Project Arafat - Taif Water Transmission System

Location : Arafat & Taif, KSA


Subject : BOQ for the Contruction of Tunnel (Package D)

Item No. Description Unit

D.1 Work Group 1


D.1.1 Access Road and Traffic Area - West Portal
for 1 km leght=
earthworks 3500
aggregate 1800
concrete roads 1380
D.1.2 Access Road and Traffic Area - East Portal
for 1 km leght=
earthworks 3500
aggregate 1800
concrete roads 1380
D.1.3 Portal Cut West, including Support and Backfill
concrete columns 14064
earthworks 72000
D.1.4 Portal Cut East, including Support and Backfill
concrete columns 14064
earthworks 72000

D.1.5 Excavation and Support for Conv. Sections


D.1.5.1 Conventional Excavation, acc. to drawing QP10-Q-6421 M

D.1.5.2 Execution of Support Measures - Conventional Excavation, acc. to drawing QP10-Q-6421 M

D.1.6 Excavation and Support for TBM Sections


D.1.6.1 Excavation in Support Class I, acc. to Dwg. QP10-Q-6416 M

m^3

to

D.1.6.2 Excavation in Support Class II, acc. to Dwg. QP10-Q-6417 M

m^3

to

D.1.6.3 Excavation in Support Class III, acc. to Dwg. QP10-Q-6418 M

m^3
to

D.1.6.4 Excavation in Support Class IV, acc. to Dwg. QP10-Q-6419 M

m^3

to

D.1.6.5 Excavation in Support Class V, acc. to Dwg. QP10-Q-6420 M

m^3

to

D.1.6.6 Execution of Support Measures in Support Class I, M


acc. to Dwg. QP10-Q-6416

D.1.6.7 Execution of Support Measures in Support Class II, M


acc. to Dwg. QP10-Q-6417

D.1.6.8 Execution of Support Measures in Support Class III, M


acc. to Dwg. QP10-Q-6418

D.1.6.9 Execution of Support Measures in Support Class IV, M


acc. to Dwg. QP10-Q-6419

D.1.6.10 Execution of Support Measures in Support Class V, M


acc. to Dwg. QP10-Q-6420

D.1.7 Geotechnical Monitoring

D.1.7.1 Standard Monitoring section, acc. to Dwg. QP10-Q-6422 pcs

D.1.7.2 Main Monitoring Section, acc. to Dwg. QP10-Q-6422 pcs

D.1.8 Regulating Shotcrete 50 mm m

D.1.9 Concrete Works and Structures

D.1.9.1 Roadway Drainage Channel (above ground pipeline sections)


m
D.1.9.2 Bituminous Wearing Course d=5 cm (above ground pipeline section)

m
D.1.9.3 Concrete Roadway d=15 cm (above ground pipeline section)
m
D.1.9.4 Concrete Pipe Foundations (saddle supports)
D.1.9.5 Concrete Fixed Points
pcs
D.1.9.6 Concrete Intermediate Fixed Points
pcs
D.1.9.7 West Portal Structure (incl. Walls, Foundations, Subbase, Finishing, etc.)
D.1.9.8 East Portal Structure (incl. Walls, Foundations, Subbase, Finishing, etc.)
D.1.10 Drainage Works

D.1.11 Backfilling Works in the Tunnel

D.1.11.1 Execution of Backfill: Conventional Section - Pipeline above Ground (incl. East Portal) m

D.1.11.2 Execution of Backfill: TBM Section - Pipeline above Ground m

D.1.11.3 Execution of Backfill: Conventional Section - Pipeline below Ground (up to pipe bottom) m

D.1.11.4 Execution of Backfill: TBM Section - Pipeline below Ground (up to pipe bottom) m

D.1.12 Tunnel Equipment incl. electrical works

D.2 Work Group 2


D.2.1 Additional Support Measures
D.2.1.1 Shotcrete Sp C20/25 for Supporting Excavation m^3
D.2.1.2 Steel Wire Mesh 150x150x5 mm Sq m
D.2.1.3 Steel Wire Mesh 150x150x6 mm Sq m
D.2.1.4 Steel Wire Mesh 150x150x8 mm Sq m
D.2.1.5 Lattice Girder 95/20/30, L= 15.53 m pcs
D.2.1.6 Steel Arch UPE 200 or Equivalent, L = 20.31 m pcs
D.2.1.7 Rock Bolts - Swellex Type, Ultimate Load 90 kN, L=3.0 m pcs
D.2.1.8 Rock Bolts - Swellex Type, Ultimate Load 240 kN, L=4.0 m pcs
D.2.1.9 Rock Bolts - SN Type, Ultimate Load 250 kN, L=4.0 m pcs
D.2.1.10 Rock Bolts - SN Type, Ultimate Load 250 kN, L=6.0 m pcs

D.2.2 Additional Geotechnical Monitoring


D.2.2.1 Standard Monitoring section, acc. to Dwg. QP10-Q-6422 pcs
D.2.2.2 Main Monitoring section, acc. to Dwg. QP10-Q-6422 pcs

D.2.3 Boreholes and Groutings


D.2.3.1 Boreholes for Probing Ahead and Grouting, 50 mm m
D.2.3.2 Grouting with Cement Suspension to
Qty. Unit Price Total Amount

m^3
m^3
m^3

m^3
m^3
m^3

m^3
m^3

m^3
m^3

320.00

320.00

1608.00

113920.77

205057.39

3746.70

265439.64

477791.36

5184.30

367288.21
661118.78

1153.90

81749.49

147149.08

462.60

32773.48

58992.26

1608.00

3746.70

5184.30

1153.90

462.60

281.00

20.00

12476.00

12004.50

12004.50

12004.50

2.00

11.00
160.00

11844.50

160.00

311.00

100.00
150.00
150.00
150.00
4.00
20.00
50.00
300.00
50.00
150.00

15.00
2.00

3000.00
300.00
Project Arafat - Taif Water Transmission System
Location : Arafat & Taif, KSA
Subject : BOQ for the Contruction of Tunnel (Package D)

Item No. Description Unit

D.1 Work Group 1


D.1.1 Access Road and Traffic Area - West Portal
D.1.2 Access Road and Traffic Area - East Portal
D.1.3 Portal Cut West, including Support and Backfill
D.1.4 Portal Cut East, including Support and Backfill

D.1.5 Excavation and Support for Conv. Sections


D.1.5.1 Conventional Excavation, acc. to drawing QP10-Q-6421 M

D.1.5.2 Execution of Support Measures - Conventional Excavation, acc. to drawing QP10-Q-6421 M

D.1.6 Excavation and Support for TBM Sections


D.1.6.1 Excavation in Support Class I, acc. to Dwg. QP10-Q-6416 M

D.1.6.2 Excavation in Support Class II, acc. to Dwg. QP10-Q-6417 M

D.1.6.3 Excavation in Support Class III, acc. to Dwg. QP10-Q-6418 M

D.1.6.4 Excavation in Support Class IV, acc. to Dwg. QP10-Q-6419 M

D.1.6.5 Excavation in Support Class V, acc. to Dwg. QP10-Q-6420 M

D.1.6.6 Execution of Support Measures in Support Class I, M


acc. to Dwg. QP10-Q-6416

D.1.6.7 Execution of Support Measures in Support Class II, M


acc. to Dwg. QP10-Q-6417

D.1.6.8 Execution of Support Measures in Support Class III, M


acc. to Dwg. QP10-Q-6418

D.1.6.9 Execution of Support Measures in Support Class IV, M


acc. to Dwg. QP10-Q-6419

D.1.6.10 Execution of Support Measures in Support Class V, M


acc. to Dwg. QP10-Q-6420

D.1.7 Geotechnical Monitoring

D.1.7.1 Standard Monitoring section, acc. to Dwg. QP10-Q-6422 pcs

D.1.7.2 Main Monitoring Section, acc. to Dwg. QP10-Q-6422 pcs

D.1.8 Regulating Shotcrete 50 mm m


D.1.9 Concrete Works and Structures

D.1.9.1 Roadway Drainage Channel (above ground pipeline sections)


m
D.1.9.2 Bituminous Wearing Course d=5 cm (above ground pipeline section)

m
D.1.9.3 Concrete Roadway d=15 cm (above ground pipeline section)
m
D.1.9.4 Concrete Pipe Foundations (saddle supports)
D.1.9.5 Concrete Fixed Points
pcs
D.1.9.6 Concrete Intermediate Fixed Points
pcs
D.1.9.7 West Portal Structure (incl. Walls, Foundations, Subbase, Finishing, etc.)
D.1.9.8 East Portal Structure (incl. Walls, Foundations, Subbase, Finishing, etc.)

D.1.10 Drainage Works

D.1.11 Backfilling Works in the Tunnel

D.1.11.1 Execution of Backfill: Conventional Section - Pipeline above Ground (incl. East Portal) m

D.1.11.2 Execution of Backfill: TBM Section - Pipeline above Ground m

D.1.11.3 Execution of Backfill: Conventional Section - Pipeline below Ground (up to pipe bottom) m

D.1.11.4 Execution of Backfill: TBM Section - Pipeline below Ground (up to pipe bottom) m

D.1.12 Tunnel Equipment incl. electrical works

D.2 Work Group 2


D.2.1 Additional Support Measures
D.2.1.1 Shotcrete Sp C20/25 for Supporting Excavation m^3
D.2.1.2 Steel Wire Mesh 150x150x5 mm Sq m
D.2.1.3 Steel Wire Mesh 150x150x6 mm Sq m
D.2.1.4 Steel Wire Mesh 150x150x8 mm Sq m
D.2.1.5 Lattice Girder 95/20/30, L= 15.53 m pcs
D.2.1.6 Steel Arch UPE 200 or Equivalent, L = 20.31 m pcs
D.2.1.7 Rock Bolts - Swellex Type, Ultimate Load 90 kN, L=3.0 m pcs
D.2.1.8 Rock Bolts - Swellex Type, Ultimate Load 240 kN, L=4.0 m pcs
D.2.1.9 Rock Bolts - SN Type, Ultimate Load 250 kN, L=4.0 m pcs
D.2.1.10 Rock Bolts - SN Type, Ultimate Load 250 kN, L=6.0 m pcs

D.2.2 Additional Geotechnical Monitoring


D.2.2.1 Standard Monitoring section, acc. to Dwg. QP10-Q-6422 pcs
D.2.2.2 Main Monitoring section, acc. to Dwg. QP10-Q-6422 pcs

D.2.3 Boreholes and Groutings


D.2.3.1 Boreholes for Probing Ahead and Grouting, 50 mm m
D.2.3.2 Grouting with Cement Suspension to
Qty. Unit Price Total Amount

320.00

320.00

1608.00

3746.70

5184.30

1153.90

462.60

1608.00

3746.70

5184.30

1153.90

462.60

281.00

20.00

12476.00
12004.50

12004.50

12004.50

2.00

11.00

160.00

11844.50

160.00

311.00

100.00
150.00
150.00
150.00
4.00
20.00
50.00
300.00
50.00
150.00

15.00
2.00

3000.00
300.00
TMB
Viiteza de inaintare 15m/zi