You are on page 1of 136

BILL of

QUANTITIES

for JUTAWAN DEVELOPMENT SDN. BHD.


at Lot 177 (GM 75148) Mukim Rompin, Daerah Jempol,
Negeri Sembilan Darul Khusus
MAIN SUMMARY
Bill 3 - Building Works For Semi-D (Amendment V)
Bill No.

RM

BUILDING WORKS

3A.S/1****

EXTERNAL WORKS

3B.S/1****

Total Cost of Works Carried to Final Summary


13023 (BW - Phase 2)

RM
3.S/1****

SEN

BILL

of

QUANTITIES

for JUTAWAN DEVELOPMENT SDN. BHD.


at Lot 177 (GM 75148) Mukim Rompin, Daerah Jempol,
Negeri Sembilan Darul Khusus
CPA
GENERAL SUMMARY
Bill 3A - Building Works (Amendment V)
Bill No.

RM

Sen

WORK BELOW LOWEST FLOOR FINISH

3A.1/6**

FRAME

3A.2/4*

STAIRCASE

3A.3/3*

STAIRCASE FINISHES

3A.4/5****

UPPER FLOOR CONSTRUCTION

3A.5/3**

ROOF

3A.6/9***

EXTERNAL WALLS

3A.7/4*

INTERNAL WALLS & PARTITIONS

3A.8/3*

WINDOWS

3A.9/10*

10

EXTERNAL DOORS

3A.10/5**

11

INTERNAL DOORS

3A.11/3**

12

IRONMONGERY

3A.12/4*

13

EXTERNAL WALL FINISHES

3A.13/2*

14

INTERNAL WALL FINISHES

3A.14/7****

15

FLOOR FINISHES

3A.15/29****

16

CEILING FINISHES

3A.16/4*

17

PAINTING

3A.17/4*

18

SANITARY FITTINGS

3A.18/16****

19

COLD WATER SERVICES

3A.19/4*

20

SANITARY PLUMBING SERVICES

3A.20/3*

Sub-Total
Total Cost of Works Carried to Final Summary
13023 (BW - Phase 2)

RM
x
RM
3A.S/1****

45
-

Units

JURU KOS (AMENDMENT II)

WORK BELOW LOWEST FLOOR LEVEL

BILL NO.3A.1
WORK BELOW LOWEST FLOOR LEVEL
Item

Description

Unit

Qty.

Rate

EXCAVATION
Excavate pits for pilecaps, footings, column,
beam and stanchion bases and the like starting
from reduce level, get out, part return, and
remove surplus excavated materials from site;
including all levelling or grading and ramming of
bottoms, trimming sides and planking and
strutting
Footings
A Not exceeding 2.00m depth

m3

88

m3

15

m2

275

m2

84

Excavate trenches; get out and remove surplus


excavated materials from site; including all
leveling or grading and ramming of bottoms,
trimming sides and planking and strutting
Ground beams
B Not exceeding 1.00m depth
HARDCORE AND THE LIKE
Hardcore and the like as described; leveling; well
consolidated; watered and blinded with sand
Non-suspended ground slab
C 150mm thick
Foyer Slab
D 150mm thick

Jutawan Development Sdn Bhd


Work Below Lowest Floor Level
13023 (BW - Phase 2)

3A.1/1**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)

WORK BELOW LOWEST FLOOR LEVEL

Item

Unit

Description

Qty.

Rate

PLAIN INSITU CONCRETE WORK


Lean concrete Grade 15
Footings
A Not exceeding 100mm thick

m3

m3

m3

14

m3

m3

18

m3

m3

14

m3

27

m3

Ground beams
B Not exceeding 100mm thick
Non-suspended ground slab
C Not exceeding 100mm thick
Foyer Slab
D Not exceeding 100mm thick
REINFORCED INSITU CONCRETE WORK
Ready mixed reinforced vibrated concrete
Grade 25
Footings
E Generally
Column stumps
F

Generally
Ground beams

G Generally
Non - suspended ground slabs
H 100mm - 150mm thick
Foyer Slab
J

100mm - 150mm thick

Jutawan Development Sdn Bhd


Work Below Lowest Floor Level
13023 (BW - Phase 2)

3A.1/2**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)

WORK BELOW LOWEST FLOOR LEVEL

Item

Unit

Description

Qty.

Rate

REINFORCEMENT
High tensile steel bar reinforcement
Footings
A 16mm Diameter rod

kg

619

B 12mm Diameter rod

kg

591

C 16mm Diameter rod

kg

991

D 12mm Diameter rod

kg

69

E 10mm Diameter rod

kg

259

12mm Diameter rod

kg

122

G 10mm Diameter rod

kg

564

kg

132

kg

335

m2

640

m2

84

Column Stump

Ground beams
F

Mild steel bar reinforcement


Column Stump
H 6mm Diameter rod as links, stirrups and binders
Ground beams
J

6mm Diameter rod as links, stirrups and binders


Fabric reinforcement cut to size; well lapped at
joints as shown in drawing including bending
fabrics and notching around obstructions
(measured nett only - no allowance made for
bending fabrics, laps at joints, intersections and
the like)
Non - suspended ground slabs

K BRC No. A7
Foyer Slab
L BRC No. A7

Jutawan Development Sdn Bhd


Work Below Lowest Floor Level
13023 (BW - Phase 2)

3A.1/3**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)

WORK BELOW LOWEST FLOOR LEVEL

Item

Unit

Description

Qty.

Rate

FORMWORK
Use and waste of sawn formwork
Sides of footings
A Exceeding 250mm but not exceeding 500mm
high

194

m2

64

443

m2

259

m2

84

Sides of column stumps


B Exceeding 1.0m high
Sides of ground beams
C Exceeding 250mm but not exceeding 500mm
high
DAMP PROOF MEMBRANE
Supply and lay approved 0.25mm thick heavy
duty polythene damp proof membrane including
folded up to top of slabs at beam edge; welded
lapped at joints; 150mm minimum lap; laid
strictly in accordance with manufacturer's
instructions (measured nett - no allowance made
for laps)
Non - Suspended ground slab
D Generally
Foyer Slab
E Generally

Jutawan Development Sdn Bhd


Work Below Lowest Floor Level
13023 (BW - Phase 2)

3A.1/4**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)

WORK BELOW LOWEST FLOOR LEVEL

Item

Unit

Description

Qty.

Rate

SURFACE TREATMENT
Anti-termite treatment to be executed by Rentokil
Sdn. Bhd. or other approved firm with Two (2)
years gurantee
A To all soil in contact with the building structure
and as described on page MITE/1 of 2 and
MITE/2 of 2

Item

SUNDRIES
B Supply and install 10mm diameter dowel bar
200mm long at 300mm centre to centre for
foyer slabs; all as per Engineer's details
drawing and instruction.

No

322

i) Hardcore for Apron & Driveway

m2

109

ii) Concrete G25 for Apron & Driveway

m3

11

C Any other items and/or associated works not


included in the above but deemed necessary
(please specify)

iii) _________________________________

Jutawan Development Sdn Bhd


Work Below Lowest Floor Level
13023 (BW - Phase 2)

3A.1/5*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)

WORK BELOW LOWEST FLOOR LEVEL

Item

Unit

Description

Qty.

Rate

COLLECTION

Page No. 3A.1/1**

................................

Page No. 3A.1/2**

................................

Page No. 3A.1/3**

................................

Page No. 3A.1/4**

................................

Page No. 3A.1/5*

................................

BILL NO.3A.1
WORK BELOW LOWEST FLOOR LEVEL
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.1/6**

Amount
RM
Sen

JURU KOS (AMENDMENT I)

FRAME

BILL NO. 3A.2


FRAME
Item

Description

Unit

Qty.

Rate

REINFORCED INSITU CONCRETE WORK


Ready mixed reinforced vibrated concrete
Grade 25
Isolated columns, struts, piers and the like
To columns
A Generally

m3

10

m3

17

C 16mm Diameter rod

kg

948

D 12mm Diameter rod

kg

78

E 10mm Diameter rod

kg

424

20mm Diameter rod

kg

1,043

G 16mm Diameter rod

kg

408

H 12mm Diameter rod

kg

828

kg

309

Beams, braces, cantilevers and the like


To beams
B Generally
REINFORCEMENT
High tensile steel bar reinforcement
Isolated columns, struts, piers and the like
To columns

Beams, braces, cantilevers and the like


To beams
F

10mm Diameter rod

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.2/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

FRAME

Description

Unit

Qty.

Rate

REINFORCEMENT (CONT'D)
Mild steel bar reinforcement
Isolated columns, struts, piers and the like
To columns
A 6mm Diameter rod as links, stirrups and binders

kg

418

kg

621

C Vertical height not exceeding 3.50m high

m2

81

D Vertical height exceeding 3.50m but not


exceeding 5.00m high

m2

119

m2

321

Beams, braces, cantilevers and the like


To beams
B 6mm Diameter rod as links, stirrups and binders
FORMWORK
Isolated columns, struts, piers and the like
Sides of column

Beams, braces, cantilevers and the like


Sides and soffit of beams
E Vertical height not exceeding 3.50m high

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.2/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

FRAME

Description

Unit

Qty.

Rate

SUNDRIES
Construct and complete cast in-situ hood
reinforced with and including 2 nos. 10mm
diameter high tensile rods at top, hooked both
ends and including 10mm diameter high tensile
rods; including stoolings and returned ends; all as
per Engineer's detail drawing No. P 21114
A Overall size 152mm x 500mm thick hood to
windows

64

B Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.2/3*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

FRAME

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.2/1*

................................

Page No. 3A.2/2*

................................

Page No. 3A.2/3*

................................

BILL NO. 3A.2


FRAME
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.2/4*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

STAIRCASE

BILL NO. 3A.3


STAIRCASE
Item

Description

Unit

Qty.

Rate

REINFORCED INSITU CONCRETE WORK


Ready mixed reinforced vibrated concrete
Grade 25
In suspended staircase and the like
A Generally

m3

m3

m3

D 12mm diameter rod

kg

325

E 10mm diameter rod

kg

138

kg

20

kg

30

In landing slabs and the like


B 100 - 150mm Thick
In landing beam of staircase
C Generally
REINFORCEMENT
High tensile steel bar reinforcement
In suspended staircases, landing slabs and the
like

In landing beam of staircase


F

16mm diameter rod


Mild steel bar reinforcement
In landing beam of staircase

G 6mm diameter rod as links, stirrups and binders

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.3/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

STAIRCASE

Description

Unit

Qty.

Rate

FORMWORK
Use and waste of sawn formwork
In suspended staircase and the like
Sloping soffit of suspended staircase
A Sloping over 15 from horizontal

m2

19

62

32

D To soffit of landing slab

m2

E To edge of landing slab; not exceeding 250mm


high

m2

m2

Risers; vertical
B Not exceeding 255mm deep
Edges of suspended staircases
C 375mm wide extreme
In landing slabs and the like

In landing beam of staircase


F

To sides and soffit of landing beam


SUNDRIES

G Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.3/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

STAIRCASE

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.3/1*

................................

Page No. 3A.3/2*

................................

BILL NO. 3A.3


STAIRCASE
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.3/3*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

STAIRCASE FINISHES

BILL NO. 3A.4


STAIRCASE FINISHES
Item

Description

Unit

Qty.

Rate

PLASTERWORKS
Plastering; in cement and sand (1:3) with
approved plasticiser; finished smooth with a
wood float
A

13mm Thick to sloping concrete soffit

m2

19

Ditto to concrete soffit

m2

Ditto to open string; 375mm wide extreme

32

SCREEDS
Screeding in cement and sand (1:3) trowelled
smooth
To receive porcelain tiles
D

20mm thick bed; to landing slab

m2

Ditto to 255mm wide step tread

47

Do to 178mm high riser

62

(Note : The tenderers shall complete pricing


the breakdown of rate for the tiling
works as provided for in the box in
the forthcoming pages)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.4/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

STAIRCASE FINISHES

Description

Unit

Qty.

Rate

Supply and lay Porcelain Tiles; YTP6300N


600mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand (1:3);
on screeded backings (measured separately);
pointing using white cement; to required
patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)
a) Supply Rate
b) Wastage
c) Profit And Overhead

34.17
%

3.42

d) Loading / Unloading On Site

28.98

f) Adhesive

9.52
2.00

e) Labour (Laying)

Total Cost Per M2

(RM)

1.51
RM

79.60

Flooring to landing slab

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.4/2****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

STAIRCASE FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; YTP6300N
600mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
.. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

3.42
%

0.51

5.69

d) Loading / Unloading On Site

0.50

e) Labour (Laying)

17.83

f) Adhesive
Total Cost Per M
A

0.35
RM

28.30

255mm wide treads including rounded edge;


to suspended staircase

47

178mm high riser; to suspended staircases

62

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.4/3****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

STAIRCASE FINISHES

Description

Unit

Qty.

Rate

METALWORK
Mild Steel Work
Railings; forged and welded together
Supply and install mild steel staircase handrail
constructed of 50mm diameter mild steel
hollow section round tube as handrail at
914mm height welded with 12mm diameter
mild steel solid round pipe bend with caping
as railing holder with one end welded to
75mm x 5mm thick mild steel plate fish tail
and cast to wall at average 2045mm centre to
centre and other end welded to mild steel
railing holder; and including all necessary
ramps, knees and bends; inclusive of all
necessary painting works; all necessary
ramps, knees and bends; and all necessary
painting works all to the Architect's
satisfaction and approval all as per
Architect's detail drawing no. P 21114;
complete all to Architect's satisfaction and
approval
A

Generally to staircase

16

SUNDRIES
B

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) __________________________________
ii) __________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.4/4*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

STAIRCASE FINISHES

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.4/1*

................................

Page No. 3A.4/2****

................................

Page No. 3A.4/3****

................................

Page No. 3A.4/4*

................................

BILL NO. 3A.4


STAIRCASE FINISHES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.4/5****

Amount
RM
Sen

JURU KOS (AMENDMENT I)

UPPER FLOOR CONSTRUCTION

BILL NO. 3A.5


UPPER FLOOR CONSTRUCTION
Item

Description

Unit

Qty.

Rate

REINFORCED INSITU CONCRETE WORK


Ready mixed reinforced vibrated concrete
Grade 25
Suspended slabs
A 100mm - 150mm thick

m3

53

B Extra over for forming 102mm diameter hole to


receive rain water down pipe inclusive all PVC
pipe sleeves

No

C BRC No A10

m2

40

D BRC No A9

m2

74

E BRC No A8

m2

364

m2

470

m2

415

REINFORCEMENT
Fabric reinforcement cut to size; well lapped at
joints as shown in drawing including bending
fabrics and notching around obstructions
(measured nett covered only - no allowance
made for bending fabrics, laps at joints,
intersections and the like)
Suspended slabs

BRC No A7
FORMWORK
Use and waste of sawn formwork
Soffit of suspended slabs

G Strutting height not exceeding 3.50m high

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.5/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

Description

UPPER FLOOR CONSTRUCTION


Unit

Qty.

Rate

WORK IN CONNECTION WITH


WATERPROOFING
To supply and apply 2 coats of Sika Top Seal
109 MY cementitious waterproofing coating at a
rate of 1.0kg/m2 per coat onto clean and
honeycomb-free concrete surface, or other
approved equivalent; laid strictly in accordance
with the manufacturer's printed instruction and
specification
A To carporch

m2

78

SUNDRIES
B Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.5/2**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

Description

UPPER FLOOR CONSTRUCTION


Unit

Qty.

Rate

COLLECTION

Page No. 3A.5/1*

................................

Page No. 3A.5/2**

................................

BILL NO. 3A.5


UPPER FLOOR CONSTRUCTION
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.5/3**
13023 (BW - Phase 2)

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)

ROOF

BILL NO. 3A.6


ROOF
Item

Description

Unit

Qty.

Rate

REINFORCED INSITU CONCRETE WORK


Ready mixed reinforced vibrated concrete
Grade 25
Roof beams, braces, cantilevers and the like
Roof beams
A Generally

m3

12

B 100mm - 150mm thick

m3

11

C Extra over for forming 202mm x 25mm deep


scupper drain; including all necessary additional
concrete and formwork

33

D Extra over for forming 102mm diameter hole to


receive rain water down pipe inclusive all PVC
pipe sleeves

No

R.C flat roof slabs

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

ROOF

Description

Unit

Qty.

Rate

REINFORCEMENT
High tensile steel bar reinforcement
Roof beams, braces, cantilevers and the like
Roof beams
A 16mm diameter rod

kg

91

B 12mm diameter rod

kg

68

C 10mm diameter rod

kg

438

kg

237

E BRC No. A9

m2

37

m2

157

m2

221

m2

90

Mild steel bar reinforcement


Roof beams, braces, cantilevers and the like
Roof beams
D 6mm Diameter rod as links, stirrups and binders
Fabric reinforcement cut to size; well lapped at
joints as shown in drawing including bending
fabrics and notching around obstructions
(measured nett only - no allowance made for
bending fabrics, laps at joints, intersections and
the like)
R.C flat roof slabs

BRC No. A7
FORMWORK
Use and waste of sawn formwork
Roof beams, braces, cantilevers and the like
Sides and soffit of roof beams

G Strutting height not exceeding 3.50m high


Soffit of R.C flat roof slabs
H Strutting height not exceeding 3.50m high

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

ROOF

Description

Unit

Qty.

Rate

WORK IN CONNECTION WITH


WATERPROOFING
Base screed in cement and sand (1:3); laid to
falls; to receive waterproofing
Reinforced concrete flat roof
A 20mm Thick (average); finishing to falls; to R.C.
flat roof slabs

m2

95

B EXTRA OVER for 202mm x 50mm deep


scupper drain

33

C EXTRA OVER for working around the 102mm


diameter rain water down pipe

No

m2

95

m2

95

To supply and apply 3 coats of Sikalastic-450,


consisting of 1 priming of 0.3kg/m2 and 2 neat
coat of 0.45kg/m2 per coat onto clean and
honeycomb-free concrete surface, or other
approved equivalent; laid strictly in accordance
with the manufacturer's printed instruction and
specification
Reinforced concrete flat roof
D To R.C. flat roof slab
To supply and apply 2 coats of Sika Top Seal
107 cementitious waterproofing coating at a rate
of 1.0kg/m2 per coat onto clean and
honeycomb-free concrete surface, or other
approved equivalent; laid strictly in accordance
with the manufacturer's printed instruction and
specification
E To flat roof slab

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/3**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

ROOF

Description

Unit

Qty.

Rate

WORK IN CONNECTION WITH


WATERPROOFING (CONT'D)
Sika-1 rendering to cement sand protective
screed inclusive formation of crack including
joint to be pointed with Sikaflex Construction,
PU sealant at a grid of 3m x 3m
Reinforced concrete flat roof
A 20mm thick (average) to R.C flat roof slab

m2

95

B 300mm High skirting with top tucked and sealed


into and including groove in concrete or
brickwork and bottom dressed over and angle
fillet

83

C EXTRA OVER for 202mm x 50mm deep


scupper drain

66

D EXTRA OVER for working around the 102mm


diameter rain water down pipe

No

83

Angle fillet in cement and sand (1:3) lay along


beam and wall / floor joints to receive
waterproofing membrane including necessary
formwork
Reinforced concrete flat roof
E To R.C flat roof slab (50mm x 50mm)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/4**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT III)


Item

ROOF

Description

Unit

Qty.

Rate

PITCH ROOF COVERING


Supply and install Lysaght klil-lok Optima in
Clean Colorbond steel or other equal and
approved equivalent profiled metal deck
roofing; 0.47mm BMT (0.53mm TCT) thick in
selected standard colours; fixed with and
including self drilling screws or other
recommended fasteners to purlins (measured
separately); all scope of work done strictly by
specialist; all to manufacturer's
recommendations (measured nett - no
allowance made for laps)
A Generally to 3 degree pitch roof

m2

304

m2

304

m2

304

D To 3 degree pitch roof

m2

304

E Extra over for making hole on roof tiles for


102mm diameter UPVC vent pipe with 22 Gauge
flashing surrounding

No

50mm Thick 40kg/m3 rockwool insulation,


well lapped at joints (measured nett - no
allowance made for laps)
B To 3 degree pitch roof
Approved double sided woven aluminium foil
well lapped at joints laid over roof purlins
(measured nett - no allawance made for laps)
C To 3 degree pitch roof
Approved one layer of BRC 3315 wiremesh
laid over roof purlins (measured nett - no
allowance made for laps)

F Allow a provisional sum of (Ringgit Malaysia :


Seven Thousand Only) for supply only solar
heater to be expanded as directed by the
Architect or deducted wholly or in part if not
required

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/5***

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

ROOF

Description

Unit

Qty.

Rate

Amount
RM
Sen

PROPRIETARY LIGHT WEIGHT STEEL


ROOF TRUSS
Notes:A Prices of roof truses shall include for all steel
members, (including wall plates), connnection
plates and bolts, priming or treatment of plates
and bolts, design fees and fabrication and
installations
B All steel truss components shall be manufactured
using Zincalume Steel
C The Contractor's design for steel roof truss shall
be subjected to the approval of the Architect or
Engineer. The tenderer may be requested to
submit their detailed design drawings and
calculation sheet prior to acceptance of his
tender.
D The Contractor shall provide a guarantee for a
period of minimum ten (10) years whereby
within the period, the Contactor shall make
inspections and carry out maintenance works
based on Client's report or whenever necessary.
E All steel truss shall be minimum tensile strength
of 550 kPa; design shall be in accordance to BS
5950 Part 5

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/6*

To Collection

RM

JURU KOS (AMENDMENT I)


Item

ROOF

Description

Unit

Qty.

Rate

PROPRIETARY LIGHT WEIGHT STEEL


ROOF TRUSS
Design, fabricate, supply, transport and install a
Complete roof structures; "Juara Steel Truss
System" or approved equivalent; including wall
plates, bracing, valley, hip and ridge boards,
purlin, tie rods, strutting, battens and all other
steel members, all fixing, fastenings and other
work in connections and other accessories for
the complete installation including design (fascia,
eaves and barge boards are measured separately)
A Generally

Item

B Flashing in 600mm (min) overall girth; twice


bent; one end dressed over roof covering and the
other end built into joints of brickwork including
all necessary sealing and jointing

57

C Capping in 1290mm (min) overall girth; four


times bent; one edge dressed over roof covering
and the other end built into joints of brickworks

48

FLASHINGS, GUTTERS AND SUNDRIES


22 Gauge galvanised steel as described
Flashing; to match the roofing sheets; well
lapped; bedded on matching coloured cement and
sand (1:3) mortar

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/7*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

ROOF

Description

Unit

Qty.

Rate

RAIN WATER DOWN PIPE


Unplasticised PVC rainwater downpipes, goods
and fittings; BS 4576 Class D; from Paling
Industries Sdn. Bhd. or other approved
equivalent; jointing in accordance with
manufacturer's instructions including short
lengths and all necessary fixing accessories
Pipes; fixing to wall and column; including
brackets and cast iron dome grating on water
outlet
A 102mm diameter UPVC rain water downpipe

17

B EXTRA OVER for 90 degree bend

No

C EXTRA OVER for 45 degree bend

No

17

No

125

Pipes; embedded in ground; including all


necessary excavation and extra concrete
D To suit 102mm diameter UPVC rain water down
pipe
Rainwater outlets; screwed domical grating;
luting flange for finishes; setting in reinforced
concrete slab; jointing to down pipe
E To suit 102mm diameter UPVC rain water down
pipe
SUNDRIES
F

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) Fascia Board
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.6/8*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT III)


Item

ROOF

Description

Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.6/1*

................................

Page No. 3A.6/2*

................................

Page No. 3A.6/3**

................................

Page No. 3A.6/4**

................................

Page No. 3A.6/5***

................................

Page No. 3A.6/6*

................................

Page No. 3A.6/7*

................................

Page No. 3A.6/8*

................................

BILL NO. 3A.6


ROOF
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.6/9***

JURU KOS (AMENDMENT I)

EXTERNAL WALLS

BILL NO. 3A.7


EXTERNAL WALLS
Item

Description

Unit

Qty.

Rate

PRECAST CONCRETE WORK


Precast concrete Grade 25 as described;
including all moulds, hoisting, fixing in position
and setting in cement and sand (1:6) mortar; all
as per Engineer's details
Lintols; reinforced with and including 4 nos.
10mm diameter high tensile rods at top and
bottom, hooked both ends and including 6mm
diameter mild steel stirrups at 150mm centres;
including stoolings and returned ends
A 125mm x 200mm lintols to doors

21

B 125mm x 200mm lintols to windows

64

C 114mm thick brickwall; generally

m2

398

D 114mm thick brickwall as brick casing

m2

m2

10

m2

17

BRICKWORKS
Cement and sand bricks as described; in cement
and sand (1;3) mortar with approved plasticiser
reinforced with "Exmet" or other equal and
approved brick reinforcement at every fourth
course

Common clay bricks as described; in cement


and sand (1;3) mortar with approved plasticiser
reinforced with "Exmet" or other equal and
approved brick reinforcement at every fourth
course
E 230mm thick brickwall as party wall
F

230mm thick brickwall as parapet firewall


1000mm high

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.7/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

EXTERNAL WALLS

Description

Unit

Qty.

Rate

MILD STEEL WORK


Railings; forged and welded together
Supply and install mild steel railing; constructed
of 50mm diameter mild steel hollow section rod;
7 nos of 20mm x 1.2mm thick mild steel hollow
section rod with 150mm spacing and both end
welded to 50mm x 8mm thick mild steel plate
and other end embedded into concrete steps;
including all necessary knees, bends and painting
works all as per Architect's drawings complete
all to satisfaction of the Architect
A 914mm high M.S railing to Air-cond ledge

TEMPERED GLASS RAILING


Design, fees and paid, supply, construct and
complete, install 12mm thick tempered heat
soaked glass railing overall height 910mm
complete with 40mm x 100mm x 3mm thick
galvanised steel channel, base plate and bracing,
50mm diameter stainless steel pipe as top rail with
10mm diameter stainless steel road fixed to glass;
including all necessary stainless steel bolts and
fixing accessories all as per Architect's details
drawing No. P 21114
B Generally to Balcony

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.7/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

EXTERNAL WALLS

Description

Unit

Qty.

Rate

SUNDRIES
6mm Diameter mild steel rod as bonding tie;
450mm girth; one end cast into concrete and
the other end cast into concrete and the other
end built into joints of brickwork at every
fourth course
A Generally

No

347

B Horizontal damp-proof course laid on 114mm


brickwall

31

C Horizontal damp-proof course laid on 230mm


brickwall

Bituminous felt damp-proof course as


described; well lapped at joints on and including
19mm bed of cement and sand (1:3) mortar
coated with hot bitumen (measured nett - no
allowance made for laps)

D Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.7/3*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

EXTERNAL WALLS

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.7/1*

...............................

Page No. 3A.7/2*

...............................

Page No. 3A.7/3*

...............................

BILL NO. 3A.7


EXTERNAL WALLS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.7/4*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

INTERNAL WALLS & PARTITIONS

BILL NO. 3A.8


INTERNAL WALLS & PARTITIONS
Item

Description

Unit

Qty.

Rate

PRECAST CONCRETE WORK


Precast concrete Grade 25 as described;
including all moulds, hoisting, fixing in position
and setting in cement and sand (1:6) mortar; all
as per Engineer's details
Lintols; reinforced with and including 4 nos.
10mm diameter high tensile rods at top and
bottom, hooked both ends and including 6mm
diameter mild steel stirrups at 150mm centres;
including stoolings and returned ends
A 125mm x 200mm lintols to doors

26

B 114mm thick brickwall; generally

m2

391

C 114mm thick brickwall as brick casing

m2

m2

126

BRICKWORKS
Cement and sand bricks as described; in cement
and sand (1;3) mortar with approved plasticiser
reinforced with "Exmet" or other equal and
approved brick reinforcement reinforcement at
every fourth course

Common clay bricks as described; in cement


and sand (1;3) mortar with approved plasticiser
reinforced with "Exmet" or other equal and
approved brick reinforcement at every fourth
course
D 230mm thick brickwall as party wall

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.8/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

INTERNAL WALLS & PARTITIONS

Description

Unit

Qty.

Rate

SUNDRIES
6mm Diameter mild steel rod as bonding tie;
450mm girth; one end cast into concrete and
the other end cast into concrete and the other
end built into joints of brickwork at every
fourth course
A Generally

No

493

B Horizontal damp-proof course laid on 114mm


brickwall

57

C Horizontal damp-proof course laid on 230mm


brickwall

20

Bituminous felt damp-proof course as


described; well lapped at joints on and including
19mm bed of cement and sand (1:3) mortar
coated with hot bitumen (measured nett - no
allowance made for laps)

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.8/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

INTERNAL WALLS & PARTITIONS

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.8/1*

..............................

Page No. 3A.8/2*

..............................

BILL NO. 3A.8


INTERNAL WALLS & PARTITIONS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.8/3*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

WINDOWS

BILL NO. 3A.9


WINDOWS
Item

Description

Unit

Qty.

Rate

Amount
RM
Sen

SPECIALIST CONTRACTOR DESIGNED ALUMINIUM WORKS


Notes:
Generally
A The Contractor is required to price separately the component parts
of the glazed aluminium works as provided for in these Bills.
B Prices for aluminium works shall include everything necessary for
the complete design, fabrication, supply, delivery and installation,
inclusive of all sub-frame, supports, matching hardware, weather
stripping opening lights, packing around and into frames with
cement mortar and pointing externally with sealant properly
caulked; installed strictly in accordance with manufacturer's
details and specification by authorised specialist.
C Prices for glazing shall include everything necessary for the
complete installation including glazing beads, NEOPRENE gaskets
or other approved equivalent, glass adaptors, setting blocks and
silicone glazing sealants.
D Prices for windows shall include approved cylinder locks, handles
and other locking devices, friction stays and all necessary hardware
and accessories.
E The aluminium extrusions shall be in alloy 6063-TS with a minimum
thickness of 1.10mm.
F

Glazing to fixed panels and casement windows shal be in 5mm thick light
green tinted clear equivalent glass panels and obsecured glass (30% green
tinted)
The Contractor is required to furnish the following information on
his proposal for the aluminium and glazing works.
ALUMINIUM WORKS

G Aluminium Extrusions Manufacturer : ALCOM or equivalent


H Name of Specialist Contractor :
J

Thickness of Extrusions (min 1.20mm thick) :


(1) Window sash ................................................
(2) Beading ........................................................

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.9/1*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

Amount
RM
Sen

SPECIALIST CONTRACTOR DESIGNED ALUMINIUM


WORKS (CONT'D)
The Contractor is required to furnish the following information on
his proposal for the aluminium and glazing works. (Cont'd)
ALUMINIUM WORKS (Cont'd)
A Ironmongery :
(1) Casement window hinges ............................. Stainless steel
G.I. Fixing Brackets
friction hinges grade
304' or equivalent
(2) Casement window catch/handles ................... Wedgeless handle or
Resilient Window Handle
equivalent
(3) Casement window stays ............................... Stainless steel
Stainless Steel Friction Stay
friction hinges grade
304' or equivalent
B GLAZING WORKS
(1) Manufacturer ..........................................

MSG, Ajiya or
equivalent product

(2) Thickness ..................................................

5mm thick

(3) Tint Colour ................................................

Tinted light green/


clear glass/ obsecured
glass

(4) Gasket Brand .............................................

NEOPRENE

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/2*

To Collection

RM

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Framed Casement
Windows And Fixed Panels
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery and accessories to be approved by
the Architect; packing around and into frames
with cement mortar and sealing joints around
edges of frames with approved silicone sealant
and fixed complete in position all accordance to
manufacturer's details and Architect's drawings
Side hung casement window (Type W4) to suit
structural opening 610mm x 1524mm high
comprising 1 no. of side hung panel size
approximately 610mm x 1524mm high; all as per
Architect's details drawing
(Bedroom 2)
A Aluminium works to side hung window inclusive
all necessary sub-frame

No

B Glazing in 5mm thick green tinted glass panels to


side hung panel

No

C Aluminium works to side hung window inclusive


all necessary sub-frame

No

D Glazing in 5mm thick green tinted glass panels to


side hung panel

No

Side hung casement window (Type W6) to suit


structural opening 1219mm x 1524mm high
comprising 2 nos of equal side hung panel size
approximately 610mm x 1524mm high; all as
per Architect's details drawing
(Kitchen, Bedroom 1 & 2)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.9/3*
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder coated Aluminium Framed Casement
Windows And Fixed Panels (Cont'd)
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery(Cont'd)
Side hung casement window (Type W7) to suit
structural opening 2430mm x 1524mm high
comprising 4 nos of equal side hung panel size
approximately 610mm x 1524mm high; all as
per Architect's details drawing
(Kitchen)
A Aluminium works to side hung window inclusive
all necessary sub-frame

No

B Glazing in 5mm thick green tinted glass panels to


side hung panel

No

C Aluminium works to top hung window inclusive


all necessary sub-frame

No

10

D Glazing in 5mm thick light green tinted


obsecured glass panels to top hung panel

No

10

Top hung casement window (Type W10) to


suit stuctural opening 1219mm x 610mm high
comprising 1 no. of top hung panel size
approximately 610mm x 610mm high; all as
per Architect's details drawing
(Bathrooms)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.9/4*
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Framed Casement
Windows And Fixed Panels (Cont'd)
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery(Cont'd)
Side hung casement window with fixed glass
panel (Type W1) to suit structural opening
610mm x 2438mm high comprising 1 no. of side
hung panel in the middle size approximately
610mm x 1218mm high; 2 nos of equal fixed
glass panel size approxiamtely 610mm x 610mm
high; all as per Architect's details drawing
(Living Hall & Kitchen)
A Aluminium works to side hung window and fixed
glass panel inclusive of all necessary sub-frame

No

B Glazing in 5mm thick light green tinted glass


panels to side hung panel and fixed glass panel

No

C Aluminium works to side hung window and fixed


glass panel inclusive of all necessary sub-frame

No

D Glazing in 5mm thick light green tinted glass


panels to side hung panel and fixed glass panel

No

Side hung casement window with fixed glass


panel (Type W2) to suit structural opening
610mm x 2438mm high comprising 1 no. of side
hung panel on top size approximately 610mm x
1524mm high and 1 no. of fixed glass panel size
approximately 610mm x 914mm high; all as per
Architect's details drawing
(Master bedroom)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/5*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Framed Casement
Windows And Fixed Panels (Cont'd)
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery(Cont'd)
Side hung casement window with fixed glass
panel (Type W5) to suit structural opening
1219mm x 2438mm high comprising 2 nos of
equal side hung panel on top size approximately
610mm x 1524mm high and 2 nos of equal fixed
glass panel size approximately 610mm x 614mm
high; all as per Architect's details drawing
(Master Bedroom)
A Aluminium works to side hung window and fixed
glass panel inclusive of all necessary sub-frame

No

B Glazing in 5mm thick light green tinted glass


panels to side hung panel and fixed glass panel

No

C Aluminium works to side hung window and fixed


glass panel inclusive of all necessary sub-frame

No

D Glazing in 5mm thick light green tinted glass


panels to side hung panel and fixed glass panel

No

Side hung casement window with fixed glass


panel (Type W9) to suit structural opening
1828mm x 2438mm high comprising 2 nos of
equal side hung panel size approximately 610mm
x 1218mm high, 2 nos of equal fixed glass panel
size approximately 610mm x1218mm high and 4
nos of equal top hung panel size approximately
610mm x 610mm high; all as per Architect's
details drawing
(Living Hall)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/6*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Framed Casement
Windows And Fixed Panels (Cont'd)
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery(Cont'd)
Fixed glass casement window (Type W3) to suit
structural opening 610mm x 2438mm high
comprising 1 no. fixed glass panel size
approximately 610mm x 1524mm high and 2 nos
of equal fixed glass panel size approximately
610mm x 457mm high; all as per Architect's
details drawing
(Family Area & Bedroom 2)
A Aluminium works to fixed glass window
inclusive of all necessary sub-frame

No

B Glazing in 5mm thick light green tinted glass


panel to fixed glass window

No

C Aluminium works to fixed glass window


inclusive of all necessary sub-frame

No

D Glazing in 5mm thick light green tinted glass


panel to fixed glass window

No

Fixed glass casement window (Type W11) to suit


structural opening 1065mm x 2438mm high
comprising 2 nos of equal fixed glass panel size
approximately 954mm x 2438mm high; all as per
Architect's details drawing
(Dinig Hall)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/7*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Framed Casement
Windows And Fixed Panels (Cont'd)
Aluminium casement top hung, side hung, sliding
casement windows and fixed panels; including
supports, fixing accessories; complete with
approved PVC glazing gaskets or other equal and
approved material, approved friction stays,
handles, locking devices and all other necessary
ironmongery(Cont'd)
Sliding glass casement window (Type W8) to suit
stuctural opening 1219mm x 1524mm high
comprising 2 nos of equal sliding glass panel size
approximately 610mm x 1524mm high; all as per
Architect's details drawing
(Bedroom 3)
A Aluminium works to sliding glass window
inclusive of all necessary sub-frame

No

B Glazing in 5mm thick light green tinted glass


panel to sliding glass window

No

No

MILD STEEL WORKS


Mild Steel Grille Window
Powder coated dark grey epoxy finish mild steel
grille window; complete with all necessary
framing, painting works; including all necessary
fixing accessories, all as per Architect's detail
drawing and satisfaction
C Mild steel grille window (Type W12) to suit
structural opening 1068mm x 1524mm;
comprising with 75mm x 40mm framing and
5mm thick flar bar vertically at every 150mm
spacing; fixed and hanging (butt measured
separately) and including all necessary fixing
accessories; all to Architect satisfaction and as
per Architect's detail
(Yard)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/8*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

Amount
RM
Sen

SUNDRIES
A Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.9/9*

To Collection

RM

JURU KOS (AMENDMENT I)


Item

WINDOWS

Description

Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.9/1*

............................

Page No. 3A.9/2*

............................

Page No. 3A.9/3*

............................

Page No. 3A.9/4*

............................

Page No. 3A.9/5*

............................

Page No. 3A.9/6*

............................

Page No. 3A.9/7*

............................

Page No. 3A.9/8*

............................

Page No. 3A.9/9*

............................

BILL NO. 3A.9


WINDOWS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.9/10*

JURU KOS (AMENDMENT I)

EXTERNAL DOORS

BILL NO. 3A.10


EXTERNAL DOORS
Item

Description

Unit

Qty.

Rate

Amount
RM
Sen

SPECIALIST CONTRACTOR DESIGNED ALUMINIUM WORKS


Notes:
Generally
A The Contractor is required to price separately the component parts
of the glazed aluminium works as provided for in these Bills.
B Prices for aluminium works shall include everything necessary for
the complete design, fabrication, supply, delivery and installation,
inclusive all sub-frame, supports, matching hardware,weather
stripping opening lights, packing around and into frames with
cement mortar and pointing externally with sealant properly
caulked; installed strictly in accordance with manufacturer's details
and specification by authorised specialist.
C Prices for glazing shall include everything necessary for the
completion installation including glazing beads, NEOPRENE gaskets
or other approved equivalent, glass adaptors, setting blocks and
silicone glazing sealants.
D Prices for sliding door shall include approved cylinder locks, handles
and other locking devices, friction stays and all necessary hardware
and accessories.
E The aluminium extrusion shall be in alloy 6063-TS with a minimum
thickness of 1.40mm
F Glazing to fixed panels and sliding door shall be in 5mm thick
tinted green glass / frosted glass
The Contractor is required to furnish the following information on
his proposal for the aluminium and glazing works.
ALUMINIUM WORKS
G Aluminium Extrusions Manufacturer : ALCOM or equivalent
H Name of Specialist Contractor :
J

Thickness of Extrusions (min 1.20mm thick) :


(1) Door suites ..............................................
(2) Door sash ................................................

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.10/1*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

Description

EXTERNAL DOORS
Unit

Qty.

Rate

Amount
RM
Sen

SPECIALIST CONTRACTOR DESIGNED ALUMINIUM WORKS


(CONT'D)
The Contractor is required to furnish the following information on
his proposal for the aluminium and glazing works. (Cont'd)
ALUMINIUM WORKS (Cont'd)
A Ironmongery :
(1) Sliding door hinges ...................................................
Stainless steel
G.I. Fixing Brackets
friction hinges grade
'304' or equivalent
(2) Sliding door catch/handles ......................................
Wedgeless handle or
Resilient Window Handle
equivalent
(3) Sliding door stays ......................................................
Stainless steel
Stainless Steel Friction Stay
friction stay grade
'304' or equivalent
B GLAZING WORKS
(1) Manufacturer ............................................

MSG, Ajiya or
equivalent product

(2) Thickness ................................................


5mm thick
(3) Tint Colour .................................................
Tinted green
tempered glass /
frosted glass
(4) Gasket Brand ..............................................
NEOPRENE or
equivalent

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.10/2*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

EXTERNAL DOORS

Description

Unit

Qty.

Rate

SPECIALIST CONTRACTOR DESIGNED


ALUMINIUM WORKS (CONT'D)
Powder Coated Aluminium Sliding Doors And
Fixed Panels
Aluminium sliding doors and fixed panels;
complete with adjustable nylon rollers, fitted with
stainless steel ball base, ball base weather strip,
nylon guides, mortised lock and surface mounted
sliding door handles with striker or other
approved equivalent, complete with all necessary
ironmongery and accessories; all as per
Architect's detailed drawing
Sliding glass door and fixed glass panel (Type
D5) to suit structural opening 2742mm x
2475mm high comprising 2 nos of equal sliding
panel size approximately 914mm x 2475mm high
ang 1 no. of fixed glass panel size approximately
914mm x 2475mm high; all as per Architect's
details drawing
(Master Bedroom)
A Aluminium works to sliding glass door and fixed
glass panel inclusive of all necessary sub-frame
and aluminium glazing beads

No

B Glazing in 5mm thick light green tinted glass


to sliding glass door and fixed glass panel

No

C Aluminium works to sliding glass door and fixed


glass panel inclusive of all necessary sub-frame
and aluminium glazing beads

No

D Glazing in 5mm thick light green tinted glass


to sliding glass door and fixed glass panel

No

Sliding glass door and fixed glass panel (Type


D6) to suit structural opening 3810mm x
2475mm high comprising 2 nos of equal sliding
panel size approximately 914mm x 2475mm high
ang 2 nos of equal fixed glass panel size
approximately 914mm x 2475mm high; all as per
Architect's details drawing
(Dining Hall)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.10/3*
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

EXTERNAL DOORS

Description

Unit

Qty.

Rate

METAL WORK
Metal Door Frames
Supply and install metal door frame from 'Asia
Roofing Industries Sdn. Bhd.' or other equivalent
and approved material with 1.1mm thick mild
steel framed with architrave inclusive of 4" x 3"
x 3mm thick stainless steel hinges and galvaneal
finish painting all to manufacturer's details
(inclusive 3 no. 12mm diameter steel bar if
necessary)
A Single leaf door (Type D1) overall size
1828mm x 2438mm high (Entrance)

No

No

CARPENTRY AND JOINERY


Solid Timber Door
Solid timber doors and panels; faced with
6mm thick plywood as approved by Architect
B Double leaves hardwood decorative timber door
(Type D1) overall size 1828mm x 2438mm high;
fixed and hanging (butt measure seperately) and
including all necessary fixing accessories; all to
Architect satisfaction and as per Architect's
detailed drawing
(Entrance)
SUNDRIES
C Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.10/4**
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

Description

EXTERNAL DOORS
Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.10/1*

.............................

Page No. 3A.10/2*

.............................

Page No. 3A.10/3*

.............................

Page No. 3A.10/4**

.............................

BILL NO. 3A.10


EXTERNAL DOORS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.10/5**
13023 (BW - Phase 2)

RM

JURU KOS (AMENDMENT II)

INTERNAL DOORS

BILL NO. 3A.11


INTERNAL DOORS
Item

Description

Unit

Qty.

Rate

METAL WORK
Metal Door Frames
Supply and install metal door frame from 'Asia
Roofing Industries Sdn. Bhd.' or other equivalent
and approved material with 1.1mm thick mild
steel framed with architrave inclusive of 4" x 3"
x 3mm thick stainless steel hinges and galvaneal
finish painting all to manufacturer's details
(inclusive 3 no. 12mm diameter steel bar if
necessary)
A Single leaf door (Type D2) overall size 1000mm x
2438mm high (Master Bedroom, Bedroom 1, 2 &
3, Maid Room & Yard)

No

12

B Single leaf door (Type D2) overall size 1000mm x


2438mm high (Store)

No

C Single leaf door (Type D3) overall size 762mm x


2134mm high (Master Bathroom, Bathroom 1, 2,
3, 4 & 5)

No

10

No

12

CARPENTRY AND JOINERY


Flush Doors
Wrot and frame pressure-treated Group B timber
"skeleton frame" hollow core flush doors and
panels; faced both side with 6mm thick plywood
and internal side with aluminium lining; all as per
Architect's drawing
D Single leaf door 37mm thick (Type D2) to suit
structural opening 1000mm x 2438mm high
constructed of 100mm x 25mm as top rail and
frame stile, 100mm x 25mm stile as intermediate
rail, 100mm x 25mm stile as bottom rail and
covered one side with 6mm thick plywood and
internal side with aluminium lining and including
38mm x 13mm thick edging all round and
hanging (butt measured separately)
(Master Bedroom, Bedroom 1, 2 & 3, Maid
Room & Yard)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.11/1**
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

Description

INTERNAL DOORS
Unit

Qty.

Rate

CARPENTRY AND JOINERY (CONT'D)


Louvred Door
Wrot and frame pressure-treated kiln dried
hardwood Balau timber fixed louvred door
A Single leaf hardwood fixed louvers door; (Type
D2) to suit structural opening 1000mm x
2438mm high, constructed of 100mm x 50mm
thick door leaf all around including 100mm x
25mm thick Group B timber louvred strip at angle
60 degree and space at 10mm centre to centre
fixed and hanging (butt measured seperately); all
to Achitect's statisfaction and as per Architect's
detail drawing No. P 21114
(Store)

No

No

10

Wrot and frame pressure-treated Group B timber


"skeleton frame" hollow core flush doors and
panel; faced both side with 6mm thick plywood
and internal side with aluminium linig; all as per
Architect's details drawing
B Single leaf door 37mm thick (Type D3) to suit
structural opening 762mm x 2134mm high
constructed of 100mm x 25mm as top rail and
frame stile, 100mm x 25mm stile as intermediate
rail, 100mm x 25mm stile as bottom rail and
covered one side with 6mm thick plywood and
internal side with aluminium lining and including
38mm x 13mm thick edging all round and
hanging (butt measured separately)
(Master Bathroom, Bathroom 1, 2, 3, 4 & 5)
SUNDRIES
C Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D 3A.11/2**
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

Description

INTERNAL DOORS
Unit

Qty.

Rate

COLLECTION

Page No. 3A.11/1**

.............................

Page No. 3A.11/2**

.............................

BILL NO. 3A.11


INTERNAL DOORS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D 3A.11/3**
13023 (BW - Phase 2)

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)

IRONMONGERY

BILL NO. 3A.12


IRONMONGERY
Item

Description

Unit

Qty.

(Note : The tenderers shall complete pricing


the breakdown of rate for the
ironmongery as provided for in the
box in the forthcoming pages)
IRONMONGERY
Supply and fix the following ironmongery or
other equal and approved; to hardwood
including providing matching screws
EPIC ED-1026 SS RE Solid Lever complete
with ED-9701 Mortise Sashlock & AX
10B-01 Restricted Keyway Entrance
Thumbturn Cylinder or approved equivalent
product
BREAKDOWN OF RATE (PER NO) RM/NO

a) Supply Rate
b) Wastage

c) Labour (Installation)
d) Profit And Other Costs
Total Rate Per No
A

%%
RM

To Entrance (D1)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.12/1*
13023 (BW - Phase 2)

No

To Collection

Rate

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

IRONMONGERY

Description

Unit

Qty.
Sen

IRONMONGERY (CONT'D)
Supply and fix the following ironmongery or
other equal and approved; to hardwood
including providing matching screws (Cont'd)
EPIC ED-1026SSRE/9701/AX10B-01
Entrance Thumbturn Cylinder or approved
equivalent product
BREAKDOWN OF RATE (PER NO) RM/NO

a) Supply Rate
b) Wastage

c) Labour (Installation)
d) Profit And Other Costs
Total Rate Per No

%%
RM

To Master Bedroom, Bedroom 1, 2 & 3,


Maid Room (D2)

No

12

To Store (D2)

No

No

10

EPIC ED-1026SSRE/9701/2000P Privacy


Thumbturn Cylinder or approved equivalent
product
BREAKDOWN OF RATE (PER NO) RM/NO

a) Supply Rate
b) Wastage

c) Labour (Installation)
d) Profit And Other Costs
Total Rate Per No
C

%%
RM

To Master bathroom, Bathroom 1, 2, 3, 4 &


5 (D3)

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.12/2*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

Description

IRONMONGERY
Unit

Qty.

Rate

Amount
RM
Sen

SUNDRIES
A

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) __________________________________
ii) __________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.12/3*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

Description

IRONMONGERY
Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.12/1*

..............................

Page No. 3A.12/2*

..............................

Page No. 3A.12/3*

..............................

BILL NO. 3A.12


IRONMONGERY
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.12/4*
13023 (BW - Phase 2)

RM

JURU KOS (AMENDMENT I)

EXTERNAL WALL FINISHES

BILL NO. 3A.13


EXTERNAL WALL FINISHES
Item

Description

Unit

Qty.

Rate

Note:
GENERALLY
The Contractor rates/price for the plastering shall be deemed to
be inclusive of all the KINK areas between the walls, beams and
columns. If any.

PLASTERWORK
Plastering; in cement and sand (1:3) with
approved plasticiser applied in two coats;
finished smooth with a wood float
A

20mm thick plainface to walls and columns

m2

461

Ditto to parapet fire wall 1000mm high

m2

17

Do to casing brick

m2

Do to party wall

m2

11

Do to concrete hood overall size 300mm x


150mm thick to windows

64

Item

SUNDRIES
F

Allow an item for PVC corner beading or other


approved equivalent materials before plastering
Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.13/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

EXTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.13/1*

............................

BILL NO. 3A.13


EXTERNAL WALL FINISHES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.13/2*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

INTERNAL WALL FINISHES

BILL NO. 3A.14


INTERNAL WALL FINISHES
Item

Description

Unit

Qty.

Rate

Note:
GENERALLY
The Contractor rates/price for the plastering shall be deemed to
be inclusive of all the KINK areas between the walls, beams and
columns. If any.

PLASTERWORK
Plastering; in cement and sand (1:6) with
approved plasticiser applied in two coats;
finished smooth with a steel trowel
A

20mm thick plainface to walls and columns

m2

1,068

Ditto; to parapet fire wall 1000mm high

m2

17

Do; to party wall

m2

279

Do to casing brick

m2

m2

348

SCREEDS
Screeding in cement and sand (1:3)
To receive porcelain wall tiles
E

13mm thick backing

(Note : The tenderers shall complete pricing


the breakdown of rates for the tiling
works as provided for in the box in
the forthcoming pages)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.14/1****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

TILING
Supply and lay Ceramic Tiles; PL1001
200mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2

RM

To Wet Cum Dry Kitchen & Yard

m2

24

To Refuse Chamber

m2

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.14/2****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; SP140A
300mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls and
10mm thick to floor in cement and sand (1:3); on
screeded backings (measured separately);
pointing using white cement; to required
patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

To Bath 3 (Master Bath)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.14/3****

74

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; V1703A
200mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls and
10mm thick to floor in cement and sand (1:3); on
screeded backings (measured separately);
pointing using white cement; to required
patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

To Bath 1

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.14/4****

65

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; V392A
200mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls and
10mm thick to floor in cement and sand (1:3); on
screeded backings (measured separately);
pointing using white cement; to required
patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2

RM

To Bath 2

m2

63

To Bath 4 & 5

m2

115

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.14/5****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

SUNDRIES
A

Allow an item for metal corner beading or


other approved equivalent materials before
plastering

Item

Allow an item for 'Exmet' to all the KINK


area between walls, beams and columns

Item

Item

Supply and lay corner plastic tile trim; all


manufacturer's details and matching to tiles
selection by the Architect (includes window
opening)
C

Generally

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.14/6*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

INTERNAL WALL FINISHES

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.14/1

...............................

Page No. 3A.14/2****

...............................

Page No. 3A.14/3****

...............................

Page No. 3A.14/4****

...............................

Page No. 3A.14/5****

...............................

Page No. 3A.14/6*

...............................

BILL NO. 3A.14


INTERNAL WALL FINISHES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.14/7****

Amount
RM
Sen

JURU KOS (AMENDMENT IV)

FLOOR FINISHES

BILL NO. 3A.15


FLOOR FINISHES
Item

Description

Unit

Qty.

Rate

(Note : The tenderers shall complete pricing


the breakdown of rate for the tiling
works as provided for in the box in
the forthcoming pages)
PAVING
Paving; in cement and sand (1:3); finished
smooth with a steel trovel
A

25mm thick to Apron

m2

52

Ditto to A/C

m2

Do to Store

m2

SCREEDS
Screeding; in cement and sand (1:3)
To receive porcelain floor tiles
D

20mm thick screeded bed

m2

147

13mm thick backing to 152mm high drop in


floor

14

13mm thick backing to 51mm high drop in


floor

13mm thick backing to 75mm high skirting

48

To receive ceramic floor tiles


H

20mm thick screeded bed

m2

483

13mm thick backing to 152mm high drop


in floor

13mm thick backing to 51mm high drop


in floor

14

13mm thick backing to 75mm high


skirting

255

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/1**** To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)
a) Supply Rate
b) Wastage
c) Profit And Overhead

21.11
%

1.69

d) Loading / Unloading On Site

Flooring to Balcony

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

6.50
1.00

e) Labour (Laying)
Total Cost Per M2

(RM)

21.20
RM

51.50
m2

3A.15/2**** To Collection

11

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Balcony

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/3**** To Collection

12

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING
Supply and lay Ceramic Tiles; E914A/C
200mm x 200mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

Ditto; to Flat roof area (Carporch)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.15/4**** To Collection

78

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; YTP6300N
600mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
f) Adhesive
Total Cost Per M2

RM

Flooring to Living Hall

m2

68

Ditto; to Dining Hall

m2

62

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/5****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; YTP6300N
600mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
.. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
f) Adhesive
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Living Hall

29

Ditto; to Dining Hall

19

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/6****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
f) Adhesive
Total Cost Per M2
A

RM

Flooring to Family Hall

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.15/7****

To Collection

37

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
.. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
f) Adhesive
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Family Hall

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/8****

To Collection

27

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; YTP6300N
600mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
.. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
f) Adhesive
Total Cost Per M
A

RM

Finish to drop 152mm high including rounded


edge; to Living Hall

Ditto; to Dining Hall

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/9****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N992B
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

Flooring to Wet Cum Dry Kitchen

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/10****

m2

To Collection

64

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N992B
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; .. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Wet Cum Dry Kitchen

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/11****

To Collection

27

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

Flooring to Yard

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.15/12****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; .. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Yard

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/13****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; .. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 152mm high including rounded


edge; to Yard

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/14****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K989C
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; .. (Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 51mm high including rounded


edge; to Yard

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/15****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2

RM

Flooring to Master Bedroom

m2

103

Ditto; to Bedroom 3

m2

41

Do; to Bedroom 2

m2

43

Do; to Bedroom 1

m2

43

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/16****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
...(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Master Bedroom

48

Ditto; to Bedroom 3

37

Do; to Bedroom 2

39

Do; to Bedroom 1

35

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/17****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
...(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 152mm high including rounded


edge; to Master Bedroom

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/18****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K991A
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
...(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 51mm high including rounded


edge; to Master Bedroom

Ditto; to Bedroom 3

Do; to Bedroom 2

Do; to Bedroom 1

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/19****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K926D
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM
m2

Flooring to Maid's Room

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/20****

To Collection

17

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; K926D
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
...(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to skirting 75mm high including


rounded top edge; to Maid's Room

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/21****

To Collection

22

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N1703C
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM
m2

Flooring to Bath 1

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/22****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

Amount
RM
Sen

TILING (CONT'D)
Supply and lay Ceramic Tiles; N992C
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2

RM

Flooring to Bath 2

m2

Ditto; to Bath 4

m2

11

Do; Bath 5

m2

11

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)
JURU KOS (AMENDMENT IV)

3A.15/23****

To Collection

RM

FLOOR FINISHES

Item

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Ceramic Tiles; N992C
400mm x 400mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 51mm high including rounded


edge; to Bath 4

Ditto; to Bath 5

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/24****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; S0140C
300mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

RM

Flooring to Master Bath

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

m2

3A.15/25****

To Collection

17

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

TILING (CONT'D)
Supply and lay Porcelain Tiles; S0140C
300mm x 600mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
...(Cont'd)
BREAKDOWN PRICE (PER M)

(RM)

a) Supply Rate
b) Wastage
c) Profit And Overhead

%
%

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M
A

RM

Finish to drop 51mm high including rounded


edge; to Master Bath

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/26****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

WORK IN CONNECTION WITH


WATERPROOFING
To supply and apply 2 coats of Sika Top Seal
109 MY cementitious waterproofing coating
at a rate of 1.0kg/m2 per coat onto clean and
honeycomb-free concrete surface, or other
approved equivalent; laid strictly in
accordance with the manufacturer's printed
instruction and specification
A

To wet area; all bathrooms

m2

57

Ditto; to Wet Cum Dry Kitchen

m2

64

Do; to Balcony

m2

11

Do; to A/C

m2

300mm High skirting; to all bathrooms

Ditto; to Wet Cum Dry Kitchen

27

Do; to Balcony

12

Treatment to floor trap

No

16

43

m2

Angle fillet in cement and sand (1:3) lay along


beam and wall/floor joints to receive
waterproofing membrane including necessary
formwork
J

To wet area (50mm x 50mm)


SUNDRIES

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) Store 300 x 300 Tiling
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.15/27****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

COLLECTION
Page No. 3A.15/1****

............................

Page No. 3A.15/2****

............................

Page No. 3A.15/3****

............................

Page No. 3A.15/4****

............................

Page No. 3A.15/5****

............................

Page No. 3A.15/6****

............................

Page No. 3A.15/7****

............................

Page No. 3A.15/8****

............................

Page No. 3A.15/9****

............................

Page No. 3A.15/10****

............................

Page No. 3A.15/11****

............................

Page No. 3A.15/12****

............................

Page No. 3A.15/13****

............................

Page No. 3A.15/14****

............................

Page No. 3A.15/15****

............................

Page No. 3A.15/16****

............................

Page No. 3A.15/17****

............................

Page No. 3A.15/18****

............................

Page No. 3A.15/19****

............................

To Carried Forward

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3.15/28****

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

FLOOR FINISHES

Description

Unit

Qty.

Rate

C O L L E C T I O N (CONT'D)
Total Brought Forward
Page No. 3A.15/20****

............................

Page No. 3A.15/21****

............................

Page No. 3A.15/22****

............................

Page No. 3A.15/23****

............................

Page No. 3A.15/24****

............................

Page No. 3A.15/25****

............................

Page No. 3A.15/26****

............................

Page No. 3A.15/27****

............................

BILL NO. 3A.15


FLOOR FINISHES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3.15/29****

Amount
RM
Sen

JURU KOS (AMENDMENT I)

CEILING FINISHES

BILL NO. 3A.16


CEILING FINISHES
Item

Description

Unit

Qty.

Rate

PLASTER WORKS
Plastering; in cement and sand (1:6) with
approved plasticiser applied in two coats; finished
smooth with a steel trowel
A 13mm thick to sides and soffit of beam;
exceeding 3.50m but not exceeding 5.00m high
(externally)

m2

102

B 3mm Thick to suspended soffit of slab; not


exceeding 3.50m high (internally)

m2

92

C Ditto; exceeding 3.50m but not exceeding 5.00m


high (externally)

m2

153

D Do; exceeding 3.50m but not exceeding 5.00m


high (internally)

m2

238

"SIKA BREFILL" Skim coat system; trowelled


smooth; applied strictly in accordance with the
manufacturer's instructions; including preparing
and levelling substrate surface by grinding or
otherwise to receive the skim coating; internally

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.16/1*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

CEILING FINISHES

Description

Unit

Qty.

Rate

EXTERNAL SUSPENDED CEILING


9mm thick fibrous gypsum plaster board as
described or other approved equivalent; fixed to
and including suspended metal system; set out
symmetrically from the centre of the room;
complete with se;ected cornices; and on
completion leave homogenous surface which
when dry is ready to receive painting (measured
separately); all works executed by specialist all in
accordance to manufacturer's instruction and as
per Architect's drawing
A To roof eaves

m2

88

B Horizontally to Master Bedroom

m2

83

C Ditto; to Bedroom 1

m2

36

D Do; to Bedroom 2

m2

35

E Do; to Master Bathroom

m2

F Do; to Bathromm 4 & 5

m2

18

No

10

INTERNAL SUSPENDED CEILING


9mm thick fibrous gypsum plaster board as
described or other approved equivalent; fixed to
and including suspended metal system; set out
symmetrically from the centre of the room;
complete with se;ected cornices; and on
completion leave homogenous surface which
when dry is ready to receive painting (measured
separately); all works executed by specialist all in
accordance to manufacturer's instruction and as
per Architect's drawing

EXTRA OVER for forming 600mm x 600mm


access panel including all necessary extra framing
and trimming (position to be adjusted on site)
G Generally (Master Bath, Bath 1, 2, 4 & 5)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.16/2*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

CEILING FINISHES

Description

Unit

Qty.

Rate

Amount
RM
Sen

SUNDRIES
A Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.16/3*

To Collection

RM

JURU KOS (AMENDMENT I)


Item

CEILING FINISHES

Description

Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.16/1*

............................

Page No. 3A.16/2*

............................

Page No. 3A.16/3*

............................

BILL NO. 3A.16


CEILING FINISHES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.16/4*

JURU KOS (AMENDMENT I)

PAINTING

BILL NO. 3A.17


PAINTING
Description

Item

Unit

Qty.

Rate

EXTERNAL PAINTING
Prepare and apply one coat of Vinilex 5100
Wall Sealer and two coats of Nippon
Weatherbond or other equal and approved
exterior or acrylic paint; applied strictly in
accordance with the manufacturer's
specification and instructions
Plastered surfaces
A

Walls and columns

m2

461

Parapet fire wall 1000mm high

m2

17

Casing brick

m2

Party wall

m2

11

Hood overall size 152mm x 500mm thick to


windows

64

Side and soffit of beam

m2

102

Concrete surfaces (Skim coating)

m2

153

m2

88

UAC and similar board surfaces


H

Suspended ceiling board

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.17/1*

To Collection

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

PAINTING

Description

Unit

Qty.
Sen

INTERNAL PAINTING
Prepare and apply one coat of Vinilex 5200
Wall Sealer and two coats of Super Matex
emulsion paint or other equal and approved
emulsion paint; applied strictly in accordance
with the manufacturer's specification and
instructions
Plastered surface
A

Walls and columns

m2

1,068

Parapet fire wall 1000mm high

m2

17

Casing brick

m2

Party Wall

m2

279

Concrete surfaces (Skim coating)

m2

330

Sloping concrete soffit

m2

19

Concrete landing soffit

m2

To open string; 375mm wide extreme

32

m2

179

57

Prepare and apply two coats of Super Matex


Emulsion paint
UAC plaster board and similar board surfaces
J

Suspended ceiling board


GALVANISED IRON SURFACE
Prepare and apply one coat of "Nippon
Etching" as primer and 2 finishing coat of
"Nippon 9000 Gloss Finish" or other equal
and approved paint as described to galvanised
surfaces applied strictly in accordance with
the manufacturer's instructions :
Flashing and the like

Generally (600mm girth)

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.17/2*

To Collection

RM

JURU KOS (AMENDMENT I)


Item

PAINTING

Description

Unit

Qty.

Rate

WOODWORK SURFACE
Prepare and apply one coat of Nippon 9000
Undercoat and two coats of Nippon Gloss
Finish or other equal and approved paint on
woodwork
Door leaves and other trims
A

General surface of door leaves

m2

107

24

METAL WORK SURFACE


Prepare and apply one coat of Nippon Zinc
Chromate Primer, one coat of Nippon 9000
Undercoat and two coats of Nippon Gloss
Finish or other equal and approved synthetic
gloss enamel paint on metalwork
Door frames, linings, architraves and other
trims
B

Surface exceeding 200mm but not exceeding


300mm girth door frame
SUNDRIES

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.17/3*

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

PAINTING

Description

Unit

Qty.

Rate

COLLECTION

Page No. 3A.17/1*

..............................

Page No. 3A.17/2*

..............................

Page No. 3A.17/3*

..............................

BILL NO. 3A.17


PAINTING
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.17/4*

Amount
RM
Sen

JURU KOS (AMENDMENT I)

SANITARY FITTINGS

BILL NO. 3A.18


SANITARY FITTINGS
Item

Description

Unit

Qty.

Rate

Amount
RM
Sen

SUPPLY, DELIVERY TO SITE, STORE AND INSTALLATION


OF THE FOLLOWING SANITARY WARES AND FITTINGS IN
SELLECTED STANDARD COLOUR UNLESS OTHERWISE
DESCRIBED WHITE AND INCLUDING ALL NECESSARY
ACCESSORIES AND STAINLESS STEEL FLEXIBLE
CONNECTOR TO SUPPLY, WASTE AND OVERFLOW PIPE
WHERE NECESSARY
Notes:The rates for all materials and goods shall include for but not
limited to the followings:A

All fixing accessories and other things necessary for the


complete and satisfactory installation and performance.

All insurances.

Cost for packing.

Freight and godown charges.

Handling and transportation to site including unloading, unpacking,


checking, handing over and removal of packings.

Replacement for defects free of charge until the expiry of the


Defect Liability Period.

Whatever duties and sales tax payable.

All sanitary wares and fittings shall be install by plumber except


toilet roll holder, soap holder and floor trap shall be install by tiler.

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/1*

To Collection

RM

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Como" 6L close coupled
washdown pedestral WC c/w
horizontal/bottom outlet, fixing sets and
outlet, 6 litres (single flush) push button
activated lid, seat and cover with cover and
fittings and accessories or approval
equivalent and all necessary 12" length
stainless steel flexible hose and TZ 1008
angle valve
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No

%
RM

Generally to Master Bath

No

Generally to Bathroom 1

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.18/2****
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Celico" close coupled
washdown pedestral WC c/w
horizontal/bottom outlet, 1 pair of fixing bolts
and straight outlet connector, 6 litres (single
flush) push button activated lid, seat and
cover with cover and fittings and accessories
or approval equivalent and all necessary 12"
length stainless steel flexible hose and TZ
1008 angle valve
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
A

%
RM

Generally to Bathroom 4 & 5

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.18/3****
13023 (BW - Phase 2)

No

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Luton" close coupled
washdown pedestral WC c/w
horizontal/bottom outlet, 1 pair of fixing bolts
and straight outlet connector, 6 litres (single
flush) push button activated lid, seat and
cover with cover and fittings and accessories
or approval equivalent and all necessary 12"
length stainless steel flexible hose and TZ
1008 angle valve
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Bathroom 2

No

No

Johnsan Suisse "Trezzo" semi recessed


square basin 480mm x 480mm x 150mm c/w
one centre pre-punched taphole, chrome
plastic bottle trap, 1 1/4" brass pop up waste
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
B

%
RM

Generally to Master Bath

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.18/4****
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Como" wall hung basin
520mm x 425mm x 185mm c/w 2
semi-punched tapholes and 1 centre taphole,
1 pair of fixing bolts, bottle trap, 1 1/4" brass
pop up waste, plug and chain
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Bathroom 1

No

No

Johnson Suisse "Bergamo" wall hung basin


500mm x 423mm x 182mm c/w 2
semi-punched tapholes and 1 centre taphole,
1 pair of fixing bolts, bottle trap, 1 1/4" brass
pop up waste, plug and chain
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


B

RM

Generally to Bathroom 4 & 5

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/5****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Boston" wall hung basin
400mm x 355mm c/w 3 semi-punched
tapholes, 1 pair of fixing bolts, bottle trap,
waste, plug and chain
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Bathroom 2

No

No

Johnson Suisse "Messina" Single Lever 1/2"


basin pillar tap
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
B

%
RM

Generally to Master Bath

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/6****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Iris" Single Lever 1/2"
basin pillar tap
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

No

Johnson Suisse "Ravenna" 1/2' basin pillar


tap
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
C

%
RM

Generally to Bathroom 2

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/7****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Pacific" fixed shower head
single function spray size 202mm x 200mm
with brass arm and flange, "Messina" single
lever concealed shower mixer
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Master Bath

No

Johnson Suisse "Celtic" fixed shower head


with brass arm and flange, single lever
concealed shower mixer
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/8****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Celtic" concealed shower
tap with fixed shower head
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Bathroom 2

No

Johnson Suisse seri-recessed soap dish size


165mm x 165mm x 95mm with chrome
plated
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Master Bathroom

No

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/9****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Fermo" 1/2" bib tap with
wall flange
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Master Bathroom

No

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

Generally to Bathroom 2

No

Generally to Yard

No

Generally to Carporch

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/10****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse screw to wall toilet roll holder
200mm x 95mm x 62mm c/w plastic roller
and fixing screws and plug
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Master Bathroom

No

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

No

Johnson Suisse screw to wall toilet roll


holder 165mm x 165mm x 95mm c/w plastic
roller and fixing screws and plug
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
D

%
RM

Generally to Bathroom 2

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/11****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Johnson Suisse "Ravenna" 1/2" stop vavle
with flange
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Master Bathroom

No

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

Generally to Bathroom 2

No

Generally to Yard

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/12****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
Approved local made 150mm x 150mm
stainless floor trap
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No

RM

Generally to Master Bathroom

No

Generally to Bathroom 1

No

Generally to Bathroom 4 & 5

No

Generally to Bathroom 2

No

Generally to Wet Cum Dry Kitchen

No

Generally to Yard

No

Generally to Carporch

No

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/13****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

SUPPLY, DELIVERY TO SITE AND


STORE THE FOLLOWING SANITARY
WARES AND FITTINGS .. (CONT'D)
CAM AH0835DD (HW) LAY ON double
bowl single drainer stainless steel kitchen
sink size: 1525mm (L) x 500mm (W) x
180mm (D) complete with 40mm PVC bottle
trap, stainless steel waste pulg and chain or
approved equivalent product
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs

Total Cost Per No


A

RM

Generally to Wet Cum Dry Kitchen

No

No

Johnson Suisse "Fermo" wall mounted sink


tap with swivel spout
BREAKDOWN PRICE (PER NO)

RM

a) Supply Rate
b) Wastage

c) Loading / unloading on site


d) Labour (fixing)
e) Profit And Other Costs
Total Cost Per No
B

%
RM

Generally to Wet Cum Dry Kitchen

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/14****

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

SANITARY FITTINGS

Description

Unit

Qty.

Rate

VANITY COUNTER TOP


200mm thick counter top; reinforced
concrete Grade 25 as described; including
forming opening for vanity basins and tap
fitting (both measured separately) fixing in
position; brackets, starter bars and all
necessary formworks; reinforcement; and
finishes (GUOCERA - TWEED SERIES
SP119A/ SP119C/ SP119E-BUI (MATT)
300mm X 600mm X 10mm thick from
Guocera Marketing Sdn Bhd) ; all to
Architect's satisfaction and approval
A

In average size 2400mm x 600mm wide; with


double basins opening; 2 sides abutting wall
(Master Bath)

No

In average size 3500mm x 600mm wide; with


double basins opening; 2 sides abutting wall
(Kitchen)

No

SUNDRIES
C

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.18/15**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

Description

SANITARY FITTINGS
Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION

Page No. 3A.18/1*

Page No. 3A.18/2****

Page No. 3A.18/3****

Page No. 3A.18/4****

Page No. 3A.18/5****

Page No. 3A.18/6****

Page No. 3A.18/7****

Page No. 3A.18/8****

Page No. 3A.18/9****

Page No. 3A.18/10****

Page No. 3A.18/11****

Page No. 3A.18/12****

Page No. 3A.18/13****

Page No. 3A.18/14****

Page No. 3A.18/15**

BILL NO. 3A.18


SANITARY FITTINGS
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.18/16****

JURU KOS (AMENDMENT I)

COLD WATER SERVICES

BILL NO. 3A.19


COLD WATER SERVICES
Item

Description

Unit

Qty.

Rate

Amount
RM
Sen

Notes:
Generally
A The Contractor shall read in conjunction with the cold water
services drawings and allow all cost for the plumbing works as
per Architect's drawings, specifications and etc.

EXCAVATION
Excavate, get out part return, fill in and ram,
remove surplus excavated materials, deposit,
spread and level where directed within the site
B Trench not exceeding 1.50m deep average
600mm deep for small pipe

59

C 19mm Diameter pipe buried in ground or


concrete slab

59

D 19mm Diameter pipe chased into brickwall or


concrete

211

E 19mm Diameter distribution pipe chased into


brickwall or concrete

20

F 32mm Diameter scour pipe with gate valve


(measured separately) to discharge to vent pipe

ABS (Kelas 9) Cold Water Pipe


Supply and install ABS (Kelas 12) pipe from
public reticulation to water storage tank cover
with compression joints fixing clips and all other
necessary bend or tee pipe

UPVC (Class D) Cold Water Pipe


Supply and install UPVC (Class D) pipe above
ground with compression joints fixing clips and
all other necessary bend pipe or tee pipe

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.19/1*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

Description

COLD WATER SERVICES


Unit

Qty.

Rate

Amount
RM
Sen

UPVC (Class D) Cold Water Pipe (Cont'd)


Supply and install UPVC (Class D) pipe above
ground with compression joints fixing clips and
all other necessary bend pipe or tee pipe
(Cont'd)
A 25mm Diameter over flow pipe to discharge to
vent pipe

No

26

No

No

Item

High pressure screwdown brass stop-cock with


crutch handle to B.S. 101 and jointing both ends
to UPVC (Class D) pipe
B 20mm Diameter
APPROVED 'POLY TANK' TO SYABAS
APPROVAL
Approved 'Poly Tank' to SYABAS approval,
water feed complete with access cover, high
pressure equilibrium ball valve, scour and
overflow UPVC class 7 pipe including bolted
dust proof lid, perforations, connection flange
pads, bends, long threads etc. internal surfaces
coated with an approved protective lining,
assembled, jointed, hoisted and fixed on and
supported by 2 nos. of 100mm x 304mm
concrete plinth
C 500 Gallon capacity
Installation of water meter inclusive all
necessary valve to be obtained from JBA
including all necessary liasions and approval
etc.; all to the approval of the Architect
D Generally
TESTING
E On completion of cold water installation test all
pipings and fittings for water tightness, make
good all defects and leave everything in perfect
working order to the entire satisfaction of the
Architect.

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.19/2*
13023 (BW - Phase 2)

To Collection

RM

JURU KOS (AMENDMENT I)


Item

Description

COLD WATER SERVICES


Unit

Qty.

Rate

SUNDRIES
25mm Diameter combined stop & drain valve
A Generally

No

No

12

25mm Diameter gate type isolating valve


B Generally
C Any other items and/or associated works not
included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.19/3*
13023 (BW - Phase 2)

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT I)


Item

Description

COLD WATER SERVICES


Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION
Page No. 3A.19/1*

...........................................

Page No. 3A.19/2*

...........................................

Page No. 3A.19/3*

...........................................

BILL NO. 3A.19


COLD WATER SERVICES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
3A.19/4*
13023 (BW - Phase 2)

RM

JURU KOS (AMENDMENMT I)

SANITARY PLUMBING SERVICES

BILL NO. 3A.20


SANITARY PLUMBING SERVICES
Item

Description

Unit

Qty.

Rate

Amount
RM
Sen

Notes:
Generally
A The Contractor shall read in conjunction with the cold water
services drawings and allow all cost for the plumbing works as
per Architect's drawings, specifications and etc.

EXCAVATION
Excavate trench to fall for internal plumbing
pipe not fill in and ram, deposit and spread in
making up levels where directed within the site
and remainder load cart away to contractor's
own dump
B Generally (In various size)

95

C 102mm Diameter as waste pipe and soil pipe


run across ceiling

56

D 51mm Diameter waste pipe and soil pipe laid in


trenches; under ground floor slab

13

E EXTRA OVER for 51mm diameter bend pipe

No

26

F 51mm Diameter waste pipe and soil pipe chased


into brickwall or concrete

22

G 102mm Diameter waste pipe and soil pipe run


across ceiling

82

H 51mm Diameter waste pipe and soil pipe run


across ceiling

71

No

16

HEAVY DUTY UPVC "GOLDEN BROWN"


PIPE (B.S.4660) AND FITTINGS
Heavy duty UPVC "Golden Brown" pipe
(B.S.4660) and fittings ; or other approved
equivalent; jointing in accordance with
manufacturer's instructions including short
lengths and all necessary fixing accessories.

EXTRA OVER for 102mm diameter bend pipe

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.20/1*

To Collection

RM

JURU KOS (AMENDMENMT I)


Item

Description

SANITARY PLUMBING SERVICES


Unit

Qty.

Rate

Amount
RM
Sen

TESTING
A On completion of sanitary plumbing installation
tesr all pipings and fittings for water tightness,
make good defects and leave everything in
perfect working order to the entire satisfaction
of the Architect and Local Authorities.

Item

B Weather flashing gauge 24 of size 250mm x


250mm base dressed over roofing with central
opening to receive and working complete
around 100mm diameter pipe with and including
all necessary sealing and extra jointing

No

C Approved galvanished wire ballon netting cap to


suit 50mm diameter soil and vent pipe and
jointing.

No

No

SUNDRIES

D Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) Solar System Plumbing
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

3A.20/2*

To Collection

RM

JURU KOS (AMENDMENMT I)


Item

Description

SANITARY PLUMBING SERVICES


Unit

Qty.

Rate

Amount
RM
Sen

COLLECTION
Page No. 3A.20/1*

.............................

Page No. 3A.20/2*

.............................

BILL NO. 3A.20


SANITARY PLUMBING SERVICES
To Main Summary

Jutawan Development Sdn Bhd


Building Works For Semi-D
13023 (BW - Phase 2)

RM

3A.20/3*

BILL

of

QUANTITIES

for JUTAWAN DEVELOPMENT SDN. BHD.


at Lot 177 (GM 75148) Mukim Rompin, Daerah Jempol,
Negeri Sembilan Darul Khusus
CPA
GENERAL SUMMARY
Bill 3B - External Works Within Lot Boundry (Amendment V)
Bill No.
1

RM

Sen

EXTERNAL WORKS WITHIN LOT BOUNDRY


3B.1/5****

Total Cost of Works Carried to Final Summary


13023 (BW - Phase 2)

RM
3B.S/1****

EXTERNAL WORKS WITHIN LOT BOUNDARY

JURU KOS (AMENDMENT II)

BILL NO. 3B.1


EXTERNAL WORKS WITHIN LOT BOUNDARY
Item

Description

Unit

Qty.

Rate

SURFACE WATER DRAINAGE


Excavate trench for 230mm wide precast
concrete half round drain; not exceeding
1.50m deep; get out; part return; fill in and
ram and remove surplus excavated materials
on site
A

Average 300mm deep

3,489

3,489

m2

1,821

m2

3,537

Salt glazed ware drains channel of best quality


set and bedded in cement and sand (1:3)
B

230mm Wide (internally) half round surface


water drainage channel finish fair on exposed
faces cast in convenient lengths, bedding,
jointing and pointing in cement and sand (1:3)
and laid to falls on 100mm thick concrete
base with blinding beneath base including all
necessary ends, angles and intersections
PAVING
Construct and complete "Broom Finish"
surface to floor as per Architect's requirement
and satisfaction; all scope of work done
strictly by an approved applicator

Flooring to Driveway
SCREEDS
Screeding; in cement and sand (1:3)
To receive ceramic floor tiles

20mm thick screeded bed to Carporch

Jutawan Development Sdn Bhd


External Works Within Lot Boundry
13023 (BW - Phase 2)

3B.1/1**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT IV)


Item

EXTERNAL WORKS WITHIN LOT BOUNDARY

Description

Unit

Qty.

Rate

TILING
Supply and lay Ceramic Tiles; KP106A
300mm x 300mm x 10mm thick from Guocera
Marketing Sdn Bhd or approved equivalent; in
standard colour; bedding 6mm thick to walls
and 10mm thick to floor in cement and sand
(1:3); on screeded backings (measured
separately); pointing using white cement; to
required patterns as shown on drawing; all to
Architect's satisfaction and approval
BREAKDOWN PRICE (PER M2)

(RM)

a) Supply Rate
b) Wastage

c) Profit And Overhead

d) Loading / Unloading On Site


e) Labour (Laying)
Total Cost Per M2
A

Flooring to Carporch

Jutawan Development Sdn Bhd


External Works Within Lot Boundry
13023 (BW - Phase 2)

RM
3,537

3B.1/2**** To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

EXTERNAL WORKS WITHIN LOT BOUNDARY

Description

Unit

Qty.

Rate

FENCING AND GATES


A

Construct and complete 115mm thick


brickwall as fencing wall overall height
610mm; with strip footing(size to be provided
by the Engineer) including all necessary
excavation, concrete reinforcement,
formwork, plastering, painting and etc.; all as
per Architect's drawing

2,139

Construct and complete of mild steel hollow


brickwall fencing on the top of parapet wall
overall height 915mm; including all necessary ,
painting and etc.; all as per Architect's drawing

2,139

Construct and complete 115mm thick


brickwall as fencing wall overall height
1525mm; with strip footing(size to be
provided by the Engineer) including all
necessary excavation, concrete reinforcement,
formwork, plastering, painting and etc.; all as
per Architect's drawing

1,365

No

180

No

180

No

90

Construct and complete of brick pillar


including 20mm thick cement and sand (1:3)
plasterin on both sides; complete with all
necessary reinforced concrete footing,
concrete, reinforcement, formwork,
brickwork, plastering, and painting, etc.; all
as per Enginner's details drawing
D

150mm x 250mm x 2350mm high brick pillar


Construct and complete R.C column as post;
complete with all necessary reinforced
concrete footing, concrete, reinforcement,
formwork, plastering and painting, etc.; all as
per Engineer's details drawing

150mm x 250mm x 2350mm high R.C


column
Supply and install double leaves mild steel
grille entrance gate; overall size 4250mm x
1500mm high; all as per Arcitect's approval
and detail drawing

4250mm x 1500mm high entrance gate

Jutawan Development Sdn Bhd


External Works Within Lot Boundry
13023 (BW - Phase 2)

3B.1/3**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

EXTERNAL WORKS WITHIN LOT BOUNDARY

Description

Unit

Qty.

Rate

REFUSE CHEMBER, LETTER BOX &


METER BOX
Construct and complete of refuse chamber
and letter box overal size 1475mm x 800mm
x 1650mm high all as per Architect's drawing
A

Generaly

No

90

No

90

No

360

2,925

Construct and complete of meter box overal


size 1475mm x 800mm x 1650mm high all as
per Architect's drawing including all
aluminium glass door as to latest TNB's
requirement
B

Generally
MANHOLE
Construct and complete internal manhole
overall size 600mm x 600mm x 600mm
average depth to be approved by the Architect
inclusive all necessary excavation, brickwork,
plastering and manhole cover all to Architect's
details and approval

Generally
Construct and complete 150mm diameter VCP
laid to fall on compacted aggregate in trench
ground and pointed in cement and sand (1:3)
including all necessary excavation, filling with
flexible rubble ring joints all to Architeects /
Engineers approval

Generally
SUNDRIES

Any other items and/or associated works not


included in the above but deemed necessary
(please specify)
i) ___________________________________
ii) ___________________________________
iii) __________________________________

Jutawan Development Sdn Bhd


External Works Within Lot Boundry
13023 (BW - Phase 2)

3B.1/4**

To Collection

RM

Amount
RM
Sen

JURU KOS (AMENDMENT II)


Item

EXTERNAL WORKS WITHIN LOT BOUNDARY

Description

Unit

Qty.

Rate

COLLECTION
Page No. 3B.1/1**

............................

Page No. 3B.1/2****

............................

Page No. 3B.1/3**

............................

Page No. 3B.1/4**

............................

BILL NO. 3B.1


EXTERNAL WORKS WITHIN LOT BOUNDARY
To Main Summary

Jutawan Development Sdn Bhd


External Works Within Lot Boundry
13023 (BW - Phase 2)

RM

3B.1/5****

Amount
RM
Sen

You might also like