You are on page 1of 111

I.

PEKERJAAN PERSIAPAN
I.1. PEK. BOUWPLANK
Panjang bangunan
Lebar bangunan

= (
= (

20.00 m
8.00 m

+
+

2.00 m
2.00 m

)
)

x
x

I.2. PAGAR PROYEK


Panjang bangunan
Lebar bangunan

= (
= (

20.00 m
8.00 m

+
+

3.00 m
3.00 m

)
)

x
x

II. PEKERJAAN STRUKTUR


A.

PEKERJAAN TANAH
1 GALIAN TANAH PONDASI TAPAK (1,5x1,5x0,2)
Tinggi
=
2.15 m
Lebar
=
1.60
Jumlah
=
24.00 ttk
Volume

132.10 m3

2 GALIAN TANAH SLOOF 20/30


Tinggi
=
0.30 m
Lebar
=
0.30 m
Panjang
=
124.00 m
Volume

11.16 m3

3 URUG TANAH PEIL LANTAI PADAT


=
11.00 m
Lebar
Panjang
=
22.00 m
Tebal
=
0.40 m
Volume

96.80 m3

4 URUG PASIR BAWAH LANTAI TB=5 CM


=
11.00 m
Lebar
Panjang
=
22.00 m
Tebal
=
0.05 m
Volume
5 URUG PASIR BAWAH
Dibawah pondasi ;
Lebar
Tebal
Jumlah
Volume

12.10 m3

PONDASI DAN SLOOF TB=5 CM


=
=
=
=

1.60
0.05
24.00
3.07

m
m
ttk
m3

B.

Dibawah sloof ;
Lebar
Panjang
Tebal
Volume

=
=
=

Volume Total

0.30
124.00
0.05
1.86

m
m
m
m3

4.93 m3

PEKERJAAN PONDASI
1. PONDASI TAPAK (1,5x1,5x0,2)
Volume
=
0.45 m3
Jumlah
=
24.00 ttk
Volume Total

10.80 m3

2. KOLOM PEDESTAL (30X30)


Tinggi
=
2.20 m
Dimensi
=
0.09 m2
Jumlah
=
24.00 ttk
Volume Total

3. SLOOF 20/30
Panjang

Volume

4.75 m3

114.90 m'
6.89 m3

4. PLASTIK SHEET
Panjang

=
=

11.00 m
22.00 m

Volume

242.00 m2

Lebar

C.

PEKERJAAN KONSTRUKSI BETON


C.1

Lantai 1 (Elevasi 0,00 ~ +4,00)

1. KOLOM 30X30
Tinggi
Luas
Jumlah

=
=
=

4.00 m
0.09 m2
24.00 ttk

Volume

8.64 m3

2. BALOK 30/40
Panjang arah x
b
h

=
=
=

Volume

70.30 m'
0.30 m
0.40 m
8.44 m3

3. BALOK 20/30
Panjang arah y
b
h

=
=
=

Volume

4. PELAT TB=12 CM
Luas
Blok I
Jumlah

=
=

12.00 m2
10.00 blok =

120.00 m2

Blok II
Jumlah

=
=

4.00 m2
1.00 blok =

4.00 m2

Blok III
Jumlah

=
=

8.00 m2
1.00 blok =

8.00 m2

Jumlah luasan
Tebal

=
=

132.00 m2
0.12 m

Volume

15.84 m3

12.00 m
0.70 m

8.40 m2

4.00 m
0.70 m

2.80 m2

Jumlah luasan
Tebal

=
=

11.20 m2
0.08 m

Volume

0.90 m3

5. CANOPY TB=10 CM
Depan ;
Panjang
=
Lebar
=
Belakang ;
Panjang
Lebar

=
=

6. RABAT BETON TB=6 CM


Panjang
=
Lebar
=
Tebal
=
Volume

C.2

Lantai 2 (Elevasi 0,00 ~ +4,00)

1. KOLOM 30X30

41.20 m'
0.20 m
0.30 m
2.47 m3

58.00 m
1.00 m
0.06 m
3.48 m3

Tinggi
Luas
Jumlah

=
=
=

4.00 m
0.09 m2
24.00 ttk

Volume

8.64 m3

2. DAK
Depan ;
Lebar
Panjang

=
=

2.00 m
20.00 m

40.00 m2

Belakang ;
Lebar
panjang

=
=

1.20 m
20.00 m

48.00 m2

=
=

88.00 m2
8.80 m3

Jumlah Luas
Volume
3. LISPLANK BETON
Panjang
Tinggi
Tebal

=
=
=

Volume

4. RINGBALK
Panjang arah x
Panjang arah y
Jumlah

Volume

=
=
=

56.00 m'
0.30 m'
0.08 m
1.34 m3

0.80
38.00
10.00
48.00

m
m'
m'
m'

2.88 m3

Volume Lantai dasar

6.44 m3

Panjang
Tinggi

=
=
=

4.00 m
2.00 m
4.47 m

29. Plat beton tangga

III. PEKERJAAN ARSITEKTUR


2. Pas. Dinding
LANTAI 1
Tinggi
Panjang arah x
Panjang arah y
Jumlah

=
=
=
=

Volume Lantai dasar =


AREA KUSEN
J2
BV
PVC
P1
P2
Kaca Depan

=
=
=
=
=
=

3.88
64.00
29.00
93.00

m
m'
m'
m'

360.84 m2

2.88
0.28
1.60
2.16
4.32
13.69

m2
m2
m2
m2
m2
m2

x
x
x
x
x
x

5.00
4.00
4.00
2.00
1.00
2.00
Jumlah

Volume Lantai dasar dikurangi vol dindi =


LANTAI 2
Tinggi
Panjang arah x
Panjang arah y
Jumlah

=
=
=
=

3.88
48.00
18.00
66.00

m
m'
m'
m'

Tinggi
Panjang arah x
Panjang arah y
Jumlah

=
=
=
=

0.80
38.00
10.00
48.00

m
m'
m'
m'

=
=
=
=
=
=
=

302.90 m2

14.40
1.12
6.40
4.32
4.32
27.38
57.94

m2
m2
m2
m2
m2
m2
m2

Volume Lantai 2
AREA KUSEN
J2
Kaca 50x50
Kaca Depan

=
=
=

114.00 m2

2.88 m2 x
1.85 m2 x
13.69 m2 x

10.00
5.00
2.00
Jumlah

=
=
=
=

Volume Lantai dasar dikurangi vol dindi =

48.57 m2

10. PARTISI GYPSUM


Dinding Gypsum;
Panjang
=
Tinggi
=
Volume

48.00 m2

Area Kusen;
P2

4.32 m2 x

Volume dinding partisi dikurangi kusen =

2.00 =
39.36 m2

PEKERJAAN LANTAI DAN DINDING

Pengurangan ;
Toilet & Tangga
Volume Lantai 1
LANTAI 2
Teras depan
Bangunan dalam

m2
m2
m2
m2

12.00 m'
4.00 m

1. Pekerjaan Lantai keramik 60x60


LANTAI 1
Teras depan
=
Bangunan dalam
=
Tangga ;
Jumlah anak tangga
=
lebar
=
Optrade
Antrede
Bordes

28.80
9.25
27.38
65.43

12.00 m2
192.00 m2
15.00 anak tangga
1.00 m
=
=
=
Jumlah
=

32.67 m2

180.83 m2

=
=

- m2
192.00 m2

4.50
3.00
2.00
9.50

m2
m2
m2
m2

8.64 m2

Tangga ;
Jumlah anak tangga
lebar
Optrade
Antrede
Bordes
Pengurangan ;
Toilet & Tangga

=
=

15.00 anak tangga


1.00 m
=
=
=
Jumlah
=

32.67 m2

Volume Lantai 2

168.83 m2

Volume Lantai 3

168.83 m2

Volume Lantai 4

168.83 m2

Volume Lantai 1

10.80 m2

Volume Lantai 2

10.80 m2

Volume Lantai 3

10.80 m2

Volume Lantai 4

10.80 m2

4.50
3.00
2.00
9.50

m2
m2
m2
m2

PAS. PLINT KERAMIK

PAS. LANTAI KERAMIK KAMAR MANDI


Volume Lantai 1

9.72 m2

Volume Lantai 2

9.72 m2

Volume Lantai 3

9.72 m2

Volume Lantai 4

9.72 m2

PAS. KERAMIK DINDING KM/WC 20x25


LANTAI 1
Tinggi
panjang
luas

=
=
=

Volume Lantai 1

PEKERJAAN KUSEN

1.25
6.00 m'
7.50 m2 30.00 m2

1.13 =

Pintu Lantai 1 = 2 = 3 = 4

1.00 unit

Jendela Lantai 2 = 3 = 4

12.00 unit

Rolling Dor

3.00 unit

(2,5*2,5)

PEKERJAAN PLAFON
LANTAI 1

Volume Lantai 1

- m2

LIST PLAFOND
Panjang Lantai 1

161.15 m'

Panjang Lantai 2

161.15 m'

Panjang Lantai 3

161.15 m'

Panjang Lantai 4

161.15 m'

=
=

7.00 m
3.93 m

PEKERJAAN ATAP

Panjang
Panjang miring

2.00
2.00

=
=

80.00 m'
32.00 m'
112.00 m'

2.00
2.00

=
=

120.00 m'
48.00 m'
168.00 m'

15
14
13
12
11
10
9
8
7
6
5
4
3
2
Optrede
Antrede

=
=
=

0.30
0.20
0.36

m
m
m

Panjang plat
Lebar
Tebal
Volume plat
Jumlah

Plesteran dan Acian

m2
m2
m2
m2
m2
m2
m2
=

605.8 m2

=
=
=
=
=

8.94
1.00
0.12
1.07
2.15

m
m
m
m3
m3

Anak tangga
=
Lebar
=
Jumlah
=
Volume Anak Tangga =

0.03
1.00
15.00
0.45

m2
m2
m2
m2
=

m2

97.14 m2

## m2

3.4

m2
m
bh
m3

Pondasi Poer Plat ad. 1:2:3 (100x100x50)


1 M3 PEMBESIAN
Atas
= d12 - 14
Bawah
= d16 - 14
1 m3 beton plat
tebal
lebar
Panjang
Check

=
=
=
=

arah lebar ;
Bawah D16 ;
panjang
jumlah

=
=

1.85 m'
15.29 bh

x
x

1.05 =
1.94 =

1.94 m'
29.69 m'

46.91 kg

Atas D12 ;
panjang
jumlah

=
=

0.95 m'
15.29 bh

x
x

1.05 =
1.00 =

1.00 m'
15.25 m'

13.57 kg

arah memanjang ;
Bawah D16 ;
panjang
jumlah

=
=

2.85 m'
8.14 bh

x
x

1.05 =
2.99 =

2.99 m'
24.37 m'

38.50 kg

Atas D12 ;
panjang
jumlah

=
=

1.95 m'
8.14 bh

x
x

1.05 =
2.05 =

2.05 m'
16.67 m'

14.84 kg

=
=
=

85.41 kg
28.41 kg
113.82 kg

0.50
1.00
2.00
1.00

m
m
m
m3

Jumlah D16
Jumlah D12
Jumlah
1 M3 BEKISTING DENGAN PAPAN
- Papan (dihitung 2 x pakai) 75 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
28.00 bh
panjang
=
8.40 m'
=
8.40 m'
- Paku 1 - 3

0.000 m'
=

0.01 m3 =
2.08 kg

Pondasi Poer Plat ad. 1:2:3 (80x80x50)


1 M3 PEMBESIAN
Atas
= d12 - 15
Bawah
= d16 - 15
1 m3 beton plat
tebal
lebar
Panjang
Check

=
=
=
=

0.50
1.00
2.00
1.00

arah lebar ;
Bawah D16 ;
panjang

1.85 m'

m
m
m
m3

1.05 =

1.94 m'

1.05 btng
kg

jumlah

15.29 bh

1.94 =

29.69 m'

46.91 kg

Atas D12 ;
panjang
jumlah

=
=

0.95 m'
15.29 bh

x
x

1.05 =
1.00 =

1.00 m'
15.25 m'

13.57 kg

arah memanjang ;
Bawah D16 ;
panjang
jumlah

=
=

2.85 m'
8.14 bh

x
x

1.05 =
2.99 =

2.99 m'
24.37 m'

38.50 kg

Atas D12 ;
panjang
jumlah

=
=

1.95 m'
8.14 bh

x
x

1.05 =
2.05 =

2.05 m'
16.67 m'

14.84 kg

=
=
=

85.41 kg
28.41 kg
113.82 kg

Jumlah D16
Jumlah D12
Jumlah
1 M3 BEKISTING DENGAN PAPAN
- Papan (dihitung 2 x pakai) 75 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
28.00 bh
panjang
=
8.40 m'
=
8.40 m'
- Paku 1 - 3

Pembuatan Sloof Beton 20/40 ad. 1:2:3


1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=
Bawah
=
Ring ;
d8-15
1 m3 beton sloof 20/40
Panjang
Vol

=
=

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=
D12
=
Dlm 1 m3 beton sloof, jml besi ring ;
panjang ring
=
Jumlah ring
=

0.000 m'
=

0.01 m3 =
2.08 kg

3 d16
0 d12
3 d16

12.50 m'
1.00 m3

75.00 m'
- m'

x
x

1.05 =
1.05 =

78.75 m'
- m'

=
=

124.43 kg
- kg

1.05 m'
63.50 bh'

x
x

1.00 =
1.05 =

1.05 m'
66.68 m'

24.67 kg

149.09 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
26.00 bh
panjang
=
15.60 m'
=
65.60 m'
- Paku 1 - 3
Pembuatan sloof beton 15/20 ad. 1:2:3
1 M3 PEMBESIAN

1.05 btng
kg

5.00 m2

50.00 m'
=
=

0.11 m3 =
2.08 kg

8.20 btng

=
=

### btng

- Besi utama ;

Ring ;

Atas
Tengah
Bawah
d8-15

1 m3 beton sloof 15/20


Panjang
Vol

=
= =

=
=

2 d12
2 d12

33.33 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D12
=
133.33 m'

1.02 =

136.00 m'

121.04 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring
=
Jumlah ring
=

x
x

1.02 =
0.51 =

0.51 m'
85.51 m'

31.64 kg

152.68 kg

0.50 m'
167.67 bh'

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
134.33 bh
panjang
=
53.73 m'
=
187.07 m'
Paku 1 - 3
Pembuatan kolom 40x40 ad. 1:2:3 lantai 1
1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=
Bawah
=
Ring ;
d8-15
1 m3 beton kolom 40/40
Panjang
Vol

=
=

8.33 m2

133.33 m'
=

0.33 m3 =
2.08 kg

23.38 btng

4 d16
4 d16
4 d16

6.25 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=

75.00 m'

1.05 =

78.75 m'

124.43 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring
=
Jumlah ring
=

1.40 m'
42.67 bh'

x
x

1.05 =
1.47 =

1.47 m'
62.72 m'

23.21 kg

147.63 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 %
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
26.00 bh
panjang
=
36.40 m'
=
86.40 m'
Paku 1 - 3

Pembuatan kolom 35x35 ad. 1:2:3 lantai 1


1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=

4 d16
2 d16

5.00 m2

50.00 m'
=

0.15 m3 =
2.08 kg

10.80 btng

Ring ;

Bawah
d8-15

1 m3 beton kolom 35/35


Panjang
Vol

4 d16

=
=

8.16 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=

81.63 m'

1.05 =

85.71 m'

135.43 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring
=
Jumlah ring
=

1.20 m'
55.42 bh'

x
x

1.05 =
1.26 =

1.26 m'
69.83 m'

25.84 kg

161.27 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 %
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
33.65 bh
panjang
=
47.11 m'
=
112.42 m'
Paku 1 - 3

5.71 m2

65.31 m'
=

0.20 m3 =
2.08 kg

14.05 btng

Pembuatan kolom 30x30 ad. 1:2:3 lantai 2 = lantai 3


1 M3 PEMBESIAN
- Besi utama ; Atas
=
3 d16
Tengah
=
2 d16
Bawah
=
3 d16
Ring ;
d8-15
1 m3 beton kolom 30/30
Panjang
Vol

=
=

11.11 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=

88.89 m'

1.05 =

93.33 m'

147.47 kg

Dlm 1 m3 beton sloof, jml besi ring d8 ;


panjang ring
=
Jumlah ring
=

1.05 m'
75.07 bh'

x
x

1.00 =
1.05 =

1.05 m'
78.83 m'

29.17 kg

176.63 kg

Jumlah
1 M BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 2 x pakai) 50 %
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
45.44 bh
panjang
=
54.53 m'
=
143.42 m'
Paku 1 - 3
Pembuatan kolom 15x15 ad. 1:2:3 lantai 3
1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=
Bawah
=
Ring ;
d8-15

2 d10
2 d10

6.67 m2

88.89 m'
=

0.25 m3 =
2.08 kg

17.93 btng

1 m3 beton kolom 15/15


Panjang
Vol

=
=

44.44 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D10
=
177.78 m'

1.05 =

186.67 m'

115.73 kg

Dlm 1 m3 beton sloof, jml besi ring d8 ;


panjang ring
=
0.45 m'
Jumlah ring
=
297.30 bh'

x
x

1 =
0.45 =

0.45 m'
133.78 m'

49.50 kg

165.23 kg

Jumlah
1 M BEKISTING DENGAN MULTIPLEK
Multiplek (dihitung 4 x pakai) 25 %
Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
178.78 bh
panjang
=
214.53 m'
=
570.09 m'
Paku 1 - 3
Pembuatan balok Induk 25x45 ad. 1:2:3
1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=
Bawah
=
Ring ;
d8-15
Panjang
Vol

=
=

3.33 m2

355.56 m'
=

1.00 m3 =
2.08 kg

71.26 btng

5 d16
2 d12
3 d16

8.89 m'
1.00 m3

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=
D12
=

71.11 m'
17.78 m'

x
x

1.05 =
1.05 =

74.67 m'
18.67 m'

=
=

117.97 kg
16.61 kg

Dlm 1 m3 beton sloof, jml besi ring ;


panjang ring
=
Jumlah ring
=

1.25 m'
51.79 bh'

x
x

1.00 =
1.25 =

1.25 m'
64.74 m'

23.95 kg

158.54 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
36.56 bh
panjang
=
31.44 m'
=
84.77 m'
- Paku 1 - 3
Pembuatan balok 20x30 ad. 1:2:3
1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
=
Bawah
=
Ring ;
d8-15
1 m3 beton kolom 30/60
Panjang
Vol

=
=

3 d16
2 d16

16.67 m'
1.00 m3

5.11 m2

53.33 m'
=

0.15 m3 =
2.08 kg

10.60 btng

Dlm 1 m3 beton sloof, jml besi utama ;


D16
=
D12
=
Dlm 1 m3 beton sloof, jml besi ring ;
panjang ring
=
Jumlah ring
=

83.33 m'
- m'

x
x

1.05 =
1.05 =

87.50 m'
- m'

=
=

138.25 kg
- kg

0.70 m'
112.11 bh'

x
x

1.05 =
0.74 =

0.74 m'
82.40 m'

30.49 kg

168.74 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
67.67 bh
panjang
=
85.26 m'
=
91.26 m'
- Paku 1 - 3
Pembuatan ring balok 15/20 ad. 1:2:3
1 M3 PEMBESIAN
- Besi utama ; Atas
=
Tengah
= Bawah
=
Ring ;
d8-15
1 m3 beton ;
Panjang
Vol

=
=

6.67 m2

6.00 m'
=

0.16 m3 =
2.08 kg

11.41 btng

2 d12
2 d12

33.33 m'
1.00 m3

Dlm 1 m3 beton jml besi utama ;


D12
=

133.33 m'

1.05 =

140.000 m'

124.60 kg

Dlm 1 m3 beton jml besi ring ;


panjang ring
=
Jumlah ring
=

0.50 m'
191.48 bh'

x
x

1.05 =
0.525 =

0.525 m'
100.525 m'

37.19 kg

161.79 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
jumlah
=
134.333 bh
panjang
=
53.733 m'
=
187.067 m'
- Paku 1 - 3
Pembuatan plat lantai ad. 1:2:3, tb = 12 cm
- Besi
Atas
= d8 - 15
Bawah
= d8 - 15

133.333 m'
=

6.667 m2

0.327 m3 =
2.08 kg

Rata-rata antara jarak 10 cm s.d 15 cm

1 m3 beton plat
tebal
lebar
Panjang
Check

=
=
=
=

0.12
1.00
8.33
1.00

arah lebar
panjang

1.00 m'

m
m
m
m3

1.00 =

1.00 m'

23.38 btng

jumlah
arah memanjang
panjang
jumlah

56.56 bh

1.00 =

56.56 m'

20.93 kg

1 =

20.93

=
=

8.33 m'
7.67 bh

x
x

1.00 =
8.33 =

8.33 m'
63.89 m'

23.64 kg

1 =

23.64

44.56

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
- Kayu gelam
- Paku 1 - 3

4.17
0.10
50.00
4.00

44.56

m2
m3
btg
kg

Pembuatan plat lantai ad. 1:2:3, tb = 10 cm


- Besi
Atas
= d8 - 15
Bawah
= d8 - 15
1 m3 beton plat
tebal
lebar
Panjang
Check

=
=
=
=

0.10
1.00
10.00
1.00

arah lebar
panjang
jumlah

=
=

1.00 m'
67.67 bh

x
x

1.00 =
1.00 =

1.00 m'
67.67 m'

25.04 kg

arah memanjang
panjang
jumlah

=
=

10.00 m'
7.67 bh

x
x

1.00 =
10.00 =

10.00 m'
76.67 m'

28.37 kg

53.40 kg

m
m
m
m3

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 50 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
- Kayu gelam
- Paku 1 - 3
Pembuatan plat pet 8/30 ad. 1:2:3
1 M3 PEMBESIAN
1 m3 beton plat
tebal
=
lebar
=
Panjang
=
Check
=

5.00
0.10
50.00
4.00

0.08
0.30
41.67
1.00

m
m
m
m3

m2
m3
btg
kg

d8-15
d8-15

arah lebar ; d8
panjang
jumlah

=
=

0.30 m'
278.78 bh

x
x

1.05 =
0.32 =

0.32 m'
87.82 m'

32.49 kg

arah memanjang ; d8
panjang
jumlah

=
=

41.67 m'
3.00 bh

x
x

1.05 =
43.75 =

43.75 m'
131.25 m'

48.56 kg

81.05 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 75 %

12.50 m2

1 =

53.40

Kaso 5/7 BS (dihitung 2x pakai) 50 %


Kayu gelam
Paku 1 - 3

Pembuatan plat tangga ad. 1:2:3


1 M3 PEMBESIAN
1 m3 beton plat
tebal
=
lebar
=
Panjang
=
Check
=

0.10 m3
50.00 btg
4.00 kg

0.120
1
8.333
1

m
m
m
m3

arah lebar bawah, d8


panjang
jumlah

=
=

2.04 m'
42.67 bh

x
x

1.05 =
2.14 =

2.14 m'
91.39 m'

33.82 kg

arah memanjang bawah, d12


panjang
jumlah

=
=

16.71 m'
6.00 bh

x
x

1.05 =
17.54 =

17.54 m'
105.25 m'

93.67 kg

127.49 kg

Jumlah
1 M3 BEKISTING DENGAN MULTIPLEK
- Multiplek (dihitung 2 x pakai) 75 %
- Kaso 5/7 BS (dihitung 2x pakai) 50 %
- Kayu gelam
- Paku 1 - 3

4.17
0.10
50.00
4.00

m2
m3
btg
kg

kg

kg

REKAPITULASI ANGGARAN BIAYA


PEKERJAAN PEMBANGUNAN LABORATURIUM KOMPUTER
IPB DARMAGA BOGOR
No.
A.

JUMLAH HARGA
(Rp)

URAIAN PEKERJAAN
STANDAR

I.

PEKERJAAN PERSIAPAN

II.
A
B
C

PEKERJAAN STRUKTUR
PEK. TANAH
PEK. PONDASI
PEK. KONSTRUKSI BETON

Rp
Rp
Rp

5,642,928.56
89,350,012.60
294,648,436.28

A
B
C
D
E
F
G

PEKERJAAN ARSITEKTUR
PEK. DINDING
PEK. LANTAI
PEK. KUSEN LENGKAP
PEK. PENUTUP ATAP
PEK. PLAFOND
PEK. SANITAIR
PEK. PENGECATAN

Rp
Rp
Rp
Rp
Rp
Rp
Rp

113,027,992.10
36,722,310.00
72,175,150.00
66,000,714.00
27,058,392.00
2,604,500.00
21,382,439.80

PEKERJAAN MEKANIKAL
PEK. INSTALASI PLAMBING

III.

IV.

V.
A
B

B.
I
II
III
IV
V

Rp

PEKERJAAN ELEKTRIKAL
PEK. LISTRIK
PEK. PENANGKAL PETIR

Rp
Rp

Rp

27,511,680.00

Rp

389,641,377.44

Rp

338,971,497.90

Rp

42,863,606.00

Rp

58,234,780.00

42,863,606.00

48,584,780.00
9,650,000.00

SUB TOTAL

Rp

857,222,941.34

PPN 10%

Rp

85,722,294.13

TOTAL

Rp

942,945,235.48

DIBULATKAN

Rp

942,900,000.00

Rp
Rp
Rp
Rp
Rp

25,716,688.24
85,722,294.13
85,722,294.13
34,288,917.65
17,144,458.83

NON STANDAR
TATA SUARA
TATA UDARA
PENINGKATAN MUTU
TELEPON & PABX
SARANA & PRASARANA LINGKUNGAN

3%
10%
10%
4%
2%

x
x
x
x
x

Rp
Rp
Rp
Rp
Rp

857,222,941.34
857,222,941.34
857,222,941.34
857,222,941.34
857,222,941.34

SUB TOTAL

Rp

248,594,652.99

PPN 10%

Rp

24,859,465.30

TOTAL

Rp

273,454,118.29

DIBULATKAN

Rp

273,400,000.00

Rp

1,216,300,000.00

TOTAL
TERBILANG
f:\336480578.xls

: Satu milyar dua ratus enam belas juta tiga ratus ribu rupiah

f:\336480578.xls

HARGA
(Rp)

f:\336480578.xls

f:\336480578.xls

RENCANA ANGGARAN BIAYA


PEKERJAAN PEMBANGUNAN LABORATURIUM KOMPUTER
IPB DARMAGA BOGOR
No.

I.

PEKERJAAN

PEKERJAAN PERSIAPAN
1 Bouwplank
2 Pagar sementara seng gelombang T. 2 m
Sub Total I.

II.

SAT.

VOLUME

HARGA SAT.
(Rp)

M'
M'

112.00
168.00

38,370.00
138,180.00

4,297,440.00
23,214,240.00
27,511,680.00

PEKERJAAN STRUKTUR
A
1
2
3
4
5

PEK. TANAH
Galian tanah pondasi tapak
Galian tanah sloof
Urug tanah peil lantai padat
Urug pasir bawah lantai t. 5 cm
Urug pasir bawah pondasi & sloof t. 5 cm

m3
m3
m3
m3
m3

132.10
11.16
96.80
12.10
4.93

14,200.00
14,200.00
6,800.00
173,230.00
173,230.00
Jumlah A

1,875,763.20
158,472.00
658,240.00
2,096,083.00
854,370.36
5,642,928.56

B
1
2
3
4

PEK. PONDASI
Pondasi Tapak 1,5x1,5
Kolom Pedestal 30x30
Sloof 20/30
Plastic sheet

m3
m3
m3
m2

10.80
4.75
6.89
242.00

3,220,940.00
5,124,050.00
4,312,500.00
2,000.00
Jumlah B

34,786,152.00
24,349,485.60
29,730,375.00
484,000.00
89,350,012.60

m3

8.64

5,124,050.00

44,271,792.00

m3
m3
m3
m3
m2

8.44
2.47
15.84
0.90
3.48

4,483,280.00
4,305,970.00
2,335,460.00
4,511,030.00
76,120.00

37,820,950.08
10,644,357.84
36,993,686.40
4,041,882.88
264,897.60

m3
m3
m3

4.23
1.37
0.42

4,538,340.00
4,608,450.00
4,627,770.00

19,209,885.55
6,290,534.25
1,943,663.40
161,481,650.00

m3

8.64

4,559,260.00

39,392,006.40

m3
m3
m3
m3
m3

8.44
2.47
8.80
2.88
1.34

4,495,710.00
5,230,810.00
2,621,550.00
5,230,810.00
3,559,550.00

37,925,809.56
12,930,562.32
23,069,640.00
15,064,732.80
4,784,035.20
133,166,786.28
294,648,436.28
389,641,377.44

C PEK. KONSTRUKSI BETON


C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Kolom 30x30
2 Balok :
Balok 20x40
Balok 20x30
3 Plat lantai t. 12 cm (M6 - 1,5 lps)
4 Canopy tb. 8 cm
5 Rabat beton t. 6 cm
6 Tangga :
Plat tangga
Plat bordes
Balok bordes (20x30)

C.2 Lantai 2 (Elevasi +4,00 ~ +8,00)


1 Kolom 30x30
2 Balok
Balok (20x40)
Balok (20x30)
3 Plat lantai dak 10 cm (M6 - 1,5 lps)
3 Ringbalk 20/30
4 Lisplank beton 8/30

Jumlah C
Sub Total II.
III.

JUMLAH HARGA
(Rp)

PEKERJAAN ARSITEKTUR
A PEK. DINDING
A.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Dinding hebel t 10 cm + MU 380
2 Plesteran dinding MU 100 t. 10 mm
3 Acian MU 200 t. 3 mm
4 Keramik dinding 20/25 warna muda
5 Kolom Praktis 10x10
6 Ring balok 10x15
7 Balok lintel 10x15
8 Finishing kolom (acian MU 200)
9 Finishing canopy (acian MU 200)
10 Partisi gypsumboard ex Elephant 9mm 2 muka
& rangka metak stud 64 t. 85 mm
11 Reiling tangga besi hollow

f:\336480578.xls

m2
m2
m2
m2
m'
m'
m'
m2
m2

302.90
605.80
605.80
30.00
64.00
72.00
40.00
96.00
11.20

99,070.00
36,140.00
17,060.00
102,960.00
83,000.00
77,820.00
77,820.00
17,060.00
17,060.00

30,008,303.00
21,893,612.00
10,334,948.00
3,088,800.00
5,312,000.00
5,603,040.00
3,112,800.00
1,637,760.00
191,072.00

m2
m2

39.36
14.62

110,110.00
400,000.00

4,333,929.60
5,849,600.00
91,365,864.60

Hal. 45

No.

PEKERJAAN
A.2
1
2
3
4
5
6

Lantai 2 (Elevasi +4,00 ~ +8,00)


Dinding hebel t 10 cm + MU 380
Plesteran dinding MU 100 t. 10 mm
Acian MU 200 t. 3 mm
Balok lintel 10x15
Finishing kolom (acian MU 200)
Finishing canopy (acian MU 200)

SAT.
m2
m2
m2
m'
m2
m2

VOLUME
48.57
97.14
97.14
104.00
96.00
88.00

HARGA SAT.
(Rp)
100,210.00
37,330.00
17,940.00
78,870.00
17,940.00
17,060.00
Jumlah A

B PEK. LANTAI
B.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Screeding t. 2 cm (MU 440)
2 Keramik 30/30 MU 450 & 408
3 Kramik Tangga
4 Step Nossing
5 Waterproofing MU 600
B.2 Lantai 2 (Elevasi +4,00 ~ +8,00)
1 Keramik 30/30 MU 450 & 408

C.2
1
2
3

Lantai 2 (Elevasi +4,00 ~ +8,00)


J2
(JA)
BV
(JA)
J1 (Kusen 3,7x3,7)

148.00
148.00
7.80
19.80
11.25

44,110.00
98,330.00
98,330.00
40,670.00
82,520.00

6,528,280.00
14,552,840.00
766,974.00
805,266.00
928,350.00
23,581,710.00

m2

132.00

99,550.00

13,140,600.00
13,140,600.00
36,722,310.00

unit
unit
unit
unit
unit
unit

2.00
2.00
4.00
5.00
4.00
2.00

1,359,620.00
2,335,690.00
650,000.00
1,576,480.00
344,070.00
8,000,000.00

2,719,240.00
4,671,380.00
2,600,000.00
7,882,400.00
1,376,280.00
16,000,000.00
35,249,300.00

unit
unit
unit

10.00
15.00
2.00

1,576,480.00
344,070.00
8,000,000.00

15,764,800.00
5,161,050.00
16,000,000.00
36,925,850.00
72,175,150.00

Jumlah C
D PEK. PENUTUP ATAP
D.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Talang tegak d. 6" PVC AW + cat
2 Waterproofing MU 600
3 Roofdrain d. 3"
D.2
1
2
3
4
5

Lantai 2 (Elevasi +4,00 ~ +8,00)


Rangka atap baja ringan
Genteng metal berpasir 41x110 cm
Nok metal berpasir P.110 cm L.5 cm T.6 cm
Talang tegak d. 6" PVC AW + cat
Roofdrain

m'
m2
bh

32.00
11.25
4.00

155,450.00
82,520.00
200,000.00

4,974,400.00
928,350.00
800,000.00
6,702,750.00

m2
m2
m'
m'
bh

157.20
157.20
20.00
32.00
4.00

212,200.00
120,670.00
59,660.00
155,550.00
200,000.00

33,357,840.00
18,969,324.00
1,193,200.00
4,977,600.00
800,000.00
59,297,964.00
66,000,714.00

Jumlah D
E PEK. PLAFOND
E.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Plafond gypsum board t. 9 mm rangka besi hollow
2 Plafond kalsiboard rangka besi hollow
3 Plafond beton expose (finishing)
4 List plafond gypsum
5 List plafond kayu
E.2
1
2
3

Lantai 2 (Elevasi +4,00 ~ +8,00)


Plafond gypsum board t. 9 mm rangka besi hollow
Plafond beton expose (finishing)
List plafond gypsum

m2
m2
m2
m'
m'

142.00
6.00
11.20
93.00
30.00

76,160.00
77,550.00
17,060.00
13,700.00
12,500.00

10,814,720.00
465,300.00
191,072.00
1,274,100.00
375,000.00
13,120,192.00

m2
m2
m'

148.00
88.00
74.00

76,660.00
17,940.00
13,700.00

11,345,680.00
1,578,720.00
1,013,800.00
13,938,200.00
27,058,392.00

Jumlah E

f:\336480578.xls

4,867,199.70
3,626,236.20
1,742,691.60
8,202,480.00
1,722,240.00
1,501,280.00
21,662,127.50
113,027,992.10

m2
m2
m2
m'
m2

Jumlah B
C PEK. KUSEN LENGKAP
C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 P-1 (PA)
2 P-2 (PA)
3 PK (PVC)
4 J2
(JA)
5 BV
(JA)
6 J1 (Kusen 3,7x3,7)

JUMLAH HARGA
(Rp)

Hal. 46

No.

PEKERJAAN

SAT.

VOLUME

HARGA SAT.
(Rp)

JUMLAH HARGA
(Rp)

F PEK. SANITAIR
F.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Closet Jongkok Standar Putih Porseline Toto
2 Wastafel Lengkap TOTO LW 230

bh
bh

5.00
1.00

304,700.00
1,081,000.00
Jumlah F

1,523,500.00
1,081,000.00
2,604,500.00

G PEK. PENGECATAN
G.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1 Cat dinding Vinilex (3x)
2 Cat dinding Partisi
3 Plitur daun pintu
4 Cat Plafond Gypsum
5 Cat plafond kalsiboard Vinilex (3x)
6 Cat plafond beton expose Vinilex (3x)
7 Cat list plafond gypsum
8 Cat list plafond kayu

m2
m2
m2
m2
m2
m2
m'
m'

605.80
78.72
21.60
142.00
6.00
11.20
93.00
30.00

15,970.00
15,970.00
33,400.00
17,580.00
17,580.00
17,580.00
5,274.00
3,058.00

9,674,626.00
1,257,158.40
721,440.00
2,496,360.00
105,480.00
196,896.00
490,482.00
91,740.00
15,034,182.40

m2
m2
m2
m'

97.14
148.00
88.00
74.00

16,510.00
18,450.00
18,450.00
5,274.00

1,603,781.40
2,730,600.00
1,623,600.00
390,276.00
6,348,257.40
21,382,439.80

G.2
1
2
3
4

Lantai 2 (Elevasi +4,00 ~ +8,00)


Cat dinding Vinilex (3x)
Cat Plafond Gypsum
Cat plafond beton expose Vinilex (3x)
Cat list plafond gypsum

Jumlah G
Sub Total III.

338,971,497.90

JUMLAH I s/d III

756,124,555.34

f:\336480578.xls

Hal. 47

No.

IV.

PEKERJAAN

HARGA SAT.
(Rp)

JML. HARGA
(Rp)

SAT.

VOLUME

unit
lot

1.00
1.00

3,500,000.00
5,000,000.00

3,500,000.00
5,000,000.00

unit

2.00

1,250,000.00

2,500,000.00

set
lot

1.00
1.00

150,000.00
6,050,000.00
Jumlah 1

150,000.00
6,050,000.00
17,200,000.00

m
m
m
lot

56.00
6.00
32.00
1.00

14,780.00
10,140.00
7,780.00
113,748.00

827,680.00
60,840.00
248,960.00
113,748.00

bh
bh

2.00
4.00

100,800.00
75,000.00

201,600.00
300,000.00

m
m
m
lot

16.00
20.00
12.00
1.00

89,990.00
31,850.00
14,780.00
225,420.00

1,439,840.00
637,000.00
177,360.00
225,420.00

bh

6.00

125,000.00

750,000.00
4,982,448.00

m
m
m
lot

53.00
10.00
56.00
1.00

14,780.00
10,140.00
7,780.00
132,042.00

783,340.00
101,400.00
435,680.00
132,042.00

bh

2.00

100,800.00

201,600.00

m
m
m
m
lot

40.00
12.00
16.00
16.00
1.00

89,990.00
64,320.00
31,850.00
14,780.00
511,752.00

3,599,600.00
771,840.00
509,600.00
236,480.00
511,752.00

bh

6.00

125,000.00

750,000.00

bh

4.00

65,000.00

260,000.00
8,293,334.00

m
m
lot

64.00
64.00
1.00

89,990.00
64,320.00
987,584.00

5,759,360.00
4,116,480.00
987,584.00

bh
bh

6.00
4.00

85,000.00
70,000.00

510,000.00
280,000.00

bh
m'

4.00
64.00

150,000.00
2,100.00

600,000.00
134,400.00
12,387,824.00
25,663,606.00

PEKERJAAN MEKANIKAL

PEK. INSTALASI PLAMBING


1

Peralatan utama
a.
Jet Pump Kap. 250 W (Sanyo)
b.
Pengeboran + Instalasi
Kedalaman +/- 20 m
c.
Tanki Atas (Cylinder)
Kap. 1 m3
d.
Automatic Water Level Control (Radar)
e.
Biofil BF08

2 Instalasi
2.1 Lantai Dasar
a.
Pemipaan Air Bersih
- Pipa PVC AW
dia. 1"
dia. 3/4"
dia. 1/2"
- Fitting
- Valves
Gate Valve dia. 1"
Kran Tembok dia. 1/2"
b.
Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4"
dia. 2"
dia. 1"
- Fitting
- Floor Drain (FD) SAN EI / Setara
dia. 2"
2.2 Lantai Atas
a.
Pemipaan Air Bersih
- Pipa PVC AW
dia. 1"
dia. 3/4"
dia. 1/2"
- Fitting
- Valves
Gate Valve dia. 1"
b.
Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4"
dia. 3"
dia. 2"
dia. 1"
- Fitting
- Floor Drain (FD)
dia. 2"
- Clean Out (CO)
dia. 2"
2.3 Atap
a.
Pemipaan Air Hujan
- Pipa PVC AW
dia. 4"
dia. 3"
- Fitting
- Roof Drain (RD)
dia. 4"
dia. 3"
- Bak Kontrol
Uk. 400x400 mm
- Galian dan urugan kembali

Jumlah 2

f:\336480578.xls

Hal. 48

No.

PEKERJAAN

JUMLAH IV.

f:\336480578.xls

SAT.

VOLUME

HARGA SAT.
(Rp)

JML. HARGA
(Rp)
42,863,606.00

Hal. 49

No.

PEKERJAAN

V.

SAT.

VOLUME

HARGA SAT.
(Rp)

JML. HARGA
(Rp)

PEKERJAAN ELEKTRIKAL
A

PEK. LISTRIK

A.1
1
2
3
4
5
6
A.2
1

A.3
1

PANEL PENERANGAN
MCB 35 A, 3P, 6kA
MCB 10A, 1P, 4,5kA
MCB 6A, 1P, 4,5kA
Lampu Indikator
Box Panel Plat
Pentanahan dan Accessories

1.00
1.00
7.00
7.00
3.00
1.00
1.00

83,000.00
65,500.00
65,500.00
80,000.00
450,000.00
2,500,000.00

83,000.00
458,500.00
458,500.00
240,000.00
450,000.00
2,500,000.00
4,190,000.00

20.00

21,500.00

430,000.00
430,000.00

INSTALASI DAN ARMATURE


Lantai Dasar
a.
Lampu Baret TL-E 20 W
b.
Lampu TL 1 x 36 W V Shape
c.
Saklar tunggal
d.
Saklar ganda
e.
Stop Kontak
f.
Instalasi penerangan
g.
Instalasi stop kontak

bh
bh
bh
bh
bh
titik
titik

28.00
18.00
9.00
23.00
16.00
46.00
16.00

279,510.00
247,800.00
20,870.00
23,400.00
20,980.00
156,110.00
168,530.00

7,826,280.00
4,460,400.00
187,830.00
538,200.00
335,680.00
7,181,060.00
2,696,480.00
23,225,930.00

Lantai Dua
a.
Lampu Baret TL-E 20 W
b.
Lampu TL 1 x 36 W V Shape
d.
Saklar tunggal
e.
Saklar ganda
f.
Stop Kontak
g.
Instalasi penerangan
h.
Instalasi stop kontak

bh
bh
bh
bh
bh
titik
titik

19.00
22.00
7.00
17.00
16.00
41.00
16.00

279,510.00
247,800.00
20,870.00
23,400.00
20,980.00
156,110.00
168,530.00

5,310,690.00
5,451,600.00
146,090.00
397,800.00
335,680.00
6,400,510.00
2,696,480.00
20,738,850.00
43,964,780.00

Jumlah A

48,584,780.00

KABEL FEEDER + KABEL BC


Dari kWh M
Panel Distribusi Daya (PD-D)
- NYY 3 x 6 mm2

unit

PEK. PENANGKAL PETIR


(System Conventional)
1

2
3

Splitzen dia. 1"


Dengan Tiang 1 meter (Pipa Galvanis)
Lengkap dengan Peralatan Bantu
Kabel BC 50 mm2 dan Peralatan Bantu
Pentanahan lengkap dengan :
a. Grounding System 1x Cooper Rod 5/8"
dengan Panjang 6 meter Maks. 2 Ohm
b. Bak Kontrol 40 x 40 x 40 cm
c. Material Bantu
Instalasi dan Material Bantu

JUMLAH V.

f:\336480578.xls

bh

6.00

250,000.00

1,500,000.00

m
lot

80.00
1.00

65,000.00
2,500,000.00

5,200,000.00
2,500,000.00

lot

1.00

450,000.00
Jumlah B

450,000.00
9,650,000.00
58,234,780.00

Hal. 50

DAFTAR HARGA SATUAN PEKERJAAN


KAB. BOGOR TAHUN ANGGARAN 2008

No.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

PEKERJAAN
PEK. SIPIL & ARSITEK
M2
Pembersihan lahan
M'
Bouwplank
M'
Pagar proyek
M3
Galian tanah max kedalaman 1 m'
M3
Galian tanah max kedalaman 2 m'
M3
Urugan tanah padat (urugan kembali)
M3
Pemadatan tanah
M3
Urugan pasir
M3
Pondasi batu kosong (anstamping batu)
M3
Pas. Batu belah 1pc:4ps
M3
Lantai kerja t. 5 cm/beton tumbuk 1pc:3ps:5kr
M2
Screeding t. 2 cm (MU 440)
M2
Screeding t. 2 cm (MU 440) (Lt. 2)
M3
Beton site mix K-175
M3
Beton site mix K-175 (Lt. 2)
M3
Beton site mix K-225
M3
Beton site mix K-225 (Lt. 2)
M3
Readymix K-225
M3
Readymix K-225 (Lt. 2)
M3
Readymix K-300
M3
Readymix K-300 (Lt. 2)
Kg
Besi beton < d 12
Kg
Besi beton < d 12 (Lt. 2)
Kg
Besi beton > D 13
Kg
Besi beton > D 13 (Lt. 2)
M2
Wire Mesh M-8 (1,5 lapis)
M2
Wire Mesh M-8 (1,5 lapis) (Lt. 2)
M2
Wire Mesh M-6 (1,5 lapis)
M2
Wire Mesh M-6 (1,5 lapis) (Lt. 2)
M2
Wire Mesh M-4 (1 lapis)
M2
Wire Mesh M-4 (1 lapis) (Lt. 2)
M'
Pipa Hitam t. 3,6 mm; D 2" (medium)
M'
Pipa Hitam t. 3,6 mm; D 2,5" (medium)
Kg
Baja Profil
M2
Bekisting multiplex 9 mm
M2
Bekisting multiplex 9 mm (Lt. 2)
M'
Sloof praktis 10/15
M3
Sloof type S-1 20/40
M3
Sloof type S-2 20/30
M3
Sloof type S-3 20/30
M3
Pondasi tapak type P-1 (4,4x2,4)
M3
Pondasi tapak type P-2 (2,4x2,4)
M3
Pondasi tapak type P-3 (2,0x2,0)
M3
Pondasi tapak type P-4 (1,5x1,5)
M3
Pondasi tapak type P-5 (1,0x1,0)
M2
Rabat beton t. 6 cm
M'
Kolom Praktis 10x10
M'
Kolom Praktis 10x10 (Lt. 2)
M3
Kolom K1-1 (40x40)
M3
Kolom K1-2 (40x40)
M3
Kolom K2-1 (30x30)
M3
Kolom K2-2 (30x30)
M'
Balok lintel 10x15

f:\336480578.xls

HARGA
(Rp)
5,750.00
38,370.00
138,180.00
14,200.00
18,640.00
6,800.00
17,750.00
173,230.00
248,940.00
525,220.00
593,820.00
44,110.00
44,290.00
898,720.00
920,410.00
960,360.00
982,050.00
856,050.00
864,150.00
905,050.00
913,150.00
16,850.00
16,890.00
17,270.00
17,310.00
137,020.00
137,420.00
77,070.00
77,290.00
22,760.00
22,830.00
49,550.00
61,570.00
21,430.00
94,580.00
96,680.00
100,280.00
4,496,360.00
4,312,500.00
4,312,500.00
2,872,340.00
3,154,900.00
2,699,550.00
3,220,940.00
4,193,120.00
76,120.00
83,000.00
83,770.00
3,614,520.00
3,290,920.00
5,124,050.00
4,559,260.00
77,820.00
Hal. 51

No.
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

PEKERJAAN
M'
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M'
M'
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Balok lintel 10x15 (Lt.2)


Balok B1
(30x60)
Balok B2
(30x60)
Balok B3
(25x55)
Balok B4
(25x50)
Balok B5
(20x40)
Balok B6
(20x40)
Balok B7
(20x40)
Balok B8
(20x40)
Balok B9
(20x40)
Balok B10
(20x30)
Balok B10
(20x30) (Lt. 2)
Balok B11
(20x30 + 8x70)
Balok B12
(20x30)
Balok B13
(25x60) (Lt. 2)
Balok B14
(25x60) (Lt. 2)
Balok B15
(20x40) (Lt. 2)
Balok B16
(20x40) (Lt. 2)
Balok B17
(20x30) (Lt. 2)
Balok B18
(20x30) (Lt. 2)
Balok bordes (20x30)
RB1 (20x25) (Lt. 2)
RB2 (20x25) (Lt. 2)
Plat tangga
Plat bordes
Plat lantai S1 t. 12 cm (M6)
Plat lantai S1 t. 12 cm (M6) (Lt. 2)
Plat lantai S2 t. 10 cm (M4)
Plat lantai S3 t. 10 cm (M6)
Plat canopy type A (1,85x0,75x0,08)
Plat canopy type A (1,85x0,75x0,08) (Lt. 2)
Plat canopy type B (2,85x0,75x0,08)
Plat canopy type C (0,75x0,75x0,08)
Plat canopy type C (0,75x0,75x0,08) (Lt. 2)
Plat canopy type D (3,70x0,75x0,08)
Plat canopy type D (3,70x0,75x0,08) (Lt. 2)
Plat canopy type E (1,70x0,40x0,08)
Plat canopy type E (1,70x0,40x0,08) (Lt. 2)
Rangka atap baja ringan
Genteng metal berpasir 41x110 cm
Genteng metal berpasir 41x110 cm (Lt. 2)
Nok metal berpasir P.110 cm L.5 cm T.6 cm
Nok metal berpasir P.110 cm L.5 cm T.6 cm (Lt. 2)
Plafond gypsum board t. 9 mm rangka besi hollow
Plafond gypsum board t. 9 mm rangka besi hollow (Lt. 2)
Plafond kalsiboard rangka besi hollow
Plafond kalsiboard rangka besi hollow (Lt. 2)
Keramik 20/20 MU 450 & 408 (Lt. 1)
Keramik 20/20 MU 450 & 408 (Lt. 2)
Keramik dinding 20/25 warna muda
Keramik dinding 20/25 warna muda (Lt. 2)
Keramik dinding 20/25 warna tua
Keramik dinding 20/25 warna tua (Lt. 2)
Keramik 30/30 MU 450 & 408 (Lt. 1)
Keramik 30/30 MU 450 & 408 (Lt. 2)
Pas. Batako PC pres 10x20x40 ad 1:4
Dinding hebel t 10 cm + MU 380
Dinding hebel t 10 cm + MU 380 (Lt. 2)

f:\336480578.xls

HARGA
(Rp)
78,870.00
4,422,150.00
2,972,870.00
4,729,910.00
4,267,510.00
5,327,140.00
4,362,110.00
4,483,280.00
4,141,410.00
3,799,530.00
4,305,970.00
4,318,100.00
3,149,520.00
3,682,810.00
3,359,780.00
3,724,860.00
4,495,710.00
4,324,580.00
5,230,810.00
4,774,450.00
4,627,770.00
4,787,430.00
4,442,400.00
4,538,340.00
4,608,450.00
2,335,460.00
2,362,900.00
2,078,450.00
2,621,550.00
4,511,030.00
4,565,110.00
4,511,030.00
4,511,030.00
4,565,110.00
4,511,030.00
4,565,110.00
2,325,540.00
2,362,650.00
212,200.00
119,730.00
120,670.00
58,320.00
59,660.00
76,160.00
76,660.00
77,550.00
78,040.00
90,530.00
91,750.00
102,960.00
105,090.00
104,760.00
106,890.00
98,330.00
99,550.00
63,660.00
99,070.00
100,210.00

Hal. 52

No.
82

PEKERJAAN

91
92
93
94
95
96
97
98

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
Un
Un
Un
Un
Un
Un
Un

1
2
3
5
6
7
8
9

PEK. MEKANIKAL
1 M Pas. Pipa PVC d. 1/2" (AW) Wavin
1 M Pas. Pipa PVC d. 3/4" (AW) Wavin
1 M Pas. Pipa PVC d. 1" (AW) Wavin
1 M Pas. Pipa PVC d. 1 1/2" (AW) Wavin
1 M Pas. Pipa PVC d. 2" (AW) Wavin
1 M Pas. Pipa PVC d. 2 1/2" (AW) Wavin
1 M Pas. Pipa PVC d. 3" (AW) Wavin
1 M Pas. Pipa PVC d. 4" (AW) Wavin

1
2
3
4
5
6
7
8

PEK. ELEKTRIKAL
1 Ttk Pas. Instalasi penerangan
1 Ttk Pas. Instalasi stop kontak
1 Ttk Stop Kontak
1 Ttk Saklar tunggal
1 Ttk Saklar ganda
1 Bh TL 2 x 36 W V Shape
1 Bh Lampu Baret TL-E 20 W
1 Bh Dwn Light PCL 13 W

83
84
85
86
87
88
89
90

B.

C.

Plesteran dinding MU 100 t. 10 mm


Plesteran dinding MU 100 t. 10 mm (Lt. 2)
Acian MU 200 t. 3 mm
Acian MU 200 t. 3 mm (Lt. 2)
Waterproofing MU 600
Waterproofing MU 600 (Lt. 2)
Pengecatan dinding Cat Vinilex
Pengecatan dinding Cat Vinilex (Lt. 2)
Pengecatan plafond (3x) Cat Vinilex
Pengecatan plafond (3x) Cat Vinilex (Lt. 2)
Pengecatan kayu (3x) berikut meni
Pengecatan kayu (3x) berikut meni (Lt. 2)
Pelaburan Bidang Kayu dengan Politur
Pelaburan Bidang Kayu dengan Politur (Lt. 2)
Pengecatan meni besi
Pengecatan besi
Pengecatan besi (Lt. 2)
Listplank metal 30 cm (Lt. 2)
P-1 (PA)
P-1' (PA)
P-2 (PA)
J1
(JA)
J2
(JA)
BV (JA)
BV-1 (JA)

f:\336480578.xls

HARGA
(Rp)
36,140.00
37,330.00
17,060.00
17,940.00
82,520.00
83,710.00
15,970.00
16,510.00
17,580.00
18,450.00
30,580.00
31,180.00
33,400.00
33,690.00
10,690.00
44,480.00
46,420.00
114,730.00
1,359,620.00
1,137,230.00
2,335,690.00
1,005,960.00
1,576,480.00
344,070.00
197,210.00

7,780.00
10,140.00
14,780.00
23,730.00
31,850.00
46,680.00
64,320.00
89,990.00

156,110.00
168,530.00
20,980.00
20,870.00
23,400.00
398,930.00
279,510.00
235,040.00

Hal. 53

DAFTAR HARGA MATERIAL


TAHUN ANGARAN 2008

No.

BAHAN BANGUNAN

Atap :
Genteng metal berpasir 41x110 cm
Nok metal berpasir P.110 cm L.5 cm T.6 cm
Flashing metal 110x10 cm Primaroof
Listplank dan talang Zam t=0,8mm powdercoating
Kalsiplank uk. 3000x300x12 mm
Bata, bata ringan, batu & pasir :
Bata merah bakar kelas I
Bata merah bakar kelas II
Batako 9x19x39 cm / PSPM
Hebel t. 10x20x60
Batu Pecah Mesin 2/3
Batu Pecah Mesin 10-15 cm
Batu Belah Pondasi
Batu koral beton kali (sirtu)
Split pecah mesin 2/3
Split pecah mesin 1/2
Pasir beton
Pasir pasang
Pasir urug
Tanah merah
Paving blok 6 cm (1 m2 = 36 Bh) (Abu)
Besi, kawat & paku :
Besi beton U-24 rata-rata KS
Besi beton U-39/U-32 rata-rata KS
Besi baja
Besi Strip
Kawat beton
Kawat harmonika
Paku 1 s/d 3 cm
Paku 5 s/d 7 cm
Paku 8 s/d 12 cm
Paku skrup
Pipa hitam D. 2" (medium)
Pipa hitam D. 2 1/2" (medium)
Cat
Cat besi glotex
Cat kayu glotex
Cat Vinilex
Cat dasar
Dempul kayu cap kucing
Plamir tembok
Plamir kayu
Politur
Politur jadi
Meni kayu/besi
Kuas 3"
Rol cat tembok
Amplas
Terpentin
Tiner A
Kayu :
Kayu balok borneo super
Kayu balok kamper medan (kruing)
Kayu terentang
Dolken Kayu 8-10 / 400 cm
f:\336480578.xls

HARGA SATUAN
(Rp)

SATUAN

99,900.00
42,350.00
45,980.00
200,000.00
58,900.00

m2
m'
m'
m'
lbr

680.00
550.00
2,500.00
8,590.00
166,200.00
158,400.00
137,600.00
101,500.00
166,200.00
183,400.00
207,000.00
197,000.00
136,400.00
59,000.00
33,000.00

bh
bh
bh
bh
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2

15,200.00
15,600.00
17,000.00
16,000.00
23,500.00
15,900.00
21,650.00
18,500.00
18,500.00
275.00
205,700.00
253,100.00

kg
kg
kg
kg
kg
m2
kg
kg
kg
bh
btg
btg

37,150.00
37,150.00
18,200.00
18,200.00
24,300.00
12,200.00
18,500.00
35,100.00
52,900.00
25,500.00
13,600.00
27,800.00
2,600.00
15,600.00
20,300.00

kg
kg
kg
kg
kg
kg
kg
Ltr
Ltr
kg
bh
bh
lbr
lt
lt

3,250,000.00
5,169,000.00
1,550,000.00
20,900.00

m3
m3
m3
btg
Hal. 54

No.

10

11

12
13

BAHAN BANGUNAN
Multiplek 9 mm 120x240
Keramik :
Keramik 20x20 (KM) KW 1 DN Putih Polos
Keramik 20x25 dinding setara IKAD (Muda)
Keramik 20x25 dinding setara IKAD (Tua)
Keramik 30x30 KW 1 DN Corak / Warna / Anti Slip
Kusen alumunium, jendela, pintu & accessories :
Kusen alumunium 3" color setara INDAL
Allumunium Profil Daun jendela 3" color
Allumunium Profil Daun Pintu 3" color
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Sealent
Kunci 2 Slaag Lengkap Mayer
Grendel pintu / jendela 5 cm
Hak Kait Angin jendela Biasa Goose Bulat
Engsel pintu Cavell (4")
Engsel Jendela Unilon Standar Belluci (Silver)
Kaca polos 3 mm
Kaca polos 5 mm
Lem :
Lem paralon
Lem putih (Fox)
Elektrikal
Stop Kontak Setara Broco
Saklar tunggal Setara Broco
Saklar seri Setara Broco
Lampu TL 2 x 36 W V Shape
Lampu Baret TL-E 20 W
Lampu Dwn Light PCL 13 W
Partisi :
Gypsumboard ex Elephant 9mm 2 muka +
rangka Metal Stud 64 t. 85mm (terpasang)
Pipa :
Pipa GIP medium A d. 1 1/2"
Pipa GIP medium A d. 1 1/4"
Pipa GIP medium A d. 1"
Pipa GIP medium A d. 1/2"
Pipa GIP Medium A d. 2"
Pipa GIP Medium A d. 2 1/2"
Pipa GIP medium A d. 3/4"
Pipa GIP medium A d. 3"
Pipa GIP medium A d. 4"
Pipa PVC d. 1 1/2" (AW) Wavin
Pipa PVC d. 1 1/4" (AW) Wavin
Pipa PVC d. 1" (AW) Wavin
Pipa PVC d. 1/2" (AW) Wavin
Pipa PVC d. 2 1/2" (AW) Wavin
Pipa PVC d. 2" (AW) Wavin
Pipa PVC d. 3" (AW) Wavin
Pipa PVC d. 3/4" (AW) Wavin
Pipa PVC d. 4" (AW) Wavin
Pipa PVC d. 5" (AW) Wavin
Pipa PVC d. 6" (AW) Wavin
Plastic sheet
Plafond :
Gypsum board (120x240x9) mm
Kalsiboard (120x240x6) mm
Hollow 40x40 jincromate
Hollow 20x40 jincromate
Paku skrup
Ramset/dinabolt
Cotton plaster
f:\336480578.xls

HARGA SATUAN
(Rp)

SATUAN

134,500.00

lbr

50,700.00
50,500.00
52,300.00
58,500.00

m2
m2
m2
m2

70,000.00
71,700.00
71,200.00
323,600.00
2,230.00
121,100.00
7,500.00
11,500.00
29,600.00
24,200.00
50,374.59
69,300.00

m'
m'
m'
m2
m'
bh
bh
bh
bh
bh
m2
m2

5,600.00
26,900.00

bh
kg

15,900.00
16,500.00
18,500.00
379,940.00
266,200.00
223,850.00

bh
bh
bh
bh
bh
bh

110,110.00

m2

359,200.00
312,400.00
230,300.00
112,700.00
497,900.00
633,200.00
158,000.00
877,900.00
1,262,900.00
53,900.00
37,800.00
26,000.00
14,100.00
87,600.00
52,000.00
127,200.00
19,500.00
175,500.00
313,100.00
418,600.00
2,000.00

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
m2

62,200.00
66,000.00
20,200.00
16,200.00
370.00
4,800.00
10,100.00

lbr
lbr
btg
btg
bh
bh
bh
Hal. 55

No.

14

15

16

16

17

18
19
20

BAHAN BANGUNAN
Coumpond
Profil alumunium T
Acustic 60x120x15 mm
Kawat seng polos/hanger
List plafond gypsum
List plafond kayu
Rangka atap baja ringan
Trusses ZAM-75 t=0.8 Rangka Utama
Trusses ZAM-75 t=0.5 Rangka Utama
Reng 16 - DB Roof Battens t=0.48 mm
Foot Plate t=1.22 mm
PLD - Diafragma Plate
WIND Bracing
Tensioner (Pengaku Tali Angin)
Baut Besar
Baut Kecil
Dynabolt
Readymix :
Readymix K-225
Readymix K-250
Readymix K-300
Semen :
PC (50 kg)
PC
MU 380 - pas. Bata ringan/10 m2 (40 kg)
MU 100 - plesteran/2,4 m2 (40 kg)
MU 200 - acian plesteran/20 m2 (40 kg)
MU 440 - perata lantai/1,2 m2 (40 kg)
MU 450 - perekat keramik/8 m2 (40 kg)
MU 400 - perekat keramik dinding/5 m2 (25 kg)
MU 600 - pelapis kedap air/1,5 m2 (3 kg)
MU 408 - pengisi nad/3 m2 (1 kg)
Sanitair :
Closet Jongkok Standar Putih Porseline Toto
Washtafel TOTO LW 230 lengkap
Cermin
Urinoar TOTO warna standard lengkap
Penyekat porslin urinoar TOTO
Kran bebek San-Ei 1/2"
Kitchenzink stainless non standard Franke (1 lubang)
Seng :
Seng BJLS 30 lembar 90 cm ( 1 rol 50 m')
Seng gelombang BJLS 30 / 3 x (0.3 mm)
Seng Plat Fumira T. 90 (0.25) / m
Solar
Sun screen Panellux ex Prometama rangka stringer
zincalum SL-1 (45o) terpasang
Wire mesh (2,10 x 5,4 m) :
MK 8
MK 7
MK 6
MK 5
MK 4

f:\336480578.xls

HARGA SATUAN
(Rp)

SATUAN

64,300.00
7,700.00
60,300.00
188,400.00
13,700.00
12,500.00
212,200.00
25,000.00
16,000.00
8,000.00
5,000.00
1,500.00
1,200.00
5,000.00
200.00
95.00
7,500.00

zak
m'
lbr
kg
m'
m2
m'
m'
m'
m'
bh
m'
bh
Pcs
Pcs
Pcs

735,000.00
742,250.00
784,000.00

m3
m3
m3

60,000.00
1,200.00
134,200.00
55,000.00
145,200.00
50,600.00
182,600.00
126,500.00
103,950.00
10,450.00

zak
kg
zak
zak
zak
zak
zak
zak
zak
zak

304,700.00
1,081,000.00
390,000.00
1,837,200.00
500,900.00
152,600.00
1,188,900.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh

25,500.00
60,600.00
33,000.00
5,500.00
726,000.00

m'
lbr
lbr
ltr
unit

1,002,650.00
767,580.00
563,970.00
395,450.00
249,810.00

lbr
lbr
lbr
lbr
lbr

Hal. 56

DAFTAR HARGA UPAH


TAHUN ANGARAN 2008

No.

KLASIFIKASI PEKERJA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Mandor
Kepala tukang besi beton
Tukang besi beton terampil
Tukang besi beton setengah terampil
Kepala tukang besi profil
Tukang besi profil terampil
Kepala tukang batu
Tukang batu terampil
Tukang batu setengah terampil
Kepala tukang kayu
Tukang kayu terampil
Tukang kayu setengah terampil
Kepala tukang cat
Tukang cat terampil
Tukang cat setengah terampil
Pekerja terampil
Pekerja setengah terampil
Pekerja

f:\336480578.xls

HARGA SATUAN
(Rp)
55,000.00
45,000.00
40,000.00
35,000.00
45,000.00
40,000.00
45,000.00
40,000.00
35,000.00
45,000.00
40,000.00
35,000.00
45,000.00
40,000.00
35,000.00
38,500.00
35,000.00
30,000.00

SATUAN
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang

Hal. 57

ANALISA HARGA SATUAN PEKERJAAN


KAB. BOGOR TAHUN ANGGARAN 2008
A.
No.
1
1

10

f:\336480578.xls

Hal. 58

f:\336480578.xls

Hal. 59

11

12

13

14

15

f:\336480578.xls

Hal. 60

16

17

18

19

20

f:\336480578.xls

Hal. 61

f:\336480578.xls

Hal. 62

21

22

23

24

25

26

f:\336480578.xls

Hal. 63

f:\336480578.xls

Hal. 64

1
27

28

29

30

31

32

33

34

35

36

f:\336480578.xls

Hal. 65

f:\336480578.xls

Hal. 66

37

38

39

40

41

42

f:\336480578.xls

Hal. 67

f:\336480578.xls

Hal. 68

43

44

45

46

47

48

49

50

f:\336480578.xls

Hal. 69

f:\336480578.xls

Hal. 70

1
51

52

53

54

55

56

57

58

59

60

f:\336480578.xls

Hal. 71

f:\336480578.xls

Hal. 72

1
61

62

63

64

65

66

67

68

f:\336480578.xls

Hal. 73

69

70

f:\336480578.xls

Hal. 74

71

72

73

74

75

f:\336480578.xls

Hal. 75

76

77

78

f:\336480578.xls

Hal. 76

79

80

81

82

83

f:\336480578.xls

Hal. 77

84

85

f:\336480578.xls

Hal. 78

1
86

87

88

89

90

f:\336480578.xls

Hal. 79

f:\336480578.xls

Hal. 80

91

92

93

94

95

96

97

f:\336480578.xls

Hal. 81

98

f:\336480578.xls

Hal. 82

ANALISA HARGA SATUAN PEKERJAAN


KAB. BOGOR TAHUN ANGGARAN 2008
PEK. SIPIL & ARSITEK
URAIAN PEKERJAAN

VOLUME

SAT.

HARGA SAT.
(Rp)
5

JUMLAH
(Rp)
6 = 3x6

1 M2 Pembersihan lahan
Pekerja
Mandor

0.1000 orang
0.0500 orang

30,000.00
55,000.00
Jumlah
Dibulatkan

3,000.00
2,750.00
5,750.00
5,750.00

1 M' Bouwplank
Kayu balok borneo super
Paku 5 s/d 7 cm
Ongkos pasang

0.0100
0.0390
0.1550

3,250,000.00
18,500.00
33,221.50
Jumlah
Dibulatkan

32,500.00
721.50
5,149.33
38,370.83
38,370.00

1 M' Pagar proyek


Seng gelombang BJLS 30 / 3 x (0.3 mm)
Kayu balok borneo super
Paku 5 s/d 7 cm
Cat besi glotex
Tukang kayu terampil
Pekerja

1.0000
lbr
0.0210
m3
0.2000
kg
kg
0.1310 orang
0.0131 orang

60,600.00
3,250,000.00
18,500.00
37,150.00
40,000.00
30,000.00
Jumlah
Dibulatkan

60,600.00
68,250.00
3,700.00
5,240.00
393.00
138,183.00
138,180.00

1 M3 Galian tanah max kedalaman 1 m'


Pekerja
Mandor

0.4000 orang
0.0400 orang

30,000
55,000
Jumlah
Dibulatkan

12,000.00
2,200.00
14,200.00
14,200.00

m3
kg
m'

1 M3 Galian tanah max kedalaman 2 m'


Pekerja
Mandor

0.5260 orang
0.0520 orang

30,000.00
55,000.00
Jumlah
Dibulatkan

15,780.00
2,860.00
18,640.00
18,640.00

1 M3 Urugan tanah padat (urugan kembali)


Pekerja
Mandor

0.1920 orang
0.0190 orang

30,000.00
55,000.00
Jumlah
Dibulatkan

5,760.00
1,045.00
6,805.00
6,800.00

1 M3 Pemadatan tanah
Pekerja
Mandor

0.5000 orang
0.0500 orang

30,000.00
55,000.00
Jumlah
Dibulatkan

15,000.00
2,750.00
17,750.00
17,750.00

1 M3 Urugan pasir
Pasir urug
Pekerja
Mandor

1.2000
m3
0.3000 orang
0.0100 orang

136,400.00
30,000.00
55,000.00
Jumlah
Dibulatkan

163,680.00
9,000.00
550.00
173,230.00
173,230.00

1 M3 Pondasi batu kosong (anstamping batu)


Batu Belah Pondasi
Pasir urug
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.2000
0.3000
0.7800
0.3900
0.0390
0.0390

137,600.00
136,400.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

165,120.00
40,920.00
23,400.00
15,600.00
1,755.00
2,145.00
248,940.00
248,940.00

137,600.00
1,200.00
197,000.00
30,000.00

151,360.00
195,600.00
102,440.00
45,000.00

1 M3 Pas. Batu belah 1pc:4ps


Batu Belah Pondasi
PC
Pasir pasang
Pekerja
f:\336480578.xls

1.1000
163.0000
0.5200
1.5000

m3
m3
orang
orang
orang
orang

m
kg
m
org

Hal. 83

2
Tukang batu terampil

f:\336480578.xls

3
0.6000

4
org

5
40,000.00

6 = 3x6
24,000.00

Hal. 84

4
org
org

5
45,000.00
55,000.00
Jumlah
Dibulatkan

6 = 3x6
2,700.00
4,125.00
525,225.00
525,220.00

218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800

kg
m3
m3
orang
orang
orang
orang

1,200.00
207,000.00
183,400.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

261,600.00
107,640.00
159,558.00
49,500.00
10,000.00
1,125.00
4,400.00
593,823.00
593,820.00

1 M2 Screeding t. 2 cm (MU 440)


MU 440 - perata lantai/1,2 m2 (40 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

0.8333
0.0495
0.0075
0.0008
0.0024

zak
orang
orang
orang
orang

50,600.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

42,166.67
1,485.00
300.00
33.75
132.00
44,117.42
44,110.00

1 M2 Screeding t. 2 cm (MU 440) (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

42,166.67
1,950.75
Jumlah
Dibulatkan

42,166.67
2,126.32
44,292.98
44,290.00

1 M3 Beton site mix K-175


PC (50 kg)
Batu Pecah Mesin 2/3
Pasir beton
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

6.8000
0.8300
0.5400
6.0000
1.0000
0.1000
0.3000

zak
m3
m3
orang
orang
orang
orang

60,000.00
166,200.00
207,000.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

408,000.00
137,946.00
111,780.00
180,000.00
40,000.00
4,500.00
16,500.00
898,726.00
898,720.00

1 M3 Beton site mix K-175 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m3
m3

657,726.00
241,000.00
Jumlah
Dibulatkan

657,726.00
262,690.00
920,416.00
920,410.00

kg
m3
m3
orang
orang
orang
orang

1,200.00
207,000.00
183,400.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

465,600.00
134,550.00
119,210.00
180,000.00
40,000.00
4,500.00
16,500.00
960,360.00
960,360.00

Kepala tukang batu


Mandor

1 M3 Lantai kerja t. 5 cm/beton tumbuk 1pc:3ps:5kr


PC
Pasir beton
Split pecah mesin 1/2
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1 M3 Beton site mix K-225


PC
Pasir beton
Split pecah mesin 1/2
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

3
0.0600
0.0750

388.0000
0.6500
0.6500
6.0000
1.0000
0.1000
0.3000

1 M3 Beton site mix K-225 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m3
m3

719,360.00
241,000.00
Jumlah
Dibulatkan

719,360.00
262,690.00
982,050.00
982,050.00

1 M3 Readymix K-225
Readymix K-225
Concrete pump
Vibrator
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.0000
1.0000
1.0000
2.5000
0.2500
0.1000
0.0100

m3
m3
m3
orang
orang
orang
orang

735,000.00
30,000.00
1,000.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

735,000.00
30,000.00
1,000.00
75,000.00
10,000.00
4,500.00
550.00
856,050.00
856,050.00

f:\336480578.xls

Hal. 85

6 = 3x6

1 M3 Readymix K-225 (Lt. 2)


Material

1.0000

m3

735,000.00

735,000.00

Alat kerja
Upah kerja

1.0000
1.0900

m3
m3

31,000.00
90,050.00
Jumlah
Dibulatkan

31,000.00
98,154.50
864,154.50
864,150.00

1 M3 Readymix K-300
Readymix K-300
Concrete pump
Vibrator
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.0000
1.0000
1.0000
2.5000
0.2500
0.1000
0.0100

m3
m3
m3
orang
orang
orang
orang

784,000.00
30,000.00
1,000.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

784,000.00
30,000.00
1,000.00
75,000.00
10,000.00
4,500.00
550.00
905,050.00
905,050.00

1 M3 Readymix K-300 (Lt. 2)


Material
Alat kerja
Upah kerja

1.0000
1.0000
1.0900

m3
m3
m3

784,000.00
31,000.00
90,050.00
Jumlah
Dibulatkan

784,000.00
31,000.00
98,154.50
913,154.50
913,150.00

1 Kg Besi beton < d 12


Besi beton U-24 rata-rata KS
Kawat beton
Pekerja
Tukang besi beton terampil
Kepala tukang besi profil
Mandor

1.0500
0.0150
0.0070
0.0070
0.0007
0.0003

kg
kg
orang
orang
orang
orang

15,200.00
23,500.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

15,960.00
352.50
210.00
280.00
31.50
16.50
16,850.50
16,850.00

1 Kg Besi beton < d 12 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

kg
kg

16,312.50
538.00
Jumlah
Dibulatkan

16,312.50
586.42
16,898.92
16,890.00

1 Kg Besi beton > D 13


Besi beton U-39/U-32 rata-rata KS
Kawat beton
Pekerja
Tukang besi beton terampil
Kepala tukang besi profil
Mandor

1.0500
0.0150
0.0070
0.0070
0.0007
0.0003

kg
kg
orang
orang
orang
orang

15,600.00
23,500.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

16,380.00
352.50
210.00
280.00
31.50
16.50
17,270.50
17,270.00

1 Kg Besi beton > D 13 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

kg
kg

16,732.50
538.00
Jumlah
Dibulatkan

16,732.50
586.42
17,318.92
17,310.00

1 M2 Wire Mesh M-8 (1,5 lapis)


MK 8
Pekerja
Tukang besi beton terampil
Kepala tukang besi profil
Mandor

0.1323
0.0572
0.0572
0.0057
0.0025

lbr
orang
orang
orang
orang

1,002,650.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

132,625.66
1,717.07
2,289.42
257.56
134.91
137,024.62
137,020.00

1 M2 Wire Mesh M-8 (1,5 lapis) (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

132,625.66
4,398.96
Jumlah
Dibulatkan

132,625.66
4,794.86
137,420.52
137,420.00

1 M2 Wire Mesh M-6 (1,5 lapis)


MK 6
Pekerja

0.1323
m2
0.0322 orang

563,970.00
30,000.00

74,599.21
965.16

f:\336480578.xls

Hal. 86

2
Tukang besi beton terampil
Kepala tukang besi profil
Mandor

f:\336480578.xls

3
0.0322
0.0032
0.0014

4
orang
orang
orang

5
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

6 = 3x6
1,286.88
144.77
75.83
77,071.85
77,070.00

Hal. 87

2
1 M2 Wire Mesh M-6 (1,5 lapis) (Lt. 2)
Material
Upah kerja

1.0000
1.0900

m2
m2

74,599.21
2,472.65
Jumlah
Dibulatkan

74,599.21
2,695.19
77,294.39
77,290.00

1 M2 Wire Mesh M-4 (1 lapis)


MK 4
Pekerja
Tukang besi beton terampil
Kepala tukang besi profil
Mandor

0.0882
0.0096
0.0096
0.0010
0.0004

lbr
orang
orang
orang
orang

249,810.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

22,029.10
286.86
382.48
43.03
22.54
22,764.01
22,760.00

1 M2 Wire Mesh M-4 (1 lapis) (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

22,029.10
734.91
Jumlah
Dibulatkan

22,029.10
801.05
22,830.15
22,830.00

1 M2 Wire Mesh M-4 (1 lapis) (Lt. 3)


Material
Upah kerja

1.0000
1.1200

m2
m2

22,029.10
734.91
Jumlah
Dibulatkan

22,029.10
823.10
22,852.20
22,850.00

1 M' Pipa Hitam t. 3,6 mm; D 2" (medium)


Pipa hitam D. 2" (medium)
Tukang besi profil terampil
Pekerja
Kepala tukang besi profil
Mandor

0.1833
0.0305
0.3054
0.0305
0.0015

btg
orang
orang
orang
orang

205,700.00
40,000.00
30,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

37,711.67
1,221.60
9,162.00
1,374.30
83.99
49,553.55
49,550.00

1 M' Pipa Hitam t. 3,6 mm; D 2,5" (medium)


Pipa hitam D. 2 1/2" (medium)
Tukang besi profil terampil
Pekerja
Kepala tukang besi profil
Mandor

0.1833
0.0391
0.3912
0.0391
0.0020

btg
orang
orang
orang
orang

253,100.00
40,000.00
30,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

46,401.67
1,564.80
11,736.00
1,760.40
107.58
61,570.45
61,570.00

1 Kg Baja Profil
Besi baja
Meni kayu/besi
Tukang besi profil terampil
Pekerja
Kepala tukang besi profil
Mandor

1.1000
0.0800
0.0060
0.0600
0.0060
0.0003

kg
kg
orang
orang
orang
orang

17,000.00
5,100.00
40,000.00
30,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

18,700.00
408.00
240.00
1,800.00
270.00
16.50
21,434.50
21,430.00

1 M2 Bekisting multiplex 9 mm
Kaso 5/7 (2x pakai) 50%
Multiplek 9 mm 120x240
Paku 1 s/d 3 cm
Pekerja
Tukang kayu terampil
Kepala tukang kayu
Mandor
Tukang kayu setengah terampil

0.0170
0.3470
0.4000
0.1200
0.1500
0.1500
0.0500
0.1200

m3
lbr
kg
orang
orang
orang
orang
orang

3,250,000.00
134,500.00
21,650.00
30,000.00
40,000.00
45,000.00
55,000.00
35,000.00
Jumlah
Dibulatkan

27,625.00
35,003.63
8,660.00
3,600.00
6,000.00
6,750.00
2,750.00
4,200.00
94,588.63
94,580.00

1 M2 Bekisting multiplex 9 mm (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

71,288.63
23,300.00
Jumlah
Dibulatkan

71,288.63
25,397.00
96,685.63
96,680.00

1 M' Sloof praktis 10/15


Beton site mix K-175
Besi beton d. 8 mm
Besi beton d. 10 mm

0.0150
0.9875
2.4800

m3
kg
kg

898,720.00
16,850.00
16,850.00

13,480.80
16,639.38
41,788.00

f:\336480578.xls

6 = 3x6

Hal. 88

2
Bekisting multiplex 9 mm

f:\336480578.xls

3
0.3000

4
m2

5
94,580.00
Jumlah
Dibulatkan

6 = 3x6
28,374.00
100,282.18
100,280.00

Hal. 89

1.0000
118.5000
35.5500
10.0000

m3
kg
kg
m2

905,050.0
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
2,046,495.00
599,017.50
945,800.00
4,496,362.50
4,496,360.00

1 M3 Sloof type S-2 20/30


Readymix K-300
Besi beton D. 13 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
104.0000
39.5000
10.0000

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,796,080.00
665,575.00
945,800.00
4,312,505.00
4,312,500.00

1 M3 Sloof type S-3 20/30


Readymix K-300
Besi beton D. 13 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
104.0000
39.5000
10.0000

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,796,080.00
665,575.00
945,800.00
4,312,505.00
4,312,500.00

1 M3 Pondasi tapak type P-1 (4,4x2,4)


Readymix K-300
Besi beton D. 13 mm
Besi beton D. 16 mm
Pas. Batako PC pres 10x20x40 ad 1:4

1.0000
43.3333
65.8333
1.2879

m3
kg
kg
m2

905,050.00
17,270.00
17,270.00
63,660.00
Jumlah
Dibulatkan

905,050.00
748,366.67
1,136,941.67
81,986.36
2,872,344.70
2,872,340.00

1 M3 Pondasi tapak type P-2 (2,4x2,4)


Readymix K-300
Besi beton D. 13 mm
Besi beton D. 16 mm
Pas. Batako PC pres 10x20x40 ad 1:4

1.0000
49.1111
74.6111
1.7778

m3
kg
kg
m2

905,050.00
17,270.00
17,270.00
63,660.00
Jumlah
Dibulatkan

905,050.00
848,148.89
1,288,533.89
113,173.33
3,154,906.11
3,154,900.00

1 M3 Pondasi tapak type P-3 (2,0x2,0)


Readymix K-300
Besi beton D. 13 mm
Besi beton d. 12 mm
Pas. Batako PC pres 10x20x40 ad 1:4

1.0000
53.2381
45.4571
1.7143

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
63,660.00
Jumlah
Dibulatkan

905,050.00
919,421.90
765,952.86
109,131.43
2,699,556.19
2,699,550.00

1 M3 Pondasi tapak type P-4 (1,5x1,5)


Readymix K-300
Besi beton D. 13 mm
Besi beton d. 12 mm
Pas. Batako PC pres 10x20x40 ad 1:4

1.0000
67.7926
57.8844
2.6667

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
63,660.00
Jumlah
Dibulatkan

905,050.00
1,170,778.07
975,352.89
169,760.00
3,220,940.96
3,220,940.00

1 M3 Pondasi tapak type P-5 (1,0x1,0)


Readymix K-300
Besi beton d. 10 mm
Besi beton d. 8 mm
Pas. Batako PC pres 10x20x40 ad 1:4

1.0000
108.6476
69.2190
4.5714

m3
kg
kg
m2

905,050.00
16,850.00
16,850.00
63,660.00
Jumlah
Dibulatkan

905,050.00
1,830,712.38
1,166,340.95
291,017.14
4,193,120.48
4,193,120.00

1 M2 Rabat beton t. 6 cm
Readymix K-225
Wire Mesh M-4 (1 lapis)
Plastic sheet

0.0600
1.0000
1.0000

m3
m2
m2

856,050.00
22,760.00
2,000.00
Jumlah
Dibulatkan

51,363.00
22,760.00
2,000.00
76,123.00
76,120.00

1 M' Kolom Praktis 10x10


Beton site mix K-175
Besi beton d. 8 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm

0.0100
0.7900
2.4800
0.2000

m3
kg
kg
m2

898,720.00
16,850.00
16,850.00
94,580.00

8,987.20
13,311.50
41,788.00
18,916.00

1 M3 Sloof type S-1 20/40


Readymix K-300
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

f:\336480578.xls

6 = 3x6

Hal. 90

f:\336480578.xls

5
Jumlah
Dibulatkan

6 = 3x6
83,002.70
83,000.00

Hal. 91

2
1 M' Kolom Praktis 10x10 (Lt. 2)
Beton site mix K-175 (Lt. 2)
Besi beton d. 8 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm (Lt. 2)

0.0100
0.7900
2.4800
0.2000

m3
kg
kg
m2

920,410.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

9,204.10
13,343.10
41,887.20
19,336.00
83,770.40
83,770.00

1 M3 Kolom K1-1 (40x40)


Readymix K-300
Besi beton d. D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
79.0000
23.7000
10.0000

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,364,330.00
399,345.00
945,800.00
3,614,525.00
3,614,520.00

1 M3 Kolom K1-2 (40x40)


Readymix K-300 (Lt. 2)
Besi beton d. D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
59.2500
23.7000
10.0000

m3
kg
kg
m2

913,150.00
16,890.00
17,310.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,000,732.50
410,247.00
966,800.00
3,290,929.50
3,290,920.00

1 M3 Kolom K2-1 (30x30)


Readymix K-300
Besi beton d. D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
140.4444
31.6000
13.3333

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
2,425,475.56
532,460.00
1,261,066.67
5,124,052.22
5,124,050.00

1 M3 Kolom K2-2 (30x30)


Readymix K-300 (Lt. 2)
Besi beton d. D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
105.3333
31.6000
13.3333

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,823,320.00
533,724.00
1,289,066.67
4,559,260.67
4,559,260.00

1 M' Balok lintel 10x15


Beton site mix K-175
Besi beton d. 8 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm

0.0150
0.5550
1.5800
0.3000

m3
kg
kg
m2

898,720.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

13,480.80
9,351.75
26,623.00
28,374.00
77,829.55
77,820.00

1 M' Balok lintel 10x15 (Lt.2)


Beton site mix K-175 (Lt. 2)
Besi beton d. 8 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm (Lt. 2)

0.0150
0.5550
1.5800
0.3000

m3
kg
kg
m2

920,410.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

13,806.15
9,373.95
26,686.20
29,004.00
78,870.30
78,870.00

1 M3 Balok B1
(30x60)
Readymix K-300 (Lt. 2)
Besi beton D. 19 mm
Besi beton d. 12 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
117.6944
9.8667
37.2000
7.0000

m3
kg
kg
kg
m2

913,150.00
17,310.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
2,037,290.83
166,648.00
628,308.00
676,760.00
4,422,156.83
4,422,150.00

1 M3 Balok B2
(30x60)
Readymix K-300 (Lt. 2)
Besi beton D. 19 mm
Besi beton d. 12 mm
Besi beton d. 10 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
86.7222
9.8667
37.2000
7.0000

m3
kg
kg
kg
m2

913,150.00
17,310.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

1,501,161.67
166,648.00
628,308.00
676,760.00
2,972,877.67
2,972,870.00

1.0000

m3

913,150.00

913,150.00

1 M3 Balok B3
(25x55)
Readymix K-300 (Lt. 2)
f:\336480578.xls

6 = 3x6

Hal. 92

2
Besi beton D. 19 mm
Besi beton d. 12 mm

f:\336480578.xls

3
113.5273
12.9164

4
kg
kg

5
17,310.00
16,890.00

6 = 3x6
1,965,157.09
218,157.38

Hal. 93

Besi beton d. 10 mm
Bekisting multiplex 9 mm (Lt. 2)

3
50.5018
8.0727

4
kg
m2

5
16,890.00
96,680.00
Jumlah
Dibulatkan

6 = 3x6
852,975.71
780,471.27
4,729,911.45
4,729,910.00

1 M3 Balok B4
(25x50)
Readymix K-300 (Lt. 2)
Besi beton D. 19 mm
Besi beton d. 12 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
107.0400
14.2080
28.4400
8.0800

m3
kg
kg
kg
m2

913,150.00
17,310.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,852,862.40
239,973.12
480,351.60
781,174.40
4,267,511.52
4,267,510.00

1 M3 Balok B5
(20x40)
Readymix K-300 (Lt. 2)
Besi beton D. 19 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
167.2500
35.5500
9.5000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
2,895,097.50
600,439.50
918,460.00
5,327,147.00
5,327,140.00

1 M3 Balok B6
(20x40)
Readymix K-300 (Lt. 2)
Besi beton D. 19 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
111.5000
35.5500
9.5000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,930,065.00
600,439.50
918,460.00
4,362,114.50
4,362,110.00

1 M3 Balok B7
(20x40)
Readymix K-300 (Lt. 2)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
118.5000
35.5500
9.5000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
2,051,235.00
600,439.50
918,460.00
4,483,284.50
4,483,280.00

1 M3 Balok B8
(20x40)
Readymix K-300 (Lt. 2)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
98.7500
35.5500
9.5000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,709,362.50
600,439.50
918,460.00
4,141,412.00
4,141,410.00

1 M3 Balok B9
(20x40)
Readymix K-300 (Lt. 2)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
79.0000
35.5500
9.5000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,367,490.00
600,439.50
918,460.00
3,799,539.50
3,799,530.00

1 M3 Balok B10
(20x30)
Readymix K-300 (Lt. 2)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
105.3333
39.5000
9.3333

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,823,320.00
667,155.00
902,346.67
4,305,971.67
4,305,970.00

1 M3 Balok B10
(20x30) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
105.3333
39.5000
9.3333

m3
kg
kg
m2

915,850.00
17,330.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
1,825,426.67
667,945.00
908,880.00
4,318,101.67
4,318,100.00

1 M3 Balok B11
(20x30 + 8x70)
Readymix K-300 (Lt. 2)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
57.9333
26.8600
8.0667

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah

913,150.00
1,002,826.00
453,665.40
779,885.33
3,149,526.73

f:\336480578.xls

Hal. 94

f:\336480578.xls

5
Dibulatkan

6 = 3x6
3,149,520.00

Hal. 95

1.0000
69.3333
39.5000
9.3333

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,200,160.00
667,155.00
902,346.67
3,682,811.67
3,682,810.00

1 M3 Balok B13
(25x60) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton D. 12 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
57.9333
11.8400
26.8600
8.0667

m3
kg
kg
kg
m2

915,850.00
17,330.00
16,910.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
1,003,984.67
200,214.40
454,202.60
785,532.00
3,359,783.67
3,359,780.00

1 M3 Balok B14
(25x60) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton D. 12 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
79.0000
11.8400
26.8600
8.0667

m3
kg
kg
kg
m2

915,850.00
17,330.00
16,910.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
1,369,070.00
200,214.40
454,202.60
785,532.00
3,724,869.00
3,724,860.00

1 M3 Balok B15
(20x40) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
118.5000
35.5500
9.5000

m3
kg
kg
m2

915,850.00
17,330.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
2,053,605.00
601,150.50
925,110.00
4,495,715.50
4,495,710.00

1 M3 Balok B16
(20x40) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
108.6250
35.5500
9.5000

m3
kg
kg
m2

915,850.00
17,330.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
1,882,471.25
601,150.50
925,110.00
4,324,581.75
4,324,580.00

1 M3 Balok B17
(20x30) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
158.0000
39.5000
9.3333

m3
kg
kg
m2

915,850.00
17,330.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
2,738,140.00
667,945.00
908,880.00
5,230,815.00
5,230,810.00

1 M3 Balok B18
(20x30) (Lt. 2)
Readymix K-300 (Lt. 3)
Besi beton D. 16 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 3)

1.0000
131.6667
39.5000
9.3333

m3
kg
kg
m2

915,850.00
17,330.00
16,910.00
97,380.00
Jumlah
Dibulatkan

915,850.00
2,281,783.33
667,945.00
908,880.00
4,774,458.33
4,774,450.00

1 M3 Balok bordes (20x30)


Readymix K-300
Besi beton D. 13 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
104.0000
39.5000
13.3333

m3
kg
kg
m2

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,796,080.00
665,575.00
1,261,066.67
4,627,771.67
4,627,770.00

1 M3 RB1 (20x25) (Lt. 2)


Readymix K-300 (Lt. 2)
Besi beton D. 13 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
104.0000
42.6600
14.0000

m3
kg
kg
m2

913,150.00
17,310.00
16,890.00
96,680.00
Jumlah
Dibulatkan

913,150.00
1,800,240.00
720,527.40
1,353,520.00
4,787,437.40
4,787,430.00

1.0000
83.2000
42.6600

m3
kg
kg

915,850.00
17,330.00
16,910.00

915,850.00
1,441,856.00
721,380.60

1 M3 Balok B12
(20x30)
Readymix K-300 (Lt. 2)
Besi beton D. 13 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1 M3 RB2 (20x25) (Lt. 2)


Readymix K-300 (Lt. 3)
Besi beton D. 13 mm
Besi beton d. 8 mm
f:\336480578.xls

6 = 3x6

Hal. 96

2
Bekisting multiplex 9 mm (Lt. 3)

f:\336480578.xls

3
14.0000

4
m2

5
97,380.00
Jumlah
Dibulatkan

6 = 3x6
1,363,320.00
4,442,406.60
4,442,400.00

Hal. 97

1.0000
97.0667
82.8800
15.8000
3.1106

m3
kg
m3
kg
m2

905,050.00
17,270.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,676,341.33
1,396,528.00
266,230.00
294,199.48
4,538,348.82
4,538,340.00

1.0000
97.0667
82.8800
6.6667

kg
kg
kg
kg

905,050.00
17,270.00
16,850.00
94,580.00
Jumlah
Dibulatkan

905,050.00
1,676,341.33
1,396,528.00
630,533.33
4,608,452.67
4,608,450.00

1 M3 Plat lantai S1 t. 12 cm (M6)


Readymix K-300
Bekisting multiplex 9 mm
Wire Mesh M-6 (1,5 lapis)

1.0000
8.3333
8.3333

m3
m2
m2

905,050.00
94,580.00
77,070.00
Jumlah
Dibulatkan

905,050.00
788,166.67
642,250.00
2,335,466.67
2,335,460.00

1 M3 Plat lantai S1 t. 12 cm (M6) (Lt. 2)


Readymix K-300 (Lt. 2)
Bekisting multiplex 9 mm (Lt. 2)
Wire Mesh M-6 (1,5 lapis) (Lt. 2)

1.0000
8.3333
8.3333

m3
m2
m2

913,150.00
96,680.00
77,290.00
Jumlah
Dibulatkan

913,150.00
805,666.67
644,083.33
2,362,900.00
2,362,900.00

1 M3 Plat lantai S2 t. 10 cm (M4)


Readymix K-300
Bekisting multiplex 9 mm
Wire Mesh M-4 (1 lapis)

1.0000
10.0000
10.0000

m3
m2
m2

905,050.00
94,580.00
22,760.00
Jumlah
Dibulatkan

905,050.00
945,800.00
227,600.00
2,078,450.00
2,078,450.00

1 M3 Plat lantai S3 t. 10 cm (M6)


Readymix K-300
Bekisting multiplex 9 mm
Wire Mesh M-6 (1,5 lapis)

1.0000
10.0000
10.0000

m3
m2
m2

905,050.00
94,580.00
77,070.00
Jumlah
Dibulatkan

905,050.00
945,800.00
770,700.00
2,621,550.00
2,621,550.00

1 M3 Plat canopy type A (1,85x0,75x0,08)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

960,360.00
16,850.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

960,360.00
665,013.33
1,381,325.56
295,811.11
1,208,522.22
4,511,032.22
4,511,030.00

1 M3 Plat canopy type A (1,85x0,75x0,08) (Lt. 2)


Beton site mix K-225 (Lt. 2)
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm (Lt. 2)

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

982,050.00
16,890.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

982,050.00
666,592.00
1,384,604.67
296,513.33
1,235,355.56
4,565,115.56
4,565,110.00

1 M3 Plat canopy type B (2,85x0,75x0,08)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

960,360.00
16,850.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

960,360.00
665,013.33
1,381,325.56
295,811.11
1,208,522.22
4,511,032.22
4,511,030.00

1 M3 Plat canopy type C (0,75x0,75x0,08)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm

1.0000
39.4667
81.9778
17.5556

m3
kg
kg
kg

960,360.00
16,850.00
16,850.00
16,850.00

960,360.00
665,013.33
1,381,325.56
295,811.11

1 M3 Plat tangga
Readymix K-300
Besi beton D. 13 mm
Besi beton d. 12 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1 M3 Plat bordes
Readymix K-300
Besi beton D. 13 mm
Besi beton d. 12 mm
Bekisting multiplex 9 mm

f:\336480578.xls

6 = 3x6

Hal. 98

Bekisting multiplex 9 mm

3
12.7778

4
m2

5
94,580.00
Jumlah
Dibulatkan

6 = 3x6
1,208,522.22
4,511,032.22
4,511,030.00

1 M3 Plat canopy type C (0,75x0,75x0,08) (Lt. 2)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

982,050.00
16,890.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

982,050.00
666,592.00
1,384,604.67
296,513.33
1,235,355.56
4,565,115.56
4,565,110.00

1 M3 Plat canopy type D (3,70x0,75x0,08)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

960,360.00
16,850.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

960,360.00
665,013.33
1,381,325.56
295,811.11
1,208,522.22
4,511,032.22
4,511,030.00

1 M3 Plat canopy type D (3,70x0,75x0,08) (Lt. 2)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
39.4667
81.9778
17.5556
12.7778

m3
kg
kg
kg
m2

982,050.00
16,890.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

982,050.00
666,592.00
1,384,604.67
296,513.33
1,235,355.56
4,565,115.56
4,565,110.00

1 M3 Plat canopy type E (1,70x0,40x0,08)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
7.6883
29.1883
7.6948
6.4935

m3
kg
kg
kg
m2

960,360.00
16,850.00
16,850.00
16,850.00
94,580.00
Jumlah
Dibulatkan

960,360.00
129,548.05
491,823.05
129,657.47
614,155.84
2,325,544.42
2,325,540.00

1 M3 Plat canopy type E (1,70x0,40x0,08) (Lt. 2)


Beton site mix K-225
Besi beton d. 12 mm
Besi beton d. 10 mm
Besi beton d. 8 mm
Bekisting multiplex 9 mm

1.0000
7.6883
29.1883
7.6948
6.4935

m3
kg
kg
kg
m2

982,050.00
16,890.00
16,890.00
16,890.00
96,680.00
Jumlah
Dibulatkan

982,050.00
129,855.58
492,990.58
129,965.26
627,792.21
2,362,653.64
2,362,650.00

1M LISPLANK Tb. 8/30 CM


Beton Ready mix K - 225
Besi Beton U.24
Pas. bekisting multiplek 9 mm

1.0000
81.0541
12.5000

m3
kg
m2

982,050.00
16,890.00
96,680.00

982,050.00
1,369,002.90
1,208,500.00

f:\336480578.xls

Hal. 99

1 M2 Rangka atap baja ringan


Trusses ZAM-75 t=0.8 Rangka Utama
Trusses ZAM-75 t=0.5 Rangka Utama
Reng 16 - DB Roof Battens t=0.48 mm
Foot Plate t=1.22 mm
PLD - Diafragma Plate
WIND Bracing
Tensioner (Pengaku Tali Angin)
Baut Besar
Baut Kecil
Dynabolt
Tukang besi profil terampil
Kepala tukang besi profil
Pekerja
Mandor

5
Jumlah
Dibulatkan

6 = 3x6
3,559,552.90
3,559,550.00

1.9850
2.8500
5.1750
0.3250
14.0000
0.7150
0.2500
54.0000
80.0000
0.8750
0.0250
0.3074
0.3500
0.0100

m'
m'
m'
m'
bh
m'
bh
Pcs
Pcs
Pcs
org
org
org
org

25,000.00
16,000.00
8,000.00
5,000.00
1,500.00
1,200.00
5,000.00
200.00
95.00
7,500.00
40,000.00
45,000.00
30,000.00
55,000.00
Jumlah
Dibulatkan

49,625.00
45,600.00
41,400.00
1,625.00
21,000.00
858.00
1,250.00
10,800.00
7,600.00
6,562.50
1,000.00
13,833.00
10,500.00
550.00
212,203.50
212,200.00

1 M2 Genteng metal berpasir 41x110 cm


Genteng metal berpasir 41x110 cm
Paku 1 s/d 3 cm
Pekerja
Tukang kayu terampil
Kepala tukang kayu
Mandor

1.0500
0.2000
0.2000
0.1000
0.0100
0.0010

m2
kg
orang
orang
orang
orang

99,900.00
21,650.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

104,895.00
4,330.00
6,000.00
4,000.00
450.00
55.00
119,730.00
119,730.00

1 M2 Genteng metal berpasir 41x110 cm (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

109,225.00
10,505.00
Jumlah
Dibulatkan

109,225.00
11,450.45
120,675.45
120,670.00

1 M' Nok metal berpasir P.110 cm L.5 cm T.6 cm


Nok metal berpasir P.110 cm L.5 cm T.6 cm
Paku 1 s/d 3 cm
Pekerja
Tukang kayu terampil
Kepala tukang kayu
Mandor

1.0000
0.0500
0.2500
0.1500
0.0150
0.0130

m'
kg
orang
orang
orang
orang

42,350.00
21,650.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

42,350.00
1,082.50
7,500.00
6,000.00
675.00
715.00
58,322.50
58,320.00

1 M' Nok metal berpasir P.110 cm L.5 cm T.6 cm (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m'
m'

43,432.50
14,890.00
Jumlah
Dibulatkan

43,432.50
16,230.10
59,662.60
59,660.00

1 M2 Plafond gypsum board t. 9 mm rangka besi hollow


Hollow 40x40 jincromate
Hollow 20x40 jincromate
Gypsum board (120x240x9) mm
Paku skrup
Ramset/dinabolt
Cotton plaster
Coumpond
Pekerja
Tukang kayu terampil
Kepala tukang kayu
Mandor

0.4150
0.1500
0.3640
25.0000
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050

btg
btg
lbr
bh
bh
bh
zak
orang
orang
orang
orang

20,200.00
16,200.00
62,200.00
370.00
4,800.00
10,100.00
64,300.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

8,383.00
2,430.00
22,640.80
9,250.00
19,200.00
727.20
8,037.50
3,000.00
2,000.00
225.00
275.00
76,168.50
76,160.00

1 M2 Plafond gypsum board t. 9 mm rangka besi hollow (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

70,668.50
5,500.00
Jumlah
Dibulatkan

70,668.50
5,995.00
76,663.50
76,660.00

1 M2 Plafond kalsiboard rangka besi hollow


Hollow 40x40 jincromate
Hollow 20x40 jincromate

0.4150
0.1500

btg
btg

20,200.00
16,200.00

8,383.00
2,430.00

f:\336480578.xls

Hal. 100

3
0.3640
25.0000
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050

4
lbr
bh
bh
bh
zak
orang
orang
orang
orang

5
66,000.00
370.00
4,800.00
10,100.00
64,300.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

6 = 3x6
24,024.00
9,250.00
19,200.00
727.20
8,037.50
3,000.00
2,000.00
225.00
275.00
77,551.70
77,550.00

1 M2 Plafond kalsiboard rangka besi hollow (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

72,051.70
5,500.00
Jumlah
Dibulatkan

72,051.70
5,995.00
78,046.70
78,040.00

1 M2 Keramik 20/20 MU 450 & 408 (Lt. 1)


Keramik 20x20 (KM) KW 1 DN Putih Polos
MU 450 - perekat keramik/8 m2 (40 kg)
MU 408 - pengisi nad/3 m2 (1 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.0000
0.1250
0.3333
0.2500
0.1200
0.0120
0.0125

m2
zak
zak
orang
orang
orang
orang

50,700.00
182,600.00
10,450.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

50,700.00
22,825.00
3,483.33
7,500.00
4,800.00
540.00
687.50
90,535.83
90,530.00

1 M2 Keramik 20/20 MU 450 & 408 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

77,008.33
13,527.50
Jumlah
Dibulatkan

77,008.33
14,744.98
91,753.31
91,750.00

1 M2 Keramik 20/20 MU 450 & 408 (Lt. 3)


Material
Upah kerja

1.0000
1.1200

m2
m2

77,008.33
13,527.50
Jumlah
Dibulatkan

77,008.33
15,150.80
92,159.13
92,150.00

1 M2 Keramik dinding 20/25 warna muda


Keramik 20x25 dinding setara IKAD (Muda)
MU 400 - perekat keramik dinding/5 m2 (25 kg)
MU 408 - pengisi nad/3 m2 (1 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.0000
0.2000
0.3333
0.1875
0.3750
0.0450
0.0188

m2
zak
zak
orang
orang
orang
orang

50,500.00
126,500.00
10,450.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

50,500.00
25,300.00
3,483.33
5,625.00
15,000.00
2,025.00
1,034.00
102,967.33
102,960.00

1 M2 Keramik dinding 20/25 warna muda (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

79,283.33
23,684.00
Jumlah
Dibulatkan

79,283.33
25,815.56
105,098.89
105,090.00

1 M2 Keramik dinding 20/25 warna muda (Lt. 3)


Material
Upah kerja

1.0000
1.1200

m2
m2

79,283.33
23,684.00
Jumlah
Dibulatkan

79,283.33
26,526.08
105,809.41
105,800.00

1 M2 Keramik dinding 20/25 warna tua


Keramik 20x25 dinding setara IKAD (Tua)
MU 400 - perekat keramik dinding/5 m2 (25 kg)
MU 408 - pengisi nad/3 m2 (1 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

1.0000
0.2000
0.3333
0.1875
0.3750
0.0450
0.0188

m2
zak
zak
orang
orang
orang
orang

52,300.00
126,500.00
10,450.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

52,300.00
25,300.00
3,483.33
5,625.00
15,000.00
2,025.00
1,034.00
104,767.33
104,760.00

1 M2 Keramik dinding 20/25 warna tua (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

81,083.33
23,684.00
Jumlah

81,083.33
25,815.56
106,898.89

Kalsiboard (120x240x6) mm
Paku skrup
Ramset/dinabolt
Cotton plaster
Coumpond
Pekerja
Tukang kayu terampil
Kepala tukang kayu
Mandor

f:\336480578.xls

Hal. 101

5
Dibulatkan

6 = 3x6
106,890.00

1 M2 Keramik dinding 20/25 warna tua (Lt. 3)


Material
Upah kerja

1.0000
1.1200

m2
m2

81,083.33
23,684.00
Jumlah
Dibulatkan

81,083.33
26,526.08
107,609.41
107,600.00

1 M2 Keramik 30/30 MU 450 & 408 (Lt. 1)


Keramik 30x30 KW 1 DN Corak / Warna / Anti Slip
MU 450 - perekat keramik/8 m2 (40 kg)
MU 408 - pengisi nad/3 m2 (1 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

11.0000
0.1250
0.3333
0.2500
0.1200
0.0120
0.0125

Bh
zak
zak
org
org
org
org

5,318.18
182600.00
10,450.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

58,500.00
22,825.00
3,483.33
7,500.00
4,800.00
540.00
687.50
98,335.83
98,330.00

1 M2 Keramik 30/30 MU 450 & 408 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

84,808.33
13,527.50
Jumlah
Dibulatkan

84,808.33
14,744.98
99,553.31
99,550.00

1 M2 Keramik 30/30 MU 450 & 408 (Lt. 3)


Material
Upah kerja

1.0000
1.1200

m2
m2

84,808.33
13,527.50
Jumlah
Dibulatkan

84,808.33
15,150.80
99,959.13
99,950.00

10.8500
0.0279
13.0000
0.2720
0.0850
0.0085
0.0128

kg
m3
Bh
orang
orang
orang
orang

1,200.00
197,000.00
2,500.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

13,020.00
5,496.30
32,500.00
8,160.00
3,400.00
382.50
701.25
63,660.05
63,660.00

1 M2 Dinding hebel t 10 cm + MU 380


Hebel t. 10x20x60
MU 380 - pas. Bata ringan/10 m2 (40 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

8.5000
0.1000
0.2720
0.0850
0.0085
0.0128

bh
zak
orang
orang
orang
orang

8,590.00
134,200.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

73,015.00
13,420.00
8,160.00
3,400.00
382.50
701.25
99,078.75
99,070.00

1 M2 Dinding hebel t 10 cm + MU 380 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

86,435.00
12,643.75
Jumlah
Dibulatkan

86,435.00
13,781.69
100,216.69
100,210.00

1 M2 Plesteran dinding MU 100 t. 10 mm


MU 100 - plesteran/2,4 m2 (40 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

0.4167
0.2000
0.1500
0.0150
0.0100

kg
orang
orang
orang
orang

55,000.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

22,916.67
6,000.00
6,000.00
675.00
550.00
36,141.67
36,140.00

1 M2 Plesteran dinding MU 100 t. 10 mm (Lt. 2)


Material
Upah Kerja

1.0000
1.0900

m2
m2

22,916.67
13,225.00
Jumlah
Dibulatkan

22,916.67
14,415.25
37,331.92
37,330.00

1 M2 Acian MU 200 t. 3 mm
MU 200 - acian plesteran/20 m2 (40 kg)
Pekerja setengah terampil
Tukang batu setengah terampil
Kepala Tukang
Mandor

0.0500
0.1430
0.1070
0.0105
0.0105

kg
orang
orang
orang
orang

145,200.00
35,000.00
35,000.00
45,000.00
55,000.00

7,260.00
5,005.00
3,745.00
472.50
577.50

1 M2 Pas. Batako PC pres 10x20x40 ad 1:4


PC
Pasir pasang
Batako 9x19x39 cm / PSPM
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

f:\336480578.xls

Hal. 102

5
Jumlah
Dibulatkan

6 = 3x6
17,060.00
17,060.00

1 M2 Acian MU 200 t. 3 mm (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

7,260.00
9,800.00
Jumlah
Dibulatkan

7,260.00
10,682.00
17,942.00
17,940.00

1 M2 Waterproofing MU 600
MU 600 - pelapis kedap air/1,5 m2 (3 kg)
Pekerja
Tukang batu terampil
Kepala tukang batu
Mandor

0.6667
0.2000
0.1500
0.0150
0.0100

zak
orang
orang
orang
orang

103,950.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

69,300.00
6,000.00
6,000.00
675.00
550.00
82,525.00
82,520.00

1 M2 Waterproofing MU 600 (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

69,300.00
13,225.00
Jumlah
Dibulatkan

69,300.00
14,415.25
83,715.25
83,710.00

1 M2 Pengecatan dinding Cat Vinilex


Plamir tembok
Cat dasar
Cat Vinilex
Amplas
Rol cat tembok
Pekerja
Tukang cat terampil
Kepala tukang cat
Mandor
Steger werk

0.1000
0.1000
0.2600
0.5000
0.0100
0.1000
0.0630
0.0063
0.0025
0.0450

kg
kg
kg
lbr
bh
orang
orang
orang
orang
lot

12,200.00
18,200.00
18,200.00
2,600.00
27,800.00
30,000.00
40,000.00
45,000.00
55,000.00
15,291.00
Jumlah
Dibulatkan

1,220.00
1,820.00
4,732.00
1,300.00
278.00
3,000.00
2,520.00
283.50
137.50
688.10
15,979.10
15,970.00

1 M2 Pengecatan dinding Cat Vinilex (Lt. 2)


Material + alat bantu
Upah kerja

1.0000
1.0900

m2
m2

10,038.10
5,941.00
Jumlah
Dibulatkan

10,038.10
6,475.69
16,513.79
16,510.00

f:\336480578.xls

Hal. 103

2
1 M2 Pengecatan plafond (3x) Cat Vinilex
Cat Vinilex
Plamir tembok
Rol cat tembok
Amplas
Pekerja setengah terampil
Tukang cat setengah terampil
Kepala tukang cat
Mandor
Steger werk

6 = 3x6

0.2000
0.1600
0.0100
0.5000
0.1000
0.1500
0.0150
0.0050
0.0425

kg
kg
bh
lbr
orang
orang
orang
orang
Ls

18,200.00
12,200.00
27,800.00
2,600.00
35,000.00
35,000.00
45,000.00
55,000.00
16,870.00
Jumlah
Dibulatkan

3,640.00
1,952.00
278.00
1,300.00
3,500.00
5,250.00
675.00
275.00
716.98
17,586.98
17,580.00

1 M2 Pengecatan plafond (3x) Cat Vinilex (Lt. 2)


Material + alat bantu
Upah kerja

1.0000
1.0900

m2
m2

7,886.98
9,700.00
Jumlah
Dibulatkan

7,886.98
10,573.00
18,459.98
18,450.00

1 M2 Pengecatan kayu (3x) berikut meni


Meni kayu/besi
Plamir kayu
Cat dasar
Cat kayu glotex
Pekerja
Tukang cat terampil
Kepala tukang cat
Mandor

0.2000
0.1500
0.1700
0.3500
0.0700
0.1050
0.0040
0.0025

kg
kg
kg
kg
orang
orang
orang
orang

25,500.00
18,500.00
18,200.00
37,150.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

5,100.00
2,775.00
3,094.00
13,002.50
2,100.00
4,200.00
180.00
137.50
30,589.00
30,580.00

1 M2 Pengecatan kayu (3x) berikut meni (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

23,971.50
6,617.50
Jumlah
Dibulatkan

23,971.50
7,213.08
31,184.58
31,180.00

1 M2 Pelaburan Bidang Kayu dengan Politur


Politur
Politur jadi
Amplas
Pekerja
Tukang cat terampil
Kepala tukang cat
Mandor

0.1500
0.3720
2.0000
0.0600
0.0160
0.0025

Ltr
Ltr
lbr
orang
orang
orang
orang

35,100.00
52,900.00
2,600.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

5,265.00
19,678.80
5,200.00
2,400.00
720.00
137.50
33,401.30
33,400.00

1 M2 Pelaburan Bidang Kayu dengan Politur (Lt. 2)


Material
Upah kerja

1.0000
1.0900

m2
m2

30,143.80
3,257.50
Jumlah
Dibulatkan

30,143.80
3,550.68
33,694.48
33,690.00

1 M2 Pengecatan meni besi


Meni kayu/besi
Kuas 3"
Pekerja
Tukang cat terampil
Kepala tukang cat
Mandor

0.1000
0.0100
0.0200
0.2000
0.0200
0.0100

kg
bh
orang
orang
orang
orang

5,100.00
13,600.00
30,000.00
40,000.00
45,000.00
55,000.00
Jumlah
Dibulatkan

510.00
136.00
600.00
8,000.00
900.00
550.00
10,696.00
10,690.00

1 M2 Pengecatan besi
Pengecatan meni besi
Cat besi glotex
Amplas
Tiner A
Kuas 3"
Pekerja terampil
Tukang cat terampil
Kepala tukang cat
Mandor

1.0000
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

M2
kg
lbr
ltr
bh
org
org
org
org

10,690.00
37,150.00
2,600.00
20,300.00
13,600.00
38,500.00
40,000.00
45,000.00
55,000.00

10,690.00
7,430.00
1,040.00
3,045.00
680.00
7,700.00
12,000.00
1,350.00
550.00

f:\336480578.xls

Hal. 104

f:\336480578.xls

5
Jumlah
Dibulatkan

6 = 3x6
44,485.00
44,480.00

Hal. 105

1.0000
1.0900

m2
m2

22,885.00
21,600.00
Jumlah
Dibulatkan

22,885.00
23,544.00
46,429.00
46,420.00

0.0954
0.2725
0.0273
0.0055
1.0000

orang
orang
orang
orang
m'

38,500.00
35,000.00
45,000.00
55,000.00
100,000.00
Jumlah
Dibulatkan

3,671.94
9,537.50
1,226.25
299.75
100,000.00
114,735.44
114,730.00

1 Un P-1 (PA)
Kusen alumunium 3" color setara INDAL
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kaca polos 5 mm
Kunci 2 Slaag Lengkap Mayer
Engsel pintu Cavell (4")
Sealent
Upah pasang

6.6000
1.6000
0.3600
1.0000
3.0000
16.6000
2.1600

m'
m2
m2
bh
bh
m'
m2

70,000.00
323,600.00
69,300.00
121,100.00
29,600.00
2,230.00
50,000.00
Jumlah
Dibulatkan

462,000.00
517,760.00
24,948.00
121,100.00
88,800.00
37,018.00
108,000.00
1,359,626.00
1,359,620.00

1 Un P-1' (PA)
Kusen alumunium 3" color setara INDAL
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kunci 2 Slaag Lengkap Mayer
Engsel pintu Cavell (4")
Sealent
Upah pasang

4.7000
1.5200
1.0000
3.0000
9.4000
1.7100

m'
m2
bh
bh
m'
m2

70,000.00
323,600.00
121,100.00
29,600.00
2,230.00
50,000.00
Jumlah
Dibulatkan

329,000.00
491,872.00
121,100.00
88,800.00
20,962.00
85,500.00
1,137,234.00
1,137,230.00

1 Un P-2 (PA)
Kusen alumunium 3" color setara INDAL
Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kaca polos 5 mm
Kunci 2 Slaag Lengkap Mayer
Engsel pintu Cavell (4")
Grendel pintu / jendela 5 cm
Sealent
Upah pasang

8.8000
3.4000
0.7200
1.0000
6.0000
1.0000
23.6000
4.3200

m'
m2
m2
bh
bh
set
m'
m2

70,000.00
323,600.00
69,300.00
121,100.00
29,600.00
2,230.00
2,230.00
50,000.00
Jumlah
Dibulatkan

616,000.00
1,100,240.00
49,896.00
121,100.00
177,600.00
2,230.00
52,628.00
216,000.00
2,335,694.00
2,335,690.00

1 Un J1
(JA)
Kusen alumunium 3" color setara INDAL
Allumunium Profil Daun jendela 3" color
Kaca polos 5 mm
Engsel Jendela Unilon Standar Belluci (Silver)
Grendel pintu / jendela 5 cm
Hak Kait Angin jendela Biasa Goose Bulat
Sealent
Upah pasang

5.9000
4.2000
1.4400
2.0000
1.0000
1.0000
23.6000
1.4400

m'
m'
m2
bh
bh
bh
m'
m2

70,000.00
71,700.00
69,300.00
24,200.00
7,500.00
11,500.00
2,230.00
50,000.00
Jumlah
Dibulatkan

413,000.00
301,140.00
99,792.00
48,400.00
7,500.00
11,500.00
52,628.00
72,000.00
1,005,960.00
1,005,960.00

1 Un J2
(JA)
Kusen alumunium 3" color setara INDAL
Allumunium Profil Daun jendela 3" color
Kaca polos 5 mm
Engsel Jendela Unilon Standar Belluci (Silver)
Grendel pintu / jendela 5 cm
Hak Kait Angin jendela Biasa Goose Bulat
Sealent
Upah pasang

10.2000
4.2000
2.8800
4.0000
2.0000
2.0000
37.2000
2.8800

m'
m'
m2
bh
bh
bh
m'
m2

70,000.00
71,700.00
69,300.00
24,200.00
7,500.00
11,500.00
2,230.00
50,000.00
Jumlah
Dibulatkan

714,000.00
301,140.00
199,584.00
96,800.00
15,000.00
23,000.00
82,956.00
144,000.00
1,576,480.00
1,576,480.00

3.9000
0.4500
7.8000

m'
m2
m'

70,000.00
69,300.00
2,230.00

273,000.00
31,185.00
17,394.00

1 M2 Pengecatan besi (Lt. 2)


Material
Upah kerja

1 M' Listplank metal 30 cm (Lt. 2)


Pekerja terampil
Tukang kayu setengah terampil
Kepala tukang kayu
Mandor
Listplank metal Zam t=0,8mm powdercoating

1 Un BV (JA)
Kusen alumunium 3" color setara INDAL
Kaca polos 5 mm
Sealent
f:\336480578.xls

6 = 3x6

Hal. 106

Upah pasang

3
0.4500

4
m2

5
50,000.00
Jumlah
Dibulatkan

6 = 3x6
22,500.00
344,079.00
344,070.00

1 Un BV-1 (JA)
Kusen alumunium 3" color setara INDAL
Kaca polos 5 mm
Sealent
Upah pasang

2.2000
0.2800
4.4000
0.2800

m'
m2
m'
m2

70,000.00
69,300.00
2,230.00
50,000.00
Jumlah
Dibulatkan

154,000.00
19,404.00
9,812.00
14,000.00
197,216.00
197,210.00

f:\336480578.xls

Hal. 107

B.

PEK. MEKANIKAL

No.
1
1

URAIAN PEKERJAAN
2
1 M Pas. Pipa PVC d. 1/2" (AW) Wavin
Pipa PVC d. 1/2" (AW) Wavin
Klem
Lem
Dinabolt
Fitting
Upah

VOLUME

SAT

1.000
1.000
0.069
2.000
1.000
0.150

HARGA SAT.
(Rp)
5

M1
BH
M1
BH
BH
OH

3,525.00
1,210.00
7,260.00
310.00
910.00
6,766.52
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 3/4" (AW) Wavin


Pipa PVC d. 3/4" (AW) Wavin
Klem
Lem
Dinabolt
Fitting
Upah

1.000
1.000
0.082
2.000
1.000
0.150

M1
BH
M1
BH
BH
OH

4,875.00
1,210.00
7,260.00
310.00
1,520.00
8,817.71
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 1" (AW) Wavin


Pipa PVC d. 1" (AW) Wavin
Klem
Lem
Dinabolt
Fitting
Upah

1.000
1.000
0.100
2.000
1.000
0.150

M1
BH
M1
BH
BH
OH

7,870.00
1,820.00
7,260.00
310.00
1,820.00
12,859.48
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 1 1/4" (AW) Wavin


Pipa PVC d. 1 1/4" (AW) Wavin
Klem
Lem
Dinabolt
Fitting
Upah

1.000
1.000
0.132
2.000
1.000
0.150

M1
BH
M1
BH
BH
OH

9,450.00
1,820.00
7,260.00
310.00
2,120.00
14,967.45
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 1 1/2" (AW) Wavin


Pipa PVC d. 1 1/2" (AW) Wavin
Klem
Lem
Dinabolt
Fitting
Upah

1.000
1.000
0.151
2.000
1.000
0.150

M1
BH
M1
BH
BH
OH

13,475.00
2,420.00
7,260.00
310.00
3,030.00
20,639.23
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 2" (AW) Wavin


Pipa PVC d. 2" (AW) Wavin
Klem
Lem
Gantungan
Dinabolt
Fitting
Upah

1.000
1.000
0.188
1.000
2.000
1.000
0.150

M1
BH
M1
BH
BH
BH
OH

13,000.00
2,420.00
7,260.00
6,050.00
310.00
4,240.00
27,697.78
Jumlah
Dibulatkan

1 M Pas. Pipa PVC d. 2 1/2" (AW) Wavin


Pipa PVC d. 2 1/2" (AW) Wavin
Klem
Lem
Gantungan
Dinabolt
f:\336480578.xls
Fitting
Upah

1.000
1.000
0.239
1.000
2.000
1.000
0.150

M1
BH
M1
BH
BH
BH
OH

21,900.00
3,030.00
7,260.00
7,260.00
310.00
6,050.00
40,592.53
Jumlah

JUMLAH
(Rp)
6 = 3x6
3,525.00
1,210.00
501.52
620.00
910.00
1,014.98
7,781.50
7,780.00
4,875.00
1,210.00
592.71
620.00
1,520.00
1,322.66
10,140.36
10,140.00
7,870.00
1,820.00
729.48
620.00
1,820.00
1,928.92
14,788.41
14,780.00
9,450.00
1,820.00
957.45
620.00
2,120.00
2,245.12
17,212.57
17,210.00
13,475.00
2,420.00
1,094.23
620.00
3,030.00
3,095.88
23,735.11
23,730.00
13,000.00
2,420.00
1,367.78
6,050.00
620.00
4,240.00
4,154.67
31,852.45
31,850.00
21,900.00
3,030.00
1,732.53
7,260.00
Hal.620.00
108
6,050.00
6,088.88
46,681.41

C.

PEK. ELEKTRIKAL

No.
1
1

URAIAN
2
1 Ttk Pas. Instalasi penerangan
NYM 3 x 2.5 mm2
Pipa Konduit 20 mm Clipsal
Pipa Flexible 20 mm Clipsal
T-Doos 20 mm Cab.3 Clipsal
Sok 20 mm Clipsal
Klem 20 mm Clipsal
Isolasi Listrik Unibell
Lasdop
Fisher + Sekrup
Upah

VOLUME

SAT

9.0000
8.0000
1.0000
2.0000
3.0000
10.0000
0.2500
6.0000
10.0000
0.1000

m1
meter
meter
bh
bh
bh
bh
bh
bh
OH

HARGA SAT
(Rp)
5
7,500.00
3,790.00
3,030.00
6,660.00
750.00
500.00
10,000.00
500.00
1,500.00
141,920.00
Jumlah
Dibulatkan

1 Ttk Pas. Instalasi stop kontak


NYM 3 x 2.5 mm2
Pipa Konduit 20 mm Clipsal
Pipa Flexible 20 mm Clipsal
T-Doos 20 mm Cab.3 Clipsal
Sok 20 mm Clipsal
Klem 20 mm Clipsal
Isolasi Listrik Unibell
Lasdop
Fisher + Sekrup
Upah

10.0000
9.0000
1.0000
2.0000
3.0000
10.0000
0.2500
6.0000
10.0000
0.1000

m1
meter
meter
bh
bh
bh
bh
bh
bh
OH

7,500.00
3,790.00
3,030.00
6,660.00
750.00
500.00
10,000.00
500.00
1,500.00
153,210.00
Jumlah
Dibulatkan

1 Ttk Stop Kontak


Stop Kontak Setara Broco
Alat bantu
Upah pasang

1.000
0.100
0.200

bh
ls
ls

15,900.00
15,900.00
17,490.00
Jumlah
Dibulatkan

1 Ttk Saklar tunggal


Saklar tunggal Setara Broco
Alat bantu
Upah pasang

1.000
0.100
0.150

bh
ls
ls

16,500.00
16,500.00
18,150.00
Jumlah
Dibulatkan

1 Ttk Saklar ganda


Saklar seri Setara Broco
Alat bantu
Upah pasang

1.000
0.100
0.150

bh
ls
ls

18,500.00
18,500.00
20,350.00
Jumlah
Dibulatkan

1 Bh TL 2 x 36 W V Shape
Lampu TL 2 x 36 W V Shape
Upah pasang

1.0000
0.0500

bh
ls

379,940.00
379,940.00
Jumlah
Dibulatkan

1 Bh Lampu Baret TL-E 20 W


Lampu Baret TL-E 20 W
Upah pasang

1.0000
0.0500

bh
ls

266,200.00
266,200.00
Jumlah
Dibulatkan

1 Bh Dwn Light PCL 13 W


Lampu Dwn Light PCL 13 W
Upah pasang
f:\336480578.xls

1.0000
0.0500

bh
ls

223,850.00
223,850.00
Jumlah
Dibulatkan

Hal. 109

JUMLAH
(Rp)
6 = 3x6
67,500.00
30,320.00
3,030.00
13,320.00
2,250.00
5,000.00
2,500.00
3,000.00
15,000.00
14,192.00
156,112.00
156,110.00
75,000.00
34,110.00
3,030.00
13,320.00
2,250.00
5,000.00
2,500.00
3,000.00
15,000.00
15,321.00
168,531.00
168,530.00
15,900.00
1,590.00
3,498.00
20,988.00
20,980.00
16,500.00
1,650.00
2,722.50
20,872.50
20,870.00
18,500.00
1,850.00
3,052.50
23,402.50
23,400.00
379,940.00
18,997.00
398,937.00
398,930.00
266,200.00
13,310.00
279,510.00
279,510.00
223,850.00
11,192.50
235,042.50
235,040.00

f:\336480578.xls

Hal. 110

Besi :
d. 6
d. 8
d. 10
d. 12
d. 13
d. 16
d. 19
d. 22
d. 25
d. 32

0.222
0.395
0.620
0.888
1.040
1.580
2.230
2.980
3.850
6.310

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

Baja siku :
50.50.5
60.60.6
70.70.7
75.75.7
80.80.8
100.100.10
65.65.6
75.75.6
40.40.4

3.750
4.597
7.380
7.940
9.660
15.100
5.910
6.870
2.417

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m

Besi WF :
100.50.5.7
125.60.6.8
150.75.5.7
175.90.5.8
200.100.3,2.4,5
200.100.5,5.8
250.125.6.9
300.150.6,5.9
350.175.7.11

9.333
13.200
14.000
18.100
11.917
21.333
29.600
36.700
49.600

kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'

Channel :
100.50.20.3,2
125.50.20.3,2
150.50.20.3,2
150.65.20.3,2
200.75.20.3,2

5.500
6.133
6.767
7.517
9.270

kg/m
kg/m
kg/m
kg/m
kg/m

Pipa hitam medium :

Wire Mesh (2,1 x 5,4) :


Toleransi
M4
15.450 lbr
MK 5
21.330 lbr
MK 6
31.370 lbr
MK 7
43.340 lbr
MK 8
57.240 lbr
MK 10

D.
D.
D.
D.

4" t. 4,5 mm
2" t. 3,6 mm
1" t. 3,2 mm
2,5" t. 3,6

Full
15.450
24.140
34.760
47.310
61.790

12.100
5.090
2.440
6.520

lbr
lbr
lbr
lbr
lbr

Plat Hitam :
t. 6 mm
47.024
t. 8 mm
62.698
t. 10 mm 78.373
t. 12 mm 94.047

7.837
kg/m2
kg/m2
kg/m2
kg/m2

Luas permukaan :
kg/m'
kg/m'
kg/m'
kg/m'

D.
D.
D.
D.

4" t. 4,
2" t. 3,
1" t. 3,
2,5" t.

0.358
0.189
0.106
0.239

berat/kg/m2/lapis
1.366
2.125
3.064
4.168
5.451
8.515

m2/m'
m2/m'
m2/m'
m2/m'

You might also like