SITE VISIT REPORT


21.3063319,76.2035362

8minutes Team Texmo Team


Site Visit By: 1) Sunil Singh Contact Person at Site: Mr. Dileep
2) Prashant Singh Designation: Project Management
Contact No. :
Technical & Quality :
Designation:
Contact No:

ADDRESS
Address: Bahadurpura Road, New Indira Colony, Burhanpur, Madhya Pradesh 450331
Phone:073252 55122
PROPOSED AREA FOR SOLAR INSTALLATION

As per preliminary site visit , Module Installation will be done at HDPE and Moulding Building
marked with blue arrow lines . Smaller area roof is HDPE and larger area roof is Moulding .
2
INVERTER & ACDB INSTALLATION
POINTS AT HDPE

Equipment layout as per the information given from the


contact person at site.

3
INVERTER AND ACDB INSTALLATION AT MOULDING BUILDING .

4
INTERCONNECTION POINT AT HDPE
BUILDING.

Interconnection setup for tapping solar power plant

NO Spare MCCB, at this point.


New solar FEEDER can be accommodated in customer LT panel, on right
side of LT panel .
5
INTERCONNECTION AT MOULDING BUILDING .

Interconnection point at Moulding building . No spare MCCB is there .


6
EARTH PITS AND LA LOCATION AT HDPE BUILDING.

Arrow marked area for DC Earth pits and AC Earth pits . LA can be mounted on
roof of Tower .
7
EARTHPITS AT MOULDING BUILDING

Locations for AC / DC Earthpits at Moulding building .