DESCRIPTION

VOLUME - 1

PROPRIETARY INFORMATION
This document contains proprietary information developed by and for exclusive use of
Saudi Electricity Company. Your acceptance of the document is an acknowledgement
that it must be used for the identified purpose/application and during the period indicated.
It cannot be used or copied for any other purposes nor released to others without prior
written authorization of Saudi Electricity Company. Saudi Electricity Company will not be
responsible for misuse and/or misapplication, and any harm resulting therefrom. Saudi
Electricity Company also reserves the right to take any necessary actions to protect its
interest against unauthorized use.

Originated By

Certified By

Approved By

Abdul Rahim Al Harbi

Khaled S. Al Rashed

Tariq M. Al Tahini

Division Manager
Generation Projects
Engineering & Design

Department Manager
Generation Projects
Engineering

Executive Director
Generation Engineering &
Projects

3.

2.

1.

DATE
NO.

REVISIONS

Fire Detection and Protection System

Date:-

Date:-

Table of Contents

Date:-

Document Responsibility:
Next Planned Update:-

Standard Specification Committee


Based on new development & technology with the
consent of designated committee

Volume-1
01-GEMSS-M-01
Steam Turbine and Auxiliary Equipment

1.0

GENERAL DESCRIPTION---------------------------

2.0

SCOPE--------------------------------------------------

3.0

APPLICABLE CODES AND STANDARDS---------

4.0

DESIGN CRITERIA AND SYSTEM DETAILS


-----------------------------------------------------------

5.0

MATERIAL---------------------------------------------

6.0

GENERAL TECHNICAL REQUIREMENT----------

6.1

Fire protection water supply-----------------------------------------

6.2

Fire water storage tanks----------------------------------------------

6.3

Fresh water fire pumps (as applicable)-------------------------

6.4

Seawater pumping system------------------------------------------

6.5

Fire protection water distribution----------------------------------

6.6

Automatic and manual water spray deluge system-------------

6.7

Automatic wet pipe sprinkler and alarm system----------------

6.8

Automatic/remote manual foam/water spray systems----------

6.9

Balanced pressure proportioning system-------------------------

6.10

Diaphragm pressure proportioning system-----------------------

6.11

Remote/manual foam system and water spray cooling


system for fuel oil tank area----------------------------------------

6.12

Tank foam injection system----------------------------------------

6.13

Fuel oil tank farm dyked area foam monitor system------------

6.14

Spray water cooling system for the fuel oil tanks---------------

6.15

Fixed seawater suppression system-------------------------------

6.16

Marine terminal and fuel oil unloading facilities (as


applicable per scope of work)--------------------------------------

6.17

Gas extinguishing systems-----------------------------------------

6.18

Fire hydrant system--------------------------------------------------

6.19

Outdoor hose storage cabinets and equipment-------------------

6.20

Standpipe and hose rack/reel cabinet system--------------------

6.21

Portable extinguishers-----------------------------------------------

6.22

Auxiliary fire equipment--------------------------------------------

6.23

Fire-fighting vehicles (as applicable per scope of work)


--------------------------------------------------------------------------

6.24

Piping, valves, actuators, hangers and supports-----------------

6.25

Facility for connection to future units----------------------------

7.0

MISCELLANEOUS REQUIREMENTS-------------

7.1

Instrumentation and Control System-----------------------------Page 2 of 32

Generation Engineering & Materials


Standard Specifications
GEMSS-M-23 Rev 02
Fire Detection and Protection System
Document Responsibility:- Engineering and Design Division

Volume - 1

Next Planned Update : Based on new development & technology with the consent of designated division

7.2

Electrical System-----------------------------------------------------

7.3

Field Quality Control------------------------------------------------

8.0