DAFTAR ANALISA BIAYA

HARGA
UPAH BAHAN
ANALISA JENIS PEKERJAAN SATUAN
(Rp.) (Rp.)
(Rp.)
(1) (2) (3) (4) (5)

JBT 1 M2 PEMBERSIHAN LAPANGAN


0.0250 Hr Pekerja 45,000.00 1,125.00 -
0.0010 Hr Mandor 47,500.00 47.50 -
Jumlah 1,172.50 0.00
JBT 1 M' PENGUKURAN BOUWPLANK
0.0040 Hr Pekerja 45,000.00 180.00 -
0.0200 Hr Tukang 52,500.00 1,050.00 -
0.0200 Hr Mandor 47,500.00 950.00 -
0.0250 M3 Papan Sembarang 1,300,000.00 - 32,500.00
0.0010 Kg Paku 10,000.00 - 10.00
Jumlah 0.00 32,510.00
JBT 1 M3 GALIAN TANAH
0.7500 Hr Buruh tak terlatih 35,000.00 26,250.00 -
0.0250 Hr Mandor 47,500.00 1,187.50 -
Jumlah 27,437.50 0.00
JBT 1 M3 URUGAN TANAH
0.3750 Hr Buruh tak terlatih 35,000.00 13,125.00 -
0.0120 Hr Mandor 47,500.00 570.00 -
Jumlah 13,695.00 0.00
JBT 1 M3 TIMBUNAN TANAH BIASA
0.2500 Hr Pekerja 45,000.00 11,250.00 -
0.0120 Hr Mandor 47,500.00 570.00 -
1.2000 M3 Tanah Timbun 30,000.00 - 36,000.00
Jumlah 11,820.00 36,000.00
JBT 1 M2 URUGAN PASIR
0.2500 Hr Buruh tak terlatih 35,000.00 8,750.00 -
0.0120 Hr Mandor 47,500.00 570.00 -
1.2000 M3 Pasir Urug 55,000.00 - 66,000.00
Jumlah 9,320.00 66,000.00
JBT 1 M3 BETON TAK BERTULANG K.175
6.0000 Hr Pekerja 45,000.00 270,000.00 -
1.0000 Hr Tukang 52,500.00 52,500.00 -
0.1000 Hr Kepala Tukang 55,000.00 5,500.00 -
0.0300 Hr Mandor 47,500.00 1,425.00 -
6.8000 Zak Semen 30,000.00 - 204,000.00
0.5000 M3 Pasir 65,000.00 - 32,500.00
1.0000 M3 Kerikil 70,750.00 - 70,750.00
0.4000 M3 Papan Begisting 1,700,000.00 - 680,000.00
4.0000 Kg Paku 10,000.00 - 40,000.00
2.4096 Jam Concrete Mixer 23,424.11 - 56,442.73
Jumlah 329,425.00 1,083,692.73
JBT 1 M3 BETON BERTULANG K.175
0.6000 Hr Pekerja 45,000.00 27,000.00 -
0.1000 Hr Tukang 52,500.00 5,250.00 -
0.0300 Hr Mandor 47,500.00 1,425.00 -
0.0100 Hr Kepala Tukang 55,000.00 550.00 -
1.0000 M3 Beton K.175 1,413,117.73 - 1,413,117.73
110.0000 Kg Tulangan Baja 6,500.00 - 715,000.00
2.0000 Kg Kawat Beton 5,000.00 - 10,000.00
Jumlah 34,225.00 2,138,117.73
JBT 1 M3 PASANGAN BATU BELAH
4.5000 Hr Pekerja 45,000.00 202,500.00 -
1.5000 Hr Tukang 52,500.00 78,750.00 -
0.2250 Hr Mandor 47,500.00 10,687.50 -
0.1500 Hr Kepala Tukang 55,000.00 8,250.00 -
1.2000 M3 Batu Kali 65,000.00 - 78,000.00
0.5200 M3 Pasir 65,000.00 - 33,800.00
3.2400 Kg Semen (PC) 30,000.00 - 97,200.00
Jumlah 300,187.50 209,000.00
JBT 1 M3 MEMASANG LANTAI JEMBATAN
0.0480 Hr Pekerja 45,000.00 2,160.00 -
0.1500 Hr Tukang 52,500.00 7,875.00 -
0.0020 Hr Mandor 47,500.00 95.00 -
0.0150 Hr Kepala Tukang 55,000.00 825.00 -
0.3990 M3 Kayu Kelas II 2,000,000.00 - 798,000.00
2.5900 Kg Paku 10,000.00 - 25,900.00
Jumlah 10,955.00 823,900.00
JBT 1 M2 LAPIS PENUTUP LANTAI
0.5250 Hr Pekerja 45,000.00 23,625.00 -
0.0260 Hr Mandor 47,500.00 1,235.00 -
0.0300 M3 Batu Pecah 2/3 85,000.00 - 2,550.00
0.0700 M3 Batu Pecah 5/7 85,000.00 - 5,950.00
4.0000 Kg Aspalt 6,500.00 - 26,000.00
0.0200 M3 Pasir 65,000.00 - 1,300.00
0.5000 Lbr Seng Plat BJLS. 20 32,500.00 - 16,250.00
Jumlah 24,860.00 52,050.00
JBT 1 M2 PEKERJAAN PLESTERAN
0.4000 Hr Pekerja 45,000.00 18,000.00 -
0.2000 Hr Tukang 52,500.00 10,500.00 -
0.0200 Hr Mandor 47,500.00 950.00 -
0.0200 Hr Kepala Tukang 55,000.00 1,100.00 -
0.0120 M3 Pasir 65,000.00 - 780.00
0.1630 Kg Semen (PC) 30,000.00 - 4,890.00
Jumlah 30,550.00 5,670.00
JBT 1 M2 PENGECETAN LOANNING
1.4000 Hr Pekerja 45,000.00 63,000.00 -
0.3500 Hr Mandor 47,500.00 16,625.00 -
0.3500 Kg Cat Tembok 7,500.00 - 2,625.00
1.0000 Set Alat Bantu 12,000.00 12,000.00 -
Jumlah 91,625.00 2,625.00
JBT 1 M2 PENGECETAN SANDARAN
1.4000 Hr Pekerja 45,000.00 63,000.00 -
0.3500 Hr Mandor 47,500.00 16,625.00 -
0.3500 Kg Cat Besi 18,000.00 - 6,300.00
Jumlah 79,625.00 6,300.00
JBT 1 M2 PEMBERSIHAN DAN PENGETERAN
0.1000 Hr Pekerja 45,000.00 4,500.00 -
0.0050 Hr Mandor 47,500.00 - 237.50
0.3500 Kg Teer 6,500.00 - 2,275.00
Jumlah 4,500.00 2,512.50
JUMLAH
UPAH+BAHAN
(Rp.)
(6)

1,125.00
47.50
1,172.50

180.00
1,050.00
950.00
32,500.00
10.00
32,510.00

26,250.00
1,187.50
27,437.50

13,125.00
570.00
13,695.00

11,250.00
570.00
36,000.00
47,820.00

8,750.00
570.00
66,000.00
75,320.00

270,000.00
52,500.00
5,500.00
1,425.00
204,000.00
32,500.00
70,750.00
680,000.00
40,000.00
56,442.73
1,413,117.73

27,000.00
5,250.00
1,425.00
550.00
1,413,117.73
715,000.00
10,000.00
2,172,342.73

202,500.00
78,750.00
10,687.50
8,250.00
78,000.00
33,800.00
97,200.00
509,187.50

2,160.00
7,875.00
95.00
825.00
798,000.00
25,900.00
834,855.00

23,625.00
1,235.00
2,550.00
5,950.00
26,000.00
1,300.00
16,250.00
76,910.00

18,000.00
10,500.00
950.00
1,100.00
780.00
4,890.00
36,220.00

63,000.00
16,625.00
2,625.00
12,000.00
94,250.00

63,000.00
16,625.00
6,300.00
85,925.00
4,500.00
237.50
2,275.00
7,012.50
DAFTAR ANALISA BIAYA
PEKERJAAN : NORMALISASI SUNGAI
LOKASI : DESA LANCANG PASILO JUMERANG
KABUPATEN : PIDIE
PROPINSI : NANGGROE ACEH DARUSSALAM

PERKIRAAN HARGA JUMLAH


ANALISA KOMPONEN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
A. TENAGA

1 Pekerja Jam 0.625 6,428.57 4,017.86


2 Mandor Jam 0.077 6,785.71 522.50
Jumlah Harga Tenaga A 4,540.36

B. PERALATAN

1 Excavator Jam 0.051 247,475.36 12,621.24


2 Alat Bantu Set 1.000 12,000.00 12,000.00
Jumlah Harga Tenaga B 24,621.24

C. JUMLAH HARGA DAN PERALATAN (A + B) 29,161.60

D OVERHEAD & PROPIT = 10 % x C 2,916.16

E HARGA SATUAN PEKERJAAN ( C + D ) 32,077.76

URAIAN ANALISA HARGA SATUAN


PEKERJAAN : NORMALISASI SUNGAI
LOKASI : DESA LANCANG PASILO JUMERANG
KABUPATEN : PIDIE
PROPINSI : NANGGRO ACEH DARUSSALAM

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan :
3 Kondisi drainase : selesai dibersihkan
4 Jam kerja efektif Ttk 7.00 Jam
5 Luas penampang saluran L 1.50 M2

II. URUTAN KERJA


1 Penggalian sungai dengan menggunakan
Alat Berat Excavator
2 Hasil galian ditimbun disamping sungai dan
membentuk tanggul
3 Sekelompok pekerja membersihkan daerah
galian dan merapikan hasil galian, sekaligus
membentuk tanggul saluran

III. PEMAKAIAN ALAT DAN TENAGA

1 ALAT
- Excavator C03 Ls
Kapasitas Bucket V 0.65 M3
Faktor Bucket Fb 0.90
Faktor Efisiensi Alat Fa 0.83
Waktu Siklus : TS1 -
- Menggali dan menimbun T1 0.50 Menit
- Lain - lain T2 0.50 Menit
TS1 1.00 M3/Jam
Kap. Produksi/Jam = V x Fb x fa x 60 Q1 29.13
TS1 -
Koef. Alat/Km = Galian Saluran -
Q1
= 1 (2 + 1)/2 x 1 C03 0.05 Jam
Q1
ALAT BANTU C10
- Cangkul Ls
- Sekop

2 TENAGA
Produksi Kebutuhan Tenaga Q1 22.41 M3
- Pekerja P 2.00 Jam
- Mandor M 0.25 Jam
Koefisien Tenaga :
- Pekerja (P x Tk) : Q1 L01 0.625 Jam
- Mandor (M x Tk) : Q1 L02 0.077 Jam

URAIAN ANALISA HARGA SATUAN ALAT


JENIS ALAT : BULDOZER 100 -150 HP
SATUAN :
LOKASI : DESA LANCANG PASILO JUMERANG
KABUPATEN : PIDIE
PROPINSI : NANGGRO ACEH DARUSSALAM
NO. URAIAN KODE KOEFISIEN SATUAN KETERANGAN

A. URAIAN PERALATAN
1 Jenis Peralatan BULDOZER 100 - 150 HP
2 Tenaga Pw 140.00 HP
3 Kapasitas Cp
4 Alat Baru :
a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,600.00 Jam
c. Harga Alat B 512,500,000.00 Rupiah
5 Alat yang dipakai :
a. Umur Ekonomis A' 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W' 1,600.00 Jam
c. Harga Alat ( * ) B' 410,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1 Nilai sisa alat = 10 % x B C 41,000,000.00 Rupiah

2 Faktor Angsuran Modal = 1 x (1+1) ^ A' D 0.65 M3


(1+1) ^ A' - 1 0.90
3 Biaya pasti per jam : 0.83
a. Biaya pengembalian modal ( B' - C ) x D E - Rupiah
W' 0.50
b. Asuransi dan lain - lain = 0,002 x B' F 0.50 Rupiah
W' 1.00
Biaya pasti per jam = ( E + F ) G 29.13 Rupiah

C. BIAYA PASTI PER JAM KERJA

1 Bahan Bakar = ( 0,175 Ltr/HP/Jam ) x Pw x Ms H 0.05 Rupiah


2 Pelumas = ( 0,01 Ltr/HP/Jam ) x Pw x Mp I Rupiah
3 Perawatan dan Perbaikan = ( 12,5 % ) x B K Rupiah
W'
4 Operator = ( 1 orang/Jam ) x U1 L Rupiah
5 Pembantu Operator = ( 1 orang/Jam ) x U2 M Rupiah

Biaya Operasi per Jam = ( H + 1 + K + L + M ) P 22.41 Rupiah


2.00
D. TOTAL SEWA ALAT PER JAM = ( G + P ) S 0.25 Rupiah

E. LAIN - LAIN

1 Tingkat suku bunga i %/Tahun


2 Upah operator/sopir U1 9,500.00 Rp./Jam
3 Upah pembantu operator/pembantu sopir U2 6,000.00 Rp./Jam
4 Bahan Bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 12,500.00 Liter

URAIAN ANALISA HARGA SATUAN ALAT


LIST OF WAGES, BUILDING MATERIAL AND EQUIPM

PROJECT : REHABILITATION OF FISHPOND


KEMBANG TANJUNG SUB DISTRIC PIDIE DISTRIC NANGGROE ACEH DAR
WORK ITEM : REPLACEMENT OF SEMI PERMANENT BRIDGE WITH 6 METER SPAN
CODE :
NAME OF OWNER :
LOCATION : JEUMANANG, PASI LHOK, LANCANG VILLAGES

WAGE/DAY WAGE/HOURS
NO. EXPLANATION UNIT
(Rp.) (Rp.)
(1) (2) (3) (4) (5)

A. WAGES UNIT PRICE


1 Non Skill Laborer Man-hours 35,000.00 5,000.00
2 Laborer Man-hours 45,000.00 6,428.57
3 Foremen Man-hours 60,750.00 8,678.57
4 Skill Laborer Man-hours 67,500.00 9,642.86
5 Chief Laborer Man-hours 80,500.00 11,500.00
6 Heavy Duty Operator Man-hours 67,500.00 9,642.86
7 Chain Saw Operator Man-hours 67,500.00 9,642.86
8 Assistent Operator Man-hours 45,000.00 6,428.57
9 Surveyor Man-hours 75,000.00 10,714.29
10 Assistent Surveyor Man-hours 50,000.00 7,142.86

TRANSPORTA
UNIT PRICE
NO. EXPLANATION UNIT TION
(Rp.) (Rp.)
(1) (2) (3) (4) (5)

B. BUILDING MATERIAL UNIT PRICE


1 Common Timber M3 750,000.00 -
2 1st Class Timber M3 3,000,000.00 -
3 2nd Class Timber M3 2,500,000.00 -
4 Log Timber dia. 15 Cm Bh 5,200.00 -
5 Nail Kg 9,250.00 -
6 Plywood Nail Kg 9,250.00 -
7 Zincplate Nail Kg 19,000.00 -
8 Porland Cement @ 50 Kg Zak 41,000.00 -
9 Soil for Filler M3 30,000.00 -
10 Sand for Filler M3 55,000.00 -
11 Sand for Mortar M3 79,500.00 -
12 Sand for Concrete M3 79,500.00 -
13 Gravel M3 70,750.00 -
14 River Stone M3 65,000.00 -
15 Crushed Stone 2/3 M3 65,000.00 -
16 Crushed Stone 5/7 M3 65,000.00 -
17 Reinforced Concrete Steel Kg 8,000.00 -
18 Reinforced Concrete Wire Kg 10,000.00 -
19 IWF 300.150.6,5.9 Steel M' 480,000.00 -
20 IWF 150.75.5.7 Steel M' 188,000.00 -
21 IWF 250.125.6.9 Steel M' 340,000.00 -
22 IWF 125.60.6.8 Steel M' 130,000.00 -
23 L 75.75.7 Steel Profile M' 88,000.00 -
24 L 60.60.6 Steel Profile M' 64,000.00 -
25 Steel Aungkur Unit 7,200.00 -
26 Bolt Unit 3,500.00 -
27 Corrugated Zinc BJLS 20 K Unit 45,000.00 -
28 Zinc Rige BJLS 35 K Unit 30,000.00 -
29 Rubber Block Unit 23,000.00 -
30 Cast Iron dia. 1,5" M1 15,000.00 -
31 PVC Pipe dia. 3/4" M1 12,000.00 -
32 PVC Pipe dia. 4" M1 30,000.00 -
33 Acrylic Painting Kg 7,500.00 -
34 Oil Painting Kg 23,000.00 -
35 Tinner for Painting Kg 5,200.00 -
36 Filler for Painting Kg 4,500.00 -
37 Base Painting Kg 18,000.00 -
38 Sand Paper Piece 2,750.00 -
39 Wood Painting Kg 15,000.00 -
40 Teer Kg 6,500.00 -
41 Zinc Plate M2 32,500.00 -
42 Gasoline Litre 4,500.00
43 Solar Litre 4,300.00
44 Grase Litre 12,500.00

RENTAL
PRICE
NO. EXPLANATION UNIT COST/HOURS
(Rp.) (Rp.)
(1) (2) (3) (4) (5)
C. EQUIPMENT RENTAL UNIT PRICE
1 Chain Saw Unit 4,510,000.00 25,995.80
2 Concrete Mixer Unit 9,840,000.00 23,424.11
3 Excavator 80 - 140 HP Unit 410,000,000.00 247,475.36
4 Buldozer 100 - 150 HP Unit 512,500,000.00 354,640.56
5 Dump Truck 3 - 4 M3 Unit 110,700,000.00 109,978.54
6 Dump Truck Unit 123,000,000.00 131,678.96
7 Stamper Unit 6,150,000.00 11,008.29
8 Jack Hammer Unit 5,330,000.00 16,306.18
9 Generator Set Unit 41,000,000.00 151,168.79
10 Supporting Equipment Unit 12,000.00 12,000.00
STRIC NANGGROE ACEH DARRUSALAM
GE WITH 6 METER SPAN

NOTE

(6)

PRICE ON
LOCATION
(Rp.)
(6)

750,000.00
3,000,000.00
2,500,000.00
5,200.00
9,250.00
9,250.00
19,000.00
41,000.00
30,000.00
55,000.00
79,500.00
79,500.00
70,750.00
65,000.00
65,000.00
65,000.00
8,000.00
10,000.00
480,000.00
188,000.00
340,000.00
130,000.00
88,000.00
64,000.00
7,200.00
3,500.00
45,000.00
30,000.00
23,000.00
15,000.00
12,000.00
30,000.00
7,500.00
23,000.00
5,200.00
4,500.00
18,000.00
2,750.00
15,000.00
6,500.00
32,500.00
4,500.00
4,300.00
12,500.00

NOTE

(6)
DAFTAR HARGA SATUAN UPAH DAN BAHAN
UPAH/HARI UPAH/JAM
NO. URAIAN SATUAN KETERANGAN
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)

A. HARGA SATUAN UPAH


1 Buruh Tak Terlatih OH 35,000.00 5,000.00
2 Pekerja OH 45,000.00 6,428.57
3 Mandor OH 47,500.00 6,785.71
4 Tukang kayu OH 52,500.00 7,500.00
5 Kepala Tukang OH 55,000.00 7,857.14
6 Operator Alat Berat OH 66,500.00 9,500.00
7 Operator Chain Saw OH 55,500.00 7,928.57
8 Pembantu Operator OH 42,000.00 6,000.00
9 Juru Ukur OH 65,000.00 9,285.71
10 Pembantu Juru Ukur OH 45,000.00 6,428.57

ONGKOS JLH HARGA


HARGA SATUAN ANGKUT DILOKASI
NO. URAIAN SATUAN
(Rp.)
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)

B. HARGA SATUAN BAHAN


1 Kayu /Papan Sembarang M3 1,300,000.00 - 1,300,000.00
2 Kayu / Papan kelas II M3 2,000,000.00 - 2,000,000.00
3 Kayu / Papan kelas III M3 1,700,000.00 - 1,700,000.00
4 Kayu Bulat dia. 15 Cm Bh 1,200.00 - 1,200.00
5 Paku Biasa Kg 10,000.00 - 10,000.00
6 Paku Triplek Kg 9,250.00 - 9,250.00
7 Paku Seng / Atap Kg 19,000.00 - 19,000.00
8 Semen PC (40 Kg) Zak 30,000.00 - 30,000.00
9 Tanah Timbun M3 30,000.00 - 30,000.00
10 Pasir Urug M3 55,000.00 - 55,000.00
11 Pasir Pasang M3 65,000.00 - 65,000.00
12 Pasir Beton M3 79,500.00 - 79,500.00
13 Kerikil M3 70,750.00 - 70,750.00
14 Batu Kali M3 65,000.00 - 65,000.00
15 Batu Belah 2/3 M3 85,000.00 - 85,000.00
16 Batu Belah 5/7 M3 65,000.00 - 65,000.00
17 Besi beton Kg 6,500.00 - 6,500.00
18 Kawat beton Kg 5,000.00 - 5,000.00
19 Besi IWF 300.150.6,5.9 M' 480,000.00 - 480,000.00
20 Besi IWF 150.75.5.7 M' 188,000.00 - 188,000.00
21 Besi IWF 250.125.6.9 M' 340,000.00 - 340,000.00
22 Besi IWF 125.60.6.8 M' 130,000.00 - 130,000.00
23 Besi L 75.75.7 M' 88,000.00 - 88,000.00
24 Besi L 60.60.6 M' 64,000.00 - 64,000.00
25 Angker/Sengkang Bh 7,200.00 - 7,200.00
26 Angkur/Baut Bh 3,500.00 - 3,500.00
27 Seng Gelombang BJLS 20 K Bh 45,000.00 - 45,000.00
28 Rabung Seng BJLS 35 K Bh 30,000.00 - 30,000.00
29 Karet Mati Bh 23,000.00 - 23,000.00
30 Saluran Air Bersih Pipa dia. 1,5" M1 15,000.00 - 15,000.00
31 Saluran Air Kotor Pipa dia. 3/4" M1 12,000.00 - 12,000.00
32 Saluran Air Kotor Pipa dia. 4" M1 30,000.00 - 30,000.00
33 Cat tembok Kg 7,500.00 - 7,500.00
34 Cat Minyak Kg 23,000.00 - 23,000.00
35 Minyak Cat Kg 5,200.00 - 5,200.00
36 Dempul Kg 4,500.00 - 4,500.00
37 Cat Menie Kg 18,000.00 - 18,000.00
38 Amplas Lbr 2,750.00 - 2,750.00
39 Cat Kayu Kg 15,000.00 - 15,000.00
40 Teer Kg 6,500.00 - 6,500.00
41 Seng Plat M2 32,500.00 - 32,500.00
42 Minyak Bensin Ltr 4,500.00 4,500.00
43 Minyak Solar Ltr 4,300.00 4,300.00
44 Minyak Pelumas Ltr 12,500.00 12,500.00
ONGKOS JLH HARGA
HARGA SATUAN ANGKUT DILOKASI
NO. URAIAN SATUAN
(Rp.)
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)

C. HARGA SATUAN ALAT


1 Chain Saw OH 4,510,000.00 25,995.80
2 Concrete Mixer OH 9,840,000.00 23,424.11
3 Excavator 80 - 140 HP OH 495,000,000.00 247,475.36
4 Buldozer 100 - 150 HP OH 512,500,000.00 354,640.56
5 Dump Truck 3 - 4 M3 OH 110,700,000.00 109,978.54
6 Dump Truck OH 123,000,000.00 131,678.96
7 Stamper OH 6,150,000.00 11,008.29
8 Jack Hammer OH 5,330,000.00 16,306.18
9 Generator Set OH 41,000,000.00 151,168.79 10,077.92
10 Alat Bantu OH 12,000.00 12,000.00
Hal. 1

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
DEEP SOIL EXCAVATION
GALIAN TANAH DALAM K.224 A

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION ASUMTION
1 Soil excavation doing by man 1 Using man power
power 2 Capacity of working group 100/ day
2 Result of soil excavation 3 Average of excavation up to 3 m
be moved from digging 4 For the stony the work with code K.224
3 Depth excavation be containing be multiplicated by 1,5 factor
water and having balance factor 5 For drying be suporting by pump

URAIAN : 1 Penggalian tanah dengan tenaga ANGGAPAN : 1 Penggunaan tenaga manusia


manusia 2 Kapasitas kerja kelompok 100/ hari
Tanah galian disingkirkan dari 3
2 Kedalaman rata - rata s/d 3 m
lobang tenaga
galian 4 Untuk jenis berbatu harga satuan pekerjaan K.224
3 Galian dalam terdapat air dan dikalikan dengan faktor 1,5
adanya faktor kesesuaian 5 Untuk proses pengeringan perlu dibantu pompa

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Non skill Laborer 8.000 1.000 8.000 35,000.00 280,000.00

327,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

- - - - - - -

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 327,500.00


VOLUME E 2.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 40,937.50 Per M3


Hal. 2

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
SOIL FILLER FOR OPRIT
TIMBUNAN TANAH/OPRIT K.225

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 For the pilling of building ASUMTION 1 Material cost be calculated on the job site
material must be clean 2 Compaction coefisien 1,30
from the organic matter
2 Construction of filling doing
layer by layer
ANGGAPAN : 1 Harga bahan sampai di lokasi pekerjaan
2 Koefisien pemadatan 1,30

URAIAN : 1 Tempat penimbunan bahan


untuk konstruksi bersih dari
bahan organik
2 Pekerjaan ditempatkan untuk
timbunan pada konstruksi lapis
demi lapis.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Non skill Laborer 4.000 1.000 4.000 35,000.00 140,000.00
Operator 1.000 1.000 1.000 66,500.00 66,500.00
254,000.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

Soil Filler 26.000 M3 - 30,000.000 780,000.00

780,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Roller Stell Whell 1.000 - 3.000 55,500.00 166,500.00

166,500.00

JUMLAH (Rp.) 1,200,500.00


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 150,062.50 Per M3


Hal. 3

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
SOIL RE-FILL
URUGAN TANAH KEMBALI 1/2 A.1

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Soil from excavation be filled ASUMTION 1 Tanah urugan diratakan dan dipadatkan dengan
to the digging location cara menumbuk.
2 The organic disposal from
digging be throwing ANGGAPAN : 1 Soil filler be flated and be compacted by
hand compaction
URAIAN : Tanah bekas galian diurug
1
kembali
ke bekas galian
2 Membuang sampah - sampah dari
bekas galian

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.012 1.000 0.012 47,500.00 570.00
Non skill Laborer 0.375 1.000 0.375 35,000.00 13,125.00
Operator -
13,695.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

- - - - - - -

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Water Pump - 0.00 -

0.00

JUMLAH (Rp.) 13,695.00


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 1,711.88 Per M3


Hal. 4

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
LOG TIMBER 15 s/d 20 Cm FOR PILLING
PENGADAAN TIANG PANCANG 15 s/d 20 Cm K.900

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Material on out of job site ASUMTION 1 Cost of material franco on pick up location
Transportation the material by 2
2 Length of timber 7 M be lifted by 4 man
man
power to the job site
Material be pilled on the pic up
3
location
The distance of pick up location
3 ANGGAPAN : 1 Harga bahan sesuai dengan tempat pengambilan
max
5 km 2 Panjang kayu kurang lebih 7 M diangkut oleh
4 orang
URAIAN : 1 Bahan/material berada diluar
lokasi pekerjaan
2 Bahan diangkut oleh tenaga
manusia ketempat pekerjaan
Bahan ditumpuk ditempat
3
pengambilan
Jarak pengambilan maksimum 5
4
Km

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.010 1.000 0.010 47,500.00 475.00
Chief Laborer 0.030 1.000 0.030 55,000.00 1,650.00
Skill Laborer 0.250 1.000 0.250 52,500.00 13,125.00
Non skill Laborer 0.100 1.000 0.100 35,000.00 3,500.00
18,750.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

Timber 0.220 M3 - 1,300,000.000 286,000.00 -

286,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

- - - - -

0.00

JUMLAH (Rp.) 304,750.00


VOLUME E 7.000 SATUAN M'
D/E HARGA SATUAN (Rp.) 43,535.71 Per M'

Hal. 5

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS LOG TIMBER 15 s/d 20 Cm PILLING
PEMANCANGAN TIANG PANCANG KAYU K.901
CEROCOK dia. 15 S/D 20 CM

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Ton
by on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cm
site 3 Foundation using the timber piling and pillar
4 Pile set up be diging before
URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier
2 Bahan diletakkan kedudukannya ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton
dekat dengan lokasi pekerja 2 Penghentian pemancangan setelah 10 kali ditumbuk
masuk = 1 cm
3 Pondasi digunakan pemancang kayu dan pilar
4 Letak pancang dilubangi lebih dahulu.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.050 1.000 0.050 47,500.00 2,375.00
Chief Laborer 0.030 1.000 0.030 55,000.00 1,650.00
Skill Laborer 1.800 1.000 1.800 52,500.00 94,500.00
Non skill Laborer 0.350 1.000 0.350 35,000.00 12,250.00
110,775.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

- - - - - - -

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Hammer 1.000 - 0.140 11,415.00 1,598.10

1,598.10
JUMLAH (Rp.) 112,373.10
VOLUME E 1.000 SATUAN M'

D/E HARGA SATUAN (Rp.) 112,373.10 Per M'

Hal. 6

WORK COST ESTIMATE ANALIZE CODE


ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
FRENCH RED CROSS
PALANG MERAH PERANCIS SAND FILLER UNDER THE FOUNDATION
URUGAN PASIR PADA BAWAH PONDASI A. 18

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Filling be compacted ASUMTION 1 Material cost be calculated on the job site
each 20 cm per layer 2 Capacity of working group 100/ day

URAIAN : 1 Timbunan harus dipadatkan ANGGAPAN : 1 Harga bahan sampai dilokasi pekerjaan
2 Kapasitas kerja kelompok 100/ hariKoefisien
setiap lapisan setebal 20 cm
pemadatan 1 : 2

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.012 1.000 0.012 47,500.00 570.00
Skill Laborer 0.375 1.000 0.375 52,500.00 19,687.50
Operator - - - 0.00
20,257.50
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

Sand Filler 1.200 M3 55,000.00 66,000.00

66,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

-
0.00

JUMLAH (Rp.) 86,257.50


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 10,782.19 Per M3

Hal. 7

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS RIVER STONE PAIRING CONTRUCTION
KONSTRUKSI PASANGAN BATU K.810

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Material and equipment stand ASUMTION 1 Using culvert, bridge and shear wall and
by on job site by supplyer ather structure with stone pairing
2 Stone crushed be install with wit water proofing mortar
PC and Sand mortar 2 Material be delivered on job site
3 Not included the excavation and filling
URAIAN : 1 Material disiapkan di lokasi oleh 4 Mortar 1 : 3
supplier
Batu belah dipasang dengan ANGGAPAN : 1
2 Digunakan pada gorong - gorong, jembatan, tembok
ikatan
spesi semen PC + Pasir penahan dan struktur-struktur yang lain yang
menggunakan pasangan batu kedap air
2 Material dikirim sampai lokasi
3 tidak termasuk pekerjaan galian/timbunan
4 Adukan spesi 1 : 3

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.010 1.000 0.010 47,500.00 475.00
Skill Laborer 4.000 1.000 4.000 52,500.00 210,000.00
Non Skill Laborer 12.000 1.000 12.000 35,000.00 420,000.00
630,475.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Batu belah 10-15 cm 5.000 M3 - 65,000.000 325,000.00 -
Pasir 1.250 M3 - 65,000.000 81,250.00 -
Semen (40 Kg) 15.000 zak - 30,000.000 450,000.00 -
856,250.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
- - - - -

0.00

JUMLAH (Rp.) 1,486,725.00


VOLUME E 5.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 297,345.00 Per M3

Hal. 8

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS PLESTERING
PLESTERAN K.811

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Ton
by on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cm
site 3 Foundation using the timber piling and pillar
4 Pile set up be diging before
URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton
2 Bahan diletakkan kedudukannya 2 Penghentian pemancangan setelah 10 kali ditumbuk
dengan pekerja masuk = 1 cm
3 Pondasi digunakan pemancang kayu dan pilar
4 Letak pancang dilubangi lebih dahulu.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 6.000 1.000 6.000 52,500.00 315,000.00
Non skill Laborer 12.000 1.000 12.000 35,000.00 420,000.00
837,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Concrete Sand 0.780 M3 - 65,000.000 50,700.00 -
PC @40 Kg 7.900 zak - 30,000.000 237,000.00 -

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 837,500.00


VOLUME E 50.000 SATUAN M2

D/E HARGA SATUAN (Rp.) 16,750.00 Per M2

Hal. 9

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
CONCRETE FORM WORK
PEKERJAAN CETAKAN UNTUK BETON K. 890

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 The equipment be installed on ASUMTION 1 Material cost be calculated on the job site
concrete or stone pairing 2 Cutting of PVC pipe dia. 2 " depend on wall thickess
with the slope to below or wall thickess.
ather 3 Palm fibre be install on the end of PVC
To be installed palm fibre round 4
2 PVC be calculated @ 40 m'
the PVC pipe
dalam peralon.
ANGGAPAN : 1 Harga bahan dihitung ditempat pekerjaan
URAIAN : 1 Memasang peralatan pada 2 Setiap potongan peralon 2 " panjang tergantung lebar/
pasangan batu/beton pada talud tebal dinding.
dengan miring ke bawah bagian 3 Ijuk dipasang diujung sekeliling peralon bagian dalam.
lainnya 4 Hitungan peralon per 40 m'
2 Memasang ijuk disekeliling bagian
dalam peralon.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Non Skill Laborer 4.000 1.000 4.000 35,000.00 140,000.00
Operator - - - 0.00
187,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Paralon 2 " 40.000 M' 15,000.00 600,000.00
Ijuk 20.000 Kg 4,000.00 80,000.00

680,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL
PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 867,500.00


VOLUME E 40.000 SATUAN M'

D/E HARGA SATUAN (Rp.) 21,687.50 Per M3

Hal. 9a

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS
PALANG MERAH PERANCIS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CANAL REPLECEMENT BY HEAVY DUTY EQ.
MEMBUAT SALURAN K. 110 A
(MENGGUNAKAN ALAT BERAT)

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Canal excavation doing by ASUMTION 1 Using the excavator (140 M3/hari)
Excavation 2 Tree and any planting be clean up
2 Soil from canal excavation be following the dykes be construction.
throwing on side of canal
3 Man power be throwing the ANGGAPAN : 1 Menggunakan alat berat exavator (140 M3/hari)
roots and ather disposal 2 Pohon-pohon dan semak belukar sudah dibersihkan
pada waktu pembentukan tanggul samping.
URAIAN : Menggali saluran dengan
1
Exavator.
excavator
2 Tanah galian diangkat ke
samping saluran yang digali.
3 Tenaga manusia membuang akar-
akar kayu dan sampah-sampah
lainnya.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Skill Operator 1.000 1.000 1.000 66,500.00 66,500.00
Operator Ass. 1.000 1.000 1.000 42,000.00 42,000.00
Non Skill Laborer 5.000 1.000 5.000 35,000.00 175,000.00
331,000.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
0.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Exavator 140 HP 1.000 1.000 5.000 247,475.36 1,237,376.80

1,237,376.80

JUMLAH (Rp.) 1,568,376.80


VOLUME E 140.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 11,202.69 Per M3


Hal. 10

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS CONCRETE FORM WORK
PEKERJAAN CETAKAN UNTUK BETON K. 710

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION ASUMTION
URAIAN : ANGGAPAN : 1 1/3 dari bahan masih dapat digunakan lagi untuk
1 Menyiapkan bahan memotong, pada cetakan lain.
mengergaji, memaku dan 2 Kapasitas produksi = 2 M3 / hari.
memasang

2 Membongkar cetakan setelah


beton mengeras.

10 Formwork
10 Cetakan dibongkar oleh pekerja
atau ijin Direksi.
TOTAL TOTAL BILLING COST SUB TOTAL
LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 6.000 1.000 6.000 52,500.00 315,000.00
Non Skill Laborer 4.000 1.000 4.000 35,000.00 140,000.00
557,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Kayu Begisting 0.800 M3 1,300,000.00 1,040,000.00
Paku 8.000 Kg 10,000.00 80,000.00

1,120,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 1,677,500.00


VOLUME E 2.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 671,000.00 Per M3


Hal. 11

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
CLEANING AND COATING
PEMBERSIHAN DAN CAT TEMBOK K.813

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION ASUMTION
URAIAN : ANGGAPAN : Bahan dihitung ditempat pekerjaan.
1 Membersihkan tempat yang akan 2 1 kg can be covered on 6 m2
dicat. 1 kg dapat menghasilkan 6 m2
3 Calculated per 1 m2
2 Cat dituang kedalam baskom Hitungan per 1 m2
dan dicatkan dengan roll kuas.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 0.010 47,500.00 475.00
Skill Laborer 1.000 1.000 0.200 52,500.00 10,500.00
Operator - - - - -
10,975.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

Cat Tembok 0.300 Kg - 7,500.000 2,250.00

2,250.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 13,225.00


VOLUME E 1.000 SATUAN M2

D/E HARGA SATUAN (Rp.) 13,225.00 Per M2


Hal. 12

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS CONCRETE REINFORCEMENT
PENULANGAN BETON K. 715

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Bahan disediakan oleh Supplier


2 Besi dipotong dibentuk dan diikat. ASUMTION 1 200 Kg besi dapat disiapkan dalam 1 hari
2 Cost of material besed on job site
URAIAN : 1 Bahan disediakan oleh Supplier 2 Harga material berdasarkan ditempat pekerjaan.
2 Besi dipotong dibentuk dan diikat. Pemakaian bahan tulangan dilebihkan 10 % untuk
3 membengkok dan penyambungan.

ANGGAPAN : 1 200 Kg besi dapat disiapkan dalam 1 hari


2 Cost of material besed on job site
2 Harga material berdasarkan ditempat pekerjaan.
Pemakaian bahan tulangan dilebihkan 10 % untuk
3 membengkok dan penyambungan.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Laborer 1.000 1.000 1.000 52,500.00 52,500.00
Skill Laborer 2.000 1.000 2.000 45,000.00 90,000.00
Non skill Laborer 2.000 1.000 2.000 35,000.00 70,000.00
260,000.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Besi Beton 220.000 Kg 6,500.00 1,430,000.00
Kawat Ikat 2.000 Kg 5,000.00 10,000.00

1,440,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 1,700,000.00


VOLUME E 2.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 850,000.00 Per M3


Hal. 13

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS CONCRETE K. 175
B E T O N K. 175 K.725

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Material and equipment stand ASUMTION 1 Material cost be calculated on the job site
by on job site by supplyer 2 Productivity of concrete mixer is 10 M3/hari.
2 Before using the agregat must be 3 Mix design 1 : 2 : 3.
cleaning 4 Length of mixing is 9 minute
3 Concrete be mixed by mechanical 5 The weight of 1 M3 concrete 2.400 Kg and
mixer and near the job site. 1 Pocket PC 40 Kg.

ANGGAPAN : 1 Harga/material dihitung dilokasi pekerjaan.


URAIAN : 1 Bahan/material disediakan oleh 2 Kapasitas produksi adukan beton 10 M3/hari.
Supplier. 3 Campuran 1 : 2 : 3.
2 Sebelum digunakan agregat harus 4 Lamanya setiap kali pengadukan 9 menit
5 1 M3 beton beratnya 2.400 Kg dan 1 Zak PC beratnya
dibersihkan dahulu
40 Kg
3 Beton diaduk dengan pengaduk
mekanis didekat lokasi
pengecoran.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 1.000 1.000 1.000 52,500.00 52,500.00
Non skill Laborer 8.000 1.000 8.000 35,000.00 280,000.00
Operator Non skill 1.000 1.000 1.000 35,000.00 35,000.00
470,000.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Batu Kerikil 1.650 M3 - 70,750.000 116,737.50 -
Semen PC 16.480 Zak - 30,000.000 494,400.00 -
Pasir Beton 1.080 M3 - 79,500.000 85,860.00 -
696,997.50

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Concrete Mixer 1.000 - 8.000 23,424.11 187,392.88

187,392.88

JUMLAH (Rp.) 1,354,390.38


VOLUME E 2.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 677,195.19 Per M3

Hal. 14

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
REINFORCEMENT CONCRETE
BETON BERTULANG LANDASAN PLAT INJAK K.725 A
DAN GLAGAR

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Reinforcement steel and concrete ASUMTION 1 Concrete mixing 1 : 2 : 3


workform be ready in jab site 2 Capacity are 2 M3/days
2 Concrete be mixing by mechanic 3 Material cost be calculated on the job site
mixer and near the concrete
location ANGGAPAN : 1 Campuran beton 1 : 2 : 3
2 Kapasitas 2 M3/hari
URAIAN : 1 Bahan besi dan cetakan telah siap 3 Haraga bahan dilokasi pekerjaan.
ditempat.
2 Beton diaduk dengan mesin
pengaduk mekanis didekat lokasi
pengecoran.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Pek. Beton 1.000 1.000 1.000 470,000.00 470,000.00
Pek. Besi 1.400 1.000 1.400 260,000.00 364,000.00
Pek. Cetakan 0.400 1.000 0.400 557,500.00 223,000.00
Operator 1.000 1.000 1.000 42,000.00 42,000.00
1,099,000.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Beton 1.000 (1) 696,997.50 696,997.50
Besi 1.400 (1) 1,440,000.00 2,016,000.00
Cetakan 0.400 (1) 1,120,000.00 448,000.00
3,160,997.50

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Concrete Mixer 1.000 - 8.000 23,424.11 187,392.88

187,392.88
JUMLAH (Rp.) 4,447,390.38
VOLUME E 2.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 2,223,695.19 Per M3

Hal. 15

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
INSTALL THE TIMBER BEAM AND BRANCHING
MEMASANG GELAGAR/SEKUR K.900E

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Balok pemikul dipasang diatas ASUMTION 1 With man pawer


tiang pancang. 2 Main Beam 25/30
2 Gelagar dipasang diatas balok 3 Timber 5/30
pemikul. 4 Be calculated per 1 M3
3 Untuk perkuatan masing-masing
sambungan memakai baut/paku ANGGAPAN : 1 Dengan tenaga manusia
dan begel. 2 Balok utama ukuran 25/30
3 Balok melintang ukuran 25/30
URAIAN : 1 Balok pemikul dipasang diatas 4 Dihitung per 1 M3
tiang pancang.
2 Gelagar dipasang diatas balok
pemikul.
3 Untuk perkuatan masing-masing
sambungan memakai baut/paku
dan begel.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 2.000 1.000 2.000 52,500.00 105,000.00
Laborer 6.000 1.000 6.000 45,000.00 270,000.00
477,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Paku/baut 6.500 Kg - 10,000.000 65,000.00 -
Kayu 1.000 M3 - 2,000,000.000 2,000,000.00 -
Besi begel 3.015 Bh - 7,200.000 21,708.00 -
2,086,708.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Alat bantu 1.000 Set - 12,000.000 12,000.00 -

12,000.00

JUMLAH (Rp.) 2,576,208.00


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 2,576,208.00 M3

Hal. 16

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
INSTALL THE TIMBER RUNNING FLOOR
PEKERJAAN KAYU BANTALAN LANTAI K. 903

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Kayu diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site
Kayu dipotong sesuai dengan 2
2 Be calculate per 1 M3
ukuran
dalam desain.
ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan.
URAIAN : 1 Kayu diketam terlebih dahulu. 2 Dihitung per 1 M3
Kayu dipotong sesuai dengan
2
ukuran
dalam desain.

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.200 1.000 0.200 47,500.00 9,500.00
Chief Laborer 1.200 1.000 1.200 55,000.00 66,000.00
Skill Laborer 12.000 1.000 12.000 52,500.00 630,000.00
Laborer 4.000 1.000 4.000 45,000.00 180,000.00
885,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Paku 0.750 Kg - 10,000.000 7,500.00 -
Kayu 1.000 M3 - 1,300,000.000 1,300,000.00 -
-
1,307,500.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

- - - - -

0.00

JUMLAH (Rp.) 2,193,000.00


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 2,193,000.00 Per M3

Hal. 17

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS COATING FOR RAILING
PENGECATAN SANDARAN K.813 A

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Membersihkan tempat yang akan ASUMTION 1 Material cost be calculated on the job site
dicat. 2 1 Kg anty terminete can be covered 3 m2 area
2 Cat dikerjakan dengan kuas. 3 Calculated per 1 m2

URAIAN : 1 Membersihkan tempat yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan
dicat. 2 1 Kg dapat menghasilkan 3 M2
2 Cat dikerjakan dengan kuas. 3 Hitungan per 1 M2

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 0.200 1.000 0.200 45,000.00 9,000.00
Skill Laborer 2.000 1.000 2.000 52,500.00 105,000.00
Laborer 4.000 1.000 4.000 55,000.00 220,000.00
381,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Nail/Bolt 6.500 Kg 10,000.00 65,000.00
Timber 1.000 M3 1,700,000.00 1,700,000.00

1,765,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL
PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Suporting Eq. 1.000 Set - 12,000.000 12,000.00 -

12,000.00

JUMLAH (Rp.) 2,158,500.00


VOLUME E 1.000 SATUAN M3

D/E HARGA SATUAN (Rp.) 2,158,500.00 Per M3

Hal. 18

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
INSTALL THE TMBER FOR BRIDGE FLOORING
MEMASANG LANTAI JEMBATAN K.902

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Papan diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site
2 Papan dipotong sesuai lebar 2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
jembatan. 3 Hitungan per 1 M2
3 Papan dibaut pada kayu bantalan
lantai ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan
2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
URAIAN : 1 Papan diketam terlebih dahulu. 3 Hitungan per 1 M2
2 Papan dipotong sesuai lebar
jembatan.
3 Papan dibaut pada kayu bantalan
lantai

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 2.000 1.000 2.000 52,500.00 105,000.00
Non Skill Laborer 6.000 1.000 6.000 35,000.00 210,000.00
417,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Nail/Bolt 6.500 Kg 10,000.00 65,000.00
Timber 1.000 M3 1,300,000.00 1,300,000.00
1,365,000.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 1,782,500.00


VOLUME E 1.000 SATUAN M2

D/E HARGA SATUAN (Rp.) 1,782,500.00 Per M2

Hal. 19

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS
INSTALL THE TIMBER FOR FLOORING COVER
LAPIS PENUTUP LANTAI K. 813 B

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job site
diteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Teer dioleskan dengan kuas. 3 Calculated per 1 m2

URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.
diteer. 2 1 Kg teer mengerjakan 3 m2 luasan
2 Teer dioleskan dengan kuas. 3 Hitungan per 1 m2

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Laborer 6.000 1.000 6.000 52,500.00 315,000.00
Operator - - - 0.00
362,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Stone Crush 5/7 cm 0.070 M3 65,000.00 4,550.00
Stone Crush 2/3 cm 0.030 M3 85,000.00 2,550.00
Terminite (Teer) 4.000 Kg 6,500.00 26,000.00
Sand 0.020 M3 65,000.00 1,300.00
Seng Plat BJLS 20 0.500 Lbr 45,000.00 22,500.00
56,900.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

Supporting Eq. 2.000 Set - 12,000.000 24,000.00 -

24,000.00

JUMLAH (Rp.) 419,400.00


VOLUME E 1.000 SATUAN M2

D/E HARGA SATUAN (Rp.) 419,400.00 Per M2

Hal. 20

WORK COST ESTIMATE ANALIZE CODE


FRENCH RED CROSS ANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PALANG MERAH PERANCIS CLEAN OUT AND TERMINITE COATING
PEMBERSIHAN DAN PENGETERAN K. 813 B

REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,


KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG
KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM

EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job site
diteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Anty termite painting be 3 Calculated per 1 m2
coating by shaving brush
URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.
diteer. 2 1 Kg teer mengerjakan 3 m2 luasan
2 Teer dioleskan dengan kuas. 3 Hitungan per 1 m2

TOTAL TOTAL BILLING COST SUB TOTAL


LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 0.080 1.000 0.080 47,500.00 3,800.00
Skill Laborer 0.540 1.000 0.540 52,500.00 28,350.00
Operator - - - 0.00
32,150.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)

Termite 0.400 Kg 6,500.00 2,600.00

2,600.00

EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL


PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)

0.00

JUMLAH (Rp.) 34,750.00


VOLUME E 1.000 SATUAN M2

D/E HARGA SATUAN (Rp.) 34,750.00 Per M2