Unified Standard Specifications For Works & Materials

Chapter 25 : Supply of Materials

Chapter 25
Supply Of Materials

25.1

25.2

Specification : Items of general use


required for day to day maintenance
by departmental staff have been
included
in
this
chapter.
Specifications for each item shall be
as given in the relevant chapter.
Where no specification has been
given for any particular item, relevant
IS Specification shall apply. List of all
relevant IS Codes has been given in
Chapter 0.

payment for leading shall be made


separately as per site conditions.
Payment for lead shall be made only
for the incremental lead on account
of location of the railway store.
25.3

Location Of Supply : The materials


are to be supplied at SSE/SE store
in the city. In case, the material is to
be supplied at a store located at a far
away place or way side station extra

Page 832 : Chapter 25

Rates : Rates include all the element


of cost of material, loading at
purchase point, unloading and
staking in the railway store but do
not include re-handling if required.
Deductions in quantity / volume for
voids shall be made as per
specification of relevant item. Rates
shall include all the taxes, royalties,
octrai etc.