17.76

TUBERIA PVC SEL PARA INSTALACIONES ELECTRICAS DE 20MM X u


TUBO PVC-P (ELEC.) 20mm 3M

MEJORAMIENTO DE LOS SERVICIOS POLICIALES DE LA COMISARIA PNP DEL DISTRITO DE HUANCHACO, PROVINCIA DE TRUJILLO - DEPARTAMENTO DE LA
LIBERTAD- C-PNP HUANCHACO DEL DISTRITO DE HUANCHACO
SECCION A

A21.1. CRONOGRAMA DE ADQUISICION DE MATERIALES

C A L E N D A R I O DE ADQUISICION DE MATERIALES
PLAZO DE EJECUCIN : 04 MESES

Und.
Descripcin

Precio
(S/.)

Presupuesto

0.32

0.31

0.25

0.12

Mes 01

Mes 02

Mes 03

Mes 04

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

Cantidad

Presup.

SC ACCESORIOS DE INSTALACION DE CISTERNA

glb

S/. 1.00

500.00

S/. 500.00

161.20

S/. 161.20

50.07

50.07

12.40

S/. 12.40

1.48

S/. 1.48

SC ACCESORIOS DE INSTALACION DE T.E.

glb

S/. 1.00

250.00

S/. 250.00

80.60

S/. 80.60

25.04

25.04

6.20

S/. 6.20

0.74

S/. 0.74

SC JARDINERIA

m2

S/. 50.00

15.00

S/. 750.00

4.84

S/. 241.80

1.50

75.11

0.37

S/. 18.60

0.04

S/. 2.22