MUNICIPALITY OF AMPATUAN

INFRASTRUCTURE
Workshop 01: LDIS Data Analysis
CORE
SECTOR/ SUB-SECTOR DEVELOPMENT TEMPORAL
CONCERNS INDICATORS
LOCAL TRENDS MAJOR ISSUES
INFRATRUCTURE 2014 2015
Some of the gravel roads are now being
Road density (area covered 0.0024Has Increase road Density concreted due to projects coming from
by roads to total land area) 0.0025Has local & national government
Total length of roads in
0.034Has There are still more roads that needs to be
km/total land area of A&D 0.032Has Increase in Total length of road
concreted
land
ECONOMIC SUPPORT Kilometer of road per 100 0.55km There are still more roads that needs to be
0.51km Increase in Km of Road
population concreted
PUBLIC ROADS
Density of farm to market 0.27Has There are still more roads that needs to be
roads (km/100 ha of 0.23Has Increase in density of FMR concreted
farmland)
Percent of permanent Maintenance bridge for safety purpose and
82% 82% No Increase
bridges establishment of permanent Bridge
Total office floor space per
4.1 Decrease in total office space per Office space should be renovated/repair to
OFFICE SPACE municipal employee (in sq. 4.4
Municipal Employee have good working place
m)
No. of fire trucks per capita Need to have additional fire truck to fight
1:24,801 No increase
1:24,801 Fire related incident
No. of police outposts/1000 Need to have additional outpost for police
PUBLIC SAFETY households 2:10 1: 5 Decrease in No. of Police Outpost feasibility to maintain peace in order
situation
No. of prisoners/detention Need Construction of detention cell to
ADMINISTRATIVES 0 No Detention Cell
cell 0 accommodate prisoners
SUPPORT Percent occupancy of 2%
1.9% Increase in Occupancy Improvement of Municipal Cemetery
MUNICIPAL CEMETERY municipal cemetery
Total area of public open 83.1 Vast open space is available for
83.1 No increase
space per 1000 inhabitants development
Total number of covered
courts/number of barangays Need additional covered court to every
OPEN SPACE 4/11 4/11 No increase
barangays to use in different activities

1
Area of Open Space ,
excluding roads, per 1000 79.30 Decrease in area of Open Space Wide open space is available for
79.74
SOCIAL SERVICES population development

Number of Households with


1,736hh 1,984HH Increase of No. of HH with MV
motorized vehicles
Percent of HH served by 65% Need to request from electric company to
Increase in No. of HH serve by Electric
electric power 60% provide electricity to barangays without
Power
UTILITIES electricity
Ratio of HH served by piped Allocate fund for additional construction of
900:2575 Increase in Ratio of HH serve by Pipe
SOCIAL SUPPORT water supply to total urban 773:2575 water system project for everybody have
water Supply
HH access to potable water supply
HEALTH No. of hospital beds per Needs to construct and avail hospital
2:24,801 2:24,801 No Increase
1000 population facilities to serve all local populate.
EDUCATION Classroom-to-pupil ratio E 1:48 Decrease and increase in classroom to
E 1:54 Construct school building to achieve the
in elementary schools; in S 1:32 Pupil ration in elem. And Secondary
S 1:30 standard of pupils to classroom
secondary schools school respectively
No. of telephones/1000 0
0 No Telephone Line.
TELE - urban HH
COMMUNICATION Ratio of postal employees to 0
0
total HH population