Romold is one stop shop for all

your house discharge works. Our


Grease Trap well established ranges of quality
PE products include:

Sewerage
inspection/manholes
chambers.

Gully traps.

Grease traps for individual


and industrial use.

Note: Control Unit is optional, Romold does not supply control unit. Triple layers water tanks
500L, 750L and 1000L.

Grease separator is an integral part of a modern sewer drainage system. Romold grease separators are Underground water tanks
designed as per European Standard: EN 1825 and DIN 4040. A grease separator is an inline device that
removes organic grease from waste water and is typically used in domestic kitchens, hotels, restaurants, Septic tanks.
fast food operation, food processing industry.

The system is composed of a solid/sludge trap (S) and a grease interceptor (F).
Multi-use, flat base
chambers for pumps,
Romold grease separator systems ensure high levels of separation with following distinct advantages: valves, electrical and
other connections.
The units are constructed of black UV stabilized polyethylene (PE)
High performance in corrosive environments. Advanced technical support
Flexible installation -- inlet and outlet connections can be oriented at varying angles up to 150o is available for all products
High quality industrial strength design with robust construction for challenging site conditions
from our technical support
team and specialist sales.
Can be installed on or off road
Unique cylindrical design for strength and reduced excavation depth.

Romold Grease Traps are manufactured in 7 sizes (please refer to table below).

Romold Grease Trap dimensions


Product NSI/s Total Working Height at Width Length Inlet/ No of Top
Code Capacity Capacity cover mm mm Outlet openings opening
level mm mm mm
GT 2000 4 2000 1857 1430 1580 1550 110/160/200 1 600

GT 2500 5 2500 2367 1430 1580 1905 110/160/200 1 600

GT 3000 6 3000 2877 1430 1580 2260 110/160/200 1 600

GT 4500 8 4500 4200 1430 1580 3110 110/160/200 2 600 MS ISO 9001 : 2008
September 2011

GT 5500 10 5500 5200 1430 1580 3820 110/160/200 2 600 Manufactured by:
Romold (Mauritius) Ltd.
GT 8000 20 8000 7800 1430 1580 5380 110/160/200 3 600

GT 10000 9666 110/160/200 4 600 Distributed by:


25 10000 1430 1580 6940
STR Marketing Ltee
Old Moka Road, Bell Village,
P.O. Box 98, Port Louis - Mauritius
In addition to above single piece systems Romold grease traps can be combine together in a Tel: (230) 212 9972
modular system to provide flexible on demand sizing. For example, NS 50 = 2 x NS 25 in parallel or Fax: (230) 212 9998
other sizing by placing systems in series. Please consult Romold technical team to provide optimal E-mail: info@str.mu
Website: www.str.mu
sizing for your project.
A. General Installation procedures
The instructions are intended for installation up to 1.5 m depth. This type of installation is
meant for non-traffic areas. Please refer to section F below for depths of more than 1.5 m
Reference Projects:
and in traffic area installation. Trou aux Biches Hotel
Important : Do not install in place where ground water might be found. Les Alles dHelvetia
Please consult Romold for such installation.
Rain water should not be allowed in grease trap. Athena Villas
Illustration of the installation at up to 1.5 m depth St Regis Hotel
TERRIN Belle Rivire Hotel
SOIL
INTLET West Rock
OUTLET
Jeetoo Hospital
Bagatelle Mall of Mauritius
DIGGING
15cm COMPACTED
BEDDING MATERIAL
30cm COMPACTED
BEDDING MATERIAL
Azure Villas
B. Excavating, digging and assembling
La Mivoie commercial center
1 Excavate 60 cm wider and 15cm deeper than the grease trap size. Long Beach Hotel
2 A base layer of 15 cm should be filled and compacted to 95% with rock sand or
selected material with size less than 32mm and without any sharp objects/rocks.
Villas Tamarin
3 Place the grease trap on the compacted layer of 15cm. Beach House Hotel
4 Check the levelling.
5 Connect your inlet and outlet with Romold inlet seals. The direction of the inlet/outlet MCB Ebne
should be taken into consideration as it can be adjusted. Please note that the diameter
of the outlet pipe should be equal to or larger than the diameter of the inlet pipe.
6 The height difference between the inlet and the outlet should be at least 3 cm. B
If this difference is less than 3 cm then the installation will not work efficiently.
Gradient of inlet and outlet pipes should be maintained at 2% for proper
drainage.

C. Back filling
Back filling material should be inserted under the grease trap in order to fill-in the
gap between the grease trap and the compacted layer.
Back fill around the grease trap with rock sand or selected material with size less B B
than 32mm and without any sharp objects/rocks in layer of 30 cm and compact to
95%. In parallel fill the grease trap with water up to same height. When the
compacted layers around the grease trap reach half the height of the grease trap, the
inlet/outlet level should be checked. Continue to fill-in and compact layers up to
ground/cover level while filling the grease trap with water at the same time.

D. Opening height adjustment


In case the ground level is higher than the grease trap cover level, PE elevation /
C
extension can be used. The extension should be installed with rubber seal between
parts. The seal is provided with the extension.

In situation where ventilation is necessary, a 50cm pipe should be connected with a


rubber seal on the opening neck of the grease trap.

E. Cover
PE covers can be used for installation in the garden or non-traffic areas (PE cover PE Cover
come with the grease trap). For installation in parking area a cover of CLASS C is
required. For installation in traffic areas a cover of CLASS D is required. Local E
government regulations must be respected.

F. Depths more than 1.5 m/Road installation instruction


For installation over 1.5 m in depth or in traffic areas, a concrete ceiling of 20-25 cm
should be used at 20-25 cm above the grease trap. This concrete ceiling should be
60 cm longer and wider than the grease trap. Please refer to the illustration below.
Please consult site engineer for concrete specifications.

25cm COMPACTES
CEILING OF CONCRETE 20cm - 25cm
60cm BIG IN THE LENGTH AND THE WIDTH
COMPACTED
BEDDING MATERIAL
DI Cover ( Class C/D )
FROM THE PRODUCT
BEDDING MATERIAL ELEVATION
TERRIN
E

All descriptions, illustrations and installation instructions are provided in good faith for guidance only. Installation instruction of consulting Engineer based on exact site considerations and local Government guidelines
must be followed. All dimensions are nominal and Romold reserves the right to modify products without prior notice.

You might also like