DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

KABUPATEN TULANG BAWANG BARAT


Triwulan I 2016
KABUPATEN TULANG BAWANG BARAT
Harga
No. Uraian Satuan Ket.
( Rp. )
1 2 3 5 6
A. UPAH
1 Mandor Hari 100,000
2 Kepala Tukang Hari 90,000
3 Tukang Hari 80,000
4 Pekerja Hari 65,000
5 Operator Terlatih Hari 90,000
6 Pembantu Operator Hari 65,000
7 Sopir Terlatih Hari 80,000
8 Pembantu Sopir Hari 50,000
9 Penjaga Malam Hari 80,000

B. BAHAN
1 Alumunium Foil M2 6,000
2 Amplas Lbr 8,000
3 Asbes Gelombang Kecil Lbr 45,000
4 Aspal Kg 14,500
5 Baja Ringan m2 330,000
6 Bak Mandi Fiber 50.50.5 Bh 285,000
7 Bak Mandi Fiber 60.60.6 Bh 300,000
8 Bambu Dia 6-8cm /600cm Btg 9,000
9 Batako Bh 4,000
10 Batu Bata Bh 490
11 Batu Belah Hitam (pondasi) M3 319,000
12 Batu Belah Putih (pondasi) M3 290,000
13 Batu Belah Hitam 10/15 Cm M3 314,000
14 Batu Belah Hitam 5/7 Cm M3 346,000
15 Batu Split 1/2 Cm M3 386,500
16 Batu Split 2/3 Cm M3 380,500
17 Batu Split 3/5 Cm M3 365,000
18 Besi Baja IWF Kg 20,000
19 Besi Baja Siku Kg 21,000
20 Besi Beton Polos Kg 18,000
21 Besi Beton Ulir Kg 19,000
22 Box Meter Unit 75,000
23 Box Zekering/ Termis 2 Group Bh 145,000
24 Box Zekering/ Termis 3 Group Bh 175,000
25 Bubungan Genteng Beton Bh 8,800
26 Bubungan Genteng Kodok Bh 5,300
27 Bubungan Genteng Mantili Bh 4,500
28 Bubungan Genteng Plentong Bh 5,600
29 Bumbungan Genteng Zincalume Pasir M' 70,000
30 Bumbungan Genteng Zincalume polos M' 40,000
31 Cat Besi Kg 42,000
32 Cat Dasar Kg 24,500
33 Cat Genteng Kg 50,000
34 Cat Kayu Kg 51,000
35 Cat Meni Kg 24,500
36 Cat Taman Kg 60,000
37 Cat Tembok Kg 22,000
38 Dempul Kg 30,000
39 Engsel Jendela Psg 26,000

Hal 1
KABUPATEN TULANG BAWANG BARAT
Harga
No. Uraian Satuan Ket.
( Rp. )
1 2 3 5 6
40 Engsel Pintu Psg 32,000
41 Eternit (240 x 120 x 0,3) cm M2 45,000
42 Genteng Beton Bh 7,750
43 Genteng Mantili Bh 1,650
44 Genteng Metal Zincalume Polos M2 70,000
45 Genteng Metal Zincalume Pasir M2 100,000
46 Genteng Plentong Bh 1,250
47 Gypsum 9 mm Lbr 77,000
48 Glass Block Bh 22,500
49 Grass Block Bh 20,000
50 Grendel Jendela Set 18,000
51 Grendel Pintu Bh 62,000
52 Hak Angin / pengkait Set 12,000
53 Harplek 1 x 1 m Lbr 25,000
54 Kabel Pompa 3 x 2,5 mm M' 25,500
55 Kabel Listrik NYM 2 x 1.5 mm Roll 400,000
56 Kabel Listrik NYM 2 x 2.5 mm Roll 675,000
57 Kabel Listrik NYM 3 x 2.5 mm Roll 750,000
58 Kaca Bening 3 mm M2 121,000
59 Kaca Bening 5 mm M2 143,000
60 Kaca Es 3 mm M2 85,000
61 Kaca Patri M2 1,650,000
62 Kaca Rayban 5 mm M2 172,000
63 Kanstin Cetak Bh 7,000
64 Kawat Beton Kg 30,000
65 Kawat Bronjong Kg 32,000
66 Kawat Duri Kg 16,000
67 Kawat Harmonika M2 17,500
68 Kawat Nyamuk M2 27,000
69 Kayu Bakar M3 450,000
70 Kayu Balok kls. I M3 7,000,000
71 Kayu Balok kls. II M3 2,800,000
72 Kayu Balok kls. III M3 2,400,000
73 Kayu Balok kls. IV M3 2,000,000
74 Kayu Dolken Btg 17,500
75 Kayu Kasau Kelas I M3 7,000,000
76 Kayu Kasau Kelas II M3 3,000,000
77 Kayu Kasau Kelas III M3 2,500,000
78 Kayu Kasau Kelas IV M3 2,100,000
79 Kayu Papan kls. I M3 7,750,000
80 Kayu Papan kls. II M3 3,150,000
81 Kayu Papan kls. III M3 2,500,000
82 Kayu Papan kls. IV M3 2,100,000
83 Kayu Reng Kelas I M3 7,000,000
84 Kayu Reng Kelas II M3 3,000,000
85 Kayu Reng Kelas III M3 2,500,000
86 Kayu Reng Kelas IV M3 2,100,000
87 Keramik 10/20 Polos M2 57,000
88 Keramik 20/20 Polos M2 57,000
89 Keramik 20/20 Warna M2 54,000
90 Keramik 20/25 Polos M2 58,000
91 Keramik 20/25 Warna M2 62,000
92 Keramik 30/30 Polos M2 62,500
93 Keramik 30/30 Warna M2 62,500
94 Keramik 40/40 Polos M2 65,000
95 Keramik 40/40 Warna M2 71,000

Hal 2
KABUPATEN TULANG BAWANG BARAT
Harga
No. Uraian Satuan Ket.
( Rp. )
1 2 3 5 6
96 Keramik 50/50 Polos M2 70,000
97 Keramik 50/50 Warna M2 72,000
98 Kloset Duduk Keramik (Natural) Bh 2,300,000
99 Kloset Jongkok Keramik Bh 230,000
101 Knee / socket / tee PVC 1/2" Bh 3,000
104 Knee / socket / tee PVC 3/4" Bh 3,500
100 Knee / socket / tee PVC 1" Bh 4,000
102 Knee / socket / tee PVC 2" Bh 9,500
103 Knee / socket / tee PVC 3" Bh 11,500
105 Kran 1/2" (stainless) Bh 37,000
106 Kran 3/4" (stainless) Bh 37,000
107 Kunci Tanam 1 x Putar Bh 110,000
108 Kunci Tanam 2 x Putar Bh 185,000
109 Lampu Hias / Sorot Bh 85,000
110 Lampu Pijar 25 Watt Bh 15,500
111 Lampu SL 18 Watt Bh 36,000
112 Lampu TL 25 Watt Bh 45,000
113 List Gypsum 5 cm M' 19,500
114 List Gypsum 10 cm M' 17,500
115 List Gypsum 15 cm M' 20,000
116 List Gypsum 20 cm M' 25,000
117 Mangkokan Listrik (Durados) Bh 15,000
118 Marmer 30/30 M2 252,000
119 Marmer 40/40 M2 282,000
120 Marmer 50/50 M2 377,000
121 Marmer 60/60 M2 397,000
122 Minyak Bensin (Premium) Ltr 7,300
123 Minyak Bensin Non Subsidi Ltr 10,950
124 Minyak Cat Ltr 27,000
125 Minyak Pelumas / Oli Ltr 32,500
126 Minyak Solar Subsidi Ltr 6,900
127 Minyak Solar Non Subsidi (Industri) Ltr 12,500
128 Minyak Thinner Ltr 22,000
129 Multiplek 9 mm Lbr 215,000
130 Multiplek 12 mm Lbr 230,000
131 Nok Asbes Set 40,000
132 Paku Kg 19,000
133 Paku Asbes Kg 38,500
134 Paku Cacing Kg 26,500
135 Paku Seng Kg 29,000
136 Paku Skrup Kg 25,000
137 Paku Triplek Kg 27,500
138 Panel Pompa Unit 2,500,000
139 Pas. Instalasi Listrik Titik 61,000
140 Pasir Beton M3 185,000
141 Pasir Pasang M3 170,000
142 Pasir Urug M3 135,000
143 Paving Block T = 6 Cm Bh 2,200
144 Paving Block T = 8 Cm Bh 2,400
145 Penangkal Petir Unit 2,700,000
146 Pipa GIP (Galvanis) 1/2" Btg 183,000
147 Pipa GIP (Galvanis) 3/4" Btg 235,000
148 Pipa GIP (Galvanis) 1" Btg 361,000
149 Pipa GIP (Galvanis) 1 1/4" Btg 476,000
150 Pipa GIP (Galvanis) 2" Btg 746,000
151 Pipa GIP (Galvanis) 4" Btg 1,780,000

Hal 3
KABUPATEN TULANG BAWANG BARAT
Harga
No. Uraian Satuan Ket.
( Rp. )
1 2 3 5 6
152 Pipa GIP (Galvanis) 6" Btg 2,852,000
153 Pipa PVC 1/2" Btg 25,000
154 Pipa PVC 3/4" Btg 35,000
155 Pipa PVC 1" Btg 45,000
156 Pipa PVC 2" Btg 90,000
157 Pipa PVC 3" Btg 150,000
158 Pipa PVC 4" Btg 250,000
159 Plamir Tembok Kg 38,000
160 Plitur Jadi Ltr 60,000
161 Polycarbonat Lbr 235,000
162 Reservoir Tower Air Fiber 0,50 M3 Bh 975,000
163 Reservoir Tower Air Fiber 1,00 M3 Bh 1,655,000
164 Rolling Door M2 500,000
165 Roster Beton 15/20 Bh 24,000
166 Rumput Gajah Mini / Australia M2 27,000
167 Rumput Golf M2 28,500
168 Saklar Tunggal Bh 30,000
169 Saklar Double Bh 35,000
170 Saklar Triple Bh 45,000
171 Saringan Air / Floor drain stainless Bh 22,500
172 Semen PC (50 kg) Zak 74,000
173 Semen Putih (50 kg) Zak 105,000
174 Seng Gelombang BJLS 27 Lbr 52,500
175 Seng Gelombang BJLS 30 Lbr 55,000
176 Seng Plat BJLS 27 Lbr 36,750
177 Seng Plat BJLS 30 Lbr 32,500
178 Sewa Stemper Kodok Hk 225,000
179 Soda Api Kg 27,500
180 Stop Kontak Bh 30,000
181 Talang Fiber M' 34,000
182 Tali Ijuk Kg 12,500
183 Tanah Urug Pilihan M3 65,000
184 Tarikan Jendela Bh 17,000
185 Teakwood 5 mm Lbr 240,000
186 Teer / Residu Ltr 14,000
187 Triplek 3 mm Lbr 65,000
188 Triplek 5 mm Lbr 87,000
189 Urinoir Keramik lengkap Bh 2,190,000
190 Washtafel keramik lengkap Bh 1,500,000
191 Water Meter Bh 462,000

Bandar Lampung, APRIL 2016

KEPALA DINAS PENGAIRAN DAN PEMUKIMAN


PROVINSI LAMPUNG,

DR. EDARWAN, SE.,M.Si.


Pembina Utama Madya
NIP. 19620404 198703 1 009

Hal 4