You are on page 1of 1

The Divisional Engineer (General)

Load Dispatch Center


APTRANSCO
Hyderabad 500 082
Fax No. 040 55665136 / 23393616
DECLARED AVAILABILITY
DATE OF ISSUE: 16.02.2017
TIME OF ISSUE: 08:30 Hrs

DATE FOR WHICH AVAILABILITY FORECAST RELATES: 17.02.2017


i) The hourly forecast of availability of the facility for the period at 290 C and 50 Hz line frequency and
70% RH will be as given below:
ii) Availability Declaration is based on firm quantity supplied by RIL.
iii) The combined cycle declared capacity as per PPA is reckoned from 30.06.2010 of 444.08 MW w.e.f
30.06.2010 17.30 hrs in Lr. No CE/EC/112/F.KGPL-COD/D.No562/10, dt: 30.12.10.
iv) The declared availability is furnished as per SCHEDULE D 3.3 (V) in terms of PPA.
You will be notified of any expected changes in this availabilities declaration.
1 2 3 4 5 6 1 2 3 4 5 6

Declared
Declared
availability
availability
in MW at Expected Expected Expected Expected
in MW at
Generator Hourly gas Hourly Gas Ambient Expected Hourly gas Hourly Gas Ambient Expected
Time of Hours Time of Hours Generator
Terminals at flow in Flow in SCM Temp. (C) Frequency flow in Flow in SCM Temp. (C) Frequency
Terminals at
site MMBTU (Hz) MMBTU (Hz)
site reference
reference
conditions
conditions

00:00 to 01:00 0 0 0 22.50 50.11 12:00 to 13:00 0 0 0 35.90 49.89


01:00 to 02:00 0 0 0 23.60 49.89 13:00 to 14:00 0 0 0 36.50 49.99
02:00 to 03:00 0 0 0 24.80 50.12 14:00 to 15:00 0 0 0 37.10 50.10
03:00 to 04:00 0 0 0 24.40 50.11 15:00 to 16:00 0 0 0 35.50 49.99
04:00 to 05:00 0 0 0 25.90 49.89 16:00 to 17:00 0 0 0 34.70 50.15
05:00 to 06:00 0 0 0 25.80 50.15 17:00 to 18:00 0 0 0 33.80 49.99
06:00 to 07:00 0 0 0 27.50 50.89 18:00 to 19:00 0 0 0 32.70 49.89
07:00 to 08:00 0 0 0 29.70 50.11 19:00 to 20:00 0 0 0 31.70 50.12
08:00 to 09:00 0 0 0 30.60 49.89 20:00 to 21:00 0 0 0 30.50 50.10
09:00 to 10:00 0 0 0 32.50 49.99 21:00 to 22:00 0 0 0 29.90 50.09
10:00 to 11:00 0 0 0 33.40 49.89 22:00 to 23:00 0 0 0 28.50 49.99
11:00 to 12:00 0 0 0 34.70 50.12 23:00 to 24:00 0 0 0 27.60 50.15
Average for the
day 0 0 0 29.40 50.03

Total Gas Consumption for the previous day MMBTU MMSCMD


(15.02.2017) 0 0
NOTE: Declared availability was zero for day Natural gas supply was zero.
Thanking you and regards
For Konaseema Gas Power Limited
K.Satish.
DESK Engineer (Operations).
C/c: The Chief Engineer (IPC) / APPCC / Hyd, Fax: 040-23393304
C/c: The Vice President (O) / KGPL / Hyderabad, Fax: 040-23301160
C/c: The Chief General Manager / KGPL / Devarapalli
C/c: The General Manager (O&M)

You might also like