1 UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG


2 FAKULTAS TEKNIK JURUSAN SIPIL
3 FORMULIR TUGAS MANAJEMEN KONSTRUKSI

4 REKAPITULASI
5 RENCANA ANGGARAN BIAYA
6
7 PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA
8 LOKASI : KAB. TTU
9
10 JUMLAH HARGA
NO ITEM PEKERJAANA
11 Rp
12 1 GALIAN BIASA 229,784,
13 2 PENYIAPAN BADAN JALAN 89,059,
14 3 LAPIS PONDASI AGREGAT KELAS A 288,178,
15 4 LAPIS PONDASI AGREGAT KELAS B 373,549,
16 5 LAPIS RESAP PENGIKAT - ASPAL CAIR 124,526,
17 6 LASTON LAPIS ANTARA (AC - BC) 538,085,
18 7 BETON MUTU SEDANG (K - 250) 15,388,
19 8 BAJA TULANGAN BJ 24 POLOS 18,157,
20

21

22

23 A SUB JUMLAH 1,676,730,


24 B OVERHEAD + PROFIT (10% X A) 167673011.3
25 C SUB JUMAH (A+B) 1,844,403,
26 D PAJAK (10 % X C) 184440312.4
27 JUMLAH TOTAL (C+D) 2,028,843,
28

29

30

31
P Q R S T U V
1

5
6
AL ANTARA BANGSA
7
8
9
10JUMLAH HARGA
11 Rp
12 229,784,100.70
13 89,059,261.35
14 288,178,212.68
15 373,549,766.92
16 124,526,497.92
17 538,085,740.45
18 15,388,959.01
19 18,157,574.04
20

21

22

23 1,676,730,113.08
24 167673011.308016
25 1,844,403,124.39
26 184440312.438817
27 2,028,843,436.83
28

29

30

31
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

REKAPITULASI
RENCANA ANGGARAN BIAYA
PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA
LOKASI : KAB. TTU

JUMLAH HARGA
NO ITEM PEKERJAANA
Rp

1 GALIAN BIASA 229,784,100.70

2 PENYIAPAN BADAN JALAN 89,059,261.35

3 LAPIS PONDASI AGREGAT KELAS A 288,178,212.68

4 LAPIS PONDASI AGREGAT KELAS B 373,549,766.92

5 LAPIS RESAP PENGIKAT - ASPAL CAIR 124,526,497.92

6 LASTON LAPIS ANTARA (AC - BC) 538,085,740.45

7 BETON MUTU SEDANG (K - 250) 15,388,959.01

8 BAJA TULANGAN BJ 24 POLOS 18,157,574.04

A SUB JUMLAH 1,676,730,113.08

B OVERHEAD + PROFIT (10% X A) 167673011.308016

C SUB JUMAH (A+B) 1,844,403,124.39

D PAJAK (10 % X C) 184440312.438817

JUMLAH TOTAL (C+D) 2,028,843,436.83


Form 1a

MLAH HARGA
Rp

229,784,100.70

89,059,261.35

288,178,212.68

373,549,766.92

124,526,497.92

538,085,740.45

15,388,959.01

18,157,574.04

1,676,730,113.08

167673011.308016

1,844,403,124.39

184440312.438817

2,028,843,436.83
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

REKAPITULASI
RENCANA ANGGARAN BIAYA

PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA


LOKASI : KAB. TTU

NO ITEM PEKERJAAN SATUAN VOLUME

1 GALIAN BIASA m3 2,800.00


2 PENYIAPAN BADAN JALAN m2 53,120.00
3 LAPIS PONDASI AGREGAT KELAS A m3 540.00
4 LAPIS PONDASI AGREGAT KELAS B m3 800.00
5 LAPIS RESAP PENGIKAT - ASPAL CAIR Ltr 8,000.00
6 LASTON LAPIS ANTARA (AC - BC) Ton 391.44
7 BETON MUTU SEDANG (K - 250) m3 10.08
8 BAJA TULANGAN BJ 24 POLOS kg 1,203.06
Form 1b

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)
82,065.75 229,784,100.70
1,676.57 89,059,261.35
533,663.36 288,178,212.68
466,937.21 373,549,766.92
15,565.81 124,526,497.92
1,374,631.46 538,085,740.45
1,526,682.44 15,388,959.01
15,092.83 18,157,574.04
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

REKAPITULASI
RENCANA ANGGARAN BIAYA

PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA


ITEM PEKERJAAN : GALIAN BIASA
LOKASI : KAB. TTU

VOLUME : 2,800.00 m3
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(Rp)

A TENAGA KERJA

1 Pekerja Jam 0.3375 7,650.00

2 Mandor Jam 0.1125 11,000.00

SUB JUMLAH A

B MATERIAL

1 - - - -

SUB JUMLAH B

C PERALATAN

1 Exavator Jam 0.1125 522,901.00

2 Dump Truck Jam 0.0460 257,815.00

3 Alat Bantu Ls 1.0000 100.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : PENYIAPAN BADAN JALAN

VOLUME : 53,120.00 m2
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(Rp)

A TENAGA KERJA

1 Pekerja Jam 0.0071 7,650.00

2 Mandor Jam 0.0018 11,000.00

SUB JUMLAH A

B MATERIAL

1 - - - -

SUB JUMLAH B

C PERALATAN

1 Motor Grader Jam 0.0005 388,598.00

2 Vibrator Roller Jam 0.0018 334,399.00

3 Water Tank Jam 0.0028 215,650.00

4 Alat Bantu Ls 1.0000 50.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : LAPIS PONDASI AGREGAT KELAS A

VOLUME : 540.00 m3
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(RP)

A TENAGA KERJA

1 Pekerja Jam 0.3125 7,650.00

2 Mandor Jam 0.0625 11,000.00

SUB JUMLAH A

B MATERIAL

1 Material Agregat Kelas A M3 1.2000 321,568.00

SUB JUMLAH B

C PERALATAN

1 Wheal Loader Jam 0.0625 337,643.00

2 Dump Truck Jam 0.2301 257,815.00

3 Motor Grader Jam 0.0208 388,598.00

4 Vibrator Roller Jam 0.0162 334,399.00

5 Water Tank Jam 0.0104 215,650.00

6 Alat Bantu Ls 1.0000 20.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : LAPIS PONDASI AGREGAT KELAS B

VOLUME : 800.00 m3
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(RP)

A TENAGA KERJA

1 Pekerja Jam 0.1563 7,650.00

2 Mandor Jam 0.0313 11,000.00

SUB JUMLAH A

B MATERIAL

1 Material Pilihan M3 1.200 280,439.00

SUB JUMLAH B

C PERALATAN

1 Wheal Loader Jam 0.0313 337,643.00

2 Dump Truck Jam 0.2651 257,815.00

3 Motor Grader Jam 0.0052 388,598.00

4 Vibro Roller Jam 0.0091 334,399.00

5 Water Tanker Jam 0.0104 215,659.00

6 Alat Bantu Ls 1.0000 200.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : LAPIS RESAP PENGIKAT - ASPAL CAIR

VOLUME : 8,000.00 ltr


HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(Rp)

A TENAGA KERJA

1 Pekerja Jam 0.0032 7,650.00

2 Mandor Jam 0.0003 11,000.00

3 SUB JUMLAH A

B MATERIAL

1 Aspal kg 0.6922 13,250.00

2 Kerosin Ltr 0.3780 12,000.00

SUB JUMLAH B

C PERALATAN

1 Asphalt Distributor Jam 0.0003 252,493.00

2 Air Compresor Jam 0.0023 147,635.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : LASTON LAPIS ANTARA (AC - BC)

VOLUME : 391.44 ton


HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(RP)

A TENAGA KERJA

1 Pekerja Jam 0.1961 7,650.00

2 Mandor Jam 0.0196 11,000.00

SUB JUMLAH A

B MATERIAL

1 Agregat 5-10 & 10-15 m3 0.3910 346,478.00

2 Agregat 0-5 m3 0.2729 380,643.00

3 Filler kg 10.5000 1,450.00

4 Aspal cair kg 58.7100 13,250.00

SUB JUMLAH B

C PERALATAN

1 Wheel Loader Jam 0.0106 337,643.00

2 AMP Jam 0.0196 6,548,792.00

3 Genset Jam 0.0196 324,283.00

4 Dump Truck Jam 0.2402 257,815.00

5 Asphalt Finisher Jam 0.0095 611,868.00

6 Tandem Roller Jam 0.0093 329,304.00

7 P. Tire Roller Jam 0.0040 343,152.00

8 Alat Bantu LS 1.0000 5,000.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : BETON MUTU SEDANG (K - 250)

VOLUME : 10.08 m3
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(Rp)

A TENAGA KERJA

1 Pekerja Jam 12.5000 7,650.00

2 Mandor Jam 1.0417 11,000.00

3 Tukang Jam 4.1667 9,500.00

SUB JUMLAH A

B MATERIAL

1 Batu Pecah m3 0.8883 310,659.00

2 Semen Kg 481.7500 1,450.00

3 Pasir m3 0.4215 90,000.00

4 Kayu Perancah Ls 0.1500 1,500,000.00

5 Paku kg 1.8000 7,500.00

SUB JUMLAH B

C PERALATAN

1 Concrete Mixer Jam 1.0417 57,377.00

2 Concrete Vibrator Jam 1.0417 42,027.00

3 Water Tank Jam 0.1147 215,650.00

4 Alat Bantu Ls 1.0000 800.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


ITEM PEKERJAAN : BAJA TULANGAN BJ 24 POLOS

VOLUME : 1,203.06 kg
HARGA SATUAN
NO KOMPONEN SATUAN KOEFISIEN
(Rp)

A TENAGA KERJA

1 Pekerja Jam 0.1050 7,650.00

2 Mandor Jam 0.0350 11,000.00

3 Tukang Jam 0.0350 9,500.00

SUB JUMLAH A

B MATERIAL

1 Besi Beton kg 1.1000 10500

2 Kawat Baja kg 0.0200 20000

SUB JUMLAH B

C PERALATAN

3 Alat Bantu Ls 1.0000 250.00

SUB JUMLAH C

JUMLAH TOTAL (A+B+C)

BIAYA UMUM DAN KEUNTUNGAN =10% x D

HARGA SATUAN = (D+E)


Form 2

ANTARA BANGSA

JUMLAH HARGA
(Rp)

2,581.88

1,237.50

3,819.38

0.00

58,826.36

11,859.49

100.00

70,785.85

74,605.23

7,460.52

82,065.75
JUMLAH HARGA
(Rp)

54.32

19.80

74.12

0.00

194.30

601.92

603.82

50.00

1,450.04

1,524.15

152.42

1,676.57
JUMLAH HARGA
(Rp)

2,390.63

687.50

3,078.13

385,881.60

385,881.60

21,102.69

59,323.23

8,082.84

5,417.26

2,242.76

20.00

96,188.78

485,148.51

48,514.85

533,663.36
JUMLAH HARGA
(Rp)

1,195.70

344.30

1,540.00

336,526.80

336,526.80

10,568.23

68,346.76

2,020.71

3,043.03

2,242.85

200.00

86,421.58

424,488.37

42,448.84

466,937.21
JUMLAH HARGA
(Rp)

24.48

3.30

27.78

9,171.650

4,536.000

13,707.65

75.75

339.56

415.31

14,150.74

1,415.07

15,565.81
JUMLAH HARGA
(Rp)

1,500.17

215.60

1,715.77

135,472.90

103,877.47

15,225.00

777,907.50

1,032,482.87

3,579.02

128,356.32

6,355.95

61,927.16

5,812.75

3,062.53

1,372.61

5,000.00

215,466.33

1,249,664.97

124,966.50

1,374,631.46
JUMLAH HARGA
(Rp)

95,625.00

11,458.70

39,583.65

146,667.35

275,958.39

698,537.50

37,935.00

225,000.00

13,500.00

1,250,930.89

59,769.62

43,779.53

24,735.06

800.00

129,084.20

1,526,682.44

152,668.24

1,679,350.69
JUMLAH HARGA
(Rp)

803.25

385.00

332.50

1,520.75

11,550.00

400.00

11,950.00

250.00

250.00

13,720.75

1,372.08

15,092.83
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MENEJEMEN KONSTRUKSI

HARGA SATUAN SUMBERDAYA


PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA

LOKASI : KAB. TTU

NO SUMBERDAYA SATUAN HARGA SATU

A TENAGA KERJA

1 MANDOR Jam

2 PEKERJA Jam

3 TUKANG Jam

B MATERIAL

1 AGREGAT KELAS A m3

2 AGREGAT KELAS B m3

3 ASPAL kg

4 KEROSIN Ltr

5 AGREGAT 5-10 & 10-15 m3

6 AGREGAT 0-5 m3

7 FILLER kg

8 ASPAL CAIR kg

9 BATU PECAH m3

10 SEMEN (PC) kg

11 PASIR m3

12 KAYU PERANCAH LS

13 PAKU kg

14 BESI BETON kg

15 KAWAT kg

C PERALATAN

1 EXAVATOR Jam

2 DUMP TRUCK Jam

3 MOTOR GRADER Jam

4 VIBRO ROLLER Jam


5 WATER TANK TRUCK Jam

6 WHEEL LOADER Jam

7 ASPHALT DISTRIBUTOR Jam

8 AIR COMPRESSOR Jam

9 AMP Jam

10 GENSET Jam

11 ASPHALT FINISHER Jam

12 TANDEM ROLLER Jam

13 P. TIRE ROLLER Jam

14 CONCRETE MIXER Jam

15 CONCRETE VIBRATOR Jam

15 ALAT BANTU LS
Form 3

HARGA SATUAN (Rp)

11,000.00

7,650.00

9,500.00

321,568.00

280,439.00

13,250.00

12,000.00

346,478.00

380,643.00

1,450.00

13,250.00

310,659.00

1,450.00

90,000.00

1,500,000.00

7,500.00

10,500.00

20,000.00

522,901.00

257,815.00

388,598.00

334,399.00
215,650.00

337,643.00

252,493.00

147,635.00

6,548,792.00

324,283.00

611,868.00

329,304.00

343,152.00

57,377.00

42,027.00

Lihat Form 2
PRODUKSI DAN WAKTU PENYELESAIAN ITEM PEKERJAAN
PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA
LOKASI : KAB. TTU

VOLUME KEBUTUHAN SUMBER DAYA PRODUK


NO ITEM PEKERJAAN KUANTITAS KOEFISIEN TOTAL (UNIT/JA
1 2 3 4 5 = 3x 4 6 = (1)/
1 GALIAN BIASA (m3) 2800.00
TENAGA KERJA
Pekerja (jam) 0.3375 0.3375 0.1125 = 3 1 0.3375
Mandor (jam) 0.1125 0.1125 0.1125 = 1 1 0.1125
MATERIAL

PERALATAN
Excavator (jam) 0.1125 8.89 8.89 = 1 1 0.1125
Dump Truck (jam) 0.0460 8.89 21.74 = 0.41 1 0.0460
Alat Bantu (Ls) 1.0000 1.000
2 PENYIAPAN BADAN JALAN (m2) 53,120.00
TENAGA KERJA
Pekerja (jam) 0.0071 0.0071 0.0018 = 4 1 0.0071
Mandor (jam) 0.0018 0.0018 0.0018 = 1 1 0.0018
MATERIAL

PERALATAN
Motor Grader (jam) 0.0005 555.56 2000.00 = 0.28 1 0.0005
Vibrator Roller (jam) 0.0018 555.56 555.56 = 1 1 0.0018
Water Tank (jam) 0.0028 555.56 357.14 = 1.56 1 0.0028
Alat Bantu (Ls) 1.0000 1
3 LAPISAN PONDASI AGREGAT KELAS A (m3) 540.00
TENAGA KERJA
Pekerja (jam) 0.3125 0.3125 0.0625 = 5 1 0.3125
Mandor (jam) 0.0625 0.0625 0.0625 = 1 1 0.0625
MATERIAL
Agregat kelas A (m3) 1.2000 540.00 x 1.2000 = 648.00
PERALATAN
Wheal Loader (jam) 0.0625 16.00 16.00 = 1.00 1 0.0625
Dump Truck (jam) 0.2301 16.00 4.35 = 3.68 1 0.2301
Motor Grader (jam) 0.0208 16.00 48.08 = 0.33 1 0.0208
Vibrator Roller (jam) 0.0162 16.00 61.73 = 0.26 1 0.0162
Water Tank (jam) 0.0104 16.00 96.15 = 0.17 1 0.0104
Alat Bantu (Ls) 1.0000 1
4 LAPISAN PONDASI AGREGAT KELAS B (m3) 800.00
TENAGA KERJA
Pekerja (jam) 0.1563 0.1563 0.0313 = 5 1 0.1563
Mandor (jam) 0.0313 0.0313 0.0313 = 1 1 0.0313
MATERIAL
Agregat base kelas B (m3) 1.2000 800.00 x 1.2000 = 960.00
PERALATAN
Wheal Loader (jam) 0.0313 31.95 31.95 = 1.00 1 0.0313
Dump Truck (jam) 0.2651 31.95 3.77 = 8.47 1 0.2651
Motor Grader (jam) 0.0052 31.95 192.31 = 0.17 1 0.0052
Vibrator Roller (jam) 0.0091 31.95 109.89 = 0.29 1 0.0091
Water Tank (jam) 0.0104 31.95 96.15 = 0.33 1 0.0104
Alat Bantu (Ls) 1.0000 1.00
5 LAPIS RESAP PENGIKAT - ASPAL CAIR (Ltr) 8,000.00
TENAGA KERJA
Pekerja (jam) 0.0032 0.0032 0.0003 = 11 1 0.0032
Mandor (jam) 0.0003 0.0003 0.0003 = 1 1 0.0003
MATERIAL
Aspal (kg) 0.6922 8,000.00 x 0.6922 = 5537.60
Kerosene (Liter) 0.3780 8,000.00 x 0.3780 = 3024.00
PERALATAN
Aspalt Distributor (jam) 0.0003 3,333.33 3333.3333 = 1.00 1 0.0003
Air Kompresor (jam) 0.0023 3,333.33 434.7826 = 7.67 1 0.0023
6 LASTON LAPIS ANTARA (AC - BC) (TON) 391.44
TENAGA KERJA
Pekerja (jam) 0.1961 0.1961 0.0196 = 10 1 0.1961
Mandor (jam) 0.0196 0.0196 0.0196 = 1 1 0.0196
MATERIAL
Agregat 5-10 dan 10-15 (m3) 0.3910 391.44 x 0.3910 = 153.05
Agregat 0-5 (m3) 0.2729 391.44 x 0.2729 = 106.82
Fillet (kg) 10.5000 391.44 x 10.5000 = 4,110.12
Aspal cair (kg) 58.7100 391.44 x 58.7100 = 22,981.44
PERALATAN
Wheal Loader (jam) 0.0106 51.02 / 94.34 = 0.54 1 0.0106
AMP (jam) 0.0196 51.02 / 51.02 = 1 1 0.0196
Genset (JAM) 0.0196 51.02 / 51.02 = 1 1 0.0196
Dump Truck (jam) 0.2402 51.02 / 4.16 = 12.26 1 0.2402
Asphalt Finisher (jam) 0.0095 51.02 / 105.26 = 0.48 1 0.0095
Tandem Roller (jam) 0.0093 51.02 / 107.53 = 0.47 1 0.0093
P.Tire Roller (jam) 0.0040 51.02 / 250.00 = 0.20 1 0.0040
Alat Bantu (Ls) 1.0000 1.000
7 BETON MUTU SEDANG (K - 250) (m3) 10.08
TENAGA KERJA
Pekerja (jam) 12.5000 12.5000 1.0417 = 12 1 12.5000
Mandor (jam) 1.0417 1.0417 1.0417 = 1 1 1.0417
Tukang (jam) 4.1667 4.1667 1.0417 = 4 1 4.1667
MATERIAL
Batu kali (m3) 0.8883 10.08 x 0.8883 = 8.95
Semen (zak) 481.7500 10.08 x 481.7500 = 4,856.04
Pasir (m3) 0.4215 10.08 x 0.4215 = 4.25
Kayu Perancah (Ls) 0.1500 10.08 x 0.1500 = 1.51
Paku (Kg) 1.8000 10.08 x 1.8000 = 18.14
PERALATAN
Concrert Mixer (jam) 1.0417 0.96 0.96 = 1 1 1.042
Concrert Vibrator (jam) 1.0417 0.96 0.96 = 1 1 1.042
Water Tank (jam) 0.1147 0.96 8.72 = 0.11 1 0.1147
Alat Bantu (Ls) 1.0000 1.000
8 BAJA TULANGAN BJ 24 POLOS (Kg) 1203.06
TENAGA KERJA
Pekerja (jam) 0.1050 0.1050 0.0350 = 3 1 0.1050
Mandor (jam) 0.0350 0.0350 0.0350 = 1 1 0.0350
Tukang (jam) 0.0350 0.0350 0.0350 = 1 1 0.0350
MATERIAL
Besi Beton (kg) 1.1000 1,203.06 x 1.1000 = 1,323.37
Kawat Baja (kg) 0.0200 1,203.06 x 0.0200 = 24.06
PERALATAN
Alat Bantu 1.0000
PRODUKSI PRODUKSI WAKTU PENYELESAIAN KEBUTUHAN SUMBER DAYA
(UNIT/JAM) (UNIT/HARI) (HARI) (PER- HARI)
6 = (1)/3 7 = 6 x Jef 8 = 3/Qmin 9 = 4 x Qmin
J.eff = 7 jam Qmin = 62.22 1
2
0.3375 x 3 = 8.89 8.89 x 7 = 62.22 2800.00 62.22 = 45.00 3 Orang 3
0.1125 x 1 = 8.89 8.89 x 7 = 62.22 1 Orang 4
5
6
7
0.1125 = 8.89 8.89 x 7 = 62.22 1 Unit 8
0.0460 = 21.74 21.74 x 7 = 152.17 0.41 Unit 9
1.0 10
J.eff = 7 jam Qmin 3,888.89 1
2
0.0071 x 4 = 555.56 555.56 x 7 = 3,888.89 53,120 3,888.89 = 13.66 4 Orang 3
0.0018 x 1 = 555.56 555.56 x 7 = 3,888.89 1 Orang 4
5
6
7
0.0005 = 2,000.00 2000.00 x 7 = 14,000.00 0.28 Unit 8
0.0018 = 555.56 555.56 x 7 = 3,888.89 1.00 Unit 9
0.0028 = 357.14 357.14 x 7 = 2,500.00 1.56 Unit 10
1.00 11
J.eff = 7 jam Qmin = 112.00 1
2
0.3125 x 5 = 16.00 16.00 x 7 = 112.00 540.00 112.00 = 4.82 5 Orang 3
0.0625 x 1 = 16.00 16.00 x 7 = 112.00 1 Orang 4
5
134.40 6
7
0.0625 = 16.00 16.00 x 7 = 112.00 1.00 Unit 8
0.2301 = 4.35 4.35 x 7 = 30.42 3.68 Unit 9
0.0208 = 48.08 48.08 x 7 = 336.54 0.33 Unit 10
0.0162 = 61.73 61.73 x 7 = 432.10 0.26 Unit 11
0.0104 = 96.15 96.15 x 7 = 673.08 0.17 Unit
1.000
J.eff = 7 jam Qmin = 223.64 1
2
0.1563 x 5 = 31.95 31.95 x 7 = 223.64 800.00 223.64 = 3.58 5 Orang 3
0.0313 x 1 = 31.95 31.95 x 7 = 223.64 1 Orang 4
5
268.37 6
7
0.0313 = 31.95 31.95 x 7 = 223.64 1.00 Unit 8
0.2651 = 3.77 3.77 x 7 = 26.41 8.47 Unit 9
0.0052 = 192.31 192.31 x 7 = 1,346.15 0.17 Unit 10
0.0091 = 109.89 109.89 x 7 = 769.23 0.29 Unit 11
0.0104 = 96.15 96.15 x 7 = 673.08 0.33 Unit
1.00
J.eff = 7 jam Qmin = 23,333.33 1
2
0.0032 x 11 = 3,333.33 3,333.33 x 7 = 23,333.33 8000.00 23,333.33 = 0.34 11 Orang 3
0.0003 x 1 = 3,333.33 3,333.33 x 7 = 23,333.33 1 Orang 4
5
16,151.33 6
8,820.00 7
8
0.0003 = 3,333.333 3333.33 x 7 = 23,333.33 1.00 Unit 9
0.0023 = 434.783 434.78 x 7 = 3,043.48 7.67 Unit 10
J.eff = 7 jam Qmin = 357.14 1
2
0.1961 x 10 = 51.02 51.02 x 7 = 357.14 391.44 357.14 = 1.10 10 Orang 3
0.0196 x 1 = 51.02 51.02 x 7 = 357.14 1 Orang 4
5
139.64 6
97.46 7
3,750.00 8
20,967.86 9
10
0.0106 = 94.34 94.340 x 7 = 660.38 0.54 Unit 11
0.0196 = 51.02 51.020 x 7 = 357.14 1.00 Unit 12
0.0196 = 51.02 51.020 x 7 = 357.14 1.00 Unit 13
0.2402 = 4.16 4.163 x 7 = 29.14 12.26 Unit 14
0.0095 = 105.26 105.263 x 7 = 736.84 0.48 Unit 15
0.0093 = 107.53 107.527 x 7 = 752.69 0.47 Unit 16
0.0040 = 250.00 250.000 x 7 = 1,750.00 0.20 Unit 17
1.0 18
J.eff = 7 jam Qmin = 6.72 1
2
12.5000 x 12 = 0.96 0.96 x 7 = 6.72 10.08 6.72 = 1.50 12 Orang 3
1.0417 x 1 = 0.96 0.96 x 7 = 6.72 1 Orang 4
4.1667 x 4 = 0.96 0.96 x 7 = 6.72 4 Orang 5
6
5.97 7
3,237.26 8
2.83 9
1.01 10
12.10

1.042 = 0.96 0.960 x 7 = 6.72 1.00 Unit


1.042 = 0.96 0.960 x 7 = 6.72 1.00 Unit
0.1147 = 8.72 8.718 x 7 = 61.03 0.11 Unit
1.0
J.eff = 7 jam Qmin = 200.00 1
2
0.1050 x 3 = 28.57 28.57 x 7 = 200.00 1203.06 200.00 = 6.02 3 Orang 3
0.0350 x 1 = 28.57 28.57 x 7 = 200.00 1 Orang 4
0.0350 x 1 = 28.57 28.57 x 7 = 200.00 1 Orang 5
6
220.00 7
4.00 8
9
10
WAKTU PENYELESAIAN ITEM PEKERJAAN
PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA
LOKASI : KAB. TTU

VOLUME KEBUTUHAN PRODUKSI


ITEM PEKERJAAN KUANTITAS KOEFISIEN SUMBER DAYA (UNIT/JAM)
NO TOTAL
1 2 3 4 5 = 3x 4 6 = (1)/3
1 GALIAN BIASA (m3) 2800.00
a TENAGA KERJA
Pekerja (jam) 0.3375 3 8.89
Mandor (jam) 0.1125 1 8.89
b MATERIAL

c PERALATAN
Excavator (jam) 0.1125 1 8.89
Dump Truck (jam) 0.0460 0.41 21.74
Alat Bantu (Ls) 1.0000 1
2 PENYIAPAN BADAN JALAN (m2) 53120.00
a TENAGA KERJA
Pekerja (jam) 0.0071 4 555.56
Mandor (jam) 0.0018 1 555.56
b MATERIAL

c PERALATAN
Motor Grader (jam) 0.0005 0.28 2000.00
Vibrator Roller (jam) 0.0018 1 555.56
Water Tank (jam) 0.0028 1.56 357.14
Alat Bantu (Ls) 1.0000 1
3 LAPISAN PONDASI AGREGAT KELAS A (m3) 540.00
a TENAGA KERJA
Pekerja (jam) 0.3125 5 16.00
Mandor (jam) 0.0625 1 16.00
b MATERIAL
Agregat kelas A (m3) 1.2000 648.00
c PERALATAN
Wheal Loader (jam) 0.0625 1 16.00
Dump Truck (jam) 0.2301 3.68 4.35
Motor Grader (jam) 0.0208 0.33 48.08
Vibrator Roller (jam) 0.0162 0.26 61.73
Water Tank (jam) 0.0104 0.17 96.15
Alat Bantu (Ls) 1.0000 1
4 LAPISAN PONDASI AGREGAT KELAS B (m3) 800.00
a TENAGA KERJA
Pekerja (jam) 0.1563 5 31.95
Mandor (jam) 0.0313 1 31.95
b MATERIAL
Agregat base kelas B (m3) 1.2000 960.00
c PERALATAN
Wheal Loader (jam) 0.0313 1 31.95
Dump Truck (jam) 0.2651 8.47 3.77
Motor Grader (jam) 0.0052 0.17 192.31
Vibrator Roller (jam) 0.0091 0.29 109.89
Water Tank (jam) 0.0104 0.33 96.15
Alat Bantu (Ls) 1.0000 1
5 LAPIS RESAP PENGIKAT - ASPAL CAIR (Ltr) 8000.00
a TENAGA KERJA
Pekerja (jam) 0.0032 11 3333.33
Mandor (jam) 0.0003 1 3333.33
b MATERIAL
Aspal (kg) 0.6922 5537.60
Kerosene (Liter) 0.3780 3024.00
c PERALATAN
Aspalt Distributor (jam) 0.0003 1.00 3333.33
Air Kompresor (jam) 0.0023 7.67 434.78
6 LASTON LAPIS ANTARA (AC - BC) (TON) 391.44
a TENAGA KERJA
Pekerja (jam) 0.1961 10 51.02
Mandor (jam) 0.0196 1 51.02
b MATERIAL
Agregat 5-10 dan 10-15 (m3) 0.3910 153.05
Agregat 0-5 (m3) 0.2729 106.82
Fillet (kg) 10.5000 4110.12
Aspal cair (kg) 58.7100 22981.44
c PERALATAN
Wheal Loader (jam) 0.0106 0.54 94.34
AMP (jam) 0.0196 1 51.02
Genset (jam) 0.0196 1 51.02
Dump Truck (jam) 0.2402 12.26 4.16
Asphalt Finisher (jam) 0.0095 0.48 105.26
Tandem Roller (jam) 0.0093 0.47 107.53
P.Tire Roller (jam) 0.0040 0.20 250.00
Alat Bantu (Ls) 1.0000 1
7 BETON MUTU SEDANG (K - 250) (m3) 10.08
a TENAGA KERJA
Pekerja (jam) 12.5000 12 0.96
Mandor (jam) 1.0417 1 0.96
Tukang (jam) 4.1667 4 0.96
b MATERIAL
Batu kali (m3) 0.8883 8.95
Semen (zak) 481.7500 4856.04
Pasir (m3) 0.4215 4.25
Kayu Perancah (Ls) 0.1500 1.51
Paku (Kg) 1.8000 18.14
c PERALATAN
Concrert Mixer (jam) 1.0417 1 0.96
Concrert Vibrator (jam) 1.0417 1 0.96
Water Tank (jam) 0.1147 0.11 8.72
Alat Bantu (Ls) 1.0000 1
8 BAJA TULANGAN BJ 24 POLOS (Kg) 1203.06
a TENAGA KERJA
Pekerja (jam) 0.1050 3 28.57
Mandor (jam) 0.0350 1 28.57
Tukang (jam) 0.0350 1 28.57
b MATERIAL
Besi Beton (kg) 1.1000 1323.37
Kawat Baja (kg) 0.0200 24.06
c PERALATAN
Alat Bantu (Ls) 1.0000
Form 4

PRODUKSI WAKTU KEBUTUHAN


(UNIT/HARI) PENYELESAIAN SUMBER DAYA
(HARI) (PER- HARI)
7 = 6 x Jef 8 = 3/Qmin 9 = 4 x Qmin
Jam kerja eff = 7 jam Qmin = 62.22

62.22 45.00 3 Orang


62.22 1 Orang

62.22 1 Unit
152.17 0.41 Unit
1 Ls
Qmin = 3,888.89

3888.89 13.66 4 Orang


3888.89 1 Orang

14000.00 0.28 Unit


3888.89 1 Unit
2500.00 1.56 Unit
1 Ls
Qmin = 112.00

112.00 4.82 5 Orang


112.00 1 Orang

134.40 m3

112.00 1 Unit
30.42 3.68 Unit
336.54 0.33 Unit
432.10 0.26 Unit
673.08 0.17 Unit
1 Ls
Qmin = 223.64

223.64 3.58 5 Orang


223.64 1 Orang

268.37 m3

223.64 1 Unit
26.41 8.47 Unit
1346.15 0.17 Unit
769.23 0.29 Unit
673.08 0.33 Unit
1 Ls
Qmin = 23,333.33

23333.33 0.34 11 Orang


23333.33 1 Orang

16151.33 kg
8820.00 Liter

23333.33 1 Unit
3043.48 7.67 Unit
Qmin = 357.14

357.14 1.10 10 Orang


357.14 1 Orang

139.64 m3
97.46 m3
3750.00 kg
20967.86 kg

660.38 0.54 Unit


357.14 1 Unit
357.14 1 Unit
29.14 12.26 Unit
736.84 0.48 Unit
752.69 0.47 Unit
1750.00 0.20 Unit
1 Ls
Qmin = 6.72

6.72 1.50 12 Orang


6.72 1 Orang
6.72 4 Orang

5.97 m3
3237.26 zak
2.83 m3
1.01 Ls
12.10 kg

6.72 1 Unit
6.72 1 Unit
61.03 0.11 Unit
1 Ls
Qmin = 200.00

200.00 6.02 3 Orang


200.00 1 Orang
200.00 1 Orang

220.00 kg
4.00 kg

1 Ls
TANGGAL MULAI 10 JUNI 2015 s.d 6 DESEMBER 2015 (180) HARI KERJA

ESTIMASI HARI KERJA EFEKTIF DALAM 5 BULAN MASA PELAKSANAAN


TAHUN 2015

NO BULAN HARI SELAIN HARI MINGGU HARI HARI KETERANGAN HARI LIBUR

MINGGU LIBUR

A B C D E F

1 JUNI 18 3 0

2 JULI 27 4 0

3 AGUSTUS 25 5 1 HARI KEMERDEKAAN

4 SEPTEMBER 26 4 0

5 OKTOBER 27 4 0

6 NOVEMBER 25 5 0

7 DESEMBER 5 1 0

S TOTAL 153 26 1

JUMLAH HARI TIDAK BEKERJA : S (D+E) = 26 + 1 = 27 HARI

HARI KERJA EFEKTIF : S C- S E = 153 - 1 = 152 HARI


CATATAN:

ESTIMASI PELAKSANAAN PROYEK TAHUN 2015 MULAI PADA AWAL MINGGU KEDUA YAITU TGL 10 BULAN JUNI

ESTIMASI WAKTU KERJA EFEKTIF DALAM HARI KERJA EFEKTIF

NO WAKTU KERJA SEHARI WAKTU MAKAN WAKTU LAIN-LAIN WAKTU KERJA EFEKTIF

A B C D E=B-C-D

1 9 1 1 7

CATATAN: JADI WAKTU EFEKTIF DALAM 1 HARI KERJA ADALAH 7 JAM


= HARI AWAL PELAKSANAAN PROYEK

= HARI LIBUR

= HARI AKHIR PELAKSANAAN PROYEK


KELENDER TAHUN 2015

BULAN JUNI

HARI LIBUR MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

RDEKAAN 28 29 30

BULAN JULI

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25
26 27 28 29 30 31

BULAN AGUSTUS

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

2 3 4 5 6 7 8
ERJA EFEKTIF
9 10 11 12 13 14 15

16 17 18 19 20 21 22

=B-C-D 23 24 25 26 27 28 29

7 30 31

BULAN SEPTEMBER

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19
20 21 22 23 24 25 26

27 28 29 30

BULAN OKTOBER

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

BULAN NOVEMBER

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30
BULAN DESEMBER

MINGGU SENIN SELASA RABU KAMIS JUMAT SABTU

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MENEJEMEN KONSTRUKSI

BOBOT KEGIATAN

PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA

LOKASI : KAB. TTU

JUMLAH
NO ITEM PEKERJAAN SATUAN VOLUME
HARGA

1 GALIAN BIASA m3 2,800.00 229,784,100.7

2 PENYIAPAN BADAN JALAN m2 53,120.00 89,059,261.3

3 LAPIS PONDASI AGREGAT KELAS A m3 540.00 288,178,212.6

4 LAPIS PONDASI AGREGAT KELAS B m3 800.00 373,549,766.9

5 LAPIS RESAP PENGIKAT - ASPAL CAIR Ltr 8,000.00 124,526,497.9

6 LASTON LAPIS ANTARA (AC - BC) Ton 391.44 538,085,740.4

7 BETON MUTU SEDANG (K - 250) m3 10.08 15,388,959.0

8 BAJA TULANGAN BJ 24 POLOS kg 1,203.06 18,157,574.0

JUMLAH 1,676,730,113.0
Form 5a

JUMLAH BOBOT WAKTU PENYELESAIAN

HARGA % (HARI)

229,784,100.70 13.70 45.00

89,059,261.35 5.31 13.66

288,178,212.68 17.19 4.82

373,549,766.92 22.28 3.58

124,526,497.92 7.43 0.34

538,085,740.45 32.09 1.10

15,388,959.01 0.92 1.50

18,157,574.04 1.08 6.02

1,676,730,113.08 100 76.01


UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

JADWAL PELAKSANAAN PEKERJAAN


PROYEK :
LOKASI :

ITEM PEKERJAAN BOBOT WAKTU Bulan juni


NO. Minggu PENYELESAIAN 1 2 3 4
%
Hari Kerja Efektif (HARI) 6 6 6 6
1.83 1.83 1.83 1.83
1 GALIAN BIASA 13.70 45.00

PENYIAPAN BADAN JALAN 5.31 13.66


2

LAPIS PONDASI AGREGAT KELAS A 17.19 4.82


3

LAPIS PONDASI AGREGAT KELAS B 22.28 3.58


4

LAPIS RESAP PENGIKAT - ASPAL CAIR 7.43 0.34


5

LASTON LAPIS ANTARA (AC - BC) 32.09 1.10


6
LASTON LAPIS ANTARA (AC - BC) 32.09 1.10
6

BETON MUTU SEDANG (K - 250) 0.92 1.50


7

BAJA TULANGAN BJ 24 POLOS 1.08 6.02


8
Jumlah (%) 100 76.01 1.83 1.83 1.83 1.83
Kumulatif (%) - 0 1.83 3.65 5.48 7.31
Realisasi (%)
Deviasi (%)

catatan : waktu penyelesaian proyek kurang dari waktu estimasi awal


hal ini untuk antisipasi kemungkinan terjadi hal-hal yang di luar dugaan seperti hujan, dan lain-lain
Form 5b

Bulan Juli Bulan agustus


1 2 3 4 1 2 3 4
6 4 6 6 6 5 6 6
1.83 1.22 1.83 1.52 13.70

2.33 2.33 0.65 5.31

17.19

22.28

7.43

32.09
0.92

0.90 0.183

1.83 1.22 4.16 3.86 53.81 45.73 1.10


9.14 10.35 14.51 18.37 72.19 117.92 119.02
JADWAL KEBUTUHAN TENAGA KERJA
PROYEK :
LOKASI :
ITEM PEKERJAAN Bulan juni Bulan Juli
WP
NO MINGGU 1 2 3 4 1 2 3 4
HARI KERJA EFEKTIF (HARI) 6 6 6 6 6 4 6 6
1 GALIAN BIASA 45.00
Pekerja 3 Orang 3 3 3 3 3 3 3 3
Mandor 1 Orang 1 1 1 1 1 1 1 1
2 PENYIAPAN BADAN JALAN 13.66
Pekerja 4 Orang 4 4
Mandor 1 Orang 1 1
3 LAPIS PONDASI AGREGAT KELAS A 4.82
Pekerja 5 Orang
Mandor 1 Orang
4 LAPIS PONDASI AGREGAT KELAS B 3.58
Pekerja 5 Orang
Mandor 1 Orang
5 LAPIS RESAP PENGIKAT - ASPAL CAIR 0.34
Pekerja 11 Orang
Mandor 1 Orang
6 LASTON LAPIS ANTARA (AC - BC) 1.10
Pekerja 10 Orang
Mandor 1 Orang
7 BETON MUTU SEDANG (K - 250) 1.50
Pekerja 12 Orang
Mandor 1 Orang
Tukang 4 Orang
8 BAJA TULANGAN BJ 24 POLOS 6.02
Pekerja 3 Orang
Mandor 1 Orang
Tukang 1 Orang
Bulan agustus
1 2 3 4
6 5 6 6

4
1

5
1

5
1

11
1

10
1

12
1
4
3 3
1 1
1 1
JADWAL KEBUTUHAN MATERIAL
PROYEK :
LOKASI :
ITEM PEKERJAAN Bulan juni Bu
WP
NO MINGGU 1 2 3 4 1
HARI KERJA EFEKTIF (HARI) 6 6 6 6 6
1 GALIAN BIASA 2,800.00 m3 45.00
2 PENYIAPAN BADAN JALAN 53,120.00 m2 13.66
3 LAPIS PONDASI AGREGAT KELAS A 540.00 m3 4.82
Agregat kelas A 648.00
4 LAPIS PONDASI AGREGAT KELAS B 800.00 m3 3.58
Agregat base kelas B 960.00
5 LAPIS RESAP PENGIKAT - ASPAL CAIR 8,000.00 Ltr 0.34
Aspal 5,537.60
Kerosene 3,024.00
6 LASTON LAPIS ANTARA (AC - BC) 391.44 Ton 1.10
Agregat 5-10 dan 10-15 153.05
Agregat 0-5 106.82
Fillet 4,110.12
Aspal cair 22,981.44
7 BETON MUTU SEDANG (K - 250) 10.08 m3 1.50
Batu kali 8.95
Semen 4,856.04
Pasir 4.25
Kayu Perancah 1.51
Paku 18.14
8 BAJA TULANGAN BJ 24 POLOS 1,203.06 kg 6.02
Besi Beton 1,323.37
Kawat Baja 24.06
Form 6b

Bulan Juli Bulan agustus


2 3 4 1 2 3 4
4 6 6 6 5 6 6

648.00

960.00

5,537.60
3,024.00

153.05
106.82
4,110.12
22,981.44

8.95
4,856.04
4.25
1.51
18.14

1,100.00 6.60
20.00 4.06
JADWAL KEBUTUHAN PERALATAN
PROYEK :
LOKASI :
ITEM PEKERJAAN Bulan juni Bulan Juli
WP
NO MINGGU 1 2 3 4 1 2 3

HARI KERJA EFEKTIF 7 (HARI) 6 6 6 6 6 4 6

1 GALIAN BIASA 45.00


Exavator Jam 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Dump Truck Jam 0.41 0.41 0.41 0.41 0.41 0.41 0.41
Alat Bantu Ls 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2 PENYIAPAN BADAN JALAN 13.66
Motor Grader Jam 0.28
Vibrator Roller Jam 1.00
Water Tank Jam 1.56
Alat Bantu Ls 1.00
3 LAPIS PONDASI AGREGAT KELAS A 4.82
Wheal Loader Jam
Dump Truck Jam
Motor Grader Jam
Vibrator Roller Jam
Water Tank Jam
Alat Bantu Ls
4 LAPIS PONDASI AGREGAT KELAS B 3.58
Wheal Loader Jam
Dump Truck Jam
Motor Grader Jam
Vibrator Roller Jam
Water Tank Jam
Alat Bantu Ls
5 LAPIS RESAP PENGIKAT - ASPAL CAIR 0.34
Asphalt Distributor Jam
Air Compresor Jam
6 LASTON LAPIS ANTARA (AC - BC) 1.10
Wheel Loader Jam
AMP Jam
Genset Jam
Dump Truck Jam
Asphalt Finisher Jam
Tandem Roller Jam
P. Tire Roller Jam
Alat Bantu Ls
7 BETON MUTU SEDANG (K - 250) 1.50
Concrete Mixer Jam
Concrete Vibrator Jam
Water Tank Jam
Alat Bantu Ls
8 BAJA TULANGAN BJ 24 POLOS 6.02
Alat Bantu Ls
Form 6c

Juli Bulan agustus


4 1 2 3 4
6 6 5 6 6

1.00
0.41
1.00

0.28 0.28
1.00 1.00
1.56 1.56
1.00 1.00

1.00
3.68
0.33
0.26
0.17
1.00
1.00
8.47
0.17
0.29
0.33
1.00

1.00
7.67

0.54
1.00
1.00
12.26
0.48
0.47
0.20
1.00

1.00
1.00
0.11
1.00
1.00 1.00
BIAYA KEBUTUHAN TENAGA KERJA

PROYEK :

LOKASI :
NO ITEM PEKERJAAN WP Bulan juni

MINGGU (HARI) 1 2 3 4

JAM KERJA EFEKTIF 7 JTK 6 6 6 6

1 GALIAN BIASA 45.00


3
Pekerja 963,900.0 963,900.0 963,900.0 963,900.0
1
Mandor 462,000.0 462,000.0 462,000.0 462,000.0
2
PENYIAPAN BADAN JALAN 13.66
4
Pekerja

1
Mandor

3 LAPIS PONDASI AGREGAT KELAS A 4.82


5
Pekerja

1
Mandor

4 LAPIS PONDASI AGREGAT KELAS B 3.58


5
Pekerja

1
Mandor

5 LAPIS RESAP PENGIKAT - ASPAL CAIR 0.34


11
Pekerja

1
Mandor
6 LASTON LAPIS ANTARA (AC - BC) 1.10
10
Pekerja

1
Mandor

7 BETON MUTU SEDANG (K - 250) 1.50

Pekerja 12

Mandor 1

Tukang 4

8 BAJA TULANGAN BJ 24 POLOS 6.02

Pekerja 3

Mandor 1

Tukang 1

JUMLAH KEBUTUHAN BIAYA TENAGA KERJA

Total 1,425,900.0 1,425,900.0 1,425,900.0 1,425,900.0

Kumulatif 1,425,900.0 2,851,800.0 4,277,700.0 5,703,600.0

Presentase Kumulatif terhadap nilai kontrak 0.07 0.14 0.21 0.28


Bulan Juli Bulan agustus

1 2 3 4 1 2 3

6 4 6 6 6 5 6

963,900.0 642,600.0 963,900.0 803,250.0

462,000.0 308,000.0 462,000.0 385,000.0

1,267,350.0 1,267,350.0 350,512.80

462,000.0 462,000.0 127,776.0

1,290,937.50

371,250.00
956,556.00

275,440.00

195,840.00

26,400.00
587,224.59

84,394.46

963,900.00

115,503.70

399,003.19

803,250.00 163,107.95

385,000.00 78,178.10

332,500.00 67,517.45

1,425,900.0 950,600.0 3,155,250.0 2,917,600.0 3,372,472.30 2,414,609.05 1,787,210.38

7,129,500.0 8,080,100.0 11,235,350.0 14,152,950.0 17,525,422.30 19,940,031.35 21,727,241.73

0.35 0.40 0.55 0.70 0.86 0.98 1.07


Form 7a

6
BIAYA KEBUTUHAN MATERIAL

PROYEK :

LOKASI :

ITEM PEKERJAAN Bulan juni


NO QM 1 2 3 4
MINGGU WAKTU PENYELESAIAN

HARI KERJA EFEKTIF (HARI) 6 6 6 6

1 GALIAN BIASA 45.00 62.22

2 PENYIAPAN BADAN JALAN 13.66 3,888.9

3 LAPIS PONDASI AGREGAT KELAS A 4.82 112.0

Agregat kelas A 1.2000 m3

4 LAPIS PONDASI AGREGAT KELAS B 3.58 223.6

Agregat base kelas B 1.2000 m3

5 LAPIS RESAP PENGIKAT - ASPAL CAIR 0.3429 23,333.3

Aspal 0.6922 kg

Kerosene 0.3780 liter

6 LASTON LAPIS ANTARA (AC - BC) 1.0960 357.1

Agregat 5-10 dan 10-15 0.3910 m3

Agregat 0-5 0.2729 m3

Fillet 10.5000 kg

Aspal cair 58.7100 kg


7 BETON MUTU SEDANG (K - 250) 1.5000 6.7

Batu kali 0.8883 m3

Semen 481.7500 zak

Pasir 0.4215 m3

Kayu Perancah 0.1500 Ls

Paku 1.8000 kg

8 BAJA TULANGAN BJ 24 POLOS 6.0153 200.0

Besi Beton 1.1000 kg

Kawat Baja 0.0200 kg

Total 0.00 0.00 0.00 0.00

Kumulatif 0.00 0.00 0.00 0.00

Presentase Kumulatif terhadap nilai kontrak 0.00 0.00 0.00 0.00


Form 7b

Bulan Juli Bulan agustus


1 2 3 4 1 2 3 4
6 4 6 6 6 5 6 6

208,376,064.00

269,221,440.00

73,373,200.00

36,288,000.00

53,029,511.19

40,661,798.70

5,959,674.00

304,504,111.80
2,781,660.57

7,041,258.00

382,384.80

2,268,000.00

136,080.00

11,550,000.00 2,345,343.00

400,000.00 81,224.00

0.00 0.00 0.00 0.00 477,597,504.00 525,766,295.69 15,035,950.37

0.00 0.00 0.00 0.00 477,597,504.00 1,003,363,799.69 1,018,399,750.06

0.00 0.00 0.00 0.00 23.54 49.45 50.20


BIAYA KEBUTUHAN PERALATAN

PROYEK :

LOKASI :

ITEM PEKERJAAN
WP Bulan juni

NO MINGGU (HARI) 1 2 3 4

JAM KERJA EFEKTIF 7 JA 6 6 6 6

1 GALIAN BIASA 45.00


1.00 21,961,842.00 21,961,842.00 21,961,842.00 21,961,842.00
Excavator
0.41 4,427,542.93 4,427,542.93 4,427,542.93 4,427,542.93
Dump Truck
1.00 4,200.00 4,200.00 4,200.00 4,200.00
Alat Bantu
2 PENYIAPAN BADAN JALAN 13.66

Motor Grader 0.28

Vibrator Roller 1.00

Water Tank 1.56

Alat Bantu 1.00

3 LAPIS PONDASI AGREGAT KELAS A 4.82

Wheal Loader 1.00

Dump Truck 3.68

Motor Grader 0.33


Vibrator Roller 0.26

Water Tank 0.17

Alat Bantu 1.00

4 LAPIS PONDASI AGREGAT KELAS B 3.58

Wheal Loader 1.00

Dump Truck 8.47

Motor Grader 0.17

Vibrator Roller 0.29

Water Tank 0.33

Alat Bantu 1.00


5 LAPIS RESAP PENGIKAT - ASPAL CAIR 0.34
1.00
Aspalt Distributor
7.67
Air Kompresor

6 LASTON LAPIS ANTARA (AC - BC) 1.10


0.54
Wheal Loader
1.00
AMP
1.00
Genset
12.26
Dump Truck
0.48
Asphalt Finisher
0.47
Tandem Roller
0.20
P.Tire Roller
1.00
Alat Bantu

7 BETON MUTU SEDANG (K - 250) 1.50


1.00
Concrert Mixer
1.00
Concrert Vibrator
0.11
Water Tank
1.00
Alat Bantu

8 BAJA TULANGAN BJ 24 POLOS 6.02

Alat Bantu 1.00


Total 26,393,584.93 26,393,584.93 26,393,584.93 26,393,584.93

Kumulatif 26,393,584.93 52,787,169.87 79,180,754.80 105,574,339.73

Presentase Kumulatif terhadap nilai kontrak 1.30 2.60 3.90 5.20


Form 7c

Bulan Juli Bulan agustus

1 2 3 4 1 2 3 4

6 4 6 6 6 5 6 6

21,961,842.00 14,641,228.00 21,961,842.00 18,301,535.00

4,427,542.93 2,951,695.29 4,427,542.93 3,689,619.11

4,200.00 2,800.00 4,200.00 3,500.00

4,533,643.33 4,533,643.33 1,253,876.21

14,044,758.00 14,044,758.00 3,884,378.78

14,089,133.33 14,089,133.33 3,896,651.73

2,100.00 2,100.00 580.80

11,395,451.25

32,034,545.01

4,364,732.74
2,925,322.45

1,211,090.40

675.00

8,454,580.72

54,677,405.20

1,616,567.68

2,434,424.72

1,794,282.88

5,008.00
605,983.20

2,716,484.00

1,400,969.94

50,243,799.15

2,487,971.82

24,240,768.68

2,275,341.29

1,198,795.65

537,293.68

38,361.12

602,477.78

441,297.62

249,329.35

8,400.27

8,750.00 1,776.78
26,393,584.93 17,595,723.29 59,063,219.60 54,664,288.78 129,949,573.58 85,754,518.54 1,303,281.80

131,967,924.67 149,563,647.96 208,626,867.56 263,291,156.33 393,240,729.91 478,995,248.45 480,298,530.25

6.50 7.37 10.28 12.98 19.38 23.61 23.67


FORM 7C

BIAYA KEBUTUHAN TENAGA KERJA


PROYEK
LOKASI
ITEM PEKERJAAN WAKTU PE- BULAN MEI BULAN JUNI
NYELESAIAN 1 2 3 4 1
NO
MINGUU 6 5 6 6 6
(HARI)
HARI KERJA EFEKTIF
FORM 7C
FORM 7C

BULAN JUNI BULAN JULI BULAN AGUSTUS


2 3 4 1 2 3 4 5 1
6 6 6 6 6 6 6 6 6
FORM 7C
FORM 7C

BULAN AGUSTUS
2 3 4
5 5 5
FORM 7C
Rincian Estimasi Biaya overhead
Jumlah Harga Jumlah Harga untuk bula
No Item pekerjaan
1 org/bulan (Rp) 5 Bulan
1 Gaji
Supervisior 1 2,500,000 12,500,000
Estimasitor 1 2,000,000 10,000,000
Tukang masak 1 1,000,000 5,000,000
Sopir pribadi 1 800,000 4,000,000
Staff 1 1,500,000 7,500,000
Keuangan 1 1,600,000 8,000,000
Jumlah Harga (Rp) 9,400,000 47,000,000

2 Akomodasi
Penginapan 50,000 250,000
Jumlah Harga(Rp) 50,000 250,000

3 Konsumsi
katering untuk supervisor 1 300,000 1,500,000
Belanja bahan makanan 1 4,000,000 20,000,000
Jumlah Harga(Rp) 4,300,000 21,500,000

4 Rapat Lapangan
Rapat Lapangan 1 300,000 Ls 1,500,000
Jumlah Harga(Rp) 300,000 1,500,000

5 Admistrasi
Admisatrsi 1 250,000 Ls 1,250,000
Jumlah Harga(Rp) 250,000 1,250,000

6 Transportasi
Bahan bakar minyak 1 800,000 4,000,000
Reparasi kend.pribadi 1 350,000 Ls 1,750,000
Jumlah Harga(Rp) 1,150,000 5,750,000
Total keseluruhan biaya overhead 15,450,000 77,250,000
Jumlah Harga untuk bulan
(Rp)

12,500,000
10,000,000
5,000,000
4,000,000
7,500,000
8,000,000
47,000,000

250,000
250,000

1,500,000
20,000,000
21,500,000

1,500,000
1,500,000

1,250,000
1,250,000

4,000,000
1,750,000
5,750,000
77,250,000
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

JADWAL BIAYA OVERHEAD


PROYEK : Peningkatan Jalan Oelmasi - Kuka
LOKASI : Oelmasi-Kukak-Barate
PANJANG EFEKTIF : 1.25 Km (HRS-Base)

NO. ITEM PEKERJAAN SATUAN

1 Gaji
1.1 Kepala Proyek Orang/bulan
1.2 Supervisor Orang/bulan
1.3 Keuangan Orang/bulan
1.4 Staf Orang/bulan
BIAYA (A)

2 Akomodasi Per bulan


3 Konsumsi Per bulan
4 Administrasi Per bulan
5 Transportasi Per bulan
6 Rapat Lapangan Per bulan
BIAYA (B)
BIAYA = (A) + (B)

Catatan :
1 Bulan = 30 hari
Biaya ini hanya berlaku selama 90 hari atau 3 bulan masa pelaksanaan
proyek
gkatan Jalan Oelmasi - Kukak - Barate
si-Kukak-Barate
Km (HRS-Base)

HARGA SATUAN

(Rp)

2,000,000.00 10,000,000.00
1,750,000.00 8,750,000.00
1,500,000.00 7,500,000.00
1,250,000.00 6,250,000.00
6,500,000.00 32,500,000.00

500,000.00 2,500,000.00
400,000.00 2,000,000.00
300,000.00 1,500,000.00
200,000.00 1,000,000.00
100,000.00 500,000.00
1,500,000.00 7,500,000.00
8,000,000.00 40,000,000.00
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

ESTIMASI BIAYA OVERHEAD

PROYEK : PEMB. AKSES PELABUHAN TERMINAL ANTARA BANGSA


LOKASI : KAB. TTU
Waktu penyelesaian : 3 bulan
TOTAL BIAYA TOTAL BIAYA Bulan juni Bulan Juli Bulan agustus
NO. Minggu Rp 1 2 3 4 1 2 3 4 1 2 3
Hari Kerja Efektif 6 6 6 6 6 4 6 6 6 5 6
1 Gaji
1,1 Kepala Proyek 10,000,000.00 3,333,333.33 - - - 2,000,000.00 - - - 2,000,000.00 - -
1,2 Supervisor 8,750,000.00 2,916,666.67 - - - 1,750,000.00 - - - 1,750,000.00 - -
1,3 Keuangan 7,500,000.00 2,500,000.00 - - - 1,500,000.00 - - - 1,500,000.00 - -
1,4 Staf 6,250,000.00 2,083,333.33 - - - 1,250,000.00 - - - 1,250,000.00 - -
2 Akomodasi 2,500,000.00 833,333.33 - - - 500,000.00 - - - 500,000.00 - -
3 Konsumsi 2,000,000.00 666,666.67 - - - 400,000.00 - - - 400,000.00 - -
4 Administrasi 1,500,000.00 500,000.00 - - - 300,000.00 - - - 300,000.00 - -
5 Transportasi 1,000,000.00 333,333.33 - - - 200,000.00 - - - 200,000.00 - -
6 Rapat Lapangan 100,000.00 33,333.33 - - - 20,000.00 - - - 20,000.00 - -

JUMLAH BIAYA OVERHEAD/BULAN 13,200,000.00 7,920,000.00 7,920,000.00


s
4
6

-
-
-
-
-
-
-
-
-
JADWAL KEBUTUHAN BIAYA TOTAL
PROYEK :
LOKASI :
ITEM PEKERJAAN Bulan juni Bulan Juli
NO MINGGU 1 2 3 4 1 2

HARI KERJA EFEKTIF 7 6 6 6 6 6 4

1 BIAYA TENAGA KERJA 1,425,900.0 1,425,900.0 1,425,900.0 1,425,900.0 1,425,900.0 950,600.0


2 BIAYA MATERIAL 0.0 0.0 0.0 0.0 0.0 0.0

3 BIAYA PERALATAN 26,393,584.9 26,393,584.9 26,393,584.9 26,393,584.9 26,393,584.9 17,595,723.3

4 BIAYA OVERHEAD 13,200,000.0 0.0 0.0 0.0 7,920,000.0 0.0

Jumlah 41,019,484.9 27,819,484.9 27,819,484.9 27,819,484.9 35,739,484.9 18,546,323.3

Kumulatif 41,019,484.9 68,838,969.9 96,658,454.8 124,477,939.7 160,217,424.7 178,763,748.0


Form 9a

Bulan Juli Bulan agustus


3 4 1 2 3 4
6 6 6 5 6 6

3,155,250.0 2,917,600.0 3,372,472.3 2,414,609.1 1,787,210.4


0.0 0.0 477,597,504.0 525,766,295.7 15,035,950.4

59,063,219.6 54,664,288.8 129,949,573.6 85,754,518.5 1,303,281.8

0.0 0.0 7,920,000.0 0.0 0.0

62,218,469.6 57,581,888.8 618,839,549.9 613,935,423.3 18,126,442.5


240,982,217.6 298,564,106.3 917,403,656.2 1,531,339,079.5 1,549,465,522.0
GRAFIK PENGELURAN (CASH OUT)
PROYEK :
LOKASI :
RANGE BIAYA BULAN JUNI BULAN J
1 2 3 4 1 2
(Rp)
6 6 6 6 6 4

NK = Rp 2.028.843.437

RAP =Rp 1.549.465522


Jumlah (Rp) 41,019,484.93 27,819,484.93 27,819,484.93 27,819,484.93 35,739,484.93 18,546,323.29
Kumulatif (Rp) 0 41,019,484.93 68,838,969.87 96,658,454.80 124,477,939.73 160,217,424.67 178,763,747.96
Realisasi (Rp)
Devisiasi (Rp)

RAP 1,549,465,522.04

Nilai kontrak

JUMLAH + OVER HEAD 1,844,403,124.39

Pajak 184,440,312.44

Total 2,028,843,436.83

FEE 479,377,914.79
BULAN JULI BULAN AGUSTUS
3 4 1 2 3 4
6 6 6 5 6 6

Pajak = Rp 184.440.312

Fee = Rp 479.377.915
62,218,469.60 57,581,888.78 618,839,549.88 613,935,423.28 18,126,442.55
240,982,217.56 298,564,106.33 917,403,656.21 1,531,339,079.49 1,549,465,522.04
PERHITUNGAN PEMBAYARAN ANGSURAN
Presentase Kemajuan Fisik
Bulan 1 = 7.31 %
Bulan 2 = 18.37 %
Bulan 3 = 119.02 %

Diketahui:
NK = 2,028,843,436.83
Pajak (PPN) = 10/110
Uang yang diterima = 20 % dari NK
Retensi Pemeliharaan = 5 %

a Uang Muka
Uang muka yang diterima = 20 % x 2,028,843,436.83 =
Pajak(PPN) = 10/110 x 405,768,687.37 =
Sisa yang diterima

b Angsuran 1 = 7.31 %
Jumlah yang diterima = 7.31 % x 2,028,843,436.83 =
Potongan:
Uang muka = 7.31 % x 405,768,687.37 =
Retensi = 5 % x 148,287,339.65 =
Sisa =
Pajak(PPN) = 10/110 x 111,215,504.74 =
Jumlah Angsuran 1 =
c Angsuran 2 = 18.37 %
Jumlah yang diterima = 18.37 % x 2,028,843,436.83 =
Potongan:
Uang muka = 18.37 % x 405,768,687.37 =
Retensi = 5 % x 372,708,935.50 =
Angsuran 1
Sisa =
Pajak(PPN) = 10/110 x 168,316,196.88 =
Jumlah Angsuran 2 =
d Angsuran 3 = 119.02 %
Jumlah yang diterima = 119.02 % x 2,028,843,436.83 =
Potongan:
Uang muka = 119.02 % x 405,768,687.37 =
Retensi = 5 % x 2,414,643,904.91 =
Angsuran 1 =
Angsuran 2 =
Sisa =
Pajak(PPN) = 10/110 x 1,531,451,227.06 =
Jumlah Angsuran 3 = =

f Angsuran 4 = 5.00 %
Jumlah yang diterima = 5.00 % x 2,028,843,436.83 =
Pajak(PPN) = 10/110 x 101,442,171.84 =
Jumlah Angsuran =
TABEL RENCANA ANGSURAN
NO Tahap Penerimaan Jumlah Penerimaan (Rp) Pajak (Rp)
1 Uang Muka 368,880,624.88 36,888,062.49
2 Angsuran 1 101,105,004.31 10,110,500.43
3 Angsuran 2 153,014,724.44 15,301,472.44
4 Angsuran 3 1,392,228,388.24 139,222,838.82
6 Angsuran 4 92,220,156.22 9,222,015.62
Jumlah 2,107,448,898.08 210,744,889.81
Jumlah Total 2,318,193,787.89

TABEL PREDIKSI PENCAIRAN ANGSURAN


NO Tahap Pembayaran Realisasi Fisik Prediksi Pencair
1 Uang Muka minggu 2, bulan 1

2 Angsuran 1, 7.3 % minggu 4, bulan 1 minggu 1, bulan 2

3 Angsuran 2, 18.4 % minggu 4, bulan 2 minggu 1, bulan 3

4 Angsuran 3, 119.0 % minggu 3, bulan 3 minggu 3, bulan 3

6 Angsuran 4,Pemeliharaan(5%) minggu 1, bulan 4 minggu 3, bulan 4

catatan :

- Prediksi pencairan angsuran adalah 1 minggu setelah pengajuan dokumen

- Masa pelaksanaan pekerjaan 5 bulan dan masa pemeliharaan diprediksi 2 bulan

- Satu bulan ekuivalen dengan 4 minggu


NGSURAN

405,768,687.37
36,888,062.49
368,880,624.88

148,287,339.65

29,657,467.93
7414366.98258667
111,215,504.74
10,110,500.43
101,105,004.31
372,708,935.50

74,541,787.10
18635446.7748167
111,215,504.74
168,316,196.88
15,301,472.44
153,014,724.44

2,414,643,904.91

482,928,780.98
120732195.245399
111,215,504.74
168,316,196.88
1,531,451,227.06
139,222,838.82
1,392,228,388.24

101,442,171.84
9,222,015.62
92,220,156.22
Pajak (Rp)
36,888,062.49
10,110,500.43
15,301,472.44
139,222,838.82
9,222,015.62
210,744,889.81
87.89

Prediksi Pencairan
minggu 2, bulan 1

minggu 1, bulan 2

minggu 1, bulan 3

minggu 3, bulan 3

minggu 3, bulan 4
UNIVERSITAS KATOLIK WIDYA MANDIRA KUPANG
FAKULTAS TEKNIK JURUSAN SIPIL
FORMULIR TUGAS MANAJEMEN KONSTRUKSI

ALIRAN KAS
PROYEK :
LOKASI :

MINGGU ANGSURAN KUMULATIF


Rp. ANGSURAN RP.
Bulan 1
1
2 368,880,624.88 368,880,624.88
3
4
Bulan 2
1 101,105,004.31 469,985,629.19
2
3
4
Bulan 3
1 153,014,724.44 623,000,353.63
2
3 1,392,228,388.24 2,015,228,741.86
4
Bulan 4
1
2
3 92,220,156.22 2,107,448,898.08
4
JUMLAH 2,107,448,898.08
Form 10a

PENGELUARAN KUMULATIF SELISIH


TOTAL Rp. Rp. Rp.

41,019,484.93 41,019,484.93
27,819,484.93 68,838,969.87
27,819,484.93 96,658,454.80
27,819,484.93 124,477,939.73 244,402,685.14

35,739,484.93 160,217,424.67
18,546,323.29 178,763,747.96
62,218,469.60 240,982,217.56
57,581,888.78 298,564,106.33 171,421,522.85

618,839,549.88 917,403,656.21
613,935,423.28 1,531,339,079.49
18,126,442.55 1,549,465,522.04
465,763,219.82

1,549,465,522.04
GRAFIK ALIRAN KAS (CASH FLOW)
PROYEK :
LOKASI :
RANGE BIAYA Bula
1
Rp
6

NK = Rp 2.028.843.437

1800000000

RAP =Rp 1.549.465522


1600000000

1400000000

1200000000

1000000000

800000000

600000000

400000000
1000000000

800000000

600000000

400000000

200000000

Jumlah (Rp) 41,019,485

Kumulatif (Rp) 0 41,019,485

Realisasi (Rp)

Devisiasi (Rp)

RAP = Rp. 1,549,465,522.04


Nilai kontrak
JUMLAH + OVER HEAD = Rp. 1,844,403,124.39
Pajak = Rp. 184,440,312.44
Total = Rp. 2,028,843,436.83
FEE = Rp. 479,377,914.79
Bulan juni B
2 3 4 1
6 6 6 6

NK = Rp 2.028.843.437

RAP =Rp 1.549.465522


27,819,485 27,819,485 27,819,485 35,739,485

68,838,970 96,658,455 124,477,940 160,217,425

1,549,465,522.04

1,844,403,124.39
184,440,312.44
2,028,843,436.83
479,377,914.79
Bulan Juli
2 3 4 1
4 6 6 6
18,546,323 62,218,470 57,581,889 618,839,550
178,763,748 240,982,218 298,564,106 917,403,656
Bulan agustus B
2 3 4 1
5 6 6 6

Pajak = Rp 184.440.312

Fee = Rp 479.377.915
613,935,423 18,126,443
1,531,339,079 1,549,465,522
Bulan sepember
2 3 4
6 6 6