Than select the selector to auto

synchronization mode by which the


engine synchronize and breaker close
automatically after synchronize.
LOW LOAD ENGINE STARTING PROCEDURE Make sure than the Woodward are in
Auto mode from controller side as well
Pre Inspection and Operation Procedure
Generator should be synchronize
as normal
well by level
the help of
Fuel Supply : Make Sure the fuel tank is manually
filled to the
synchrocheck
meter,
speedlevel
and voltage
Lubrication : Check the engine oil level and ensure that the correct
is always
adj
selector
switch
is
there
in
GCP panel
maintained
by which
Coolant: check the engine coolant level and
ensuresynchronize
that the levelcondition
is alwaysobtained
after
met
the
condition
breaker
close
maintained at the coolant expansion tank
button
press
manually
(optional)
Batteries: Make sure batteries are charged and electrolyte is at correct level and all
Load sharing is also done automatically
connection are correct and tight.
in power
Auto mode
Check all auxiliary equipment is receiving
fromby
LVEasy
roomgen.
LOW LOAD ENGINE STOP PROCEDURE
Make sure all radiator motor is in running condition
Make sure all fuel cooler motor is in running condition
Make sure emergency stop button are in operation
Make sure
the Engine
is in
Auto
for ECP
Starting
at manual
mode
: To
startrun
themode
generator
in manual mode press manual
button
Unloadon
thethe
engine
before
Shutdown
plan
engine operating panel and then press start button (This is optional
till
Select
theconfiguration
unload optionon
from
GCP there is a selector switch down for unloading
alarm
SCADA)
purpose
First
Start the engine in manual mode to check all protection from down stairs
because
When unload
done
break automatically
open room
there is
no alarm
indication in control
Stop the
Engine
from GCP
and wait
until
function
achieved
is timepanel
Than
Stop
the Engine
in manual
mode
by stop
pressing
the stop
buttonthere
on engine
delay for
300tosecond
as mentioned
(Time
delay
stop function
is 300 before
second)
Than
After Select
Shutdown
Select in
theAuto
manual
normalize
unload
selector
switch
the engine
run mode
mode and
by pressing
Auto
button
from the
ECP
After Auto mode From ECP, Engine start excess is now shift to control room
Press the Start button from control room (GCP) and check all its parameter.
Select the Auto option there is an Auto mode selector switch down the panel.
Once the generator set has achieved nominal voltage and frequency than breaker
is close automatically because of Auto mode selection
Than close the NGR breaker from MCP panel

STANDARD OPERATING PROCEDURES

Paralleling Operation

Start the second engine by follow the same method as above mention
Once the generator set has achieved there nominal voltage and frequency
than the set is ready to be in parallel with bus bar supply
To check the supply voltage and bus bar voltage there is a selector switch
called generator voltage switch which have 3 position to find out
individual phase voltage and current