Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment For Fixing of Location:-
Contractor :- boom for crane

Probabili
ty

Probabili
ty
Sl Basic Job Potential Initial Additional R

Residual
risk
Consequence Current control measure Risk rating
No. Steps Hazard Risk control is
measure k
r
a
P E A R P E A R
ti
1 Lifting of Failure of sling Get All the wire rope must be tested by 1 0 0 0 2 2 n
boom by the injury/Fatality competent person and it should be colour g
hydra coaded
Only authorised person allow for giving the
signal
Deployment only skill workmen

Before starting the activity all the extra manpower


should be removed from the working area
Barricade the working area by caution tape
2 Fixing of boom Fall /Slip of man Get Injury Ascecding and descending on the top of the boom 1 0 0 0 2 2
to be done through inbuilt landing step
Use of safety shoe,helmet,handgloves &floresecent
jacket and goggles
Before fixing the boom it should be properly
supported by the wooden butten
Nobody allow under the suspended load
Prepared By Approved By Reviewd By
Contractor Contractor
Date Date Date